HomeMy WebLinkAbout18- Task Order DTN18-001 - Sanderson Stewart - Bridger Park Garage Expansion Feasibility Analysis City of Bozeman Urban Renewal District Term Contract Task Order Number #DTN18-001 PROJECT: Bridger Park Garage Expansion Feasibility Analysis Issued under the authority of Urban Renewal District Term Contract Professional Services Agreement with Sanderson Stewart for Architectural and Engineering Services. This Task Order is dated October 10, 2018 between the City of Bozeman Downtown Urban Renewal District (URD) and Sanderson Stewart (Contractor). The following representatives have been designated for the work performed under this Task Order: URD: Chris Naumann, Downtown URD Director Contractor: Danielle Scharf, Sanderson Stewart SCOPE OF WORK: The scope for this task order is detailed in the attached City of Bozeman Urban Renewal District Scope of Work — Task Order Number DTN18-001. COMPENSATION: Sanderson Stewart will bill for its services on a lump sum basis with a project total of$43,000.00. Sanderson Stewart shall submit invoices to the City of Bozeman Downtown URD for work accomplished during each calendar month. The amount of each monthly invoice shall be determined on the "percentage of completion method" whereby Sanderson Stewart will estimate the percentage of the total work (provided on a lump sum basis) accomplished during the invoicing period. The provisions of the Professional Services Agreement shall govern the Work. IN WITNESS WHEREOF, the parties authorized to commit resources of the parties have executed this Task Order: City of Bozeman Sanderson Stewart JILI Andrea Surratt, City Manager Danielle Sch rf, Principal ►14� SANDERSON %Kre Downtown Urban Renewal District Scope of Work - Bridger Park Garage Expansion Feasibility Analysis Task Order No. DTN18-001 10/11/18 Sanderson Stewart is pleased to provide this scope of work for feasibility analysis for the Bridger Park Garage Expansion.This work is to be done as a part of the Downtown Urban Renewal District term contract for architectural and engineering services. Analysis and consultant assistance will be provided by DCI Engineers and A&E Architects as shown by the attached scope/fee. This project consists of the Schematic Design for the expansion of the existing parking garage to add two (2) parking levels and a roof to the existing structure.The structural systems for the parking levels to be considered will be 1) structural steel and 2) post-tensioned concrete.The original structural Construction Documents did include the future expansion of the parking garage for an additional 2 levels of parking,and it is possible that a light-framed steel roof with solar panels could be added as well.The project team will address mechanical,electrical,architectural and structural implications of the additional parking levels and roof,including the extension of the elevator.We are partnered with Martel Construction as the General Contractor to provide a timeline and cost estimate based on the Schematic Narrative. Scope of Work: The project will consist of multiple phases as outlined below,with timelines as noted from the notice to Proceed(subject to revision following coordination with the team): Phase Schedule Phase 1:Analysis of As-Built Documents and Onsite Survey of Existing Building 3 weeks Phase 2:Develop Draft Schematic Narrative with Structural Schematic Plans for Each of the Options and the Roof Structure,Construction Schedule and Cost Estimate 3 weeks Phase 3: City Review of Draft Narrative and Meeting with Design Team to Discuss Findings 2 weeks Phase 4: Final Schematic Design Submittal 2 weeks Total Timeline: Approximately 10 Weeks from Notice to Proceed Fees and Billing Arrangements: Phase Fee 1. Project Management(Sanderson Stewart) $1 000 2. Structural Schematic Documents $12,500 3. Architectural Schematic Documents $12,500 4. Mechanical/Electrical Schematic Documents $5,500 5. Construction Schedule and Cost Estimate $11,500 Total $43,000 Unless noted otherwise, direct project reimbursable expenses are separate from our fees. These include in- house production plotting,reprographic services,courier costs,and travel expenses.These will be billed at 1.10 times the direct cost as noted on the attached Schedule of Expenses. Sanderson Stewart will bill for its services on a fixed fee basis of$43,000 +Reimbursable Expenses. Sanderson Stewart shall submit invoices to the Client for work accomplished during each calendar month. The amount of each monthly invoice shall be determined on the"percentage of completion method" whereby Sanderson Stewart will estimate the percentage of the total work(provided on a lump sum basis) accomplished during the invoicing period. Project Schedule: The anticipated schedule for this project consists of the final schematic design deliverable approximately 10 weeks from notice to proceed. Project Team: Sanderson Stewart proposes the following primary design team members: General Project Manager: Danielle Scharf,PE- Sanderson Stewart Structural Principal: Jami Lorenz,PE-DCI Engineers Structural Project Manager: Alex Smith,PE-DCI Engineers Contractor: Tony Martel-Martel Construction Architect: Brad Doll,AIA-A&E Architects Mechanical/Electrical Engineer: Curtis L. Smit- CDS Engineering