Loading...
HomeMy WebLinkAbout01-14-19 City Commission Packet Materials - A3. Fire EMS Impact Fee Study Presentation - SUPPLEMENTAL MATERIALS (2)City of Bozeman Fire/EMS & Transportation Impact Fee Update Study JANUARY 14, 2018 1 Presentation Overview 2 1 Fire/EMS Background/Purpose 3 Multi-Modal Transportation 2 4 Next Steps • Last technical study update in 2012 • Consumption-based methodology  Charges growth for the value of capacity consumed • Compliance with Montana Impact Fee Act 3 Background/Purpose Impact Fee Update Definition:  One-time capital charge to new development  Covers the cost of new capital facility capacity  Implements CIP 4 Background/Purpose  Montana Impact Fee Act (Section 7-6-1602 MCA) Fee reasonably related to development’s share of cost  Documentation of need for public facilities  Consideration of development’s contribution through other revenue sources  Cannot correct deficiencies / LOS  Fee amount cannot include operational/maintenance costs 5 Background/Purpose Impact Fee Components: • Inventory • Service Area and Population • Level of Service • Cost Component • Credit Component • Demand Component • Calculated Fee • Fee Comparison • Future Demand Analysis and Revenue Estimates 6 Background/Purpose Presentation Overview 2 1 Fire/EMS Background/Purpose 3 Multi-Modal Transportation 7 4 Next Steps 8 Fire/EMS Basic Impact Fee Formula: Net Impact Fee = (Cost – Credit) x Demand Cost to Add Capacity Non-Impact Fee Revenue from Future Development Persons per Housing Unit/ Calls per Unit 9 Fire/EMS Inventory  3 fire/EMS stations  26,100 sf  1.6 acres of land  Unit Costs:  Buildings: $350 per square foot  Land: $200,000 per acre 10 Fire/EMS Inventory  Includes equipment and vehicles 17 vehicles (Ambulance, Fire Engine, Brush Truck, etc.) Total Vehicle and Equipment Value = $3.9 M 11 Fire/EMS Service Area and Population  Fire/EMS services are provided citywide  Fee calculations utilize both population and call data  2018 Population:  Permanent - 43,687  Weighted Seasonal - 44,041 12 Fire/EMS Level of Service Variable Figure 2018 Weighted Seasonal Population 44,041 Number of Stations 3 Population per Station 14,680 Current LOS (Stations per 1,000 Population) 0.068 13 Fire/EMS Level of Service Comparison Jurisdiction Stations SA – Population* Population per Station LOS Butte-Silver Bow City-County 2 33,708 16,854 0.059 City of Billings 7 109,089 15,584 0.064 City of Great Falls 4 59,479 14,870 0.067 City of Helena 2 30,102 15,051 0.066 City of Missoula 5 70,117 14,023 0.071 City of Bozeman 3 41,761 13,920 0.072 City of Kalispell 2 21,619 10,810 0.093 * Source: 2016 ACS, 5-Yr. Estimates – Represents permanent population 14 Fire/EMS Cost Component Variable Figure % of Total Building Value $9.12 M 68.4% Land Value $0.31 M 2.3% Vehicle/Equipment Value $3.92 M 29.3% Total Value ≈ $13.4 M 100.0% Avg. Annual Calls (2012-16)* 3,649 - Total Impact Cost per Call ≈ $3,660 - * Represents the average annual number of calls between 2012 and 2016, excluding calls to fire and police stations, jails, and calls to outside of the City of Bozeman 15 Fire/EMS Credit Component  Review of historical and programmed capital expenditures  Impact fees have been used for capacity projects historically (past 5- years) and no programmed capacity projects (next 5-years)  No outstanding debt service No credit provided 16 Fire/EMS Demand Component Residential (PPH) and non-residential (calls per square foot)  Average annual calls by land use between 2012 and 2016  Excludes calls to fire and police stations, jails, and calls outside Bozeman Calls not assigned to a land use were redistributed based on the distribution of calls to assigned land use  Montana Department of Revenue property data used for units 17 Fire/EMS Demand Component Property Type Demand Unit Avg. Annual Calls (2012-16)* % Dist. Demand Units Calls per Unit Residential Persons 1,747 47.9% 44,041 0.040 Industrial 1,000 gsf 28 0.8% 2,333 0.012 Retail, Accommodation and Food Services 1,000 gsf 610 16.7% 5,491 0.111 Health Care and Social Assistance 1,000 gsf 690 18.9% 1,447 0.477 All Other Services 1,000 gsf 574 15.7% 4,810 0.119 Total - 3,649 100.0% - - * Includes re-distribution of calls to unknown property types (915 calls to streets, highways, construction sites, etc.) 18 Fire/EMS Calculated Impact Fee (Net Impact Cost)  Impact Cost per Call: $3,660 (Utilized for non-residential)  Residential Calls per Person: 0.040  Residential Impact Cost per Person: $146 19 Fire/EMS Residential Split  Separate Fees for “Single Family” and “Multi-Family”  Tiered by size of home Persons per housing unit (PPH) by home size estimates based on: o American Housing Survey (national data) o 2016 American Community Survey data for Bozeman 20 Fire/EMS Calculated Impact Fee Single Family PPH Impact Fee (du) (w/ Admin. Fee) 1,400 sf or less 2.12 $326 1,401 to 1,600 sf 2.17 $334 1,601 to 1,800 sf 2.21 $340 1,801 to 2,000 sf 2.25 $346 2,001 to 2,200 sf 2.29 $352 2,201 to 2,400 sf 2.33 $358 2,401 to 2,600 sf 2.38 $366 2,601 to 2,800 sf 2.42 $372 2,801 to 3,000 sf 2.47 $380 3,001 sf or more 2.59 $398 Multi-Family PPH Impact Fee (du) (w/ Admin. Fee) 1,400 sf or less 1.50 $231 1,401 to 1,600 sf 1.54 $237 1,601 to 1,800 sf 1.57 $241 1,801 to 2,000 sf 1.60 $246 2,001 to 2,200 sf 1.62 $249 2,201 to 2,400 sf 1.66 $255 2,401 to 2,600 sf 1.69 $260 2,601 to 2,800 sf 1.72 $264 2,801 to 3,000 sf 1.75 $269 3,001 sf or more 1.84 $283 21 Fire/EMS Calculated Impact Fee (All Uses) Property Type Unit PPH Calls per Unit Total Impact Fee Total Impact Fee (w/ Admin. Fee) Residential: Single Family: 1,801 to 2,000 sf Du 2.25 n/a $329 $346 Multi-Family: 1,801 to 2,000 sf Du 1.60 n/a $234 $246 Mobile Home Du 1.98 n/a $290 $304 Group Quarters person n/a 0.040 $146 $154 Non-Residential: Industrial 1,000 gsf n/a 0.012 $44 $46 Retail, Accommodation and Food Services 1,000 gsf n/a 0.111 $406 $427 Health Care and Social Assistance 1,000 gsf n/a 0.477 $1,746 $1,833 All Other Services 1,000 gsf n/a 0.119 $436 $457 Impact Fee Comparison 22 Fire/EMS Land Use Unit City of Bozeman City of Bozeman City of Belgrade City of Kalispell City of Livingston City of Missoula* Study Year - 2018 2012 2007 2015 2006 2002 Adoption % - 100% 100% 55% 45% 100% N/A Population (2016) 41,761 41,761 7,874 21,619 7,210 70,117 Single Family (2k sf) Du $346 $326 $529 $483 $155 $114 Industrial 1,000 sf $46 $30 $69 $350 $26 $108 Office 1,000 sf $457 $365 $122 $350 $84 $189 Retail 1,000 sf $427 $411 $404 $350 $84 $134 * Fees shown for office and retail are for the smallest available tier. Note: All fees shown include 5% administration fee. 23 Fire/EMS Future Demand Analysis and Revenue Estimates Variable Figure 2018 Bozeman Population 44,041 2040 Bozeman Population 72,320 Residents Added 28,279 Total Asset Value (Current) $13.4 M Current Value per Resident ≈ $303 Value of Additional Assets Needed (2040 Demand) ≈ $8.6 M Note: Fire & EMS Master Plan suggests need for a new station within the next 5 to 10 years 24 Fire/EMS Future Demand Analysis and Revenue Estimates Variable Fire/EMS Impact Fee Revenue Historical Impact Fee Revenues - Average 2006-16 (per year) $288,150 - Average 2012-16 (per year) $358,100 Estimated Revenue (2018 Dollars)* - Annual $290 K to $410 K - Total Through 2040 $6.7 M to $9.5 M * Based on review of recent permitting activity and population growth along with calculated impact fee levels Presentation Overview 2 1 Fire/EMS Background/Purpose 3 Multi-Modal Transportation 25 4 Next Steps 26 Transportation Transportation Impact Fee Variables: Demand Component Trip generation rate, trip length, % new trips Cost Component Multi-Modal: Roadways, transit infrastructure, sidewalks, bike lanes, person-miles Credit Component Multi-Modal: Non-impact fee funding for transit/bike/pedestrian & roadways 27 Transportation Basic Impact Fee Formula: Net Impact Fee = (Cost – Credit) x Demand Cost to Add Capacity Non-Impact Fee Revenue from Future Development Vehicle/Person- Miles of Travel 28 Transportation Total Impact Cost ≈$5,600 17.5 person-miles of daily travel Capacity ≈10,300 Person-miles of capacity ≈$320 Total Credit ≈$400 Fee ≈$5,200 ÷ = = X One Lane Mile ≈$3.3 M 29 Transportation Demand Component Sources: National ITE Reference Local trip characteristics studies Tindale Oliver TCS database Bozeman Transportation Model Demand Calculation: Trip Generation Rate x Trip Length x % New Trips 30 Transportation Demand Component Split Single Family and Multi- Family Land Uses Residential tiering based on: ITE 10th Edition American Community Survey (ACS) o Public-use Microdata (PUMS) Tier Single Family Multi-Family 1,400 sf or less 7.39 5.21 1,401 to 1,600 sf 8.23 5.80 1,601 to 1,800 sf 8.96 6.31 1,801 to 2,000 sf 9.61 6.77 2,001 to 2,200 sf 10.21 7.19 2,201 to 2,400 sf 10.75 7.57 2,401 to 2,600 sf 11.24 7.92 2,601 to 2,800 sf 11.71 8.25 2,801 to 3,000 sf 12.14 8.55 3,001 sf or more 12.26 8.63 31 Transportation Demand per Units of Development Trip Generation Rate = Number per day Trip Length = Travel A to B % New Trips = Accounts for trips already on the roadway Interstate Adjustment Factor = Accounts for travel using limited access facilities Trip Length Adjustment Factor = Adapts national data for local use Vehicle-Trip to Person-Trip Factor = Converts VMC to PMC 32 Transportation Single Family Example (2,000 sq ft): Trip Generation Rate = 9.61 Trip Length = 3.52 % New Trips = 100% Interstate Adjustment Factor = 19.9% Trip Length Adjustment Factor = 0% Vehicle-Trip to Person-Trip Factor = 1.30 (9.61 * 3.52 * 100% / 2) * (1 - 0.199) * 1.30 ≈ 17.62 33 Transportation Trip Exchange Districts Downtown: 29% reduction in demand University: 25% to 62% reduction in demand Downtown TED University TED 34 Transportation Cost Component Transportation Master Plan – Construction Cost City road improvements ≈ $2.8 million per lane mile State road improvements ≈ $3.2 million per lane mile Right-of-Way Estimated at 10% of construction 35 Transportation Estimated Cost per Lane Mile Phase City Roads State Roads City & State Roads Right-of-Way (≈10%) $280,000 $320,000 $298,000 Construction $2,800,000 $3,200,000 $2,980,000 Total $3,080,000 $3,520,000 $3,278,000 Lane Mile Distribution* 55% 45% - *Based on the 2017 TMP 36 Transportation Average Capacity per Lane Mile *Based on the NHTS Item Lane Mile Added Vehicle-Miles of Capacity Added VMC/PMC added per Lane Mile City Roads 32.97 260,040 7,887 State Roads 27.11 214,125 7,898 Avg. VMC added per Lane Mile 7,900 Vehicle-Trip to Person-Trip Factor* 1.30 Avg. PMC added per Lane Mile 10,270 37 Transportation Level of Service Variation  Roadway LOS measured in terms of speed of travel/congestion levels Adopted LOS Standard D: o results in V/C = 1 (average of 13 to 17 mph) Bozeman’s Achieved LOS (V/C): Current V/C = 0.53 (average of 35 mph) 2040 Projected V/C = 0.73 (average of 22 mph) 38 Transportation Alternate V/C Scenario 0% 2% 4% 6% 8% 10% 12% 14% 16% 18% 20% 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 Current VMT Distribution Current, 0.53 Adopted Standard, 1.00 >=35 mph >=28 mph >mph=22 mph >mph=17 >=13 <13 mph 39 Transportation Alternate V/C Scenario 0% 2% 4% 6% 8% 10% 12% 14% 16% 18% 20% 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 2040 VMT Distribution Future, 0.73 Adopted Standard, 1.00 >=35 mph >=28 mph >mph=22 mph >mph=17 >=13 <13 mph 40 Transportation Alternate V/C Scenario Option to slow degradation Assess impact fee at a higher LOS than the adopted standard (1.00) Adjust capacity to V/C of 0.73 Capacity ≈ 10,270 * 0.73 ≈ 7,500 41 Transportation Cost Component Cost per Lane Mile ≈ $3,278,000 million per lane mile Capacity Scenario #1 ≈ 10,270 person-miles of capacity Scenario #2 ≈ 7,500 person-miles of capacity Cost per PMC Scenario #1 ≈ $319 Scenario #2 ≈ $417 42 Transportation Credit Component: $.01 penny 1 CENT GAS TAX PER GALLON 43 Transportation Equivalent Pennies of Capital Improvement Credit Credit Avg. Annual Expenditures Value per Penny Equivalent Pennies per Gallon City Revenues $1,899,953 $501,545 $0.038 State Revenues $1,129,481 $501,545 $0.023 Total $3,029,434 $0.061 44 Transportation Single Family Example (2,000 sq ft), Scenario #1: Net PMT = 17.62 Cost per PMC = $319.18 Total Impact Cost = $5,621 Revenue Credit = $401 Calculated Impact Fee Rate = $5,220 MMTIF with 5% Admin Fee = $5,481 Net Impact Fee = (Cost – Credit) x Demand 45 Transportation Calculated Impact Fee – Residential Tiering Single Family TGR Impact Fee (du) (w/ Admin. Fee) V/C 1.00 Impact Fee (du) (w/ Admin. Fee) V/C 0.73 1,400 sf or less 7.39 $4,211 $5,886 1,401 to 1,600 sf 8.23 $4,689 $6,556 1,601 to 1,800 sf 8.96 $5,119 $7,152 1,801 to 2,000 sf 9.61 $5,481 $7,662 2,001 to 2,200 sf 10.21 $5,832 $8,148 2,201 to 2,400 sf 10.75 $6,127 $8,566 2,401 to 2,600 sf 11.24 $6,410 $8,960 2,601 to 2,800 sf 11.71 $6,680 $9,337 2,801 to 3,000 sf 12.14 $6,926 $9,680 3,001 sf or more 12.26 $7,000 $9,781 Multi-Family TGR Impact Fee (du) (w/ Admin. Fee) V/C 1.00 Impact Fee (du) (w/ Admin. Fee) V/C 0.73 1,400 sf or less 5.21 $2,617 $3,657 1,401 to 1,600 sf 5.80 $2,918 $4,077 1,601 to 1,800 sf 6.31 $3,176 $4,436 1,801 to 2,000 sf 6.77 $3,406 $4,759 2,001 to 2,200 sf 7.19 $3,615 $5,052 2,201 to 2,400 sf 7.57 $3,802 $5,314 2,401 to 2,600 sf 7.92 $3,973 $5,556 2,601 to 2,800 sf 8.25 $4,134 $5,782 2,801 to 3,000 sf 8.55 $4,297 $6,004 3,001 sf or more 8.63 $4,340 $6,064 Impact Fee Comparison 46 Transportation Land Use Unit City of Bozeman Sc. 1 City of Bozeman Sc. 2 City of Bozeman City of Belgrade City of Livingston City of Missoula* Study Year - 2018 2018 2012 2007 2006 2007 Adoption % - 100% 100% 100% 55% - 47% Population (2016) 41,761 41,761 41,761 7,874 7,210 70,117 Single Family (2k sf) Du $5,481 $7,662 $4,497 $2,227 $601 $1,209 Multi-Family (2k sf) Du $3,406 $4,759 $4,497 $1,363 $601 $733 Industrial 1,000 sf $1,255 $1,759 $2,866 $803 $437 $550 Office 1,000 sf $2,477 $3,467 $4,535 $1,536 $1,393 $1,447 Retail 1,000 sf $7,222 $10,112 $10,476 $4,008 $1,393 $3,205 * Fees shown for office and retail are for the smallest available tier. Note: All fees shown include 5% administration fee. 47 Transportation Future Demand Analysis and Revenue Estimates Variable Road IF Revenue Historical Roadway Impact Fee Revenue - Average 2006-16 (per year) $2.5 M - Average 2012-16 (per year) $3.4 M Estimated Revenue (2018 Dollars)* Scenario #1 - Annual $3.7 to $5.3 M - Total Through 2040 $86 M to $121 M Estimated Revenue (2018 Dollars)* Scenario #2 - Annual $5.2 to $7.4 M - Total Through 2040 $120 M to $170 M * Based on review of recent permitting activity and population growth along with calculated impact fee levels The City’s Transportation Master Plan identifies over $180 million of roadway expansion and intersection improvement projects. Presentation Overview 2 1 Fire/EMS Background/Purpose 3 Multi-Modal Transportation 48 4 Next Steps • City Commission Input/Direction • Final Report • Implementation Process 49 Next Steps Thank You! 50 Questions