Loading...
HomeMy WebLinkAbout94- Utility Cost Agreement Lot 3A, Block 1, Valley Unit Subdivision . ~ . ii THE CITY OF BOZEMAN to) , ,,'t). 35 NO. BOZEMAN AVE. P.O. BOX 640 i * ~, ',' _ * CARNEGIE BUILDING PHONE (406) 586.3321 t._., ' , _._,~ Q 0:, .- _,_-CC' 'II' BOZEMAN, MONTANA 59771-0640 'P -:c:c-_,_ =:C';:: Jii <'<, ~" .~r ".0'" '" co. UTILITY COST AGREEMENT ~ LOT 3A, BLOCK 1, VALLEY UNIT SUBDIVISION, PHASE I SEWER MAIN EXTENSION This agreement between the City of Bozeman, hereinafter referred to as the "City", and Wayne Paffhausen, hereinafter referred to as the "Developer", addresses construction of Public Sewer Main Improvements. Whereas the Developer intends to construct a sewer main extension within Lot 3A, Block 1, Valley Unit Subdivision, Phase I- , Whereas the project would normally be constructed as an 8-inch PVC pipe to serve the Developer's needs; Whereas the City desires to have the main constructed with 12- inch (PVC) pipe to serve as a main City sewer interceptor line; Whereas as the estimated increase costs differential (estimate attached) for oversizing is $3,650.40 based on the Owner's and Contractor's quotation of cost; Therefore the Developer and City agree upon the following: 1. The City shall reimburse the Developer up to $3,650.40 for its share of the satisfactorily installed 12 inch sewer main paid as a single lump sum amount following project completion and initiation of service. 2. The Developer shall at his cost have the project inspected by a Professional Engineer (PE) who shall provide post-construction certification of the project and provide Record Drawings to the City, and the Montana Department of Health and Environmental Science ( MDHE S) . 3. The developer shall be wholly responsible for any utility relocation costs associated with the project, which are not directly a result of the pipe oversizing. 4. An accurate accounting of all construction costs shall be kept at all times by the Developer and shall be available for inspection at any reasonable time by the City or its representatives, and shall be retained by the Developer for not less than three years from the date of final payment. 5 . No actual work is to be performed on this project until the plans and specifications have been approved by the City, a preconstruct ion conference has been held, and the City has authorized the work to proceed. HOME OF MONTANA STATE UNIVERSITY GATEWAY TO YELLOWSTONE PARK . 6. Whereas the sewer main improvements are not located in public right-of-way, the Developer shall provide for filing with the County Clerk and Recorder's office an executed City standard sewerline easement. 7. Following completion of construction and initiation of service of the line, and after the expiration of a one year warrantee period, the Developer grants and the City accepts ownership of the line and its long term operation, maintenance, and replacement to perpetuity. 8 . The Developer is and shall perform as an independent contractor and as such shall have and maintain complete control over all of its employees, subcontractors, agents and operations, being responsible for any required payroll deductions and providing required benefits, such as, but not limited to, workman's compensation and unemployment insurance. The Developer hereby agrees to indemnify and hold the City harmless from all claims and liabilty due to the activities of the Developer, their agents, employees, or both, in performing the work required under this project. 9. In the event it becomes necessary for either party of this Agreement to retain an attorney to enforce any of the terms or conditions of this Agreement or to give any notice required herein, then the prevailing party or the party given notice shall be entitled to reasonable attorney's fees and costs, including fees, salary, and costs of in-house counsel. " , 4 . IN WITNESS WHEREOF, the parties hereto affix their respective corporate name~ seals through this duly authorized officer, this ~ day of ~0' 199~.~ STATE OF MONTANA ) '~~-.{' : ss. Paffhausen GALLATIN COUNTY ) ku:.;i~~ On this ,J.3 day of <.]{UtO ({i rr , 19qi/ , before me, a Nota y Public in and for the State of Mo ana, personally appeared Wayne Paffhausen, known to me to be the persons whose name is subscribed to within this instrument and acknowledged to me that he did execute the same. In witness whereof, I have hereunto set my hand and affixed my official seal the day and year first above written. {? e b y{Jl -",/t, 'c-fi--- ,--(Lz_<{_;-- NOTARY PUBLIC F }_:H~J"~(~;~~_' OF 7~?~~;~~ ,{ {l/ Residing at My commission exp es cP /' -- ~f-- SEAL C_ ACCEPTED: ~:/~ Clerk of the city Commission STATE OF MONTANA ) : ss. GALLATIN COUNTY ) On this 1st day of February , 19 94 , before me, a Notary Public for the State of Montana, personally appeared James E. Wysocki and Robin L. Sullivan, known to me to be the City Manager and Clerk of the City commission known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he executed the same. In witness whereof, I have hereunto set my hand and affixed my seal on the day and year first written above. ~ 7\~~fY1r~~ NOTAR PUBLIC FOR HE STATE OF MONTANA Residing at Bozeman My commission expires June 11, 1996 SEAL ,". lit .. Wayne Paffhausen & Sons GENERAL CONTRACTING 2 Cedar Lake Drive Phone 406.494.2847 1/0\8191 Butte, Montana 59701 L:~~~~'l\<1.{- ~~ ~,,~ \k ~O~~~~i'~~~I-\~~ ~i\t~ t\~ 0~:::2.'" ~~'~ ~ D8~~ Co'fll.~Lw: ~ 10 "- "5-\-. c:s~~ Cb~~ ~935\. 40 \(Q.~~ \=~, ) loB. (() ~~, ~~~\\{~~ ~~h 'dSo,co q-bl' ~~~'" ~ 1> ~~.^'o ... "S \'t\C:"-~ \JJ~~ !--I\. - , " , 0\ * , .. . . .SIME. ~ rJ" / ,f~J- CONSTRUCTION I EXCAVATION AND ROAD BUILDING I, i/ 485 ZACHARIAH LANE BOZEMAN, MONTANA 59715 763-4573 . 566-1700 MOBILE 585-5687 · FAX 7~B3 August 23t 1993 Wayne Paffbausen Butte, MT Re: USDA Building - Bozeman, MT Way~e. the following is a list of the additional cost to Sime Construction for the change -in pipe diameter, extra manhole, and additional pipe for stub outs. . ~ 8" to 12" pipe - 2?~F pipe @ $3.60jLF $1,260.00 i": Manhole ~ A~locks 50.00 V/ Additional manhole 1,200.00 · mE. additional 12" pipe @ $18.60fLF _.__.125~ $3,235.40 Sincerely, ~~ Ronald W. Pike + , 4,\:) 1st . . 3~?/J. (l) ~ ~~'t\~x'h~ -'00 · _ ft fJt ~~'O6'.:- flJ~ ().\\ ~~.. \. 6'\0. . -i ~ 46R5'~(\