Loading...
HomeMy WebLinkAboutTIF Request exhibits Cottonwood+Ida 2-27-19Exhibit A EXHIBIT A URBAN RENEWAL PROJECT REQUEST COTTONWOOD AND IDA MIXED USE PROJECT 5/8/2019 PROPOSED IMPROVEMENTS RELATED TO TIF PROJECTS ESTIMATED COSTS OFF-SITE INFRASTRUCTURE 1,647,108$ IMPACT FEES 522,120$ TOTAL ESTIMATED TIF FUNDED PROJECTS 2,169,228$ POTENTIAL BOND ABLITY BASED ON TAX REVENUE AND REQUIRED DEBT COVERAGE BOND AMOUNT 2,169,228$ PROJECT DETAILS OFF-SITE INFRASTRUCTURE 1,647,108$ See Engineers estimates COTTONWOOD 544,842$ IDA 191,316$ ASPEN 590,950$ TAMARAK (BOULEVARD ONLY)20,000$ WALLACE (BOULEVARD ONLY)20,000$ FRONT STREET / PARK PARKING 280,000$ IMPACT FEES per unit (93 residential / per 1,000 SF commercial) Transportation/ Residential 3,053$ 283,894$ Transportation / Commercial 4,535$ 136,501$ Water / Residential 559$ 60,962$ Water / Commercial 3,556$ 12,497$ Fire / Residential 186$ 17,265$ Fire / Commercial 365$ 11,001$ TOTAL IMPACT FEE COSTS 522,120$ Exhibit B EXHIBIT B URBAN RENEWAL PROJECT REQUEST COTTONWOOD AND IDA MIXED USE PROJECT 2/27/2019 PROJECT ESTIMATES FOR TAX GENERATION AND BONDING ABLITIY TOTAL PROJECT COST 35,215,856$ ESTMATED TAXES 1%352,159$ annually - all increment Debt coverage limits 1.5 Amount availible for Bond payment 234,772$ Estimated bond rate 4.5% BOND TERM 20 years ESTIMATED BOND POSSIBLE 3,100,000$ with above assumptions on debt coverage and taxes collected PROPOSED BOND REQUEST 2,169,228$ ESTIMATED BOND PAYMENTS 184,949$ ESTIMATED BALANCE OF PROJECT TAXES AVAILIBLE FOR FUTURE NEURB PROJECTS 167,210$ ANNUALLY SUMMARY of Cottonwood+Ida Off-Site Costs – updated 2-27-19 East Cottonwood ($544,842.12) Improvements for East Cottonwood include the following: • replacing a 6-inch water main with a new 8-inch main, from the west property line to Ida Avenue • replacing a 6-inch sanitary main with a new 8-inch main, from the west property line to a manhole near Plum Avenue • New diagonal parking on the north side of Cottonwood street • New concrete sidewalk on the north side of the parking • Gravel base and asphalt paving patch for new water and sewer mains Ida Avenue ($279,987.35) Improvements for Ida Avenue include the following: • New 31-foot asphalt street section with 1-1/2-inch base course gravel (16-inch section) and curb and gutter • New 5-foot wide sidewalk on west side Front Street ($191,316.16) Improvements for Front Street Parking: • New 31-foot asphalt parking section with 1-1/2-inch base course gravel (16-inch section) and curb and gutter. East Aspen Street ($590,950.05) Improvements for East Aspen Street include the following: • New 8-inch water main from North Wallace to Front Street, with new water and fire service lines • New 8-inch sewer main from North Wallace to Front Street, with new service lines • New 8-inch storm drain main from the west property line to Wallace Street, including 2 new manholes • New 8-foot sidewalk on the north side • New 5-foot sidewalk on the south side • New 35-foot asphalt street section with 1-1/2-inch base course gravel (16-inch section) and curb and gutter from Wallace Avenue through the Ida/Aspen intersection Summary East Cottonwood $544,842.12 Ida Avenue $279,987.35 Front Street / parking $191,316.16 East Aspen Street $590,950.05 Total $1,607,095.68 Cost estimates include 15% contingency and 13.5% design/inspection/testing fees