Loading...
HomeMy WebLinkAbout12-17-18 City Commission Packet Materials - C13. PSA with Sanderson Stewart for 3rd and Graf Intersection Improvements Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer SUBJECT: 3rd and Graf Intersection Improvements Project – Professional Services Agreement. MEETING DATE: December 17th, 2018 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve and authorize City Manager to sign the Professional Services Agreement with Sanderson Stewart. BACKGROUND: Attached is a copy of the partially executed Professional Services Agreement with Sanderson Stewart for the 3rd and Graf Intersection Improvements Project. The document is in the City’s standard format. In December of 2017, the City entered into an Agreement with Sanderson Stewart to provide Engineering services for improvements to the intersection of South 3rd and Graf Street. That agreement only included the predesign phase which was to determine the type of intersection control to be installed at the intersection. As a result of that effort, installation of a roundabout was the chosen alternative. Typically, the existing contract would be amended to add the design phase services. In this case, the City’s standard Professional Services Agreement has been updated since the original document was executed. A new updated agreement is being executed to add the design services instead of the normal amendment. The FY18 Capital Improvement Plan included $150,000 for the design of this project. The predesign services totaled $43,545. The addition of the design services will bring this total to $123,865. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission FISCAL EFFECTS: $80,320 from the Street Impact Fee Fund (project SIF131). Attachments: Professional Services Agreement Report compiled on: 12/4/18 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218