HomeMy WebLinkAbout02-11-19 City Commission Packet Materials - C4. NOA to Omdahl for Stormwater ImprovementsCommission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Kyle Mehrens, Stormwater Program Coordinator Andrea Surratt, City Manager SUBJECT: Notice of Award to Omdahl Excavation and Utilities, Inc. in the amount of $136,230.00 for construction of the 2019 Bozeman Stormwater Improvements MEETING DATE: February 11, 2019 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign a Notice of Award for construction of the 2019 Bozeman Stormwater Improvements to Omdahl Excavation and Utilities, Inc., in the amount of $136,230.00 and the final contract documents, once received. BACKGROUND: In 2014, the City Commission instructed Staff to implement a Stormwater Division (Division) to manage public infrastructure, improve local waterway health, and comply with regulations. Since, the Division has constructed projects, implemented programs, and developed processes focused on achieving set goals. The 2019 Bozeman Stormwater Improvements (Project) is a continuation of these efforts. On January 29, 2019, the City Clerk opened seven bids for construction of the Project, which involves the installation of two stormwater treatment units (units) located one-half block south of the following intersections: W. Mendenhall St. and N. Black Ave., and W. Mendenhall St. and N. Bozeman Ave. The Division selected the units’ locations because the roads, parking lots, yards, and driveways contained within their watersheds have a direct connection to Bozeman Creek, meaning no removal of stormwater pollutants currently occurs. Once constructed, the units will treat stormwater flowing from 57 urban acres, and collect approximately 10 tons of sediment, litter, and other pollutants annually. Omdahl Excavation and Utilities, Inc. submitted the low bid of $136,230.00, which the Division reviewed and found their prices reasonable and consistent with local costs. Attached is a copy of the certified Bid Tabulation. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the Commission. FISCAL EFFECTS: Staff will pay for the Project with Stormwater Enterprise Funds approved in the City’s FY19 Budget (Capital Plan Project STRM39). Attachments: Bid Tabulation Notice of Award Project Drawings Report compiled on January 30, 2019 55 56 57 Section 006 NOTICE OF AWARD Page 1 of 1 NOTICE OF AWARD 2019 Bozeman Stormwater Improvements DATED: ____________________ TO: Omdahl Excavation & Utilities, Inc. ADDRESS: 659 Morning Mist Rd. Manhattan, MT 59741 PROJECT: 2019 Bozeman Stormwater Improvement Project CONTRACT FOR: Installation of two (2) stormwater treatment units (units) located one‐half block south of the following intersections: W. Mendenhall St. and N. Black Ave. and W. Mendenhall St. and N. Bozeman Ave. The 2019 Bozeman Stormwater Improvements (Project) generally includes: 1. Traffic control 2. Excavating and uncovering existing storm mains within project extents 3. Adjusting existing utilities to accommodate work 4. Setting and connecting two (2) units to existing storm mains and manholes 5. Backfilling, compacting, and restoring disturbed areas 6. All related work incidental to construction You are notified that the City of Bozeman (Owner) has considered your bid opened on January 29, 2019, for the above Contract. The Owner has determined that you are the apparent successful bidder and is awarding you the Contract for the 2019 Bozeman Stormwater Improvement Project. The price of your Contract is: One Hundred Thirty‐Six Thousand Two Hundred and Thirty Dollars ($136,230.00). You must comply with the following conditions within fifteen (15) days of the date of this Notice of Award, that is, by________________________________. You must deliver the following to the Owner before the aforementioned date: 1. Four (4) executed counterparts of the Agreement Form, including all Contract Documents and Drawings. 2. Executed Agreement Form, Payment Bond, and Performance Bond as specified in the Instructions for Bidders and General Conditions. 3. Certificates of Insurance as specified in the Supplementary Conditions (paragraphs SC‐5.04 and SC‐ 5.06). Failure to comply with these conditions within the time specified will entitle the Owner to consider your bid abandoned, annul this Notice of Award, and declare your Bid Security forfeited. The Owner will return to you two fully signed counterpart of the Agreement with the Contract Documents attached within ten (10) days after you comply with these conditions. CITY OF BOZEMAN, MONTANA ATTEST: BY: ____________________ BY: ____________________ (CITY MANAGER) (CITY CLERK) DATE: ____________________ 58 59 60 61 62