HomeMy WebLinkAbout02-04-19 City Commission Packet Materials - C7. Amendment 4 with Robert Peccia for 5.3 MG Water Storage Reservoir ProjectCommission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Shawn Kohtz, City Engineer SUBJECT: 5.3 Million Gallon (MG) Water Storage Reservoir Project - Amendment No. 4. MEETING DATE: February 4th , 2019 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve and authorize City Manager to sign Amendment No. 4 with Robert Peccia and Associates. BACKGROUND: Attached is a copy of the partially executed Amendment No. 4 with Robert Peccia and Associates for the 5.3 Million Gallon (MG) Water Storage Reservoir Project. The document is in the City’s standard format. Amendment number 2 added the bidding and construction phase services for the project. The time and fee included in that amendment was based on the contact time included in the construction contract, plus the additional time necessary to complete the project closeout tasks. During the course of construction, there were a few time extensions granted to the contractor with approved change orders. The contractor is now over on contract time including those extensions. As a result, the consultant has exhausted the fees included in amendment 2 for construction phase services. It is estimated that there is still 6 to 8 weeks of construction in the spring necessary to complete the project. This amendment will add the additional construction services to our consultants contract to complete the project. It is anticipated that the additional inspection and contact administration time will be withheld from the contractor’s future payments as liquidated damages. The construction phase services are paid on a time and materials basis, so only those hours needed to complete the project will be compensated. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission 80 FISCAL EFFECTS: $127,873.00 from the Water Impact Fee Fund (90%) and Water Fund (10%). It is anticipated that the additional inspection and contact administration time will be withheld from the contractor’s future payments as liquidated damages. Attachments: Amendment No.4 Report compiled on: 1/18/17 81 82 83 84 85 86 87 88 89 90 91 92