Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Bob Murray, Project Engineer
SUBJECT: Oak and 27th Intersection Improvements Project – Professional Services
Agreement.
MEETING DATE: December 17th, 2018
AGENDA ITEM TYPE: Consent
RECOMMENDATION: Approve and authorize City Manager to sign the Professional Services
Agreement with Sanderson Stewart.
BACKGROUND: Attached is a copy of the partially executed Professional Services
Agreement with Sanderson Stewart for the Oak and 27th Intersection Improvements Project. The
document is in the City’s standard format.
In March of 2016, a corridor study for Oak Street from Rouse to Cottonwood was reviewed and
adopted by the Commission. A number of the recommended improvements from the study have
been constructed. The next scheduled improvement is for the installation of a traffic signal along
with some geometric improvements to the intersection of Oak and 27th. The geometric
improvements consist of widening of the east leg of the intersection to provide a dedicated left-turn lane, through lane, and a shared through/right-turn lane. A Request for Proposals for the
engineering services was published in the Bozeman Daily Chronicle on August 12th and 19th,
with the proposals being due on September 7th. Proposals were received from 2 firms on the
project which were distributed to a selection committee of 3 city employees. The written
proposals were scored by the selection committee and Sanderson Stewart was selected the most qualified to complete the project.
UNRESOLVED ISSUES: None
ALTERNATIVES: As suggested by the City Commission
FISCAL EFFECTS: $58,095 from the Street Impact Fee and Arterial and Collector District Funds (Project SIF058).
Attachments: Professional Services Agreement
Report compiled on: 12/4/18
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197