HomeMy WebLinkAbout18- Change Order G-4 - Vertex Electric - Lyman Spring Junction Box Monitoring and Controls Improvements Change Order No. G-4 Date of Issuance: October 26,2018 Effective Date: Project: Lyman Spring Junction Box Monitoring Owner: Owner's Contract No.: and Controls Improvements City of Bozeman Contract: General Construction Date of Contract: July 8,2018 Contractor:Vertex Electric Engineer's Project No.: P0 5 0 9 7-201 4-0 04 The Contract Documents are modified as follows upon execution of this Change Order: Description: Relocate Radio Panel to enable safe access.Cost of materials is$323 and cost of labor is$729. Attachments: (List Documents supporting change): Contractor Cost Estimate CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: ❑ Working days ❑ Calendar days Substantial completion(days or date): $ $i30,000.00 I Ready for final payment(days or date): 1 [Increase][^D^Fea;e]from previously approved ' Change Orders ![Increase][Decrease] from previously approved Change Orders !Substantial completion(days): $ $4,986.00 Ready for final payment(days): Contract with[Increase'r'�ea-scrfrom previously approved Change Orders !Contract Times prior to this Change Order: !Substantial completion(days or date): $ $134,986.00 Ready for final payment(days or date): Increase 4lDesrease3 of this Change Order ,[Increase][Decrease]Time of this Change Order: ;Substantial completion(days or date): $ $i 052.00 ;Ready for final payment(days or date): Contract Price incorporating this Change Order: lContract Times with all approved Change Orders: !Substantial completion(days or date): $ $136,038.00 1 Ready for final payment(days or date): ! RECOMMENDED: /� ACCEPTED: ACCEPTED: _4 By: � _// , By: By: Engineer(Authorized Signature) Buyer uthorized Si ature) +� s el�'r(Authorized Signature) Date: `! os �$ Date: �� Date: 1 Approved by Funding Agency( applicable): Date: Lyman Spring M&C Improvements 00 63 63 - 1 Apr-18 Bozeman, Montana Change Order Form Scott Jungwirth From: James Tex <tex@vertexelectricmt.com> Sent: Thursday, October 25, 2018 10:59 AM To: Scott Jungwirth Cc: Misty Johnson Subject: Re: Lyman Improvements Substantial Completion Punch List Hi Scott, Thanks for taking the time to discuss the Lyman Project with me this morning. I have solar plexus sending me the breaker to separate the battery banks. Hope to see that early next week.The cost to relocate the radio panel in the water plant breaks down to the following: • Materials-$323 - Includes junction box to put in the location of where the radio panel is now, Conduit and fittings to extend the power, Cat 5, and coax to new location of radio panel nearby on grated area, reinstalling Cat 5 including new RJ45 ends, New LMR400 Coax Connectors, Reinstalling ground connection to new location. • Labor-$729-Includes labor to uninstall panel as it is now and relocate and install material listed above. Let me know if you have any questions or concerns Thank you, James Tex i