HomeMy WebLinkAbout17- Challenge Cost Share Agreement Modification - USDA, Forest Service, Custer Gallatin National Forest - Mystic Lake Beaver Dam Removal tl�s
USDA Forest Service OMB 0596-0217
FS-1500-19
MODIFICATION OF GRANT OR AGREEMENT PAGE OF PAGES
1 2
1 U S FOREST SERVICE GRANT/AGREEMENT NUMBER: 2 RECIPIENT/COOPERATOR GRANT or 3 MODIFICATION NUMBER:
1 8-CS-1 1 0 1 1 1 00-008 AGREEMENT NUMBER,IF ANY: 001
M stic Lake Beaver Dam Removal
4 NAMEIADDRESS OF U S FOREST SERVICE UNIT ADMINISTERING 5.NAME/ADDRESS OF t1.S.FOREST SERVICE UNIT ADMINISTERING
GRANT/AGREEMENT(unit name,street,city,state,and zip+4): PROJECT/ACTIVITY(unit name,street,city,state,and zip+4):
Charlie Boucher, Custer Gallatin National Forest Jonathan Kempff, Custer Gallatin National Forest
3710 Fallon Street, Suite C, Bozeman, MT 59715 PO Box 130, Bozeman,MT 59771
6 NAME/ADDRESS OF RECIPIENT/COOPERATOR(street,city,state,and zip+ 7.RECIPIENT/COOPERATOR'S HHS SUB ACCOUNT NUMBER(For HHS
4,county): payment use only):
City of Bozeman
PO Box 1230, Bozeman,MT 59771
8. PURPOSE OF MODIFICATION
CHECK ALL This modification is issued pursuant to the modification provision in the grant/agreement
THAT APPLY: referenced in item no. 1, above.
CHANGE IN PERFORMANCE PERIOD:
® CHANGE IN FUNDING:Additional funds in the amount of$6,000
® ADMINISTRATIVE CHANGES:See Block 9
OTHER(Specify type of modification):
Except as provided herein,all terms and conditions of the Grant/Agreement referenced in 1,above,remain unchanged and in full
force and effect.
9. ADDITIONAL SPACE FOR DESCRIPTION OF MODIFICATION(add additional pages as needed):
The purpose of this modification is to add additional funds in order to meet the intent of the originally negotiated cost-share match.
The U.S.Forest Service has determined it is prohibitive to provide helicopter support,therefore,additional funds will go towards the
added contract cost for delivery of pipe. See Mod 1 Financial Plan.
Original Financial Plan-FS Non-Cash Contribution for Helicopter Support and related Salary costs have been removed. The new
cummulative Match Determinations follows:
Matching Costs Determination
Total Forest Service Share=53.78%
Total Cooperator Share=46.22%
Total =100.00%
Provision IV.THE FOREST SERVICE SHALL. Remove section IV.D.Provide helicopter support for the delivery of pipe to the
pra'ect site.
10. ATTACHED DOCUMENTATION (Check all that apply):
Revised Scope of Work
Revised Financial Plan
® Other:Mod 1 Financial Plan
11. SIGNATURES
AUTHORIZED REPRESENTATIVE:BY SIGNATURE BELOW,THE SIGNING PARTIES CERTIFY THAT THEY ARE THE OFFICIAL REPRESENTATIVES OF
THEIR RESPECTIVE PARTIES AND AUTHORIZED TO ACT IN THEIR RESPECTIVE AREAS FOR MATTERS RELATED TO THE ABOVE-REFERENCED
GRANT/AGREEMENT.
I LA.CIT 01'BOZEMA GNATURE I I B.DATE 1 LC U.S R ZVEGN 1 LD.DATE
! SIGNED SIGNED
Si nature of Signatory Official l�• 4 Si nature o i ato fficial) L l
I I E NAME(type or print):ANDREA SURRATT 11 F NAM/(type or pr t
t):MARY C. ERICKSON
1.
[1�S
USDA Forest Service OMB 0596-0217
FS-1500-19
1 I.G.TITLE (type or print):Interim City Manager 11.H. TITLE(type or print):Forest Supervisor
12. G&A REVIEW
12.A.The authority and format of this modification have been reviewed and approved for signature by: 12.8.DATE
SIGNED
-- November 3,
CHARLENE BOUCHER 2018
U.S.Forest Service Grants&Agreements Specialist
^ m
N �
98
W
O O
LO
O ch O -' O
m O O O O O O O O O O O
LL 69 69 69 64 6R O 69 O 69 69 O
N O 69 64 EA
N
t=
O O O O O O O O O
p - O O O O O O O O
7 (�
Z Q z 69 69 69 69 69 69 69
O O
Z o o
�o 0)o o
CD
�- . Cm o00000 00 0 0L L o
� � o o � o c
C z Q o 0 o O
00 eC cLLIc
(L
o m m cn UO Z
'♦3 +�+ a "O 0 0 0 0 0 0 0 0 O fq
y t 4) O O O O O O O O O N
y N Z O O O O O O O O O C
U) 0 bs 6s s9 sA o0 0o ss o 3 V
U C t�C 0 1- co tc
K.� LL m CNO
E d L +y.+ 4) U
W Q Z U 0
G cc
21 p
a m c Li E c 0 a L
E w L m >,0 �
�a o L y W
0 0 cv o 0 0 0 0 0 0 o 0 0 N
- r y E U o 0 0 0 0 0 0 0 0 U U)
Q � CD 0 0 0 6 0 6 6
Z Z «s O c E �, o c w c� � ssssr� s9 ss sAss N 0
a) N LL z- Q. W U) N b1J
N 0) s p O y O v II 0 II I I
N
cn
~ 0 0 0 Q W v Z LL � U
s t �-
QQ ZI- F-o aO
o � + mo a+
U) 2 o
-QL
�• " ♦-
N
p X
O
U r
ea In
Z U U
W p
) i
ca
a W t� m � � m
m -J o � � -E
w O � E T >
= a�
C V ' N Q Q O Q
m U) N@ > 7 Q C O
m Q CT =3O (6
LL OU o U) l- W co LL O O U) U LL -
it (3)
r U
y
4)
O Q
LL
WORKSHEET FOR
FS Cash to the Cooperator Cost Analysis, Column b
Use this worksheet to perform the cost analysis that supports the lump sum figures provided in the
matrix. NOTE: This worksheet auto populates the relevant and applicable matrix cells.
Cost element sections may be deleted or lines may be hidden, if not applicable. Line items may be
added or deleted as needed. The Standard Calculation sections provide a standardized formula for
determing a line item's cost, e.g. cost/day x#of days=total, where the total is calculated automatically.
The Non-Standard Calculation sections provide a write-in area for line items that require a calculation
formula that is other than the standardized formules, e.g. instead of salaries being calculated by
cost/day x#of days, costs may be calculated simply by a contracted value that is not dependent on
days worked, such as 1 employee x$1,200/contract= $1,200. Be sure to review your calculations when
entering in a Non-Standard Calculation, and provide a brief explanation of units used to make
calculation, e.g. '1 month contract,'on a line below the figures.
Salaries/Labor
Standard Calculation
Job Description Cost/Day 1#of Days I ITotal
$0.00
$0.00
$0.00
$0.00
$0.00
Non-Standard Calculation
Total Salaries/Labor 1 $0.00
Travel
Standard Calculation
Travel Expense lEmployees Cost/Trip 1#of Trips I ITotal
$0.00
$0.00
$0.00
$0.00
$0.00
Non-Standard Calculation
Total Travel I 1 $0.00
Equipment
Standard Calculation
Piece of Equipment 1#of Units Cost/Day 1#of Days I ITotal
$0.00
$0.00
$0.00
$0.00
$0.00
Non-Standard Calculation
Total Equipment $0.00
Supplies/Materials
Standard Calculation
Supplies/Materials 1#of Items Cost/Item ITotal
$0.00
$0.00
$0.00
$0.00
Non-Standard Calculation
Total Supplies/Materials $0.00
Printing
Standard Calculation
Paper Material 1#of Units Cost/Unit I ITotal
$0.00
Non-Standard Calculation
$0.00
Total Printing $0.00
Other Expenses
Standard Calculation
Item 1 1#of Units Cost/Unit I ITotal
MOD 1 -ALTERNATE PLAN $6,000.00 $6,000.00
Added Mystic Lake Beaver Dam Removal Contract Cost $0.00
Non-Standard Calculation
Total Other $6,000.00
Subtotal Direct Costs $61000.00
Cooperator Indirect Costs
Current Overhead Rate J Subtotal Direct Costs ITotal
$6,000.00 $0.00
Total Coop. Indirect Costs F $0.00
TOTAL COST $6,000.00
WORKSHEET FOR
Cooperator Non-Cash Contribution Cost Analysis, Column c
Use this worksheet to perform the cost analysis that supports the lump sum figures provided in the matrix.
NOTE: This worksheet auto populates the relevant and applicable matrix cells.
Cost element sections may be deleted or lines may be hidden, if not applicable. Line items may be added or
deleted as needed. The Standard Calculation sections provide a standardized formula for determing a line
item's cost, e.g. cost/day x#of days=total,where the total is calculated automatically. The Non-Standard
Calculation sections provide a write-in area for line items that require a calculation formula that is other than the
standardized formules, e.g. instead of salaries being calculated by cost/day x#of days, costs may be calculated
simply by a contracted value that is not dependent on days worked, such as 1 employee x$1,200/contract=
$1,200. Be sure to review your calculations when entering in a Non-Standard Calculation, and provide a brief
explanation of units used to make calculation, e.g. '1 month contract,' on a line below the figures.
Salaries/Labor
Standard Calculation
Job Description Cost/Day 1#of Days I ITotal
$0.00
$0.00
$0.00
$0.00
$0.00
Non-Standard Calculation
Total Salaries/Labor
Travel
Standard Calculation
Travel Expense lEmployees Cost/Trip 1#of Trips I ITotal
$0.00
$0.00
$0.00
$0.00
$0.00
Non-Standard Calculation
Total Travel I I $0.00
Equipment
Standard Calculation
Piece of Equipment 1#of Units Cost/Day 1#of Days I ITotal
$0.00
$0.00
$0.00
$0.00
$0.00
Non-Standard Calculation
Total Equipment $0.00
Supplies/Materials
Standard Calculation
Supplies/Materials 1 1#of Items Cost/Item ITotal
$0.00
$0.00
$0.00
$0.00
Non-Standard Calculation
Total Supplies/Materials $0.00
Printing
Standard Calculation
Paper Material 1 1#of Units Cost/Unit I ITotal
$0.00
Non-Standard Calculation
$0.00
Total Printing $0.00
Other Expenses
Standard Calculation
Item 1#of Units Cost/Unit I ITotal
MOD 1 -ALTERNATE PLAN $6,000.00 $6,000.00
Added Mystic Lake Beaver Dam Removal Contract Cost $0.00
$0.00
$0.00
Non-Standard Calculation
Total Other I $6,000.00
Subtotal Direct Costs $67000.00
Cooperator Indirect Costs
Current Overhead Rate ISUbtotal Direct Costs I IT'otal
$6,000.00 $0.00
Total Coop. Indirect Costs $0.00
TOTAL COST $6,000.00