Loading...
HomeMy WebLinkAbout11-19-18 City Commission Packet Materials - C9. Res 4961, Approve CO3 with MT Civil Contractors for 5.3 MG Water Storage Tank Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Resolution 4961 authorizing Change Order No. 3 to the 5.3 Million Gallon (MG) Water Storage Tank Project. MEETING DATE: November 19, 2018 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution 4961 authorizing Change Order No. 3 to the 5.3 MG Water Storage Tank Project. BACKGROUND: Attached is a copy of resolution 4961 and change order number 3 for the above referenced project. This change order includes four items. The first and largest change is required because the existing main between the plant and Nash road found to be much deeper and in a different horizontal location than anticipated. This required replacement of the new flow meter vault with a larger one and increased the installation costs. Also related to this item was additional large diameter piping that was needed to make the connection to the existing main in the revised location. The final two item were requested by the plant staff. The first is to paint the exterior exposed concrete on a new manhole being installed and the other is for the relocation of one existing fence gate and installation of a second new one. Pages three through seven of the change order provide a short description of each of the items involved with this change along with additional cost information. Overall this change will increase the contract price by $70,068.80 and increase the contract time by 22 days. The final recommended change in cost and time for these items is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: Overall this change order increases the contract amount by $70,068.80 from $7,631,999.94 to $7,702,068.74. Attachments: Resolution No 4961, Change Order No 3 Report compiled on: 11/7/18 125 COMMISSION RESOLUTION NO. 4961 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH MONTANA CIVIL CONTRACTORS, INC., BELGRADE, MONTANA. WHEREAS, the City Commission did, on the 10th day of April 2017, authorize award of the bid for the City of Bozeman 5.3 MG Water Storage Tank project, to Montana Civil Contractors, Inc., Belgrade, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Montana Civil Contractors, Inc., as contained in Change Order No. 3, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 126 PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 19th day of November, 2018. ______________________________________ CYNTHIA L. ANDRUS Mayor ATTEST: ____________________________________ ROBIN CROUGH City Clerk APPROVED AS TO FORM: ______________________________________ GREG SULLIVAN City Attorney 127 128 129 130 131 132 133 134