Loading...
HomeMy WebLinkAbout12-17-18 City Commission Packet Materials - C16. Amendment 3 to PSA with Morrison Maierle for Sunset Hills Cemetery Commission Memorandum Report To: Honorable Mayor and City Commission From: Jessica Ahlstrom, Water Conservation Specialist Shawn Kohtz, Interim Director of Public Works Subject: Sunset Hills Cemetery and Lindley Park Water Conservation Project Design Services Meeting Date: December 17, 2018 Agenda Item Type: Consent Item Recommendation: Authorize the City Manager to sign Amendment No. 3 to Professional Services Agreement dated November 16, 2015 with Morrison-Maierle Inc. for design services for the Sunset Hills Cemetery and Lindley Park Water Conservation Project. Background: This project will conserve potable water supplies currently being used for irrigation at Sunset Hills Cemetery and Lindley Park, reduce safety risks to city staff associated with the existing diversion structure on Bozeman Creek, and increase instream flows for fish habitat in Bozeman Creek. Estimated water savings realized upon completion of the Project total 1,141 Acre Feet.1 The scope of this project includes the construction of a pump system to be located near the Church St. parking lot for Burke Park. The purpose of the pump system is to pump water from Mill (Story) Ditch to the Sunset Hills Cemetery irrigation system where it will be used to irrigate the cemetery, resulting in the conservation of potable water that is currently being used to irrigate this area. In order to reduce overall construction costs for this project, the original pump house design needs to be modified to include a pump enclosure. This, as well as a few additional minor design revisions, will achieve construction cost savings that allow the City to move forward with this project while staying within budget. Alternatives: As suggested by the Commission. Fiscal Effects: Total project costs to the Cemetery Irrigation Project CIP General Fund (GF 231) for this work are not to exceed $6,740.00. 1 Morrison & Maierle Engineering Preliminary Engineering Report, April 2016 (on file with Water Conservation Specialist). 236 Attachments: Amendment No. 3 to Professional Services Agreement dated November 16, 2015 with the engineering firm of Morrison-Maierle Inc. for the Sunset Hills Cemetery and Lindley Park Water Conservation Project. 237 238 239 240 241