HomeMy WebLinkAbout18- Amendment 1 to Memorandum of Agreement - Montana Department of Transportation (MDT) - North 7th Avenue Corridor Streetscape Projects and Maintenance AMENDMENT #1
CITY/STATE MEMORANDUM OF AGREEMENT
N 7Tx AVENUE CORRIDOR W-118).
STREETSCAPE PROJECTS AND MAINTENANCE
BOZEMAN, MONTANA
This Memorandum of Agreement (MOA) and entered into by and between the city of
Bozeman ("the City'),a self-governing municipality operating pursuant to its Charter and
the laws of the State of Montana, PO Box 1230, Bozeman, MT 59771 and the Montana
Department of Transportation ("MDT"),a department of the State of Montana, PO Box
201001, Helena MT 59620-1001 together referred to as "the Parties."
The MOA sets forth the respective responsibilities and duties of the City and MDT
associated with the N 7thAvenue Corridor (N-118) from Main Street(N50) on the south
through the westbound 1-90 interchange on the north within the City of Bozeman ("N 71h
Avenue Corridor") on N 71h Ave (N-118) from Reference Post(RP) 0.000 to 1.213.
The purpose of this amendment is to modify the City of Bozeman Maintenance
Responsibilities (Attachment B) to include Bulb outs within Sidewalks and to further define
sidewalk maintenance.
ATTACHMENT B SHALL BE AMENDED TO READ:
1. Sidewalks/Bulb outs
a. Snow and ice removal
b. Repair and ADA compliance to replacing small portions or damaged
sidewalk; repair of chipped fractured or broken surface from any cause
including but not limited to frost heaving,landscaping tree roots, or
permitted encroachments; removal of debris and other obstructions or
impediments to safe pedestrian travel; and any and all other normally
accepted maintenance practices.
c. Any damage must be repaired within 30 calendar days of MDT written notification
or at a time determined by mutual agreement.
The remaining terms and provisions of the original MOA include any subsequent
amendments,remain in full force and effect and are incorporated fully herein.
i
CITY OF BOZEMAN
By 2018
Andrea Surratt, City Manager
City of Bozeman, Montana -
STATE OF MONTANA, DEPARTMENT OF TRANSPORTATION
f�
By w ��T�3�2 2�1 . 2018
Monta Alf
ep tment of Transportation
�z7 p� D ` a
Approved for Legal Content
Attachment B Revised 9/2018
City of Bozeman Maintenance Responsibilities
1. Sidewalks/Bulb outs
a. Snow and ice removal
b. Repair and ADA compliance to replacing small portions or damaged sidewalk; repair of
chipped fractured or broken surface from any cause including but not limited to frost
heaving, landscaping tree roots,or permitted encroachments; removal of debris and
other obstructions or impediments to safe pedestrian travel;and any and all other
normally accepted maintenance practices.
c. Any damage must be repaired within 30 calendar days of MDT written notification or at
a time determined by mutual agreement.
2. Landscaping—landscaping repair within MDT right-of-way will occur within 30 calendar days of
MDT written notification or at a time determined by mutual agreement.
a. Trees—includes trimming,removal and replacement
b. Median and boulevard landscaping including irrigation
c. Pavers
d. Decorative lighting—including electrical costs
3. Roadway Lighting using City standard decorative poles, bases,arms and heads—From
Mainstreet to 1-90 Eastbound On/Off ramps—roadway lighting must be repaired within 10
calendar days of MDT written notification of at a time determined by mutual agreement
a. Replacement
b. Repair
c. Standard bulb replacement
d. electrical costs
4. Cross-walks parallel to N 7tn across City maintained streets
a. Striping
b. Signage
5. Storm drains
6. Other Amenities
a. Street furniture
b. Bike racks