Loading...
HomeMy WebLinkAbout19- Amendment 4 to PSA - Robert Peccia and Associates - 5.3 Million Gallon Water Storage Reservoir Amendment No. 4 to Professional Services Agreement for 5.3 Million Gallon Water Storage Reservoir THIS AMENDMENT TO THE AGREEMENT is made as of this 14th day of January, 2019, between THE CITY OF BOZEMAN, a Municipal Corporation, Bozeman, Montana, herein referred to as OWNER and Robert Peccia and Associates an Engineering Consulting Firm of Helena, Montana, herein referred to as ENGINEER. WHEREAS, the parties have entered into a Professional Services Agreement dated January 5, 2015, herein referred to as Original Agreement for professional engineering services; and WHEREAS,the parties desire to further amend the provisions of this Agreement. NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: The conditions and provisions set forth in the attached exhibits to this AMENDMENT FOUR to the Original Agreement; EXHIBIT C (Engineering Fee Proposal for Construction Phase Services Due to Contractor Contract Time Overrun), EXHIBIT D (Engineering Fee Proposal for Project Closeout Services) and EXHIBIT E (Schedule of Reimbursable Expenses) are hereby incorporated in and made part of this Agreement. EXHIBIT A (Engineer's Status During Construction), and EXHIBIT B (Listing of the Duties, Responsibilities and Limitations of Authority of the Resident Project Representative) which are attached to Amendment No. 2 remain in effect for this amendment. This Amendment 4 shall cover engineering expenses due to the Contractor exceeding the Contract Time as defined in the Construction Contract Documents for the 5.3 Million Gallon Water Storage Reservoir and engineering expenses to closeout the project. ARTICLE 1 -ENGINEERING SERVICES 1.1. The detailed description of the specific project components is described as follows: The engineering project components are the engineering construction and project closeout phases for the new 5.3-million-gallon water storage tank. Major work tasks for the remaining construction phase services include review of contractor submittals, preparation of progress reports, preparation of work orders and change orders, and construction inspection. Major work tasks for the project closeout services include preparation of as-built drawings, coordination with the funding agency (SRF), 2-year warranty inspection and project closeout services. The Agreement and this amendment does not include the preparation of an Operation and Maintenance Manual for the Storage Tank. 1 1.2. The scope of services under this contract are set forth in the Original Agreement, Amendment Two to the Original Agreement and this Amendment Four to the Original Agreement. ARTICLE 4 - BASIC ENGINEERING SERVICES 4.5 CONSTRUCTION AND CLOSEOUT PHASE The responsibilities of the ENGINEER during the Construction and Closeout Phase are summarized in Amendment 2 and follows: 4.5.1. General Administration of Construction Contract. ENGINEER shall consult with and advise OWNER and act as OWNER'S representative as provided in EXHIBIT A - ENGINEER'S STATUS DURING CONSTRUCTION (attached to Amendment 22. The extent and limitations of the authority, duties, and responsibilities of the ENGINEER on the construction job site as assigned here-in shall not be modified except as the ENGINEER may otherwise agree in writing. All of OWNER's instruction to Contractor(s) will be issued through ENGINEER who will have authority to act on behalf of OWNER to the extent provided in the General Conditions except as otherwise provided in writing. 4.5.2. Resident Project Representative. ENGINEER shall provide a qualified Resident Project Representative at the job site to provide observation of the work as provided in EXHIBIT B - A LISTING OF THE DUTIES, RESPONSIBILITIES AND LIMITATIONS OF AUTHORITY OF THE RESIDENT PROJECT REPRESENTATIVE, (attached to Amendment 2) and as outlined and discussed in Amendment 2. ARTICLE 6—COMPENSATION FOR ENGINEERING SERVICES Except as specifically amended herein, the original agreement shall remain in full force and effect and the Parties shall be bound by all terms and conditions therein. 6.2 DIRECT LABOR COST PAYMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER. Construction and project documentation services performed as Basic Engineering Services under section 4.5 shall be compensated in accordance with the following: 2 6.2.1 The OWNER shall pay for Construction Phase Services an amount not to exceed $95,740.00 except as provided under 6.2.1.2 and 6.2.4. The OWNER shall pay for Project Closeout Services an amount not to exceed $32 133.00. See attached Exhibits to this Amendment Four: Exhibit C Engineering Fee Proposal for Construction Phase Serviced Due to Contractor Contract Time Overrun, Exhibit D Engineering Fee Proposal for Project Closeout Services for a summary of the construction and closeout phases engineering services costs. 6.2.1.1 Costs Compensation. Compensation for these services shall be based on the ENGINEER's Direct Labor Cost times a factor of 3.11 for services rendered which shall cover Direct Labor, Direct Labor Overhead, General & Administrative Overhead and Profit. 6.2.1.2 Notification. At any time during the construction that it becomes apparent that the Construction Phase and Project Documentation Services rendered under this Agreement will exceed the negotiated compensation for these services, and prior to performing services in excess of the contract ceiling, the ENGINEER shall give OWNER written notice thereof. Promptly thereafter OWNER and ENGINEER shall review the scope and progress of the project work. ENGINEER shall obtain written authorization from OWNER,prior to any additional costs being incurred under paragraph 6.2.1.3. If it is determined that due to a change in project scope under paragraph 5.2.1,the ENGINEER is entitled to additional compensation, OWNER and ENGINEER may negotiate terms as provided under 6.2.1.1. The amount and terms of any additional compensation under 6.2.1.1 or 6.2.1.3 shall be negotiated and agreed in writing pursuant to 9.16 of the original agreement. 6.2.2. Reimbursable Expenses, as defined in section 7.4 of this Agreement, for Basic Services and Approved Additional Services shall be paid to the ENGINEER by the OWNER in the actual amount of the costs incurred up to an amount not to exceed $16,231.70. The estimated reimbursable expenses are identified in the attached Exhibits to this Amendment: Exhibits "C (Construction Phase), D (Project Closeout), and E (Schedule of Reimbursable Expenses)". 3 IN WITNESS WHEREOF,the parties hereto do make and execute this Agreement on the day and year first above written. CITY OF BOZE ' N By: -7r ATTEST: �` F BO2 Robin Crough - City Clerk •, 1883 '9TrN co• " o'• < as a APPR ED O FORM By: , City Attorney ENGINEER ROBERT P IA AND ASSOCIATES By: �'reS ems, r ATTEST: By: 4 EXHIBIT C ESTIMATE OF CONSTRUCTION PHASE COSTS s AMENDMENT FOUR EXHIBIT C FEE PROPOSAL FOR CONSTRUCTION PHASE SERVICES DUE TO CONTRACTOR CONTRACT TIME OVERRUN ROBERTPECCIA8ASSOCIATES y of,f3ozeman8,A GonetetewaterSlorageResrirvam" CIVIL ENGINEERING SERVICES CONTRACT SCHEDULE OF ESTIMATED COSTS CONSTRUCTION PHASE ENGINEERING SERVICES City of Bozeman FOR ENGINEERING SERVICES RESULTING FROM CONSTRUCTION CONTRACTOR CONTRACT TIME OVERRUN RPA Project No.14702.000 Date:January 7th,2019 Preilect Prolect 'Plolaet'; Stmict ys Survey Surveyor SurveyCrow' 'AecoUnint'; CADD CADD Admin. Total' Work ttarNSubtask Mana0al' Engineer Inspector Inspector OT En0lnoer NLnnOar Chlo1, ', Manager Operator Peraon ._�,..,.. ,,. ,.,. _,._.<.,,. ..,. ... ,r. .......:.... ...... ..�;...,....3E1.63 s ...w_ „,;r3674,,,,.„ ..,,„S45 E8.._._......,;502.9,8�..., '. $4790. ...,..{E227.�:_,W544 E$.�, ,,;,_,59791_.,,.,b51A7.' ..,,,..63EA8... $09.18. ,.$29.24 a, $24.70 Hours.. TASK 3:CONSTRUCTION PHASE Project Management 8.00 200 10.00 Construction Administration 8,00 56C0 64.00 Submrtel Reri- 400 24.00 28.00 Constmctbn Progrma Meetings 2400 24.00 48.00 Constructon Inspection(Includes,9nal impectlons,punch lets etc) 600 24.00 47000 40.00 400 546.00 Process Pay Appllcatiorm 16.00 1600 Prepare Charge Orders 200 S00 2000 30.00 TOTAL PERSON.OURS: 'y 0.8 M.0 "-`1E26 "; 47D0 400'„;" 4.0 00 00 00 .0 0.0 0,0 20.0 742.0. LABOR COST PER EMPLOYEE: $16,40L20,,;' 51n71EA0,... $20909 ,;, ,3000 .,. ,$000, ;000„ 3TI.31 $0.00 , ,$0.00 $49544 $27,263.31 DIRECT EXPENSES Assumotlons I Exclusions: EqupmoM(Compuem) $674.00 Pnnumac ft,ms Cc—.,wn1 D ins woxs nsrt yosr. Nuclear Oomometer $1.300.00 P.Dlem-Day $500.00 Per Me.-O—night $5,108.00 Mileage $2,253.20 Telephone and Fax $300.00 Miss.S Ibs $500.00 Total: $10,935.20 SUMMARY OF ENGINEERING SERVICES Leaded Lebo,Cost $84,804.44 Dlroct Ep.— $10,935.20 Total Engineering fee:::- 595740 i EXHIBIT D ESTIMATE OF CLOSEOUT SERVICES COSTS 6 AMENDMENT FOUR EXHIBIT D FEE PROPOSAL FOR CONSTRUCTION PHASE PROJECT CLOSEOUT SERVICES ROBERT PECCIA 6 ASSOCIATES DHy at Bozeman 5:3 Mo Ooriorete UVgtcrt?totuge Reservoir, CIVIL ENGINEERING SERVICES CONTRACT -eoteman,(1o0tana .-,. SCHEDULE OF ESTIMATED COSTS CONSTRUCTION PHASE ENGINEERING SERVICES Clly,ot Bgielltati _ FOR ENGINEERING SERVICES RESULTING FROM CONSTRUCTION CONTRACTOR CONTRACT TIME OVERRUN RPA Project No.14702.000 Date:January 7th,2019 Parson Days _ PrwWent '`Projeel Pro)ed project Prgl SfroaL`"' 6Ur'4ay Surveyor SulvdyCiiVv Accountant CAD CADD Admin. Total Work lterNSdbta6k Manager Enitneer Inspector �InsPector OT Enphwer Manages -Chief Manager Operator Person: $24.79 ..Hours'. PROJECT CLOSEOUT A Bulll 01ewing. 8.00 16.00 24.W 2.00 8.00 12,00 40.00 4000 20.00 170.00 Pro)ect Closooul 16.00 40.00 4,00 60.00 TOTAL PERSON-HOURS: 001 "'24.9 d60 `<x 24,0 00 00 I. 2.0 ,' S.0 12,0 4.0 40.0 40.0 20,0 200.0 LABOR COST PER EMPLOYEE. ,,,y SO,DQT - 5.1,1¢7,36 ,,;`;2p56 b1e,,,,, ,;�781.04, ,,.„: .�,5000„„.,,;, ,,5000,,,,_,._,f6B 69,,; b00311 .,� SS4S.95 $164,62„- ,51,447dS_ S1,199.67 $496.54 $0,629.04 DIRECT EXPENSES - Assumptions I Exclusions: Egdpmant(Survey GPS S4001day) $800.00 Eopment(Compulem) $576.50 Per Dlem-Dey $100.W Per Diem-Overnight $150.W Teiaphona end Fax $20,00 Printing $3,SW.00 Ml-Supplies $150 00 Total: $5,296.60 SUMMARY OF ENGINEERING SERVICES Loaded Lal or Cost $26.836.31 Dire.Expereas $5,296.50 Total Eo q inmrin Fao:, $3 133 EXHIBIT E REIMBURSIBLE EXPENSES ROBERT PECCIA&ASSOCIATES,INC. SCHEDULE OF REIMBURSABLE EXPENSES July 5,2018 TRAVEL EXPENSES: Mileage Expense-Two Wheel Drive Vehicles $0.545 per mile or current Federal mileage rate Mileage Expense-Four Wheel Drive Vehicles $0.595 per mile SUE Truck-Mileage $1.00 permile Per Diem State or Federally Allowable Rates Cessna 172 $75.00 per hour Other $at actual cost REPRODUCTION EXPENSES: Plain Paper Photocopies $0.10 per copy Color Photocopies-8 1/2 X 11 $1.00 per copy Color Photocopies-11 X 17 $1.15 per copy All Other Outside Printing Expenses $at actual cost Photographic Developing Charges $at actual cost CONSTRUCTION ENGINEERING&SURVEYING EQUIPMENT: 4-Wheeler $100.00 per day Confined Space Entry Equipment $100.00 per day Controlotron Ultrasonic Flow Meter $15.00 per hour/$100.00 per day Digital Level $75.00 per day/$350 per weeW$1000 per month Flow Recorder $10.00 per day/$30 per week/$100 per month GPS-Rover $225.00 per day GPS-RTK System $400.00 per day Jackhammer $45.00 per day Laser Level $20.00 per day/$75 per week/$225 per month Line Locator $30.00 per day Nonsubmersible Transducers(with data logger) $100.00 per day Nuclear Densometer $100.00 per day/$200 per week/$650 per month Rebar Locator $150.00 per day Robo-5600 $225.00 per day Robot S6 $325.00 per day Sewer Flow Meter $25.00 per day/$50 per week/$150 per month Submersible Transducers(with data logger) $120.00 per day Wind Recorder $75.00 per month SUE-Vacuum Truck Usage $150.00 per hour Trimble Juno GPS/GIS Hand Held $50.00 per day Troll 9500(Water Quality Sampler) $560.00 per month Turbidimeter $20.00 per day TRAFFIC&TRANSPORTATION EQUIPMENT: Traffic Counters $50.00 per day Range Tracking System $50.00 per day Electronic Turning Movement Counters $15,00 per day Traffic Signs $20 per job per sign OFFICE EQUIPMENT&SUPPLIES: Computers: Word Processing/Accounting $2.50 per hour Computers: CADD/Microstation/Corel Draw $7.00 per hour Fax Machine $1.00 per page Long Distance Telephone Charges $at actual cost Postage Costs $at actual cost Federal Express Services $at actual cost Other Office Supplies(Specifically purchased for project) $at actual cost SUBCONTRACTORS: Invoiced at actual cost incurred by Consultant plus administrative charges. OTHER EQUIPMENT: All other equipment is included in the hourly rate charge,and the client will not be charged separately for such items. This policy is subject to change in the future. The above equipment list may be amended as necessary for future equipment purchases. APPROVED BY:RPA BOARD OF DIRECTORS Date: 01/30/18 FlAcdg1ADMINMReimbumable Expemes\REIMBEXP 2018.xis Robert Peccia & Associates 2018 Per Diem Rates Effective 10/01/2018 Breakfast $ 13.00 Lunch $ 14.00 Meals Total $ 50.00 Dinner $ 23.00 Lodging $ 94.00 Fu I I Day Total $ 144.00