HomeMy WebLinkAbout01- Solid Waste Transfer Station, Amendment No. 1 to Professional Services Agreement , ' . , . l' ---...' ~ I , . . " '. EXHIBIT C SCOPE OF SERVICES PHASE 0 - Pro.iect Management Methodology: ALLIED prepares a Project Plan for every projcct it undertakes. The Plan identifies the goals of our clients and budget, schedule and resource requirements. The Plan is a working tool which is referred to often throughout the project. Progress is monitorcd on a regular basis and reported to the clicnt. The Plan is updated as required to provide new information to the project team. Tasks: tasks will include the following: Task 0.1 Project Administration Provide general administration of Consultant Agreement for engineering services, including I Allied I coordination with City staff, ALLIED/SCS staff and subconsuItants. Provide overall management of project activities, project team members, and subconsultants throughout the duration of the project. Prepare a Project Plan for use by the project team. This document will include the contractual scope of services; estimated resource requirements; an itemized budget by task; a project schedule; and other project requirements necessary to fully identify project objectives. Thc Project Plan will also outline communications procedures between the City and ALLIED/SCS, including monthly technical and budget status reporting requirements. Prepare and submit to the City a monthly status report of technical and budgetary progress on the project to accompany invoices for serviccs. Thc progress rcport will includc a statement of the percent of project work completed to date; the minutes of any project team and regulatory meetings held during the month; a review of completed work; a statement of work planned during the coming month, with explanations for deviations from the scope of services or schedule; and identification of problem areas, with descriptions of suggested remedial action. Organize and conduct progress meetings as necessary for maintammg full and clear communication and for providing effective management of the project. Prepare wri ttcn minutes of the meetings and distribute to all attendees. A total of three meetings at the City's offices have been included in the Budget. Task 0,2 Quality Assurance and Control Conduct review of work products by senior members of ALLIED/SCS staff to ensurc Allied conformance with the scope of services, standards of professional practice, and applicable and SCS regulations. Such review by senior personnel shall be performed prior to or in conjunction with review by the City. PHASE 1 - Site Selection and Environmental Review (MEPA Compliance) Methodology: For a facility siting process to be successful, it must contain a public involvement I I' . . . . " ---. ' ~ , , . , , .. component as well as an objective sitc identification process within a defined search area and a multi- step site evaluation and selection process. We will employ a two task siting process. In Task 1 - Preliminary Site Selection, ALLIED/SCS will: . establish site selection framework; . establish a public involvement plan; . establish siting criteria; . assist the City in identifying potential sites; . conduct initial screening of candidate sites; and . conduct reconnaissance level site evaluation. Tn Task 2 - Final Site Selection, we will: . develop a "shortlist" of potential sites; . conduct a comparative site evaluation; and . prepare a site evaluation report. Following development and selection of a preferred site, additional field investigations will be conducted as necessary to prepare a Montana Environmental Policy Act (MEP A) Checklist. When the MEP A process is initiated, necessary site development permit applications will be prepared and submitted to the City and/or County Planning Departments. A Transfer Station License application and applications for other necessary permits will be prepared during the later design stages. Tasks: tasks include the following: Task 1.1 Preliminary Site Selection Subtask 1.1.1 Site Selection Framework: To establish an appropriate framework for the site I scs I selection process, ALLIED/SCS will meet with the City and the City and County Planning Dcpartment to assimilate information. We will also review pertinent elements of solid waste planning documents. We will also review regulatory requirements related to siting. Subtask 1,1.2 Public Involvement Plan: Public involvement throughout the siting of a ~ transfer station project is critical to its success. The ALLIED/SCS Team will meet with City staff to develop a general approach to public involvement. It is our belief that public involvement in a siting project can be enhanced with the formation of a Solid Waste Advisory Committee (SW AC) comprised of interested citizens, thus achieving effective two-way communication and decision-making between thc ALLlED/SCS Team, City staff, elected officials and citizens. A SW AC should be formed, for the purpose of this contract agreement, with the single charge to assist in the developmcnt and rcvicw of proposed siting criteria and their application. Members, appointed by the City Commision, could include local residents, elected city officials, public interest groups, and businesses. The SW AC would serve as an advisory committee only, and would make recommendations to the City Commissioners. The Commissioners would make final decisions after considering SW AC recommendations and other available information. Subtask 1.1.3 Site Selection Criteria: A siting process must be thoroughly formulated and ~ then implemented without bias toward any particular site. The purpose of this task is to develop categories of siting criteria which will be applied during candidate site screcning and 2 , ' , , , . ( -' l , , , , , ,. comparative site evaluation, and to prepare evaluation methodologies for their application. The criteria developed will reflect both the unacceptable and acceptable site features consistent with regulatory and operational requirements. The ALLIED/SCS team will develop the methodologies for the application of the critcria developed for the different tasks and phases of the facility siting project. Site evaluation methodologies will be identified for both the initial site scrccning and comparative site evaluation. The ALLIED/SCS Team will generate a memorandum containing clearly defined criteria for the facility, and dctailed methodologies for their application during both the initial site screening and comparative site evaluation. Subtask 1.1.4 Site Identification: We have found that site identification using local chamber of commerce, local commercial real estate brokers, City and County Real Property Departments, public notices and "drive by" searches works effectively. We have also found SCS with that it is important to close the identification process once the initial site screening begins. Allicd assist. One extremely important point we have learned is that once the identification proccss is closed, it should remain closed. To do otherwise can cause the siting process schedule to extend and costs to escalate. An cffort should be made to inform City citizens of the siting process, and that candidate sites may be nominated by landholders. This step can bc critical in the citizen's perception of the "fairness" of thc siting process. A press release can be an effective means to accomplish this step. Subtask 1.1.5 Initial Site Screening: Using the site screening criteria, the candidate sites will be evaluatcd to identify those sites which are unacceptable for development. First, the sites SCS with will be evaluated using only criteria that could potentially result in a site being considered Allied assist. "fatally flawed". From this evaluation, a list of preliminary sites will emerge for comparative evaluation using available reports and data. Initial site screening criteria will at a minimum consider the following: . General site requirements . Hydrogeology . Slopc stability . Presence of wetlands . Presence of threatened or . Adjacent land usc / l' endangered species . Potential impacts on fisheries' \ ~y"t\ . Potential traffic impacts . Proximity to floodplains ~?~ . Aesthetics issues . Noise and air quality issues .. . (61 6 . Presence of known cultural . Proximity to reSidenti~ resources neiohborhoods i~ ,\ IS 01 The result of the initial site screening will be to exclude all sites which are unsuitable. A tabulation of identified sites will be developed which identifies up to 10 suitable sites for further comparative evaluation. ALLIED/SCS will assist the City in preparing a press release to present the results of the initial site screening. Task 1.2 Final Site Selection Subtask 1.2.1 Develop Shortlist of Potential Sites: Following the press release regarding thc ~ initial site screening, the ALLIED/SCS Team will review the analysis conducted under previous subtasks and develop a shortlist of sites for further evaluation. This will be 3 J' . . , I " '-. . J , . '. . , .. performed using data collected from previous subtasks to rank the remaining sites. The top three to five sites will be selected for further comparative evaluation. As part of this subtask, siting criteria developed under Task 1.1 would be revised as necessary to suit site-specific conditions and to more clearly distinguish permitting feasibility and environmental risk. Subtask 1.2.2 Comparative Site Evaluation: The top three to five sites will be evaluated for their relative merits in meeting the full range of environmental and operational criteria. ALLIED/SCS will compare and numerically rank sites according to their ability to satisfy SCS with operational requirements, their potential impacts to the surrounding area from operation of the Allied facility, and their overall feasibility. Optimization of collection routes will also be a factor assist. used to compare and numerically rank the sites. An optimization study will be completed under the additional services section of the Professional Services Agreemcnt or by the City of Bozeman, therefore has not been included in this scope of services nor within the budget. Comparative costs of the sites will also be developed. The ALUED/SCS Team will conduct reconnaissance levcl, on-site visual surveys and investigations necessary to evaluate the physical characteristics of candidate sites. The comparative site evaluation will provide a numerical ranking of the three to five sites according to each factor. Working with the SSAC, criterion will be ranked or weighted in terms of their relative importance in numerical terms. The extent to which each alternative site meets each criterion will be estimated and ranked in numerical terms as well. The resulting values will be summed for each alternative sitc to obtain an overall goals- achievement score. The numerical ranking will be accompanied by comments on the pros and cons of the respective sites. A consensus building process will then be initiated to eonsidcr benefits, tradeoffs, and mitigations such that the most feasible site or sites can be recommended for further consideration and environmental review. Subtask 1.2.3 Site Selection/Evaluation Report: The ALLIED/SCS Team will prepare a draft I SCS I site selection/evaluation report, documenting the findings of the evaluation. The draft report will compare and contrast the sites and will present information so that it highlights the major diffcrences between the sites. The draft report will be presented at a public workshop where the site rankings will be identified and public, agency and City comments solicited. ALLlED/SCS will then prepare a final site selection/evaluation report incorporating comments received. The final report will identify the selected site that will be considered for dctailed environmental review in subsequent tasks. Task 1.3 Environmental Review Process (MEPA Compliance) Development of a solid waste handling facility is an action that must undergo public revicw SCS with under the Montana Environmental Policy Act. For facilities such as a transfer station it is Allied possible to mitigate significant adverse environmental impacts. Therefore, an expanded assist. checklist is expected to be sufficient to complete MEP A review and receive a declaration of non-significance (DNS). Subtask 1.3.1 MEPA Pmcess: While limited environmental evaluation was conducted as part of the comparative evaluation in Task 1.2, a more detailed evaluation will build on that SCS with data. The ALLIED/SCS Team will conduct detailed environmental investigations to Allied determine potential impacts and technical feasibility of the preferred site. The investigations assist. will be responsive to environmental aspects of a MEP A Checklist, and other questions 4 . ; , . . I -. q .. , . . , . deemed necessary by thc SSAC and/or the City. An expanded checklist will be prepared incorporating the findings of the environmental field investigations. We anticipate performing expanded analyses for traffic, odor and noise to support the MEr A checklist. Othcr areas that will be addressed as part of the MEP A checklist in elude subsurface conditions of in-situ soils, ground and surface water, air quality, plants and animals, wetlands, health risk, land use, aesthetics, public service and utilities, historical/cultural preservation, and other issues. A draft checklist will be submitted to the City for review and comment prior to submission to the lead agency. We will attend a public hearing to address public comment on the proposal. PHASE 2 - Pcrmitting Pemlitting will occur in conjunction with project siting and environmental review and dcsign. The specific permits required will depend on a number of site-specific issues. Permitting requirements cannot be completely determined until a specific site has been selected, the MEP A process has been completed, and the facility has been designed at least to a conceptuallevcl, if not a preliminary one. Table 3-1 identifies those permits assumed to be required and those potentially required. During the siting and design phases, the ALLIED/SCS Team will idcntify possible permitting issues that could delay, or potentially preclude, development of the facility. We will develop a pcrmitting strategy and conduct pre-application meetings with jurisdictional agcncies as required to adequately coordinate permitting requirements. Task 2.1 Sitc Devclopment and/or Conditional Use Permits: I SCs I A solid waste transfer station is generally considered a conditional use, requiring a Conditional Use Permit. The City and/or County Commission may grant a Conditional Use Permit if it is determined that the facility is not detrimental to the community as a whole, and that mitigation efforts can overcome any incompatibilities with surrounding land uses. ALLIED/SCS will assist the City in securing required City and/or County permits through preparation of descriptions and drawings to support the permit applications. Task 2.2 Transfer Station Liccnsc: I scs I In accordance with 75-10-221 Montana Codes Annotated (MCA), a transfer station license must be obtained for a transfer/recycling facility. Generally the transfer station license must be obtained prior to initiating construction. Approximately 3 months should be allowed for DEQ and County Health Department review of thc pcmlit application, facility design and operating plan. ALLIED/SCS will prepare the Transfer Station License application for City submission to DEQ. Task 2.3 Other Permits: ALLIED/SCS will prepare applications for other permits as listed in Table 3~ 1 for City submission to the appropriate agency. 5 I .' , . _1 ~ . TABLE 3-1 PRELIMINARY LIST OF PERMITS PERMIT AUTHORITY REGULATORY AGENCY SCS Transfer Station License Chapter 75-1-0221 MCA DEQ and County Health Department Allied Site Development City Zoning Ordinance City and/or County Planning scs Department Conditional Use City Zoning Ordinance City and/or County Planning scs Department MPDES for Construction Montana Codes Annotated Departmcnt of Environmental Allied Activity Quality SCS Building Uniform Building Code City Planning/Building Department MPDES Gcneral Permit Montana Codcs Annotated Department of Environmental Quali ty PHASE 3 - Conceptual Facility Design Methodology: Up to two conceptual designs will be developed to define the requirements of the project, develop conceptual site layouts and cost estimate, and establish size and arrangement of site elcments for review and approval by the City. If appropriate, alternative transfer and site concepts will be identified. A non-site-specific conceptual layout will be prepared during the siting process to assist public involvement programs. Tasks: tasks will include the following: Task 3.1 Conceptual Facility Layout I scs I Identify and evaluate alternative facility layouts and site access routes. Identify the facilities needed onsite and develop design criteria to meet them. Task 3.2 Transfer Station Concept Workshop I scs I Conduct a transfer station concept workshop at the City office to discuss alternate site layouts and concepts with City staff. Review proposed facility layouts with the City to identify preferred layout and its further development. Task 3,3 Surveying and Mapping I Allied I Prepare topographic mapping using either field or aerial photographic methods. Maps will be prepared at a horizonal scale of 1"=50' with a contour interval of two feet. Mapping will be provided in digital format for direct transfer to our AutoCad Drafting System. Task 3.4 Geotechnical Investigations ~ Evaluate the subsurface condition within the depth of influence of the proposed facility and 6 I . . . . ~ _.' , , . -. . identify specific geotechnical considerations for the design and construction of the proposed facility. Review available published geologic and geotcchnical data of the area and site. Conduct a geotechnical exploration of the site by observing and classifying exposed soil, bedrock, and geomorphological features. Select and mark locations for test excavations. Perform a subsurface exploration consisting of excavating a maximum of five (5) test pits to depths within the influence of proposed structures. Observe, classify, log and sample subsurface materials. Deliver soils samples to a laboratory for testing and examination. Perform laboratory tests on representative samples of material obtained from the excavations. Tests shall include determinations of natural moisture content, consolidation, and grain size distribution analysis. Perform geotechnical engineering analysis to develop design data as follows: . allowable soil bearing pressure . modulus of subgrade reaction . potential for settlement (total and differential) . recommended foundation type . design loads for walls for active, at-rest, and passive conditions . suitability of onsite soils for use as structural fi.11 . maximum water level in subsurface . subdrain system requirements (if any) . excavation requirements Prepare a geotechnical exploration report summarizing the results of the field investigations, laboratory testing, analysis, and setting forth the geotechnical engIneenng design recommendations for the project. Clearing and site preparation will be completed by City personnel at locations directed by ALLIED/SCS before conducting site explorations. Task 3.5 Off-site Improvements Analysis I Allied I Identify ofT-site facility needs, ineluding transportation improvcments, signage, sanitary sewer, water supply, electric and telephone service, and develop design criteria for each. Task 3.6 Operations Plan To support applications for the Transfer Station License, prepare an operations plan ~ identifying the basic operating requirements for the facility. The plan will include gcncral operating procedures, description of how solid wastes are to be handled onsite, user traffic patterns, estimated staffing requirements, hours of operation, load monitoring requirements, and other pertinent requirements. Task 3.7 Conceptual Design Report ~ Prepare a Technical Memorandum which summarizes the results of the activities of Phase 3. The Memorandum will serve as a basis for detailed design. Prepare a conceptual level 7 j . . , . -- 1 I . . . I . , construction cost estimate based on the conceptual plans, design criteria, and preliminary design drawings. PHASE 4 - Detailed Design and Drawings Methodology: Detailed design will be based on the recommendations presented in the Conceptual Design Report prepared under Phase 3. Tasks: tasks will include the following: Task 4.1 Grading and Paving Design scs~ Establish site grades based on topographic mapping to accommodate facility layout, building concept elevations, and to promote adequate drainage. Prepare design of street improvements Allied - necessary to provide paved ingress and egress to the site. Prepare pavement designs to detailed accommodate anticipated vehicle loadings. Task 4.2 Stormwater Control System Design I Allied I Analyze impact of proposed development on natural surface water courses. Analysis shall determine amount and frequency of runoff; detrimental cffects of subsurface water; natural points of concentration; discharge and other hydraulic controls; and the most efficient disposal facilities consistent with site, budget, and environmental constraints. Design stonnwater control system in accordance with City of Bozeman or applicable drainage ordinances or guidelines. Design shall include collection system, detention system (if required), sedimentation control system (if required) and discharge system. Off-site receptors for stonn water flow have been assumed to be adequate, and no design of improvements to ofI...site receptors has been included in the Budget. Task 4.3 Utility System Design Prepare design of site utilities, including water, electrical power, and sanitary sewer service. I Allied I Coordinate water, sewer and power requirements with the City and Montana Power Company (MPC). Water and sewer system design shall be in accordance with City and, as appropriate, municipal standards. The Budget presented herein assumes that required utility service is available within 200 feet of the site. The design of off-site utilities beyond 200 feet from the site has not been included in this Scope of Services nor within the Budget. Task 4.4 Foundation Design I Allied I Prepare structural design of reinforced concrete foundation for pre-engineered transfer station building. Building design will be by the pre-engineered building manufacturer; foundation reactions suitable for design of the foundation will also be provided by the pre-engineered building manufacturer. Foundation design has been assumed to be slab-an-grade with spread footings and grade beams as required to support typical pre-engineered building construction. Task 4,5 Architectural Design I scs I Prepare transfer station building elevations and interior office area details. 8 I' , ~ , . -_ 1 , I , , . . I . . Task 4,6 Mechanical Design I SCS I Prepare mechanical design of tire water pumping, storage and distribution system. Prepare service watcr distribution system design for transfer station and office area. Prepare heating, ventilation and air conditioning design for office area. The design of a sprinkler system within the transfer station building has not been included within this Scope of Services nor in thc Budgct. Task 4,7 Electrical Design ~ Prepare electrical design to provide power servicc to transfer station building, scale, yard lighting, and outside equipment. Design yard lighting system. Task 4.8 Design Drawings Allied Prepare detailed contract drawings nccessary to clearly depict the construction requirements of the project. A preliminary list of Contract Drawings for the transfer/recycling facility is and SCS included as Table 3-2. The list includes thosc drawings estimated to be rcquircd to adequately describe the charactcr and extent of the improvements, and forms the basis of the Budget. 9 1 i,! . . -I . , , ~ . . . TABLE 3-2 PRELIMINARY LIST OF CONTRACT DRAWINGS Dra wing No. Title C-l Vicinity and Location Maps, Legend, and Index to Drawings C-2 Grading and Paving Plan C-3 Site Piping Plan C-4 Miscellaneous Civil Details A-I Transfer Building Floor Plan A-2 Transfer Building Elevations & Details A-3 Administration Area Floor Plan & Details A-4 Scale Building Plan, Elevations & Details A-5 Architectural Details S-l Structural Notes & Standard Details S-2 Transfer Building Foundation Plan S-3 Foundation Sections & Details S-4 Scale Building Plan, Sections & Details S-5 Recycling Center Retaining Wall Plan, Sections & Details S-6 Recycling Center Cover Plan, Sections & Details S-7 Miscellaneous Structural Details M-l Standard Mechanical Details M-2 Transfer Building Piping & Plumbing Plan M-3 Administration Area Plumbing Plans M-4 Transfer Building Fire Protection Plan M-5 Transfer Building Heating & Ventilation Plan E-I Standard Electrical Details E-2 Electrical Site Plan E-3 Symbols & One Line Diagram E-4 Transfer Station Building Lighting & Power Plan E-5 Scale Building & Recycling Center Lighting & Power Plan 10 I . II ~ . -- f . . , , ., \ . . . PHASE 5 - Specifications Methodology: Prepare contract specifications consisting ofthe following: scs . Invitation to Bid and Instructions to Bidders following the City's standard procedures with . Bid Form (in Lump Sum Bid Format) Allicd . Standard City Legal and Insurance Forms assist. . Standard City General Conditions . Special Provisions, as required . Technical Specifications following the CSI specification format. PHASE 6 - Construction Cost Estimate SCS with Methodology: Prepare a preliminary estimate of construction cost based on the preliminary drawings Allied and specifications. The construction cost estimate will be prepared in a lump sum bid price proposal assist. format. PHASE 7 - Bid Documents Allied Methodology: Prepare an interim submittal of the Contract Documents when completion is dctermined to be approximately 60 percent complete, as determined hy the ALLIED/SCS. Convene a with review meeting not less than two weeks following submittal of the draft documents at the City's SCS assist. office. Prepare final contract documents for bidding. Incorporate or resolve all changes requcstcd by the City into the final bidding documents. Revise the preliminary estimate of construction cost. Provide reproduciblc final bidding documents and deliver to the City for reproduction and distribution to prospective bidders. Task 7,1 Assistance During Ridding Allied Field and respond to inquiries from prospective bidders regarding the requirements of the with Contract Documents. All inquiries will be documented and transmitted to the City on a pcriodic scs basis during the bidding phase. assist. Issue addenda required to clarify or modify the requirements of the Contract Documents. Copies of the addenda will be issued to all planholders and plan centers. Conduct a pre-bid conferencc to providc bidding information to prospective bidders. Pre-bid conference will include conducting a site visit for prospective bidders. Prepare minutes of pre- bid conference and distribute to attendees and planholders. Evaluate bids and make recommendations to the City regarding award of contract. Task 7.2 Award of Contract Allied/SCS will prepare documents and execute award of construction contract. Revised Scope /0-/5-0 I. doc 11 I' 1,1, . ~ , , . , , "> . City of Bozeman Transfer Station Task and Cost List Key People Project Director (Allied) Threlkeld Project Director (SCS) Roberson/Conner Project Manager (Allied) Smith Project Manager (SCS) Colville Design Engineer (Allied) Gebhard Design Engineer (SCS) Harrington Siting Specialist (SCS) Assorted Technician (Allied) Gronseth Technician (SCS) Lindsay Administration (SCS) Lester Clerical (Allied) Dynneson Clerical (SCS) Robinson O. Project Management Phase Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour 40 $4,674.80 Project Director (SCS) $130.00 hour 40 $5,200.00 Project Manager (Allied) $75.50 hour 120 $9,060.00 Project Manager (SCS) $130.00 hour 80 $10,400.00 Design Engineer (Allied) $66.44 hour $0.00 Design Engineer (SCS) $95.00 hour $0.00 Siting Specialist (SCS) $80.00 hour $0.00 Administration (SCS) $70.00 hour 10 $700.00 Clerical (Allied) $39.26 hour 20 $785.20 Clerical (SCS) $60.00 hour 20 $1,200.00 Subtotal 330 $32,020.00 Project Management Phase Total $32,020.00 1. Siting Phase 1.1. Preliminary Site Selection Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour $0.00 Project Manager (SCS) $130.00 hour 18 $2,340.00 Design Engineer (Allied) $66.44 hour $0.00 Design Engineer (SCS) $95.00 hour $0.00 Siting Specialist (SCS) $80.00 hour 110 $8,800.00 Technician (Allied) $58.89 hour $0.00 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour 12 $720.00 ~ Subtotal 140 $11,860.00 Tasks 10"10.01 ,xis 1 I . . . - I , , , , I Exhibit D , City of Bozeman Transfer Station Task and Cost List 1.2. Final Site Selection Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour $0.00 Project Manager (SCS) $130.00 hour 16 $2,080.00 Design Engineer (Allied) $66.44 hour $0.00 Design Engineer (SCS) $95.00 hour $0.00 Siting Specialist (SCS) $80.00 hour 60 $4,800.00 Technician (Allied) $58.89 hour $0.00 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour 8 $480.00 Subtotal 84 $7,360.00 1.3. Environmental Review Process Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour $0.00 Project Manager (SCS) $130.00 hour 16 $2,080.00 Design Engineer (Allied) $66.44 hour $0.00 Design Engineer (SCS) $95.00 hour $0.00 Siting Specialist (SCS) $80.00 hour 10 $800.00 Technician (Allied) $58.89 hour $0.00 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Subtotal 26 $2,880.00 Siting Phase Total $22,100.00 Tasks 10-10-01.xls 2 I " . . '- 1 , L , L Exhibit 0 City of Bozeman Transfer Station Task and Cost List 2. Permitting Phase 2.1. Site Development and/or Conditional Use Permits Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour $0.00 Project Manager (SCS) $130.00 hour 30 $3,900.00 Design Engineer (Allied) $66.44 hour $0.00 Design Engineer (SCS) $95.00 hour 40 $3,800.00 Siting Specialist (SCS) $80.00 hour 10 $800.00 Technician (Allied) $58.89 hour $0.00 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Subtotal 80 $8,500.00 2.2. Transfer Station License Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour $0.00 Project Manager (SCS) $130.00 hour 30 $3.900.00 Design Engineer (Allied) $66.44 hour $0.00 Design Engineer (SCS) $95.00 hour 40 $3,800.00 Siting Specialist (SCS) $80.00 hour 20 $1,600.00 Technician (Allied) $58.89 hour $0.00 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Subtotal 90 $9.300.00 Tasks 10-10-01xl$ 3 I .. , - - / . , , Exhibit 0 City of Bozeman Transfer Station Task and Cost List 2.3. Other Permits Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour 10 $1.168.70 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour 40 $3.020.00 Project Manager (SCS) $130.00 hour 20 $2,600.00 Design Engineer (Allied) $66.44 hour 60 $3,986.40 Design Engineer (SCS) $95.00 hour 20 $1.900.00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour $0.00 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Subtotal 150 $12,675.10 Permitting Phase Total $30,475.10 3. Conceptual Facility Design Phase 3.1. Conceptual Facility Layout Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour $0.00 Project Manager (SCS) $130.00 hour 6 $780.00 Design Engineer (Allied) $66.44 hour $0.00 Design Engineer (SCS) $95.00 hour 10 $950.00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour $0.00 Technician (SCS) $60.00 hour 10 $600.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Subtotal 26 $2,330.00 Tasks 10-10-01.xls 4 , .. . . i . , , , Exhibit D , , City of Bozeman Transfer Station Task and Cost List 3.2. Transfer Station Concept Workshop Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour 4 $467.48 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour 4 $302.00 Project Manager (SCS) $130.00 hour 6 $780.00 Design Engineer (Allied) $66.44 hour $0.00 Design Engineer (SCS) $95.00 hour $0.00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour $0.00 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Subtotal 14 $1,549.48 3.3. Surveying and Mapping Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour 8 $604.00 Project Manager (SCS) $130.00 hour $0.00 Design Engineer (Allied) $66.44 hour 20 $1,328.80 Design Engineer (SCS) $95.00 hour $0.00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour 40 $2.355.60 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Surveying Crew $110.00 hour 50 $5,500.00 Materials $200.00 LS 1 $200.00 Subtotal 119 $9,988.40 Tasks 10-10-01.xls 5 , , . " t . I . , Exhibit 0 , City of Bozeman Transfer Station Task and Cost List 3.4. Geotechnical Investigations Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour 6 $701.22 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour 2 $151.00 Project Manager (SCS) $130.00 hour $0.00 Design Engineer (Allied) $66.44 hour 40 $2,657.60 Design Engineer (SCS) $95.00 hour $0.00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour 4 $235.56 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour 4 $157.04 Clerical (SCS) $60.00 hour $0.00 Subcontractor $1,500.00 LS 1 $1,500.00 Testing $500.00 LS 1 $500.00 Subtotal 58 $5,902.42 3.5. Offsite Improvements Analysis Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour 6 $701.22 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour 12 $906.00 Project Manager (SCS) $130.00 hour $0.00 Design Engineer (Allied) $66.44 hour 40 $2,657.60 Design Engineer (SCS) $95.00 hour $0.00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour $0.00 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Subtotal 58 $4,264.82 Tasks 10"10-01.xls 6 , . . 'I f . . l , Exhibit 0 City of Bozeman Transfer Station Task and Cost List 3.6 Operations Plan Unit Cost Unit No_ Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour $0.00 Project Manager (SCS) $130.00 hour 8 $1,040.00 Design Engineer (Allied) $66.44 hour $0.00 Design Engineer (SCS) $95.00 hour 16 $1,520_00 Siting Specialist (SCS) $80_00 hour $0.00 Technician (Allied) $58_89 hour $0.00 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Subtotal 24 $2,560_00 3.7 Conceptual Design Report Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0_00 Project Manager (Allied) $75.50 hour 2 $151.00 Project Manager (SCS) $130.00 hour 2 $260.00 Design Engineer (Allied) $66.44 hour 10 $664.40 Design Engineer (SCS) $95_00 hour 10 $950_00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour 6 $353.34 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour 4 $157.04 Clerical (SCS) $60.00 hour $0.00 Subtotal 34 $2,535.78 Conceptual Facility Design Phase Total $29,130.90 Tasks 10-10.01_xls 7 , " , " f . I . Exhibit 0 City of Bozeman Transfer Station Task and Cost List 4. Detailed Design and Drawings Phase 4.1 Grading and Paving Design Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour 20 $1,510.00 Project Manager (SCS) $130.00 hour 8 $1,040.00 Design Engineer (Allied) $66.44 hour 50 $3,322.00 Design Engineer (SCS) $95.00 hour 30 $2,850.00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour 40 $2,355.60 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Subtotal 148 $11,077.60 4.2 Stormwater Control System Design Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour 10 $755.00 Project Manager (SCS) $130.00 hour $0.00 Design Engineer (Allied) $66.44 hour 40 $2,657.60 Design Engineer (SCS) $95.00 hour $0.00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour 40 $2,355.60 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Subtotal 90 $5,768.20 Tasks 10-10-01.xls 8 . ,.1 I " ) . l , , , Exhibit 0 City of Bozeman Transfer Station Task and Cost List 4.3 Utility System Design Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour 20 $1,510.00 Project Manager (SCS) $130.00 hour $0.00 Design Engineer (Allied) $66.44 hour 80 $5,315.20 Design Engineer (SCS) $95.00 hour $0.00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour 80 $4,711.20 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Subtotal 180 $11,536.40 4.4 Foundation Design Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour 8 $604.00 Project Manager (SCS) $130.00 hour $0.00 Design Engineer (Allied) $66.44 hour 30 $1,993.20 Design Engineer (SCS) $95.00 hour $000 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour $0.00 Technician (SCS) $60.00 hour 30 $1,800.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Subtotal 68 $4,397.20 Tasks 10-10-01.xls 9 , , ~ ',I I " f . , , , . Exhibit D City of Bozeman Transfer Station Task and Cost List 4.5 Architectural Design Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0,00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour $0.00 Project Manager (SCS) $130.00 hour 8 $1,040.00 Design Engineer (Allied) $66.44 hour $0.00 Design Engineer (SCS) $95.00 hour 40 $3,800.00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour $0.00 Technician (SCS) $60.00 hour 40 $2,400.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39,26 hour $0.00 Clerical (SCS) $60.00 hour $0,00 Subtotal 88 $7,240.00 4.6 Mechanical Design Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75,50 hour $0.00 Project Manager (SCS) $130.00 hour 8 $1,040,00 Design Engineer (Allied) $66.44 hour $0.00 Design Engineer (SCS) $95.00 hour 40 $3.800,00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour $0.00 Technician (SCS) $60.00 hour 40 $2,400.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39,26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Subtotal 88 $7,240,00 Tasks 10.10-0 1.xls 10 , ,1.lI , '. ~ ; . . , . Exhibit D City of Bozeman Transfer Station Task and Cost List 4.7 Electrical Design Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour $0.00 Project Manager (SCS) $130.00 hour 4 $520.00 Design Engineer (Allied) $66.44 hour $0.00 Design Engineer (SCS) $95.00 hour 20 $1,900.00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour $0.00 Technician (SCS) $60.00 hour 20 $1.200.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Electrical Subcontractor $17.000.00 LS 1 $17,000.00 Subtotal 45 $20,620.00 4.8 Final Design Drawings Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour 8 $934.96 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour 30 $2,265.00 Project Manager (SCS) $130.00 hour 30 $3,900.00 Design Engineer (Allied) $66.44 hour 80 $5,315.20 Design Engineer (SCS) $95.00 hour 40 $3,800.00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour 80 $4,711.20 Technician (SCS) $60.00 hour 50 $3,000.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Subtotal 318 $23,926.36 Detailed Design and Drawings Phase Total $91,805.76 Tasks 10-10-0 1.xls 11 " . '.' '. ) . , , \ '. , . . Exhibit D City of Bozeman Transfer Station Task and Cost List 5. Specifications Phase Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour 2 $151.00 Project Manager (SCS) $130.00 hour 2 $260.00 Design Engineer (Allied) $66.44 hour 30 $1,993.20 Design Engineer (SCS) $95.00 hour 30 $2,850.00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour $0.00 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour 16 $1,120.00 Clerical (Allied) $39.26 hour 4 $15704 Clerical (SCS) $60.00 hour 4 $240.00 Subtotal 88 $6,771.24 Specifications Phase Total $6,771.24 6. Construction Cost Estimates Phase Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour 4 $302.00 Project Manager (SCS) $130.00 hour 8 $1.040.00 Design Engineer (Allied) $66.44 hour 12 $797.28 Design Engineer (SCS) $95.00 hour $0.00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour $0.00 Technician (SCS) $60.00 hour $0.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour $0.00 Clerical (SCS) $60.00 hour $0.00 Subtotal 24 $2,139.28 Construction Cost Estimates Phase Total $2,139.28 Tasks 10-10-01.xls 12 ~) . , . " .\ . , l , . . . Exhibit D City of Bozeman Transfer Station Task and Cost List 7. Bid Documents Phase Unit Cost Unit No. Units Extended Subtotal Project Director (Allied) $116.87 hour $0.00 Project Director (SCS) $130.00 hour $0.00 Project Manager (Allied) $75.50 hour 8 $604.00 Project Manager (SCS) $130.00 hour 8 $1.040.00 Design Engineer (Allied) $66.44 hour 20 $1.328.80 Design Engineer (SCS) $95.00 hour 20 $1,900.00 Siting Specialist (SCS) $80.00 hour $0.00 Technician (Allied) $58.89 hour 10 $588.90 Technician (SCS) $60.00 hour 20 $1,200.00 Administration (SCS) $70.00 hour $0.00 Clerical (Allied) $39.26 hour 4 $157.04 Clerical (SCS) $60.00 hour 4 $240.00 Subtotal 94 $7,058.74 Bid Documents Phase Total $7,058.74 Miscellaneous Expenses Unit Cost Unit No. Units Extended Subtotal Mileage $500.00 LS 1 $500.00 Airfare (17 trips) $10,200.00 LS 1 $10,200.00 Travel (Shuttles. Parking) $800.00 LS 1 $800.00 Vehicle Rental $1,140.00 LS 1 $1.140.00 Lodging and Meals $1,330.00 LS 1 $1.330.00 Reproduction and Printing $1.500.00 LS 1 $1,500.00 Engineering Equip.lSupplies $1,000.00 LS 1 $1,000.00 $16,470.00 Expenses Total $16,470.00 PROJECT DESIGN PHASE TOTAL $237,971.02 Tasks 10-10.01.xls 13 ,I ~ L ",t.. i.tll 1\ .. .L .... II' i , .~,_,~~". ."''''~'',~..",~ "~ . .~w,.. .,~.,~,~-~ g '" ------------- -------------- .. ---------------------- CO ~ CO --------------- -----------------. III!~ [ ~ ------------ --. ------------------ - - ------------------- --- II!I : -------------- ---------------- --------------------- 111,11111 Q t"'} _____________________ ____________________ ______________________..__ ~ ~ :11. ~ Q ~ E N >- " -------------------- ------------------ --------------------------- t'i; ~ C " ~ ------------- ----------------- --------------------------- ~ ~ N ~ I : uuuuuuuuu .uuuuuuu. uuuuuuuuuuuu ---------------------- ------------------- - -------------------------- N W a; __.__________________ ______________________. _._._._ 8' Q: N a : .......7:: - - -- -- - - -- -- - - - - - -- -- -- -- -- -- -- -- - -- -- - - OJ i ~ - .... .... R w ;u'uuuuuuuuuOu I ..J N ::J '" Cl L(j ~ - -- -- -- -- ... 0 o N U) '" W z 5 ~ ;,: -- -- -- -- -- -- - ,,,. " ,,,. - . .8 ~~~ ~ ~ uJ....... N (1:! - N,,""(9 9 m I- ~ ill ~ :~mHU UUm~lu.uu_riir miuiiuuuuu i [I i o .... __ __ __ LJ tJ- -- -- ~ m -- -- - -- - ~ -- -- -- -- -- -- -- -- '" .... D . "" --------------- ----------- ----- ------------- ... . ~ ".. ... - c5 ",. _,,_ -D---------------... .,. ...--------------- -----..........--------------------------- N N ~ ~ N N N ~ N N N N N N N N N N N N N ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ; ; ; ~ ~ ~ ~ ~u. LL it Q) ~ ~ ~ it ~ ~ c it ~ -g c ~ ~ ~ ~ J2 ~ 3 ~ ~ ;~ tf lL ~ ~ ~ ~ ~ LL ~ ~ ~ ~ - - - ~ ~ ~ ~~NN ~N NNNNNNNNNNNN ~I o 0 0 0 0 0 0 0 0 0 0 0 0 0 000 0 0 0 0 0 000 0 0 m m ~ ~ m ~ ~ N m M ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ a a - N N ~ ~ a ~ ~ N N ~ ~ -_ ~~ ~ : ~ ~ ~ ~ ~ ~ N ~ ~ Q) ~ ~ ~ ~ ~ ~ ; ; ~ ~ ~ (f)~ ::J ::J :J :J :J .J:: 0 :3 Q) "'D c"'O 0 :J ~ ;;I ::) ::J :J :J ::J :J :J :J 0 0 ~ ~ ~ ~ ~ ~ r ~ ~ ~ ~ ~ ~ ~ r r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ .~ ll. :il ~ ~ ~ ro 0.. I- 0. "" c ,,~ a o ~ ~ ~ .~ .~ ~ Q) 8 0 ~ "0 6 ceO :J ~ ~ rn t.~ ~ $ U.2 0.. -2 ~ ar ~ ~ 8. ~ U; ~ .~ ~ E .~ ~ ~ ~ i ~ & ~ ~ ~ ~ ~ ~ ~ ~ .~ & ~ 0 ~ ~ .9.!; g ~ .~ (:: v 11l ..~ ~ $ ~ ~ 8 1= ~ :r: e 0 O.Q)':: ~ .~ :J U) Q) ~ .~ g ~ ~ 0 U ~ ~ e ~ ..-- ~." 0 ~ U) <li E U) .- E ;;; 0 U <I) ,,;;> ro.::! .::{ ro QJ E Q) - ~ 15 o::(/)o ~ ~ ~ :~ il) .~ ll. ~ E tt1 -g 25 U'J.O' ro Z.O'''''' {J.rr J: (9d:~ z ~ uJ~~ 0..-- ,..... f.f).{5'~ _ N U "- ~ (1)0..0 . ' ,',l' " , ,\ J , -" '! Amendment No.1 to Professional Services Agreement For City of Bozeman Solid Waste Transfer Station THIS AGREEMENT is made as of this _10th day of ___po May .._' 2004, between THE CITY OF BOZEMAN, a Municipal Corporation, Bozeman, Montana, herein referred to as OWNER and ALLIED ENGINEERING SERVICES INC., an Engincering Consulting Firm of Bozeman, Montana, herein rcferred to as ENGINEER. WHEREAS, thc parties have cntered into a Professional Services Agreemcnt dated NtJvP-#lbe.- /3 ZOIJ I, herein referred to as Original Agreement for professional engincering services; and ' WHEREAS, the parties desire to furthcr amend the provisions of this Agreement. NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: 1. EXHIBIT D Modified Scope of Services will replace EXHIBIT C Scope of Services for the remainder of the project as of February 15,2004 2. ARTICLE 6.1.1 ofthe original agreement relating to compensation for Engineering Service is amended to read: "The OWNER shall pay for design phase services performed as Basic Engineering Services under sections 4.1 through 4.4 of this agreement pay a total sum in the amount of $384,986.32 for such services." 3. ARTICLE 6.1.2 paragraphs two, three, and four ofthe original agreement rclating to Payment Schedule is amended to read: "$76,997.26 (approximately 20% of design fee) until Tasks 1.1 through 1.3 of Exhibit D- Modified Scope of Services have been completed and submitted to the OWNER. $288,739.74 (approximately 75% of design fee) until Tasks 2.1 through 4.7 ofExhibitD- Modified Scope of Services have been completed and submitted to the OWNER. $346,487.69 (approximately 90% of design fee) until Tasks 4.8 through Phase 7 of Exhibit D - Modified Scope of Services havc been completed and submitted to the OWNER." Except as specifically amendcd herein, the original agreement shall remain in full force and effect and the Parties shall be bound by all terms and conditions therein. -1- .,- , ., " \ J . , - i IN WITNESS WHEREOF, thc parties hereto do make and execute this Agrcement on the day and year first above written. CITY OF ZN By:___ __._~ ._----",'~.-._- ATTEST: ~y~. Robin L. Sullivan Clerk of Commission By: ENG;~RJ:~fJJ ATTEST: By: ~ YfC{h)t -2-