Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: David Fine, Urban Renewal Program Manager Shawn Kohtz, Interim Public Works Director
SUBJECT: Authorize City Manager’s signature on Task Order MID 19-001 with Sanderson Stewart for Midtown and Downtown Sanitary Sewer Manhole Survey
MEETING DATE: November 26, 2018 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign the Task Order. BACKGROUND: Properties located in the Midtown and Downtown Urban Renewal Districts predominantly discharge into the same sewer drainage basins. As a result, new development projects, inflow, and infiltration in the sewer system in Midtown will impact sewer flows in Downtown, and vice versa. Capacity limitations within this basin cause most new proposed developments to independently contract for flow monitoring to assess the impact of its project on the system. This process adds time and expense for each project and asks individual developers to repeatedly analyze similar issues. The Public Works Department is updating its sewer hydraulic model in a way that will assist infill projects throughout the study area, as well as assist with capital planning. In order to complete this work, the department requires additional survey data that was not included in the original data gathering. This Task Order is to obtain the additional data. UNRESOLVED ISSUES: None.
73
FISCAL EFFECTS: Funding for Task Order MID 19-001 would be split evenly between the Downtown Urban Renewal District and the Midtown Urban Renewal District. The lump sum cost of the task order is $1,975 ($987.50 each).
ATTACHMENTS: Task Order No. MID19-001 Midtown and Downtown Sanitary Sewer Manhole Survey
74
City of Bozeman Urban Renewal District Term Contract
Task Order Number #MID19-001
PROJECT: Midtown and Downtown Sanitary Sewer Manhole Survey
Issued under the authority of Urban Renewal District Term Contract Professional Services Agreement with Sanderson Stewart for Architectural and Engineering Services.
This Task Order is dated November 26, 2018 between the City of Bozeman Economic Development Department and Sanderson Stewart (Contractor). The following representatives have been designated for the work performed under this
Task Order:
City: David Fine, Urban Renewal Program Manager Contractor: Danielle Scharf, Sanderson Stewart
SCOPE OF WORK: The scope for this task order is detailed in the attached City of Bozeman Urban Renewal District Scope of Work – Task Order Number MID19-001. COMPENSATION: Sanderson Stewart will bill for its services on a lump sum basis with
a project total of $1,975.00. Sanderson Stewart shall submit invoices to the City of
Bozeman for work accomplished during each calendar month. The amount of each monthly invoice shall be determined on the “percentage of completion method” whereby Sanderson Stewart will estimate the percentage of the total work (provided on a lump sum basis) accomplished during the invoicing period. The provisions of the Professional Services Agreement shall govern the Work.
IN WITNESS WHEREOF, the parties authorized to commit resources of the parties have executed this Task Order: City of Bozeman Sanderson Stewart
Andrea Surratt, City Manager Danielle Scharf, Principal
75
Midtown and Downtown Urban Renewal Districts
Scope of Work – Task Order No. MID19-001
Midtown and Downtown Sanitary Sewer Manhole Survey
11/13/18
Sanderson Stewart is pleased to provide this scope of work for surveying existing sewer manholes as
requested by the City of Bozeman and HDR to assist HDR with updating the City’s sewer hydraulic model.
A detailed scope of services for the project is outlined below and a map showing the proposed manholes to
be surveyed is attached for reference.
Scope of Work:
Phase 1 – Project Management
This phase of the project will include project initiation, scoping, contract preparation, phone calls with the
City and HDR, and project management throughout the project.
Phase 2 – Survey Sanitary Sewer Manholes
Survey up to 10 existing sanitary sewer manholes in the Midtown and Downtown areas at locations provided
by HDR as shown on the attached map. The survey will include manhole rim elevations, invert elevations,
and pipe sizes of all pipes in the manhole with a hand drawn sketch of each manhole showing pipe locations,
size and elevations. The survey will be tied to the vertical datum of NAVD 88. The survey information and
sketches will be submitted to HDR electronically.
Fees and Billing Arrangements:
Midtown District Proposed Fees
Phase Fee
1. Project Management $475
2. Survey Sanitary Sewer Manholes $1,500
Total $1,975
Sanderson Stewart will bill for its services on a lump sum basis with a project total of $1,975. Sanderson
Stewart shall submit invoices to the Client for work accomplished during each calendar month. The amount
of each monthly invoice shall be determined on the “percentage of completion method” whereby Sanderson
Stewart will estimate the percentage of the total work (provided on a lump sum basis) accomplished during
the invoicing period.
76
Sewer Capacity Analysis Scope of Work
Page 2
Project Schedule:
The anticipated schedule for this project consists of completing the manhole survey and submitting to HDR
by November 21, 2018.
77
!
!!
!!!!
!!
!
!
!!
!
!!
!
!
!
!
!
!
!
!!!!!
!
!!!
!
!!!!!
!
!
!
!!!!!
!
!
!
!
!
!
!
!
!!
!!
!
!!!
!!
!
!
!
!!
!
!
!
!!
!
!
!
!
!!!!!!!!!!!!
!!!!!!!!!
!
!!!!!!
!!!!!!!!!!!!!!
!!!!!!
!!
!!
!!!
!
!!!!!!!!
!
!
!
!
!
!
!
!
!
!
!!
!!!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!!
!
!
!
!
!!
!!
!
!
!!!!!
!!!
!!!
!
!!
!!
!!
!
!
!!
!
!!
!!!
!
!
!
!!
!!
!!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!!!!
!
!!
!!
!!
!
!
!
!!!
!
!!
!
!!!
!
!
!!
!
!
!
!!
!!
!!
!!!
!
!
!
!!
!!
!!!
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!
!
!!
!
!
!!!!
!
!
!
!
!!!
!
!
!
!
!!!
!
!
!
!
!
!!
!
!!
!!!!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!!
!!
!
!
!!!
!
!!
!
!
!
!
!
!
!
!
!
!!!!!!
!
!
!
!!!
!!!!
!
!
!!
!
!!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!!
!!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!!
!
!
!
!
!!
!
!
!
!
!!
!
!
!
!!
!!
!
!
!
!!
!
!
!!
!!
!
!
!
!!
!!!!!
!
!!
6 in8 in6 in
8 in 8 in8 in
8 in10 in6 in8 in8 in10 in
8 in
10 in6 in6 in 8 in6 in8 in6 in
6 in8 in
8 in
8 in
24 in12 in
8 in
10 in8 in 6 in6 in6 in8 in6 in 8 in8 in
8 in
10 in
12 in 8 in8 in 15 in6 in
6 in
6 in
8 in
6 in6 in8 in 8 in6 in
6 in6 in6 in24 in6 in8 in6 in
6 in
6 in
10 in
6 in
6 in14 in
8 in8 in
8 in8 in6 in6 in6 in8 in6 in6 in
1 2 i n
8 in6 in8 in
6 in10 in6 in 8 in8 in8 in
8 in8 in8 in8 in
8 in
6 in
8 in10 in18 in6 in
6 in20 in
12 in6 in12 in10 in 6 in6 in18 in8 in8 in8 in
6 in 6 in6 in8 in6 in12 in
10 in6 in8 in8 in10 in8 in8 in8 in
6 in8 in8 in8 in
8 in
6 in
8 in 8 in8 in12 in
10 in
8 in
6 in6 in
8 in6 in8 in8 in
8 in8 in
6 in
8 in 6 in
6 in
6 in
6 in
8 in
6 in
6 in24 in24 in30 in10 in
8 in24 in24 in10 in10 in18 in 18 in6 in12 in12 in8 i n
8 in8 in
8 in10 in
10 in8 in8 in
8 in8 in
6 in
6 in8 in8 in8in8 in10 in10 in
8 in14 in14 in 6 in6 in
6 in
6 in6 in6 in15 in15 in8 in
8 in6 in6 in
6 in6 in
6 in
6 in8 in8 in
6 in6 in
8 in8 in 8 in8 in
6 in6 in6 in8 in
8 in30 in
6 in VILLAGEDOWNTOWNPEACH12TH
VILLA
G
E
C
R
O
S
SIN
G
V
IL
L
A
G
E
C
R
OS
S
I
N
GHEMLOCK
JUNIPER
ASPEN
SHORT
L
BABCOCK 9TH5TH8THKOCH PLUMBLACKBOZEMANDURSTON
B
O
H
A
R
T
FRONT
SHORT
V ILLA G E D O W N TO W N3RDJUNIPER
CRABAPPLE
SHORT
9THBEALL
7TH6TH10TH7THCHURCHCOTTONWOOD
4TH8TH8TH5THASPEN
DICKERSON7THCURTISS
STORY10THKOCH MONTANAASPEN
GRANDVILLARD
5THOLIVE
SHORT ROUSE8TH3RDBROADWAY4THFRIDLEY
ASPEN
BABCOCK
DAVIS
CURTISS
H
A
G
G
E
RTYBRADY8THASPEN
ORANGE
CHEQUAMEGONVI
LLAGEIN
T
E
R
S
T
AT
E 90
IN
T
E
R
S
T
AT
E 90
IVAN
MCADOWCYPRESSLAMME
DICKERSON
LAMME
STORY WILLSONTAMARACK
6THIDA3RD13TH12TH7THMONTANATRACYPEACH
DAVIS
FRIDLEY
11THJUNIPEROAK PARKPEAR
WALLACEC U R T I S S
STORY
BONNERDRIVEWAYAVOCADO
MENDENHALL
AYLSWORTHMAIN
COTTONWOOD
OLIVE
DELLCARSOND R IVEW AY
BOGERT
SUNSET HILLS CEMETERYOFF RAMP
ON RAMP
BABCOCK
LINDLEYRUTH THIEBAULT9THBUTTONWOODGOLFSUNSET HILLS CEMETERYPERKINS HIGHLANDCEDAR
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community¯0 153 306Feet
Downtown District
Midtown District
!Sewer Manholes
Unknown
AC
CI
CMP
DI
VCP
PVC
Bridger Creek
East Gallatin River
Farmers Canal
Spring Creek
Upper Bozeman Creek
Upper Rouse
1 inch = 306 feet 78