Loading...
HomeMy WebLinkAbout91- HKM Associates Contract Amendment l " ' . - \ <' .~ \ .- .'" CONTRACT AMENDMENT Contract No. 4M229.110 between the CITY OF BOZEMAN, a Municipal Corporation, and HKM ASSOCIATES, 20 East Olive, P.O. Box 1090, Bozeman, Montana, effective date April 25, 1991, is hereby amended as follows: 12.3 TOTAL CONTRACT AMOUNT: The OWNER shall pay the ENGINEER the total contract amount, not to exceed Twenty-two thousand seven hundred forty-three and no/l00 dollars ($22743.000) which shall include Thirteen thousand six hundred and no/100 ($13,600) for the engineering services rendered in field investigations, preparation of plans and specifications, and Nine thousand one hundred forty- three and nO/lOa dollars ($9143.00) for construction contract administration and construction inspection, as outlined in Section 4 of this Agreement, EXCLUSIVE of additional services set forth in section 5 of this Agreement, for the design and construction for the RELOCATION OF THE SANITARY SEWER OUTFALL LINE GENERALLY LOCATED PARALLEL TO U.S. HIGHWAY NO. 10 ALONG THE NORTHWEST APPROACH RAMP TO THE EXISTING NORTH SEVENTH AVENUE HIGHWAY OVERPASS OF THE MONTANA RAIL LINK TRACKS. The man-hour and cost breakout is shown in Exhibit B. The method of payment is described in the following paragraphs. CITY OF BOZEMAN, MONTANA ENGINEER ~ g ~ . HKM ~~IA~ES. ~ BY: ., ~ . l l ~ BY: ~/. ity Manager ' Presldent DATE: 10 February 1992 DATE: ,,:l~~...v /992- ~~~ESTc?J-: 01 ~ city Clerk WAH\ld:WAH-TEMP\AMEND02.192 .. . " .. . . . .L- , f . '" ~ PROJECT: NORTH SEVENTH SEWER RELOCATION PROJECT, BOZEMAN, MONTANA ENGINEER: HKM ASSOCIATES, Bozeman, MT 586-8834 DATE: January 27, 1992 CONSTRUCTION INSPECTION AND CLOSEOUT COSTS Itemized costs for construction contract administration, construction inspection and project closeout. Labor Costs: LABOR EST CHG EST OVER TOTAL ITEM HRS HRS RATE COST COST COST (1) (2) (3) (4) (5) (6) (7) Project Manager 8 25 24.75 198.00 420.75 618.75 Staff Engineer 86 92 13.00 1,118.00 78.00 1,196.00 Technician 72 234 10.00 720.00 1,620.00 2,340.00 CADD Drafter 6 16 11. 00 66.00 110.00 176.00 Sec'y 4 10 6.50 26.00 33.00 59.00 DIRECT LABOR 176 377 2,128.00 2,261.75 4,389.75 CONSTRUCTION ADMINISTRATION. INSPECTION AND QUALITY ASSURANCE COSTS Total Direct Labor (100%) 2,128.00 2,261.75 4,389.75 Payroll Overhead (38.4%)* 817.15 868.51 1,685.66 Gen'l & Admin O'head (107.1%) 2,279.09 -0- 2,279.09 TOTAL LABOR & OVERHEAD 5,224.24 3,130.26 8,354.50 Profit (7.94%) x TOTAL LABOR 414.80 -0- 414.80 TOTAL LABOR, O'HEAD, & PROFIT 5,639.04 3,130.26 8,769.30 Direct Expenses: Communications 34.61 Materials & Supplies 59.15 Photos 48.94 Subcontracted services (Braun Intertec: concrete cylinders, Proctor dry unit wgt) 231.00 373.70 TOTAL COSTS for CONSTRUCTION ADMIN & INSPECTION $9,143.00 WAH\ld:WAH-TEMP\REVCA.MEM .. . "A' . . . ,I.' . CONTRACT AMENDMENT Contract No. 4M229.110 between the CITY OF BOZEMAN, a Municipal Corporation, and HKM ASSOCIATES, 20 East Olive, P.O. Box 1090, Bozeman, Montana, effective date April 25, 1991, is hereby amended as follows: Sec. 12 . 1. 4 .....Reimbursable Expenses shall also include the amount billed to ENGINEER (other than as an authorized Additional Service under Paragraph 12.1.2 above) at cost times a factor of 1. 00; and shall also include expenses incurred for computer time and other highly specialized equipment. Note: Mark-up factor is changed from 1.10 to 1.00. Sec. 20 LATE PAYMENT is deleted in its entirety. CITY OF BOZEMAN, MONTANA ENGINEER BY~Y~ l'LJ*,^~' H~ ASS~CI~~, . ~/ BY. a -/- .C- -::,I /,"r/ .$.~' t . lty Manager PI' sldent DATE: August 5. 1991 DATE: :jJ0/9/ ~~~ESTt&~L ~ cit:y Clerk -----------