Loading...
HomeMy WebLinkAboutResolution 5002 Requesting Distribution of Bridge and Road Safety Accountability Program Funds RESOLUTION NO. 5002 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA. REQUESTING DISTRIBUTION OF BRIDGE AND ROAD SAFETY AND ACCOUNTABILITY PROGRAM FUNDS WHEREAS, the Bridge and Road Safety and Accountability Account created by HB 473 requires the Montana Department of Transportation to allocate accrued funds to cities, towns, counties,and consolidated city-county governments for construction,reconstruction,maintenance, and repair of rural roads, city or town streets and alleys, bridges, or roads and streets that the city, town, county, or consolidated city-county government has+the responsibility to maintain; and, } v4 _ • 5 u WHEREAS, a city, town, county, or consolidated,city-county government that requests funds under the Bridge and Road Safety and"'Accountability Account must match each $20 requested with$1 of local government matching funds; and;' WHEREAS, a city, town, county, or consolidated city-county government requesting distribution of allocated funds may make such a request to the Department of Transportation between March 1 and November 1 of the year the funds were allocated; and, WHEREAS, a description of the projects to be funded are detailed in Appendix A; and, WHEREAS,the local match for the allocated funds has been budgeted from Street Arterial Construction Fund and the Street Impact Fee Fund NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana,to wit: Resohttion 5002,HB473 Distribution Regttest for Distt•ibtttion ofBridge and Road Safety andAccountability Program Funds 1. City of Bozeman requests distribution of its share of the allocated Bridge and Road Safety and Accountability funds to be used for the projects identified in Appendix A. 2. That Kristin Donald, the City Finance Director, is hereby empowered and authorized to execute such further documents as may be necessary to facilitate the distribution of said funds. PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman,Montana, at a regular session thereof held on the 28th da nuary 2019. C RU Mayor ATTEST. ��� s o2e 00 ROB—A CROUCH w U• �_"` City Clerk APPR D O FORM. IN CO• � ULLIVAN City A rney Page 2 of 3 Resolution 5002,HB473 Distribution Request for Distribution of Bridge and Road Safety and Accountability Program Funds Appendix A SIF085 Baxter (7t' to 19") - CONSTRUCTION This project consists of Baxter Lane was upgraded to the City's 3-lane urban collector street standard including: 1. An adding two-way center turn lane to increase the capacity of the roadway 2. Improving road section to the City standard 3. Improving pedestrian connectivity with new sidewalk construction 4. Installing bike lanes 5. Installing curb and gutter 6. Corridor lighting 7. Stormwater improvements Page 3 of 3