Loading...
HomeMy WebLinkAbout03-04-19 City Commission Packet Materials - C12. Res. 5026, CO3 with Knife River for E. Tamarack ReconstructionCommission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Shawn Kohtz, City Engineer SUBJECT: Approve Resolution 5026 authorizing Change Order No. 3 to the East Tamarack Street Reconstruction Project. MEETING DATE: March 4, 2019 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution 5026 authorizing Change Order No. 3 to the East Tamarack Street Reconstruction Project. BACKGROUND: Attached is a copy of resolution 5026 and change order number 3 for the above referenced project. This change order is for the additional cost incurred due to a conflict with an existing gas main while installing the trunk sewer main. The gas ended up being in the trench excavation which required more time to expose and support the gas, and additional shoring to install the sewer. The gas was in a different location than shown on the plans creating the changed condition. Overall the change will result in a increase in the contract price of $20,100.00. There is no change to contract time. The final recommended change in cost and time for this item is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: This change order increases the contract amount by $20,100.00 from $1,618,847.00 to $1,638,947.00. Attachments: Resolution No 5026, Change Order No 3 Report compiled on: 2/20/19 186 RESOLUTION NO. 5026 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH KNIFE RIVER - BELGRADE, BELGRADE, MONTANA. WHEREAS, the City Commission did, on the 11th day of June 2018, authorize award of the bid for the City of Bozeman East Tamarack Street Reconstruction project, to Knife River - Belgrade, Belgrade, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Knife River - Belgrade, as contained in Change Order No. 3, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 187 2 of 2 PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 4th day of March, 2019. ______________________________________ CYNTHIA L. ANDRUS Mayor ATTEST: ___________________________________ ROBIN CROUGH City Clerk APPROVED AS TO FORM: ______________________________________ GREG SULLIVAN City Attorney 188 189 190 191