HomeMy WebLinkAboutResolution 4961 Approving Change Order 3 with Montana Civil Contractors, Inc. for the 5.3 MG Water Storage Tank Project B0
.2_�'�r
88
Co. ��
COMMISSION RESOLUTION NO. 4961
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH
MONTANA CIVIL CONTRACTORS,INC., BELGRADE,MONTANA.
WHEREAS,the City Commission did,on the 1 Oth day of April 2017,authorize award of
the bid for the City of Bozeman 5.3 MG Water Storage Tank project,to Montana Civil Contractors,
Inc., Belgrade, Montana; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such
alterations or modifications of the specifications and/or plans of the contract be made by resolution;
and
WHEREAS,it has become necessary in the prosecution of the work to make alterations or
modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of
Bozeman, Montana,that the proposed modifications and/or alterations to the contract between the
City of Bozeman, a municipal corporation, and Montana Civil Contractors, Inc., as contained in
Change Order No. 3,attached hereto,be and the same are hereby approved;and the City Manager is
hereby authorized and directed to execute the contract change order for and on behalf of the City;
and the City Clerk is authorized and directed to attest such signature.
PASSED, ADOPTED, AND APPROVED by the City Commission of the City of
Bozeman, Montana, at a regular session thereof held on the 191h day of November, 2018.
THIA L. US
= Mayor
ATTEST:
OF.B.0
(S• y 4 7
_J
ROBIN CROUGH U:
City Clerk
'��•, 1883 .•S� APP O S TO FORM:
SULLIVAN
Ci Attorney