Loading...
HomeMy WebLinkAbout18295 Application Summary buZEMAN Community Development Al DEVELOPMENT REVIEW APPLICATION 1. PROJECT Development Name: West Peach Condominiums Description: Site Plan - Residential 2. PROPERTY OWNER Name: Iron Wood Development attn: Julien Morice Full Address: 2110 Sourdough Bozeman, MT 59715 Phone: 406 581-999 Email: 3. APPLICANT Name: SAME AS PROPERTY OWNER Full Address: Phone: Email: 4. REPRESENTATIVE Name: Madison Engineering LLC attn: Chris G Budeski, PE Full Address: 895 Technology Blvd Suite 203 Phone: 406-586-0262 Email: chris@mad-eng.com S. PROPERTY Full Street Address: 313 Peach Street, Bozeman MT 59715 Full Legal Description: wESTLAKES 1ST ADDITION,S01,T02S R05E,BLOCK 1,LOT 1(AMENDED PLAT F-25A)LOT 2(AMENDED PLAT F-25 AD),LOT 3(AMENDED PLAT F-25-A) Current Zoning: R5 Current Use: Vacant Community Plan Designation: Residential Development Review Application Al Page 1 of 3 Revision Date 01-04-]G Required Forms: I Varies by project type Recommended Forms; I Presentation of submitted plans and specifications Overlay ❑ Neighborhood Conservation ❑ Entryway Corridor ❑ None District: Urban Renewal ❑ Downtown ❑■ North 711, Avenue ❑ Northeast ❑ None District: 6. STATISTICS (ONLY APPLICATION TYPES 2-12, 17, 24 AND 26) Gross Area: Acres:.89 Square Feet:38,768 Net Area: Acres: .89 Square Feet:38,768 Dwelling Units: 3 4-plex and 1 5-plex Nonresidential Gross Building Square Feet: 0 7. APPLICATION TYPES Check all that apply, use noted forms. Form Form ❑ 1. Pre-application Consultation None ❑ 17. Informal Review INF ❑ 2. Master Site Plan MSP ❑ 18. Zoning Deviation None ❑■ 3. Site Plan SP ❑ 19. Zoning or Subdivision Z/SVAR Variance ❑4. Subdivision pre-application PA ❑ 20. Conditional Use Permit CUP ❑ 5. Subdivision preliminary plat PP ❑ 21. Special Temporary Use STUP Permit ❑ 6. Subdivision final plat FP ❑ 22. Comprehensive Sign Plan CSP ❑ 7. Subdivision exemption SE ❑ 23. Regulated Activities in RW Wetlands ❑8. Condominium Review CR ❑ 24. Zone Map Amendment(non ZMA Annexation) ❑ 9. PUD concept plan PUDC ❑ 25. UDC Text Amendment ZTA ❑ 10. PUD preliminary plan PUDP ❑ 26. Growth Policy Amendment GPA ❑ 11. PUD final plan PUDFP ❑ 27. Modification/Plan MOD Amendment ❑ 12.Annexation and Initial Zoning ANNX ❑ 28. Extension of Approved Plan EXT ❑ 13.Administrative Interpretation AIA ❑ 29. Reasonable Accommodation RA Appeal ❑ 14.Administrative Project Decision APA ❑ 30. Other: Appeal ❑ 15. Commercial Nonresidential COA CCOA ❑1 6. Historic Neighborhood NCOA Conservation Overlay COA 8. APPLICATION FEES AND MATERIALS A. Fees are to be provided based upon the adopted fee schedule FS. Contact our office for an estimate. Development Review Application Al Page 2 of 3 Revision Date 01-04-16 Required Forms: Varies by project type Recommended Forms: Presentation of submitted plans and specifications B. Application materials shall be submitted for each application as shown in the specific guidance and checklists that is provided for each application type. A common development review application form and common notice materials may be provided for an application that includes more than one application type. All other application materials shall be submitted for each individual application type per the project guidance and checklists. 9. CERTIFICATIONS AND SIGNATURES This application must be signed by both the applicant(s) and the property owner(s) (if different) for all application types before the submittal will be accepted. The only exception to this is an informal review application that may be signed by the applicant(s) only. As indicated by the signature(s) below, the applicant(s) and property owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code, It is further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project. Further, I agree to grant City personnel and other review agency representative's access to the subject site during the course of the review process (Section 38,34.050, BMC). I (We) hereby certify that the above information is true and correct to the best of my (our) knowledge. Certification of Completion and Compliance — I understand that conditions of approval may be applied to the application and that I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with municipal code provisions. Statement of Intent to Construct According to the Final Plan — 1 acknowledge that construction not in compliance with the approved final plan may result in delays of occupancy or costs to correct noncompliance. Applicant Signature: Printed N Owner Signature: Printed NamJ Owner Signature Printed Name: J rb..�—a If signing as a corporation, please provide the title anA lJosition of the individual signing on behalf of the corporation. Attach separate sheets for additional owner signatures. CONTACT US Alfred M.Stiff Professional Building phone 406-S82-2260 20 East Olive Street S971S (FED EX and UPS Only) fax 406-582-2263 PO Box 1230 planning@bozeman.net Bozeman, MT S9771 www.bozeman.net Development Review Application Al Page 3 of 3 Revision Date 01-04-16 Required Forms: Varies by project type Recommended Forms: Presentation of submitted plans and specifications