Loading...
HomeMy WebLinkAbout05 - Design Report - Baxter Meadow Ph 2A - Addendum DESIGN REPORT ADDENDUM BAXTER MEADOWS PHASE 2A BOZEMAN, MONTANA November 10, 2005 Prepared for.• BAXfER MEADOWS, LLC Prepared by., Thomax, [)van k- Hoski"s,Inc. I THOMAS, DEAN AND HOSKINS, INC. TD &14-1)- 215 W MENDENHALL, SUITE C-1 Eaginearingc� � t: Y '.` ' BOZEMAN, MT 59715 Project No. B05-016-021 Introduction The purpose of this report is to support design alterations that have occurred for Baxter Meadows Phase 2A since the original Phase 2 report submitted by Robert Peccia and Associates (RPA), October 2003. This report documents changes occurring to storm drain systems in Phase 2A. Water and sewer systems have been vertically adjusted to assist in raising the road grades, but the basis of design has come from the original Peccia plans. All other aspects of this design shall adhere to the original design. The Baxter Meadows subdivision is located in the northeastern area of the City of Bozeman, Montana. The project is bounded by Davis Lane on the east, Oak Street on the south, Harper's Puckett to the west, and Cattail Street on the north. Phase 2A is enclosed to the south by Baxter Lane, west by Vaquero Parkway, north by Equestrian Street, and east by Caballo Avenue. Design Report Stormwater The original design report broke Phase 2 into seven distinct drainage basins each flowing to its respective pond. Phase 2A alterations have impacted basins 2 and 3. Master planning by PC Development called for pond 2 to be eliminated. To facilitate this, runoff from basin 2 shall be piped directly to pond 3. See attached map in appendix. Stormwater Conveyance PVC pipe with a minimum cover of 3' shall be used throughout the project in accordance with City standards. All inlets shall conform to City of Bozeman Standard Drawing number 02720-1A. Neenah R-3067 grates shall be utilized in all locations. All inlets and pipes have been sized for the 25-year event. Inlets locations shall adequately collect water to limit the water surface elevation to a max of .3'within the flowline. Pipe flow analysis was conducted for the 25-year event. Time of concentrations and "C" values were per RPA calculations and were not revised. Flows were generated via the rational method and flow capacity was checked using Manning's equation. All calculations can be seen in the appendix. Stormwater Detention Stormwater ponds are used to provide detention so that the peak outflow after development is less than or equal to the peak outflow from the property before development. The original Pond 3 was built in conjunction with the Tracker Building project. Recently, the pond was altered to make it more aesthetically pleasing. The new pond shall have 13,029 cf of storage. Original calculations by Peccia derived a required volume of 1264 cf for Basin 2 and 10,882 cf for Basin 3. By combining the areas and recomputing required volume we derived 12,824 cf. At this time, we believe that the existing pond will be adequate for this increase in runoff. APPENDIX ORIGINAL STORM DRAIN CALCULATIONS ROBERT PECCIA & ASSOCIATES OCTOBER 2003 b N M N � N co p ■■ J C C � <OCD co [ , _CQ � L, CVrfV CV 0000 ow E 6a; Co r r r r LqLq .q "R E CN CV C C r LL 0000 m CV N Ch ky r IR u r r N N k. c r 1. C toff r o � C4- - � N N r r O 11 O LL W rillro O : Qu000 r w bM N H S O p 0 0 C > N n N C h E �. w E � U vos w.� 08 oCoC M I� N f[I OOr (OTh I C t3 r h r v Oro 0CN w� C r N C 7 p H !a n I li 0 � k/ o LnaIL �2 )f= Ufa 04 ! E u � co ®ƒ 2ci � # �G� § \ § cm }�f In04 co � § 20 �E : v E ii) c E s CL D co r k ) Exu oo �� 2 0 2 2 .2 IIk / % Q 0000 0000 ca;6 {22 ( f� k � 0 a � (D6 � 2 � e 2222 �c aLL - # e § )f )- 4£ 0. ® �k } i (m,4L- i f i IN . 1 4 l) v ❑ alip, ---_ _ r r � �� � �CNYNtO001 �� f�C(00• � �MT (O �J �L COCT COfV TTGOO � at O) O !D t0 (O t0 N OOD � N � a t0 l� aa � `� �t C `C cV cgc (,,j TNTfVNN(V NN � sh000fOONOetO00000D o `.3 •E Muiocoacoadocd00000T l , T T T T T T T T T T T T T T T T v � � nsomNNvaocgnnaoao E (VNTe- {vj M � � fV fV CV TfVN � s} Y Y ID T MMMM M M N co co N M M I, > 1L c � � E c T v jp ' �L W?W! h1� MMhP�l eF l^C) U hl� MM oco so N l O ` � ppLococooto ppcoww p ' Coin LL a r ��q is b, 0 0 o 0 0 0 0 0 0 0 0 0 o O o 0 O 0 � MMIn LL) fO fOMMTN11Y InrT y � � NN .- T MMNNTTNN � et m W a 0 0 d m� 00000000 �0000000 N N N N fV fV fV (V CV LV SC Lb O C m O O O O O O O ' � �O-- NNNNNNNo� � � � NNf00 F p E m � O u v 8 a=i V Uj m(Dcoocoocoococ cCOCD(D uoiW E 0000000000o666o6 C � N � OTNNf� O) fO OD (D 11'1 lA lC'/ M OOD fO � 4 •tNNTafnnp� Np� r. tiNNNM TNMI* r � r� 3 E �A Q Vf t_ oDroNN M MNN 10 n/0 M MM In'n N naD w - NNMO O ,rn�°ao N Q - U f0 QQ tp M N p W �C1 Q) a0 n O� CD Z (D 10 W Q 1�f0 10 �n n�n Q 4 Q M M M Q V N C_ - .-N - - - - .- - a-- .- .- N N N N- r• W •N C a o (D O1 N w 00 t O w m O w 0 0 0 Cl r .� N N _NE - _ __ N N O^ O N N 3 c O C 'f N O M M M M N a M M .- O 0 T o M V 0 0 o Im E 0 -- (n Z, N'-^ w O N C>W Nnrn CO b n G o a N N Or n V)67 M O O)O cD '- M r d d` M MMoo v MO o La co ao Of O) N M a 'T O co O O e+M C N r0+_ mi E C N N N e C o J u yy �. O In b O r n M Of O M 10 a° ^ In I-M aD M c0 N MM N <Dn M M iA N n OD .- N M � G IL c r.@ 0 o o ` 0C> n Ooo no o �J e. cDNn oQ E j w 9[ fA y N M M M M 0 0 N N 0 co W 7 a V M m o O M M a Q n n N N �D •- � �O� O) t E XQ 00 �- N NM M V a'�n� C> - .- -co i0 IL =v a 3 0 v A r2 W ` V t0 cn�i N N �n A R m C O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q�() 0 4710 f0 tD (O CD fD f:J fD N W lD cp fD cO y ° 0 0 0 0 0 0 0 0 0 O o o 0 0 0 0 o C O —tU O 'D a NV Q .-- m NW M M '- Q Q M ;al N^C 0-6 N oty Uf aS GN N 4Of O OM OUn On 00 O'n O M G � f<<0 N 10 N 1cc6 C L G M C C C C C C C C � C tD('4 CO j OEM U) n �8 OM E ro M o c n O n v 0 o n 3 M c d � � m h r y LL n m,r v �o m n�o m -- d °1 c c '-' Q rn U) uai m5L° c2c cm �� � a � c w= L _ c _ a L) v a m o L �"o L- F,A sirs 3 y 1 96 Ave, fe A IL 42. Alt 7-1 •� � �,�p c'� ,� 1. �q� � r! �2. 3 • I I I- C1- a L I Baxter Meadows-Phase 11 Detention Basin 2 Design Storm Frequency 10 yr Basin Area(Ac) 2.17 Pro-Development Coefficient C Post-Development Coefficient C Area(Ac) C .Area(Ac) C Open Space 2.17 0.20 Open Space 0.20 Med.Res. 0.35 Med.Res. 0.35 Dense Res. 0.50 Dense Res. 2.17 0.50 Comm.Neigh. 0.60 Comm.Neigh. 0.60 Comm.Down 0.80 Comm.Down 0.80 Industrial 0.80 Industrial 0.80 Total Area: 2.17 Composite C: 0.2 Total Area: 2.17 Composite C: 0.5 Pre-Development Post-Development Runoff Distance 500 it Runoff Distance 650 It Average Slope 1.20% Average Slope 0.90% Time of Concentration 36 min Time of Concentration 32 min Average Rainfall Intensity 0.89 Inft Average Rainfall Intensity 0.96 Irdhr Maximum Runoff 0.39 cis Maximum Runoff 1.04 cis �I Stone Intensity Developed Developed Undeveloped Required Duration 10 Yr Flow Runoff Runoff Storage (minl pnAu) (cfs) (cf) (CO (cf) 1 6 3.22 3.49 1048 116 931 10 2.05 2.23 1335 232 1103 15 1.68 1.71 1639 348 1190 20 1.31 1.42 1702 466 1237 25 1.13 1.23 1840 581 1259 36 0.91 0.99 2070 813 1257 40 0.83 0.90 2169 929 1240 46 0.77 0.84 2260 1045 1215 50 0.72 0.78 2345 1161 1184 55 0.68 0.13 2425 1278 1147 60 0.64 0.69 2500 1394 1106 65 0.61 0.66 2571 1510 1061 70 0.58 0.63 2638 1626 1012 75 0.55 0.60 2703 1742 961 80 0.53 0.58 2765 1858 906 85 0.51 0.55 2824 1974 850 90 0.49 0.63 2581 2091 790 95 0.47 0.62 2936 2207 729 100 0.46 0.50 2989 2323 666 105 0.44 0.48 3041 2439 602 110 0.43 0.47 3091 2555 535 116 0.42 0.46 3139 2671 468 120 0.41 0.44 3186 2787 399 125 0.40 0.43 3232 2904 328 130 0.39 0.42 3277 3020 257 135 0.38 0.41 3320 3136 184 140 0.37 0.40 3363 3252 111 145 0.36 0.39 3404 3308 36 150 0.35 0.38 3445 3484 -39 Minimum Basin Area Minimum Volume= 1264 cf Minimum Area(18"basin depth) 843 sf Actual Area(shaped to drain)= 1685 sf Minimum Area for Sediment Control->145 of per 1 cfs Peak Developed Flow-> 1.09 cis Minimum Area= 158 of I Baxter Meadows-Phase II Detention Basin 3 Design Storm Frequency 10 yr Basin Area(Ac) 12.15 it Pro-Development Coefficient C Post-Development Coefficient C Area(Ac) C Area(Ac) C Open Space 12.16 0.20 Open Space 0.20 Mod.Res. 0.35 Mod.Res. 0.35 Dense Res. 0.50 Dense Res. 3.15 0.50 Comm.Neigh. 0.60 Comm.Neigh. 9 0.60 Comm.Down 0.80 Comm.Down 0.80 Industrial 0.80 Industrial 0.80 Total Area: 12.15 Composite C: 0.2 Total Area: 12.16 Composite C: 0.57 Pre-0evelopment Post-Development Runoff Distance 1300 ft Runoff Distance low it Average Slope 0.80 % Average Slope 0.50 % i Time of Concentration 87 min Time of Concentration 38 min Average Rainfall Intensity 0.80 haft Average Rainfall Intensity 0.86 INhr Maximum Runoff 1.45 ofs Maximum Runoff 8.01 cfs Storm Intensity Developed Developed Undeveloped Required Duration 10 Yr Flow Runoff Runoff Storage (min) (INfv) (cfs) (cf) (co (cf) ' 5 3.22 22.46 6735 434 6300 10 2.05 1431 8684 869 7715 15 1.58 10.99 9892 1303 8690 20 1.31 9.12 10940 1737 9203 25 1.13 7.89 11829 2171 9668 30 1.00 7.00 12609 2606 10003 35 0.91 6.34 13308 3040 10208 40 0.83 5.81 139" 3474 10470 45 0.77 5.38 14531 3908 10623 50 0.72 5.03 15077 4343 10734 65 0.68 4.72 15588 4777 10811 60 0.64 4.46 16070 5211 10856 70 0.58 4.04 16961 6080 10882 76 0.65 3.86 17376 6514 10662 80 0.53 3.70 17773 6948 10824 85 0.51 3.56 18154 7383.r. 10771 90 0.49 3.43 18521 7817 10704 95 0.47 3.31 18875 8251 10623 100 0.46 3.20 19216 8685 10631 105 0.44 3.10 19547 9120 10428 110 0.43 3.01 19868 9554 10314 115 0.42 2.92 20180 9988 10192 120 0.41 2.84 20483 10422 10060 125 0.40 2.77 20777 10857 9921 130 0.39 2.70 21065 11291 9774 135 0.38 2.64 21345 11725 9620 140 0.37 2.57 21618 12159 9459 145 0.36 2.52 21885 12594 9292 150 0.35 2.46 22147 13028 9119 Minimum Basin Area Minimum Volume= 10882 of Minimum Area(18"basin depth) 7255 sf Actual Area(shaped to drain)■ 14509 of Minimum Area for Sediment Control->145 sf per 1 cfs Peak Developed Flow-> 4.24 cis Minimum Area= 615 of I ` REVISED CALCULATIONS Baxter Meadows Phase 2A Stormdrain Design - 25 Year Storm Event Location Runoff Calculation Storm Drain Design Comments From To Drainage Runoff CA (acre) Sum CA Tc Across Cumulative Tc Rainfall Runoff (cfs) Pipe Dia. Manning's Pipe Pipe Velocity Pipe Flow Pipe Pipe Pipe Area A Coeff. C (acre) Area(min) (min) Intensity (in) coefficient Slope Length Of Flow Time(min) Capacity Velocity Capacity (acre) (in/hr) ..n" (ft/ft) (ft) (ft/s) (cfs) Check Check 3.1 MH A 0.40 0.50 0.20 0.20 13.4 13.40 2.04 0.41 12 0.013 0.50% 62 3.21 0.32 2.52 OK 1ADEQUATE 3.2 MH A 1.21 0.50 0.61 0.81 15.4 15.40 1.86 1.13 12 0.013 0.50% 18 3.21 0.09 2.52 OK ADEQUATE MH A MH C 0.00 0.00 0.81 15.49 1.86 1.49 15 0.013 0.35% 37 3.11 0.20 3.82 OK !ADEQUATE 3.3 MH B 0.22 0.60 0.13 0.13 10.0 10.00 2.46 0.32 12 0.013 0.50% 20 3.21 0.10 2.52 OK JADEQUATE 3.4 MH B 0.15 0.60 0.09 0.22 10.0 10.00 2.46 0.22 12 0.013 0.50% 45 3.21 0.23 2.52 OK JADEQUATE MH B MH C 0.00 0.00 0.22 10.23 2.42 0.54 15 0.013 0.35% 76 311 0.41 3.82 OK JADEQUATE MH C MH D 0.00 0.00 1.03 15.69 1.84 1.89 15 0.013 0.35% 305 3.11 1.63 3.82 OK ADEQUATE 3.5 MH D 0.47 0.60 0.28 0.28 10.0 10.00 246 0.69 12 0.013 0.50% 62 3.21 0.32 2.52 OK ADEQUATE 3.6 MH D 1.79 0.60 1.07 1.36 16.6 16.60 1.78 1.91 12 0.013 0.50% 18 3.21 0.09 2.52 OK ADEQUATE MH D MH E 0.00 0.00 2.38 17.32 1.73 4.12 15 0.013 0.42% 35 3.41 0.17 4.18 OK ADEQUATE MH E MH F 0.00 0.00 2.38 17.50 1.72 4.09 15 0.013 0.42% 374 3.41 1.83 4.18 OK ADEQUATE 3.8 MH F 0.98 1 0.60 0.59 2.97 18.2 1.67 0.98 12 0.013 0.50% 58 3.21 0.30 2.52 OK ADEQUATE 3.9 MH F 0.26 0.60 0.16 3.13 10.0 2.46 0.38 12 0.013 0.50% 18 3.21 0.09 2.52 OK ADEQUATE MH F MH I 0.00 0.00 313 19.32 1.61 5.04 18 0.013 0.30% 39 3.25 0.20 5.75 OK ADEQUATE 2.1 2.2 0.18 0.50 0.09 0.09 10.0 2.46 0.22 12 0.013 0.50% 65 3,21 0.34 2.52 OK ADEQUATE 2.2 MH G 1.71 1 0.50 0.86 0.95 1 10.34 2.40 2.27 15 0.013 2.28% 89 7.95 1 0.19 9.74 OK ADEQUATE 2.3 2.4 0.16 0.50 0.08 0.08 10.0 2.46 0.20 12 0.013 0.50% 63 3.21 0.33 2.52 OK ADEQUATE 2.4 MH G 0.12 0.50 0.06 0.14 10.33 2.41 0.34 15 0.013 0.50% 37 3.72 0.17 4.56 OK ADEQUATE MH G IMH H 0.00 1 0.00 1.09 10.52 2.38 2.58 1 15 0.013 0.33% 261 3.02 1.44 3.71 OK JADEQUATE 3.9 MH H 0.26 0.60 0.16 1.24 10.0 1 2.46 0.38 12 0.013 0.50% 43 3.21 0.22 2.52 OK ADEQUATE 3.10 MH H 1.95 0.60 1.17 2.41 16.4 1.79 2.09 12 0.013 0.95% 22 4.42 0.08 3.47 OK ADEQUATE MH H MH I 0.00 0.00 2.41 16.48 1 78 4.30 18 0.013 0.33% 35 3.41 0.17 6.03 OK ADEQUATE MH I MH J 0.00 0.00 5.54 19.52 1.60 8.86 21 0.013 0.57% 199 4.97 0,67 11.95 OK i ADEQUATE 3.A MH J 0.29 0.50 0.15 5.68 10.0 1 2.46 0.36 12 0.013 4.80% 17 9.94 1 0.03 7.80 OK ]ADEQUATE 3.13 MH J 0.48 0.50 0.24 5.92 10.0 246 0.59 12 0.013 1.67% 57 5.86 0.16 4.60 OK ADEQUATE MH J MH K 0.00 0.00 5.92 20.19 1.57 9.28 21 0.013 0.57% 183 4.97 0.61 11.95 OK ADEQUATE 3.15 MH K 0.29 0.50 0.15 6.07 10.0 2.46 0.36 1 15 0.013 1.00% 15 526 0.05 6.45 OK ADEQUATE MH K 3.16 0.00 0.00 6.07 20.80 1.54 9.32 21 0.013 0.50% 1 59 4.66 0.21 11.19 OK ADEQUATE 3.16 MH M 0.48 0.50 0.24 6.31 1 21.01 1.53 9.63 21 0.013 0.50% 48 4.66 0.17 11.19 OK ADEQUATE 3.11 3.12 1.15 0.60 0.69 0.69 10.0 2.46 1.69 15 0.013 0.71% 131 4.43 0.49 5.44 OK ADEQUATE 3.12 MH N 0.75 0.60 0.45 1.14 10.49 238 2.71 15 0.013 1.54% 109 6.53 0.28 8.01 OK ADEQUATE 3.14 MH N 0.29 0.60 0.17 017 10.0 2.46 0.43 15 0.013 0.50% 24 3.72 1 0.11 4.56 OK ADEQUATE MH N MH L 0.00 0.00 1.31 10.11 2.44 320 15 0.013 2.38% 38 8.12 0.08 9.96 OK ADEQUATE 3.13 MH L 0.23 0.60 0.14 0.14 10.0 246 0.34 15 0.013 0.50% 58 3.72 0.26 4.56 OK ADEQUATE MH L MH M 1 0.00 0.00 1.45 10.26 242 1 3.51 1 15 0.013 0.84% 82 4.82 0.28 1 5.91 OK ADEQUATE MH M OUTLET 0.00 1 0.00 1 7.76 21.19 1 1.52 1 11.78 1 21 0.013 0.59% 1 131 5.06 0.43 12.16 OK ADEQUATE i25 = 0.78 • T,- 64 Q = C i A V = 1 . n R2i3 s'12 t= I Q = V A Project: B05-016-021 �Fj-I �oza • w a F�1 ,T V) O am eNN J Z II II II II II N O (/] 1 xzw Y J g� Z¢ In A �Z a Wm _ `'• O V3 �Z W W W O c LLI ¢ FI caw \ •ti~ 30 77 a�'Z F H H IL cc mmm I ` ; �-_ DRAWN BY: JLN DESIGNED BY: JLN 40 1 _ _ QUALITY CHECK: Z W w 0, - ! DATE: 11.10.05 JOB NO.3 p O 20) F ELLD OOK 805-01fi(ONA d 1 ¢Z Z _ eO I ¢ oa nm♦ Za `i \4 Nip r p II H r� dY- N Vwi OZi w^ .-__ ___ - __ -__ -Sea - - - JJ FJ-Nml�O ... - Z wZ O�Y II .wU- w J O w of 1 v 3 1 o- FFz�w G� J < t9 ma I a W �p N-O 9 mN a¢ r��zp pW o , = Q 22�� �� cp� a_ CU W ,�� z� 1a. �za A� VY n3 - m Z W 0 OV N I w a w Z j _ •{ - - > Pam" u- �'' wa Q �� ---M - - z i o z a 3 - 0) (\\ 'o m m Z \ - O � - _ .cae .b1 o Z W Lu u')_ _ :,: .;..�................. . O N c r ❑ > .� DU — � . .... co E i Zm .. d 0 U _ _- - - Lu .. .. ............. ... -_ . O — _ _i N _ . ................ ....................... ........... o ... w LLl Lu (o �_- H0lla JNI'6dS Z G�?l,��r �.:.... ....... a -'..... M - U O � . J N o �o n m J� CD azI CD N z °>O z> z CAO NBJFPh2AP..d-2.DWG SHEET 1 OF c J Z ador� 0 50' 100' 150' N V 02 am SCALE i F *4 xzz p-� �?3 Ow. z I � za DO WWI^ J W a' o w C/� a w a 0_L) W a�N 0 N W W W dwg 00 0 G � 4 50 — u�J r t W W W Q 9 LU J Z v 0o0 IA M O N I'I to N 0) DRAWN BY: JLN m DESIGNED BY: _ 4• --_-- - _ , QUALITY CHECK: KW M_ _ DATE: 11.9.05 JOB NO. B05-016.21 Z FIE,DBOOK J I d i1 I M O _O Lb O O N a -77 v, M � zZ o oz Z � w0 O Q o W 2 N m F' N In J I, 7Q5 O E M � '" m m 2 z a T 0 � M � J cu CIL J (O Q M O Z L ^Q m Lo CAO NO- dreln6ase.DWG ��" SHEET 1 OF