Loading...
HomeMy WebLinkAbout93- Bridger Creek Development Annexation Agreement . \ .,. BRIDGER CREEK DEVELOPMENT ANNEXATION AGREEMENT "'1 '" II.. , 135 P/\CE 775 THIS AGREEMENT, is made and entered into this 16th day of August 1993, by and between THE CITY OF BOZEMAN, a municipal corporation of the State of Montana, with offices at 411 East Main Street, Bozeman, Montana 59771-0640, hereinafter referred to as "City", and GOLF COURSE PARTNERS, INC., c/o Rex Easton, 9315 Cougar Drive, Bozeman, MT 59715, hereinafter referred to as "Landowner". WHEREAS, the Landowner owns in fee simple certain real property situated in the Section 31, TIS, R6E, P.M.H., Gallatin County, Montana, and more particularly described as follows: Certificate of Survey No. 1353 and Certificate of Survey No. 1353B, located in Section 31, Township 1 South, Range 6 East, Montana Principal Meridian, Gallatin County, Montana, and consisting of 287.5 acres. WHEREAS, the Landowner recognizes that the annexation of the above-described property, hereinafter referred to as the "Bridger Creek Development" will entitle the Landowner to City services, including municipal water and sewer service; and WHEREAS, the City's present water supply is insufficient to enable it to supply reasonably adequate water service to additional customers outside the present city boundaries; and WHEREAS, the landowner wishes to convey to the City certain water rights or take some equivalent action to provide water and sewer service to the property; and ,';. "' C: ANNEXATION AGREEMENT GOLF COURSE PARTNERS, INC. BRIDGER CREEK DEVELOPMENT PAGE 2 OF 11 FIl. ~ 135 r~Ct 776 WHEREAS, the City's present sewer service system is insufficient to enable it to supply reasonable sewer collection service to additional customers outside the present city boundaries; and WHEREAS, all parties recognize that the development of the Bridger Creek Development Tract will impact Bridger Drive, Story Mill Road, and McIllhattan Road, as well as the intersections thereof, and will require additional public streets for traffic circulation; and WHEREAS, the Landowner finds that this Agreement will provide for the most satisfactory and dependable water supply or service available to furnish water, provide for the most satisfactory and dependable sewer service available to furnish sewer collect ion service, and provide traffic circulation for development within the Bridger Creek Development Tract; and WHEREAS, the making and performance of this agreement is desirable to promote the development of the most adequate water supply, sewer collection and traffic circulation pattern for the City as it now exists and as it is reasonably expected to enlarge; and WHEREAS, the Landowner understands and agrees that no development shall be approved for any portion of the Bridger Creek Development Tract, other than the previously approved golf course, until water, sewer and street improvements are made resulting in ,f , , ANNEXATION AGREEMENT GOLF COURSE PARTNERS, INC. BRIDGER CREEK DEVELOPMENT PAGE 3 OF 11 m~ 135 (,\C[ 777 adequate city transportation and sanitation facilities to safely accommodate use of and travel to, from, and wi thin the parcel proposed for development, which adequacy shall be determined by the Director of Public Service or his designee; and WHEREAS, the securing of an adequate water supply, sewer collection, and traffic circulation system by the City is necessary and of mutual advantage to the parties hereto. WIT N E SSE T H: IN CONSIDERATION of the mutual covenants and agreements herein contained, the parties hereto agree as follows: 1. Recitals. The above recitals are true and correct. 2. Anne~.?-tion. The City Commission will annex the Bridger Creek Development Tract in accordance with its decision on October 26, 1992. 3. Services Provided by City. Pursuant to Section 7-2-4409, M.C.A. and Commission Resolution No. 2879, the City will, after annexation, make City services, including water and sewer, available to the Bridger Creek Development Tract. ,! ~ , ANNEXATION AGREEMENT GOLF COURSE PARTNERS, INC. BRIDGER CREEK DEVELOPMENT PAGE 4 OF 11. m~ 135 P~~CE 778 4. Municipal Water Service Defined. The term "municipal water service" as is used in this Agreement shall be the service which is supplied by the City in accordance with Chapter 13.12, Bozeman Municipal Code, as well as any other terms and conditions which apply to the City's provision of this service. The term does not contemplate the extension of lines or construction of necessary improvements for delivery of water to and within the Bridger Creek Development Tract or any hook-up, connection, or development charges which may be established by the City. 5. Municipal Sewer Service Defined. The term "municipal sewer service" as 1S used in this agreement shall be the service which is supplied by the City in accordance with Chapter 13.24, Bozeman Municipal Code, as well as any other terms and condi tions which apply to the City's provision of this service. The term does not contemplate the extension of lines or construction of necessary improvements for collection of sewage at and within the Bridger Creek Development Tract or any hook-up, connection, or development charges which may be established by the City. ,'I' .., . ANNEXATION AGREEMENT GOLF COURSE PARTNERS, INC. BRIDGER CREEK DEVELOPMENT PAGE 5 OF 11 r:l~ 135 P~CE 779 6. Water Ri~hts. The parties acknowledge the following City policy: Prior to annexation of property, it shall be the policy of the City of Bozeman to acquire usable water rights, or an appropriate fee in lieu thereof, equal to the average annual diversion requirement necessary to provide the anticipated average annual consumption of water by residents and/or users of property when fully developed on the basis of the zoning designation(s). The fee may be used to acquire water rights or for improvements to the water system which would create additional water supply capacity., This policy is subject to the following exceptions: a. For any annexation in excess of ten (10) acres, it shall be carried out prior to final plat approval, final site plan approval or the issuance of any building permit, whichever occurs first. Section 2, No.5, Commission Resolution 2716 adopted October 3, 1988. The Bridger Creek Development Tract consists of approximately 287.5 acres. The Landowner understands and agrees that he must provide sufficient water rights in accordance with the City's policy prior to final plat approval, final site plan approval or the issuance of any building permit for any portion of the Bridger Creek Development Tract, whichever first occurs, other than those previously approved in conjunction with the development of the golf course. The Landowner shall supply water rights or fee in lieu as calculated by the City for each phase developed. The Landowner further understands that the r 'S r. ANNEXATION AGREEMENT GOLF COURSE PARTNERS, INC. BRIDGER CREEK DEVELOPMENT PAGE 6 OF 11 m ~ 1:35 P~\C[ 780 Ci ty shall calculate average annual diversion requirements necessary to provide water on the basis of the zoning designation for the property or the maximum use allowable under the covenants, by-laws and developmental guidelines for each phase, whichever is less, at the time such calculation is made. Cash-in-lieu of water rights for each phase of development may be provided, with said cash-in-lieu being held in escrow until the issue of acceptable water rights is resolved, or for a period of two years of the date of final annexation, whichever first occurs. If no resolution of the issue is reached, the City will retain said cash-in-lieu. 7. Waivers of Right to Protest Special Improvement Districts to Fund Improvements to the Lyman Creek Water System to Allow for Backfeeding the Lyman Creek Source at Additional Point{s). The Landowner has executed a Waiver of Right to Protest Creation of Special Improvement Districts for improvements to fund improvements to the Lyman Creek Water System to allow for backfeeding the Lyman Creek source at additional point (s) . This Waiver is attached hereto as Exhibit A. 8. Agreement to Provide a Separate Water Supply for Irrigation Purposes. The Landowner may provide a separate water supply to be used for irrigation purposes for the entire development. If so, a partial return of cash-in-lieu, referenced in 6 above, will be made as calculated by the City of Bozeman. " 'r i, " ANNEXATION AGREEMENT GOLF COURSE PARTNERS, INC. BRIDGER CREEK DEVELOPMENT PAGE 7 OF 11 rl!.~ 135 P,'GE 781 9. Formal Analysis of the Possible Service Area of the Sewer Trunk Main. The Landowner has completed a formal analysis of the possible service area of the sewer trunk main to be extended to serve this property. As a result of this analysis, the lines will be installed to adequately serve the area shown on the Exhibit Map contained in Exhibit B, except as approved and allowed by the City during the design of the sewer main. This Analysis is attached hereto as Exhibit B. 10. Complete Analysis of the Levels of Existing: and pro.iected Levels of Service on Story Mill Road. Brid%er Drive. and the Intersection o~ the TWQ~ A complete analysis of the levels of existing and projected levels of service on Story Mill Road, Bridger Drive, and the intersection of the two has been completed by the landowner. As a result of this analysis a Waiver of Right to Protest Special Improvements Districts to Fund the Installation of a traffic signal light at the intersection of Bridger Drive and Story Hill Road. This analysis is attached hereto as Exhibit C. 11. Waiver of Rig:ht to Protest Special Improvement District Fund the Installation of a Traffic Sig:nal Lig:ht at Jntersection of Bridg:s-r Driye_and Story Hill Road. to the The Landowner has executed a Waiver of Right to Protest Creation of a Special Improvement District for his proportionate share in the funding of the installation of a ,~ ANNEXATION AGREEMENT GOLF COURSE PARTNERS, INC. BRIDGER CREEK DEVELOPMENT PAGE 8 OF 11 fit ~ 135 Pr'Cf 782 traffic signal light at the intersection of Bridger Drive and Story Mill Road. This Waiver is attached hereto as Exhibit D. 12. Additional Terms for Road Easements and Waivers. All parties recognize that this document must be filed and of record with the Gallatin County Clerk and Recorder prior to the sale of any land wi thin the Bridger Creek Development Tract by the Landowner, and the parties agree that the City may file these documents at any time. In addition to executing the Waivers and Agreements, the Landowner shall dedicate all public streets on future Final Subdivision Plat(s). 13. Utility Easements. The Landowner understands and agrees that utility easements, thirty (30) feet in width, will be necessary for the installation and maintenance of water and sewer utility services to the annexed parcel. The Landowner shall create such easements on their property in locations agreeable to the City during subdivision, conditional use, planned unit development, or site plan review procedures, but in no event later than the filing of any final plat or site plan, or issuance of a building permit. " ANNEXATION AGREEMENT GOLF COURSE PARTNERS, INC. BRIDGER CREEK ANNEXATION PAGE 9 OF 11 ~ 11l.l t _ , 1:35 P,\CE 783 14. Governin~ Law. This Agreement shall be construed according to the laws of the State of Montana. 15. Invalid Provision. The invalidity or unenforceability of any provision of this Agreement shall not affect the other provisions hereof, and this Agreement shall be construed in all respects as if such invalid or unenforceable provision were omitted. 16. Modifications or Altera~ions. No modification or amendment of this Agreement shall be valid unless evidenced by a wri ting signed by the parties hereto. 17. No Assi~nment. It lS expressly agreed that the Landowners shall not assign this Agreement In "'hole or in part wi thout prior written consent of the City. 18. Successors. Except as provided in paragraph 17, this Agreement shall be binding upon, inure to the benefit of and be enforceable by the parties hereto and their respective heirs, successors and assigns. 19. Covenants to Run with the Land. The parties intend that the terms of this Agreement shall be covenants running with the land and shall not expire at their deaths or upon transfer of ownership of the property. ANNEXATION AGREEMENT GOLF COURSE PARTNERS, INC. BRIDGER CREEK DEVELOPMENT PAGE 10 OF 11 FIL'" 135 rt\Gf 784 t " IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed the day and year first above written. CITY OF BOZEMAN Attest:. ~, ~d Cled:'lr,Jof the City C.8mmission APPR~ AS TO FOR~I: / . y Attorney LANDOWNER GOLF COURSE PARTNERS, INC. BY:_~~' ~ Title: /~ ANNEXATION AGREEMENT GOLF COURSE PARTNERS, INC. BRIDGER CREEK DEVELOPMENT PAGE 11 OF 11 riL ~ 135 r/\CE 785 ''l STATE OF MONTANA ss County of Gallatin , 1993 before me, a of Montana, personally appeared known to me to be the of Golf course Partners, Inc., the cor oration that executed the foregoing Annexation Agreement and acknowledged to me that he/she executed the same for and on behalf of said corporation. IN WITNESS WHEREOF, I r al S 1 the day and hereunto set my hand and affixed by first above written. , ':~ ','; t'J .to'. ",,,~~~". ""'~.. "_';~~".'." .,,'" " " ., ,. ~... ') \ 1 [I f).. . "i) : : I,{ w . _- . ;,~ "~/I., \ ~ ~ \.. '\ ~ ~,...", --... "....., -/;;;'/ . , /0 % .\....~ ~ ....... " 3 N .~i\~",,~~. 'otary Public or Sta of M07a Residing at Bozeman, ~ ~ Commission Expires: /2; 9 tH"I~ , 'I . EXHIBIT "A" '"'I .. II~ . 1:35 rr'CE 786 WAIVER OF RIGHT TO PROTEST CREATION OF SPECIAL IMPROVEMENT DISTRICTS TO FUND IMPROVEMENTS Tp THE LYMAN CREEK WATER SYSTEM 1~ ALLQW FOR ~ACKFEEDING THE LYMAN CREEK SOURCE AT, ADDITIONAL POINT(S) I, the undersigned owner of the real property situated in the County of Gallatin, State of Montana, and more particularly described as follows: Certificate of Survey No. 1353 and Certificate of Survey No. 1353B, located in Section 31, Township 1 South, Range 6 East, Montana Principal Meridian, Gallatin County, Montana, and consisting of 287.5 acres. IN CONSIDERATION of receiving annexation approval from the City of Bozeman, along with accompanying rights and privileges and for other and valuable consideration, the receipt of which is hereby acknowledged, in recognition of the demand for additional city water that will be generated by the development of the above- described property on the Lyman Creek Water System, have waived and do hereby for ourselves, our heirs, personal representatives, successors and assigns, the right to protest the creation of one or more special improvement districts to fund improvements to the Lyman Creek Water System to allow for backfeeding the Lyman Creek Source at additional point(s), or to make any written protest against the proposed work or against the extent or creation of the districts to be assessed in response to a duly passed resolution of intention to create one or more special improvement districts which would include the above-described property. 1 't ~ .- EXHIBIT A, ANNEXATION AGREEMENT GOLF COURSE PARTNERS, INC. PAGE 2 OF rlL ~ 135 P,\Cf 787 This Waiver is limited to the Landowner's proportionate share of the costs of administration, engineering, inspection and construction of needed improvements to the Lyman Creek Water System to allow for backfeeding the Lyman Creek Source at additional point(s). This waiver shall be a covenant running wi th the land and shall not expire. I warrant that I am lawfully seized and possessed of the real property described above and that I have a lawful right to convey the property or any part of it. DATED this 1'" day of J ",Iv / GOLF COURSE PARTNERS, INC. 199 J . M. Pl, ~ By: lI..x /J. ff.s""f... Title: ,'r.Aild04'" +- STATE OF HONTANA :ss County of Gallatin ) ~this 714 day , 19~, before me, a No r l>>,~ the k~~ownntanat'o pe~:ona~~y ~~pea~~= ~ _____ of Golf Course Partners, Inc., the corporation that executed the foregoing Waiver of Right to Protest, and acknowledged to me that he/she executed the same for and on behalf of said corporation. .. have hereunto set my hand and above written. set my . "\J(" .' " ~ \} f .-1 D '. / i!- \ . .,',( ..:-!:.. ' ..- / ':, \ i (. y- (., t,') ~ I!~ ~ """~ -" I ,I , --X "~j '. i' .)/'J " 1.1" \.,< \....".~..., .;.:: ~\ ." ;Hr~ '\ .' 2 .. EXHIBIT "B" SEWER SERVICE AREA STUDY FOR GOLF COURSE PARTNERS, INC. Written By: Reviewed By: ~ ~ EXHIBIT B SEWER SERVICE AREA STUDY FOR GOLF COURSE PARTNERS, INC. REVISED MAY 1993 PREPARED BY: MORRISON-MAIERLE/CSSA 901 TECHNOLOGY BLVD. BOZEMAN, MT 59715 Michael Smith, EIT Keith S. Belden, P.E. ~\\""\II"'",, """, \\ tl TAN. """ $o"'~~ ......... '4~'~ ~ '\....T .. .. ~ ~ ~ V,,".- -..,. '"rY. ~ ~... KEITH S. -.." ~ -...... .".- ::ww: BELDEN : l,I.l: ::...L .10692ES : > :: S~.J:> n..:. JL ~ ~ ~ cP. *. # . \P'~"_~ ~ ~~'"f.'/ST~'~''' ~i ~ 1'1' ........ -.\.~ $" '~~ c;' 4t & \. fl..~\\\'~ """'"''"''\\\\\ MM#: 2089.002.010.0310 " I' ~ PURPOSE: The purpose of this report is to provide the basis for the design of a sanitary sewer main extension which will connect the sani- tary sewer system of the Bridger Creek Subdivision as well as portions of the surrounding area to the City of Bozeman's sani- tary sewer system. SUMMARY: The proposed system will connect to an existing 30" RCP sewer main in the North right-of-way of Montana State Highway 10. The sewer main will extend northeast and east approximately 2400 feet to the East side of Manley Road. This section of the proposed main will be 15-inch SDR 35 PVC with capacity to service the entire developable area (Blocks 1 through 6) as outlined in Exhibit #1. This area will consist of approximately 450 acres. A 12-inch PVC sewer main will continue from this point eastward 750 feet. This section will service the eastern one-half of Block 2 and Blocks 3 through 6. At this point a 10-inch main is proposed to cross the East Gallatin River to service Blocks 3 and 4. In addition the 12-inch main will extend Southeasterly from this point for approximately 3000 feet crossing the East Gallatin river and connecting to two proposed sewer mains which will serve Blocks 5 and 6. One proposed main will be 8-inch SDR 35 PVC and will serve the northern part of Block 5 while the other proposed main will be 10-inch SDR 35 PVC and will serve the southern part of Block 5 and all of Block 6. DESIGN REQUIREMENTS Design Requirements will be based on Ten-States Standards. Per Capita Flows - the assumed per capita flow will be 100 gpd which is assumed to cover normal infiltration. Peak Design Flow - the ratio of extreme flow to daily average flow is determined by the following method: Q max = Q avg. 18+/P 4+/P where P = population in thousands. population Estimate - population estimates will be based on the average persons per household (2.5) as determined by the Gallatin County Development Corporation and a living unit density of four units per acre. The commercial and light manufacturing areas will be combined with the residential areas in estimating popula- tion. 1 450 acres x 4 living units per acre x 2.5 persons per unit persons. (Equates to 10 persons per acre). 4500 i .. . Daily Demand 4500 persons x 100 gpd per person = 450,000 gpd (= 1000 gpd/acre) 450,000 gpd . (1440 min. per day) = 312.5 gpm Peak Demand Peaking Factor: Qmax = 18+/4.5 = 3.29 Qavg 4+/4.5 312.5 gpm x 3.29 = 1028.2 gpm Use 1050 gpm for design purposes. Sizing Mains 1. Size main to serve Blocks 1 through 6: (450 acres) (Use Manning's equation) Assume 15-inch SDR 35 PVC Flow = Q= 1050 gpm x 1 cfs = 2.34 cfs 448.8 gpm Minimum Slope Manning's n = = 0.0015 as per Ten-States Standards 0.013 as per City of Bozeman Standards for PVC v = 2 ft/s minimum full flow velocity Ten-States Standards. as per Velocity = Q 1.49 x A x (R)2/3 x (S)~ n = 1.49 x T (1.25,)2 x (1.25 . 4)2/3 x (0.0015)~ 0.013 4 Q = 2.50 cfs V :; 2.04 fps 2. Size main to serve the East portion of Block 2 and Blocks 3 through 6: (320 acres) Assume 12-inch PVC, n = 0.013, S = 0.0023 population = 320 acres x 10 persons/acre = 3200 persons 2 1 .. Peaking Factor = 18+/3.2 = 3.42 4+/3.2 Flow Q = 320 acs x 1000 gpd/ac + 1440 min/day x 3.42 Q = 760 gpm x 1 cfs = 1.69 cfs 448.8 gpm Q 1.49 x xi!l2 x (1+4)2/3 x (0.0023)~ 0.013 4 760 gpm Q = 1. 72 cfs V = 2.18 fps 3. Size main to serve Blocks 3 and 4: (58 acres) Assume 10-inch PVC, n = 0.013, S= 0.0028 Population = 58 acres x 10 persons/acre = 580 persons Peaking Factor = 18+/0.58 = 3.94 4+/0.58 Flow = Q = 58 acs x 1000 gpd/ac + 1440 min/day x 3.94 = 163.2 gpm Q = 163.2 gpm x 1 cfs = 0.36 cfs 448.8 gpm Q 1.49 x y(0.83)2 x (0.83 + 4)2/3 x (0.0028)~ 0.013 4 Q = 1.16 cfs V 2.13 fps 4. Size main to serve the northern portion of Block 5 (12 acres) Assume 8-inch PVC, which is the smallest main size allowed by Ten-State Standards for gravity sewers; n = 0.013, S = 0.0040. population = 12 acres x 10 persons/acre = 120 persons Peaking Factor = 18+/0.12 = 4.22 4+/0.12 Flow = Q = 12 acs x 1000 gpd/ac . 1440 min/day x 4.22 Q = 35.2 gpm x 1 cfs = 0.08 cfs 448.8 gpm Q = 1.49 x y(0.67)2 x (0.67 +4)2/3 x (0.0040)~ 0.013 4 35.2 gpm 3 '\ Q 0.77 cfs V = 2.20 fps 5. Size main to serve the Southerly portion of Block 5 and all of Block 6: (222 acres) Assume 10-inch PVC, n = 0.013, S = 0.0032 population = 222 acres x 10 persons/acre = 2220 persons Peaking Factor = 18+/2.22 = 3.55 4+/2.22 Flow = Q = 222 acs x 1000 gpd/ac + 1440 min/day x 3.55 = 547.3 gpm Q 547.3 x 1 cfs = 1.22 cfs 448.8 gpm Q 1.49 x T(0.83)2 x (0.83+4)2/3 x (0.0032)~ 0.013 4 Q = 1.24 cfs V = 2a27 fps From the above calculations it is clear that the assumed main sizes will meet all requirements. Additionally, we believe our main sizes are conservative for the following reasons: 1. Portions of Blocks 1, 2 and 6 which lie within the floodplain were included within the study area. likelyhood, these areas will never be built on, reducing the useable areas and future flows. 100-year In all thereby 2. The Mannings "n" suggested by past testing is 0.010 or 0.009, which is more conservative than the n = 0.013 used in this study. We would suggest that an n = 0.011 be used leading to a 15% increase in line capacities. 4 5 J ~ Additional Construction Requirements Connection to the existing main will require the tapping of the existing manhole at Highway 10 matching the crown of the new 15- inch main to the crown of the existing 3D-inch main and forming a new invert channel. The crossing of the ditch that parallels the existing sewer main will be completed with IS-inch restrained joint ductile iron pipe. The pipe shall be wrapped with protective insulation where exposed to the elements. The crossing of Manley Road will be by open trench method using "Type 2" trench excavation and "Type A" trench backfill as de- scribed in Montana Public Works Specifications. Crossings of the East Gallatin River shall be with restrained joint ductile iron pipe with a minimum separation between river bottom and the top of the pipe of 3-feet as required in Ten- States Standards. An access road will be constructed where required to provide access to each manhole for cleaning and maintenance. C:\KEITH2\brcreek.rpt 3/19/93 - SEWER SERVICE AREA I ,l;'---.J ~/ /'//- I DATE' MAR C H 1993 PREPARED BY' MORRISON - MAIERlE/CSSA JOB NO. 2089.002 ".'.... ~ \\S'~"'-J"/i"<'" !'~'~..... ... ... ......... '\ \ \~ '-... EXHIBIT -- ! ----I , ......~~ . .. ~;... ~i , SERViCE AREA SUMMARY BLOCK AREA FLOW I 70 AC. 160 GPM 2 88 AC. 201 GPM 3 23 AC. 53 GPM 4 35 AC. 80 GPM 5 84AC. 191GPM 6 150 AC. 343 GPM TOTAL 450 AC 1028 GPM 32 --;.--:=====::>\ C \ \ -' .' ~ \ \ / / \~,/ , '. ~ II -- . ---- : . ~; , I I. '. '\~ ~_. ~--_/. .:.'-:: . \. "~ 1. IS T. 2 S Wi. 'w I/lllD . I . a:: 'a:: I I I l '.~ ,/ ,/ ,/ ......-....... / ""~ ~" " ...X i "~'1 1- :~" 1- : ~-.~ -: --- 'i.;!,' ! ? -- -', \'V'-- ~I I :~~.l ~ (~ ..r- ! . . .., ,.Q ~n'~ 1--;:- t ':: . ~_. ~O.. ! ~ 'I ': _I >l 'tSC::U l:, i"OIl'oO' '1" II ~'l' _.o.-=ll2:J GRIFF7~ J L!"J'~- I - /-". /--:--~ ., ~-~~~ ) J / !'---.... . '------\\.v.~ .,,----..) ~~.[ I L /1 Ii I, \'!'""\ L' .,. " \ ':. '- \.--' GA 36 LA I I I I~ ~ u p: l~ ;';I).~ 1-- \ I I I \. ~ ... ., '\ EXHIBIT "e" STORY MILL ROAD TRAFFIC STUDY FOR GOLF COURSE PARTNERS, INC. " '. \ , Written By: Reviewed By: .", EXHIBIT C STORY MILL ROAD TRAFFIC STUDY FOR GOLF COURSE PARTNERS, INC. APRIL, 1993 Prepared By: Morrison-MaierlejCSSA 901 Technology Boulevard Bozeman, MT 59715 Keith S. Belden, P.E. Jack R. Schunke, P.E. MM# 2089.002.010.0310 " ~ 1 " PURPOSE The purpose of this report is to review existing traffic and levels of service on Story Mill Road and to assess the impacts from the build-out of Bridger Creek Subdivision and the 18-hole golf course associated with it. The basis for this study are traffic counts collected between November 13, 1992, and November 20, 1992, and trip generation estimates developed from the ITE Trip Generation Manual, 4th Edition, 1987. SUMMARY Story Mill Road is currently operating at a Level of Service A (LOS A) and may operate at a LOS B for short periods of time. Phase 1 of Bridger Creek Subdivision will add 109 vehicles per hour (vph) to an existing load of 125 vph. With the increased loading from Phase 1, Story Mill Road will operate at a LOS B, with the increased traffic being substantially mitigated by improvements to Story Mill Road and McIlhatten Road. It is assumed that the golf course will be operating at 75% ultimate capacity at the conclusion of Phase 1. phases 2 and 3 will increase the vehicular loading on Story Mill Road by 167 vph and 258 vph respectively, to 292 vph and 383 vph respectively. With the addition of Phase 2, Story Mill Road shall continue to operate at a LOS B. At full build-out of Bridger Creek Subdivision, Story Mill Road may operate at a LOS C during peak hours, with a reserve capacity of 165 vph. An analysis of the intersection of Story Mill Road with Bridger Canyon Drive was performed based upon the methodology in the Highway Capacity Manual, Special Report 209, 1985. The existing LOS for this unsignalized intersection was examined, together with a capacity determination for each successive phase. A review of the intersection worksheets indicates that all four legs have an existing LOS A. The south leg of the intersection eventually reaches a LOS C with full build-out, while all other legs remain at LOS A. Bridger Canyon Road is currently operating at a LOS C at peak hours during the months of ski operation. Traffic counts by Montana Department of Transportation (MOOT) reveal that there were 390 vph during the peak hour on November 19, 1992. Bridger Creek Subdivision will add 414 vph to Bridger Canyon Drive for a total of 804 vph. Therefore, Bridger Canyon Drive may operate at a LOS D (=1,048 vph) for short periods of time. Phase 2 will add 323 vph to Bridger Canyon Drive peak hour traffic for a total of 713 vph and operate between a LOS C (=691 vph) and LOS o. Bridg- er Canyon Drive will operate at a LOS C with the build-out of Phase 1 based upon Phase 1 generating 265 vph for a peak of 655 ... " .. vph on Bridger Canyon Road. If we use the existing flow rate of 222 vph in lieu of the one day peak of 390 vph to assess service levels, one can show that the Level of Service does not drop below LOS C. (414 vph +222 vph = 636 vph < 691 vph = LOS C). TRAFFIC ANALYSIS EXISTING CONDITIONS~ Story Mill Road is a two-lane County paved road that runs north from Bridger Canyon Drive and which inter- sects with McIlhatten Road north of Bridger Creek. From this intersection Story Mill Road continues north beyond the city landfill as an improved County gravel road. McIlhattan Road is also an improved County gravel road. FUTURE IMPROVEMENTS. "Conditions of Approval" for the approved preliminary Plat for Phase I of Bridger Creek Subdivision and for the opening of the golf course require that Story Mill Road be improved to a 24-foot wide County paved road with a 3 or 4 foot paved shoulder for a bicycle lane, north from Bridger Canyon Drive to the intersection with McIlhattan Road. McIlhattan Road shall be improved likewise west from Story Mill Road to the subdivision boundary and shall be improved from the subdivision boundary to the intersection of Manley Road, to a County gravel standard. EXISTING TRAFFIC. Traffic counts supplied by Gallatin County for the period of November 13, 1992, to November 20, 1992, show a weekday average of 915 vpd and peak hour average of 96 vph. Our report used an actual peak hour traffic volume of 125 vph adjust- ed to reflect a IS-minute peak period within the peak hour. We elected to use this adjusted peak hour believing it to be more appropriate for urban conditions (Bridger Canyon Drive) and more conservative when analyzing rural traffic (Story Mill Road). Traffic to the City of Bozeman Landfill contributes 27% or 246 ADT (= 25 vph) of the traffic experienced on Story Mill Road. We assumed that each load contributed two trips or vehicles per day to the traffic count. LANDFILL PERCENT OF TRAFFIC COUNT LANDFILL LOAD VEHICLE EXISTING DATE (ADT) COUNT COUNT TRAFFIC 11/16/92 1013 162 324 32% 11/17/92 958 126 252 26% 11/18/92 798 104 208 26% 11/19/92 890 100 200 22% MDOT completed a two day traffic count over November 19 and 20, 1992, at a point south of Bridger Creek Trailer Court on Bridger Canyon Drive. They recorded an ADT of 4330 vpd and a peak hour of 390 vph between 5:00 and 6:00 p.m. Historically, the highest hourly volumes have occurred in January with an average of 408 'I ., vph with as many as 636 vph occurring between 4:00 and 5:00 p.m. on a Saturday. Existing traffic splits range from 60-40 to 83-17 during the afternoon peak hour in the ski season. We used a 70-30 split for the Story Mill Road-Bridger Canyon Road intersection analysis on the assumption that the weekday peak from the subdivision does not conflict with the weekend or weekday peak generated by the Bridger Bowl ski resort. LEVEL OF SERVICE Level of Service criteria address physical constraints relating to mobility and accessibility when rural roads are considered and address delay times when analyzing unsignalized intersections. Level of Service is divided into six categories for rural two- lane highways and unsignalized intersections from A to F as follows: RURAL TWO-LANE HIGHWAYS Level of Service A is the highest quality of service a particular class of highway can provide. It is a condition of free flow where there is Ii ttle or no restriction on speed or maneuverability caused by the presence of other vehicles. Oper- ating speed is in the highest range and vehicle density is low. because speeds are high and volumes low, the occurrence rate of some kinds of accidents may be higher than at other service levels and the total economic cost of providing the service may be excessive. Two lanes typically provide operating speeds of 60 mph or higher and 75% of the passing maneuvers can be completed with little or no delay. Under ideal conditions, a service volume of 400 passenger vph, total two-way can be achieved. Level of Service B is a zone of stable flow. However, operating speed is beginning to be restricted by other traffic. The re- striction on maneuverability is still negligible, and there is little probability of major reduction in speed or flow rate. This level of service approximates typical design volumes for high volume type rural highways, including freeways. Two lanes typically provide operating speeds of 50 mph or greater and volumes may reach 45% capacity with continuous passing sight distance. Volumes of 900 passenger cars per hour, total two way, can be carried under ideal conditions. Level of Service C is still a zone of stable flow but at this volume and density level, most drivers are becoming restricted in their freedom to select speed, change lanes, or pass. Operating speeds are still in the range of 2/3 to 3/4 of the maximum. This level of service is frequently selected as being an appropriate criterion for design purposes, particularly for urban freeways where the cost of providing the higher service levels during peak ~ ~ '. periods may be prohibitive. Two lane traffic still provides a stable flow. Operating speeds are 40 mph or above. The total volume under ideal conditions equals 70% of capacity with contin- uous passing sight distance or 1400 passenger vph, two-way. Level of Service D approaches unstable flow. Tolerable average operating speeds are maintained, but are subject to considerable and sudden variation. Freedom to maneuver and driving comfort are low because land density has increased and the probability of accidents has also increased. Most drivers would probably con- sider this service level unsatisfactory. Two lanes of traffic are approaching unstable flow. Operating speeds of approximately 35 mph and two-direction volumes of 85% of capacity are encoun- tered with continuous passing opportunity. This level of service provides approximately 1,700 passenger cars per hour total two- way traffic under ideal conditions. The upper limit of Level of Service E is the capacity of the facility. Operation in this zone is unstable, speeds and flow rates fluctuate, and there is little independence of speed selec- tion or maneuver. Since headways are short and operating speeds subject to rapid fluctuation, driving comfort is low and accident potential high. Although circumstances may make operation of these facilities under these conditions necessary, it is clearly undesirable and should be avoided whenever feasible. Traffic volumes under ideal conditions for two lane, two-way total, is approximately 2,000 passenger vph. Level of Service E may never be attained and operation may go directly from level D to level F. Level of Service F describes forced flow operations after the density has exceeded optimum. Speed and rate of flow are below the levels attained in level E and may, for short time periods, drop to zero. Level of service F is forced, congested flow with unpredictable characteristics. The volume of two-way traffic falls below that of level E. UNSIGNALIZED INTERSECTIONS LEVEL OF SERVICE CRITERIA FOR UNSIGNALIZED INTERSECTIONS RESERVE CAPACITY (PCPH) LEVEL OF SERVICE EXPECTED DELAY TO MINOR STREET TRAFFIC a. A B C D E F Little or no delay Short traffic delays Average traffic delays Long traffic delays Very long traffic delays a. >400 300-399 200-299 100-199 0-99 TABLE 10-3. HIGHWAY CAPACITY " a. When demand volume exceeds the capacity of the lane, extreme delays will be encountered with queuing which many cause severe congestion effecting other traffic movements in the intersection. This condition usually warrants improvements to the intersection. The service flow rates for Story Mill Road and Bridger Canyon Drive are as followa: EXISTING IMPROVED BRIDGER SERVICE STORY MILL STORY MILL CANYON LEVEL ROAD ROAD ROAD LOS A 128 157 144 LOS B 264 324 375 LOS C 447 548 691 LOS D 660 810 1048 LOS E 1278 1568 2025 Our service flow rate calculations for Story Mill Road, included within the Appendix, were based upon rolling terrain with 80 percent of the road offering passing opportunities. MDOT esti- mates for Bridger Canyon Drive were based upon rolling terrain and 50 percent of the road offering passing opportunities. As previously stated, Story Mill Road is operating at a LOS A with 125 vph and a reserve of 3 vph. It follows that Story Mill Road will operate at the following service levels and reserve capacities: PHASE SERVICE LEVEL RESERVE CAPACITY Phase 1 LOS B (234 vph) 90 vph Phase 1 & 2 LOS B (292 vph) 32 vph Phase 1 - 3 LOS C (383 vph) 165 vph (Table A-I in the Appendix summarizes the aformentioned informa- tion. ) MDOT Road vph. been has stated that the existing flow rate for Bridger Canyon is 222 vph which is LOS B with a reserve capacity of 153 Peak hour traffic volumes as high as 636 vph (LOS C) have recorded during the ski season. Applying a peak hour factor of 10 percent times the ADT generated by Bridger Creek Subdivision and summing this product to the average flow of 222 vph we can estimate the service flow rates on Bridger Drive as the subject project develops. , , 1 1&2 1-3 2649 3228 4141 PEAK HOUR (vph) 265 323 414 SERVICE FLOW RATES LOS PHASE ADT 487 545 636 C C C As previously stated Bridger Canyon Drive can be expected to operate at a LOS D for short periods of time but only during the ski season and then only if the peak hours for the development and the resort coincide. This is unlikely to occur to any great extent inasmuch as the expected resort peaks will generally occur on weekends as opposed to a weekday peak for the development. The intersection of Story Mill Road with Bridge Canyon Drive will operate at LOS A for the turning movements from Bridger Canyon Drive and for all of the movements from the north leg of Story Mill Road. The service level from the south leg of Story Mill Road will progress from a LOS A with an average reserve capacity of 442 passenger cars per hour (pcph) to a level of LOS C with a reserve capacity of 257 pcph. We believe that this drop in service level to be insignificant due to the fact that less than 15 pcph are expected to use this leg of the intersection under average conditions. Complete intersection analyses are provided in the Appendix. TRAFFIC GENERATION Trip generation rates were developed from the ITE Trip Genera- tion, Fourth Edition 1987 and from generally accepted rates as used by the City of Bozeman Planning and Engineering Staff. A rate of 9 tripends per day per unit was used for all of the residential areas. The raw acreage in Phases 2 and 3 and in portions of Phase 1 were converted to residential units by assum- ing that 25 percent of the gross area was utilized for roads, parking lots, etc. and that an average of 5 units per acre could be realized on the remaining land. The rate of 9 tripends per day represents trips generated by the residential units including service vehicles. Bridger Creek Subdivision will generate 3,177 residential ADT with Phase 1 = 1,188 ADT, Phase 2 = 744 ADT and Phase 3 = 1,215 ADT. The commercial areas of Phase 1 utilized data from Section 770, Business Parks, page 1041 from ITE Trip Generation manual to estimate trip generation. Ln (T) = 0.88 Ln (X) + 5.46 where: T X = Ln = Number of Trips Acres (= 7.11 Ac) Natural Logrithm Ln (T) 0.88 Ln (7.11) + 5.46 T 1321 ADT The trip generation rate for the light industrial areas of Phase 1 was also developed from the ITE manual and is again based upon acreage. From Section 130, General Light Industry on page 118, trip generation for the light industrial is as follows: T 42.44 (X) + 263 where T and X are defined as stated previously. T = 42.22 (5.69 Ac) + 263 503 ADT Trip generation estimates for the golf course are based upon an analysis of valley View and Riverside Country Clubs completed for a previously submitted conditional use permit for a development in the Bozeman Area. The conditional use permit dated April, 1991 was subsequently approved by the local governing budget. The former study estimated a maximum of 90 group rounds of golf per day with an average of 3 golfers per group. Therefore a maximum of 270 golfers per day can be expected to have tee times. If we use an average of 1.5 golfers/vehicle then a maximum of 180 vehicles per day would be generated by the golf course. 90 group/rounds x 3 golfers group + 1.5 golfers/vehicle = 180 vpd In addition, the driving range and service personnel will gener- ate 50 and 20 vehicles per day, respectively. Therefore a total of 250 vehicles per day would be generated as a result of de- veloping the golf course. This equates to 500 tripends per day: GOLF COURSE DRIVING RANGE SERVICE TOTAL 180 vpd 50 vpd 20 vpd 250 vpd x 2 tripends/vehicle = 500 ADT The previously mentioned study assumed that 60 percent of the golf course use was generated internally. We have assumed an internal generation rate of 40 percent which represents 6.3 percent of the future residential traffic loading. Ski Resort. occurs during the weekday coinciding with a peak hour sponsored by the development for which the highway will operate for short time periods at a LOS D. In general Bridger Canyon Road will operate at a LOS B or C. c:\keith2\traffic APPENDIX . , " , . r10!risonACSS1\ Materiel' ~ LE.V \:=.. L PRO.lCT: B ~ \ '0 G €12.... C ~ e. E ~' ~.J,% b '" Is.., 0 \J BY: \:::::S6 DATE ~ -\~-93 PIlO1NQ. CHK: PAGE: \ OF DATE O~ s~\C.Y\CE STo'C:'( M \ LL- 'e."D . . E 'XIS-\\ t--l C:, 'S\oe '( ~ \ '-L \CO (.':,.."'U G 'vel""\ ". rv - so ffi'O'" soe~ ~ 'I I I \ I \,oJ.:> - \ \ \ c.'(\e~' \"..J \~\...... -z..' S'n0-.>\d.l.':..\$ ,"0\ \\ 'f\ ')- -t-<=- C-T Co ; ..... "l.oV{ =- C"\ u - f "'" ~~ , (j ") 1:Q 1\ e.. Go/~o. d\r-c:...c....~'o('\.:..\ S"(\'\.-T \'" ~/.:) +C-\.I';"\~-.':l \'>/0 'ou.",e~ '2. cJ/o '2. '-..l's. "'\ \JI,~ ~ <'" = _ ?....~s.c::.I"\"0-eA C""'.-"" /L; ~ \ 0"7 ~ ?~' 9-,-~ IV' +r-c. ~h" co 'f""\ \ \ - \l... - '7?.... \ 09 -;: 1 '"2.. S. - o. 8"'1 c.-.::u I"\~ V ?\-\F =. w \,.-,. e \' c.. 'F' \-t F \ ~ r;.r<:)<Y\ T...'-o\..:. e.:~~ ?8-l C c.. \ c.....; \ c..~ 0 ".... ->0 " \ 'S+:": ~ '2.60.:> 'i... (:t/c..). f-. \.6. -.,(, ~"" )I. ~ Hy ~ ~ '-C-\4~ ~ - \/ ~.,.. "1?-r (J~\-\') .;-?e (E['t-\) +- '?\? (E~-\5] whe.re. ~ '"\) I ~ ~ \ :. Co ~ \-J =- 0.\0 ~,... o.Sl (:.()~ \ZD \ " "''':) 0.'- s~ r- LO~ _ ~ I 0 . 1. '7 ~ r- LO So C- o. c:r ~ ~t- LO~ IS. (T ~\o\"C.- e, I \ I 'Z-O (J /..::, f\ u ? .... H \ 1\ '} , ) '-os. p... I \.;..O~ D , \ct"'",...\..... 1 o,cr'i (\~\o\c:. 6..~\ 't-'CJe>-9 90\, fJ,O/4.0 Sfkt) O,IS: ~r LoC ~-i) I L Tc.o\~ B.G. 1 r'''o t?>-9 2. \ s'n(),.A~e~)- o. a~ LC)~ G. ~..- \ \ I \ c.Y"\e~ c,~ - . . - E -:. "" ~.-- La':, Ac I S ~.- L.OS -g-G:. T Ee. "" 3:2. \:u.- La:::, A-) "3.3 ~,- LeI::::. ~~C ( E--g. =- 5.0 ~.- LO,S (:>.. 3.4 ~r LO";:) 'B},.c , I (To:;'b\-c..- B;~ I ~ 8.,..~) s.':> Lo~ 'D ~,E '2..9- LO"S \)~" G , , " PROKT: f1o!risonACSS1\ Malerle/' ~ BY: DATE PROJ. NO, CHK: DATE PAGE: ~ OF C~~C.I...Cb f:..:) ::\ I ~~'~-\c.. (~_\).l,. .oi. ('3.'2.':\) + ,0 \ (~-\)~' ': 0;<.046 C ~'1 \L.o's 'B ~c) ~ \ I u -\- . \v (~- \ ') ~ .OL (3 ,9-\) ~ .0\ (3,o:\-\JJ ::_.O.~B\ ~ (LD~ b ~G.J::' \ I G. +. \G, (~-\J ~,UL ( ~ .~-\) ~,O\ (-z.,9-I)j I-JrV :. O.SBi Gl="~= 'Z.eoo~o.\O ~d.9~'i.. 0,\';. )<._0.<..042..- \ "Z.. S 'I l' ~ . . , S-TOC-, {"{\\\\ \.::::, o?e\",-~{\a. c.~.... . _ S ec-'-I \ ~ {::... \.U ~e (".e... \ "l.S -p " 'f, \--. Q 1"\d .\ So 0- '?? ro o..c.. """' \. (\ ";;). 0. L eo. '-L -eX 0 ~ L- e. '11-e\ 0 ~ L \"'70 L - .'--0 .........1'''1. So C- \'-..,r \ c....-c l.S. . r ._~ _... .,._. -..... n... _...-' : ~" MO!risonACSS1\ Malerle/' ~ PIlO.lCT , . , BY, DATE PIlOJ. NO, CHK: DATE PAGE: 2) OF . .. r--U\u~G. ~"\ 01:::.'(' ,J'\'\ \ '-L \<.. D _ Gi"e'f'\ ~ +\I-lCl \""2.' \ <2.V\.es W\-\-~ 4\ s.."t;Q..l\6e.~ C.:\ ".." ,,~() ~ . SF = L. S:.F 'I.. S~IC:::,.\\N.~ c. yJ L. - ~v.} S......'l:.\\N(.. Q. : \oJ' (. 0.9"2.. L-O~ ~-D 0.'=7"'1 LO S G.. , , , 9~, t.. = (2w l4.:)( ''''-n '" l.o o .'7"2.... O,IS ~~ L os.. ~ - 0 O.'7t a.B~ ~ r L-O-S. tC.. .. / 0,1 S; S'i=-""~ :::. \ ?. e, 'f.. _0.97- :: \S, v,,\.t Stt:" E - ~ '2.(0 .:3.. ' 'I.. _0."7"2.. /OIIS :. 3"2..6. v'?\t S~c:.. :: 4~\ Y- O .'7L.! 0,1 S - s...1.& 'v'"f~ - SF-p ~ CoCo 0 (... O. ~'2.. / 0.1 S :::.. 8\0 v,?"" SFc. - \L..""lS '.(. 0.'=71 /o,Be :. \ ~Co 8 "'?"" - --" .. .. - - _, .~'. _W. ~ . ,.- ._~ , , . MO!risonACSS1\ Malerle/' ~ PIlO..ECT, BY, CHK: ~ ..d::u f-'\ A. N -- 0 V u) il1 u~ (1) - Jl <i 4: ~ - --':t 0- rJ H- .... rD- 111 tJ cLI~ uJ ............. JI ~ <t <1 :t P. '<"1 - uJ '<j'" dJ J) d)O """- <1 ~ <t - t'J IT' \ ::r I}- _ _ on - , '.. -, .-'-'> -- - . . ~- _.' 1 (1) ~ Lf) ~ tJ -tf1 <i - - <[ - X uJ -, I- I- --~ ~ W -1 0~ ~ 6 ~ i ~ !l .' \.l 1.11 c... U1 oJ 4 ,.., ,,-.D ill --u.-v _ _ tJ, ., ..- d \J. tJ \J 0 J \) I.1l ~ ~ ~ 7. o ttl '7 / ~~ u__ ----:t- "'7 ~ -- ~,. ,.,. '. . bl.- , juJ -l!)Q -.. ~. 7 () a p. ,.. ') .J ~ fr f 4" o 7. f w cJ ;J ~ .. $ .,. Ul Q j 2 I- ~ l- ,.. 4: - "2 ~ \J .i - u.l U -- ~ III III IJ.. J Q r!) <i I- J J DATE PRQl NO. DATE PAGE: uJ :t r 0 F@ ..., J 0 4: ~ ') p... . ('f r- ill Z ill W JlIf - r (1 o D LL J J: O-W o /' bJ 0 1.0 ......0 o J 9 J uJ --- 1 ~ '" r :J J r[).u. !J. 0 o - - r. ---- lf1~uJ o VI ~J<1. - -. - 0 :r 1.1 ~ J - ' rll.J ]l.lJ ) <t ~ o ~ [1J V r - - ~ UJ J a J 1 /J. o' ~ ~ rjJ~~r: ill ill 'J,. P l->L!J<[ o 1 .-: " " OF , . FUTU RE P.HASE :3 ~1 LEGEt-rD B ADT'S BETWEEN NODES 23 DIRECTION-SPECIFIC ADT . NODE !!} + N 0 ~~ < 0 a: ....I ....I ::E 0 >- a: 0 I- (J) GOLF COURSE, ;375ADT McLLHATTEN 23 ADT <:"J' STORY MILL 2 ADT -'>'4,. ~ \ . ,.~ "'" ~ +~ 040 FUTURE PHASE 2. RESIDENTIAL .COMMERCIAL INDUSTRIAL 4r. C'/< PHASE I 3012 ADT 1188 ADT 1321 ADT 503 ADT ~ ~ 1040 E1 40 0/0 ~l GOLF COURSE 75 ADT INTERNAL 412 ADT MclLHATTEN 136 ADT STORY MILL 15 ADT 0;12. IDO If')\l) BRIDGER CANYON DRIVE GJ w " FIG. . . TRAFFIC STUDY-PHASE 182 ~s r.- "1 '!SQ -'0.1 FUTU RE PHASE 3 ~ /~ s GOLF COURSE 42S ADT MclLHATTEN 23 ADT >.) STORY MILL 2ADT ~~/( ~~ I,-W )-~ 1- '90 '40 PHASE 2 22,98 AC. x 0,75 x Sunits/k x 9 ADT ,= 774 ADT MelLHATTEN 35 ADT .sTORY MILL ,4 ADT .GOLF-COURSE 50 ADT LNTERNAL 106 <0 PHASE I 3012 ADT RESIDENTIAL COMMERCIAL INDUSTR IAL 1188 ADT 1321 ADT S03 AD T 1040 40% GOLF COURSE 75 ADT INTERNAL . 412 ADT Mel LHATTEN 136 ADT STORY MILL ISADT .-- ~ o Q <.D 0 U'} <.D BRIDGER CANYON DRIVE ~ ~1 0 ~I <l: 0 " -.l ...J ~ :::E >- c:: 0 l- ll) <.DIU) NO N- ~l ill G 23 . . . LEGEND ADT'S BETWEEN NODES DIRECTION*S PECIFIC ADT NODE FIG. 2 BRIDGER C REEK SUBDIVISION TRAFFIC STUDY-PHASE 1,2,3 GOLF COURSE 500 ADT MclLHATTEN 23ADT /'51'0' STORY MI LL 2 ADT ~ PHASE 3 36.01 Ac, x 0,75 x 5 uni1S/Ac. x9ADT: 1215 ADT t-4cILHATTEN 55 ADT STORY MILL 6 ADT GOLF COURSE 75 ADT JNTERNAL 166 PHASE 2 22,96 Ac. x 0.75 x 5 units/Ac. x 9 ADT : 774 ADT MclLHATTEN 35 ADT STORY MILL 4 ADT GOLF COURSE 50 ADT INTERNAL 106 ~ 4,;;:V ""l )oJ': ~1' -90 ""'It) PHASE I 3012 ADT 1166 ADT 1321 ADT 503 AD T RESIDENTIAL COMMERCIAL INDUSTRIAL GOLF COURSE 75 ADT INTERNAL 412 ADT MclLHATTEN 136 ADT STO RY MILL 15 ACT ~ o 0 \1)0 10 \I) BRIDGER CANYON DRIVE 1040 ~1 1 40% ~l ~!0 ~t o oct o c:: ...J ...J :::E [ ~ I ~ [j] ~ 23 . \ LEGEND ADTS BETWEEN NODES DIRECTION-SPECIFIC ADT NODE FIG. 3 UNSIGNALIZED INTERSECTIONS 10-35 E.. X\ S \' \ r--\ G:. WORKSHEET FOR FOUR-LEG INTERSECTIONS Page 2 STEP 1: RT From Minor Street r V9 j VI2 Conflicting Flows, V ( 1/2V)+V2=V(9 1/2V6+Vs=Vm \"'S. <:; + 85 = \o-z... vph \.'~ -l- z.o 3 - 20<;;' vph _i_- Critical Gap, T( (Tab, 10-2) CO.5 (sec) uS (sec) Potential Capacity, cp (Fig. 10-3) cp9 = 6\0 pcph Cpl2 = ,"2.0 pcph Percent of cp Utilized (V9/C;9) X 100 = 3 % (V12/CpI2) X 100 = 0.6, % Impedance Factor, P (Fig, 10-5) P9 = Q. "?B P12 = 6.99 Actual Capacity, cm cm9 = cp9 = 8\0 pcph c = C = (La pcph ml2 pl2 STEP 2: LT From Major Street I V4 ~ VI Conflicting Flows, V ( V)+VZ=VC4 V6+VS=V<I ~+ es = I\S vph '3 ..l.. '2..03. = "2.06 vph -,- Critical Gap, T ((Tab. 10-2) So.S (sec) IS.S (sec) Potential Capacity, cp (fig, 10-3) cp4 = '790 pcph cpl = 980 pcph Percent of cp Utilized (V4/Cp4) X 100 = c....S % (vjcpl) X 100 = 0.\ % ,Impedance Factor, P (Fig. 10-5) P 4 = O.'7G:. P1= o.q<:7 Actual Capacity, cm cm4 = cp4 = 99-0 pcph Cm 1 = cp I = BeD pcph I STEP 3: TH From Minor Street \ VB I VII Conflicting _ Flows, V ( 1/2V )+V 2+V I+V 6+VS+V4=V<B 1/2V6+V s+V4+V)+V2+V I=V<l1 JL + e:,e, + ---L- + ~+ t..o3. + ,0 + ~+ 203 + lD = 319 vph ...E:!- + 8~ + -L-= '3'7\ vph Critical Gap, T< (Tab. 10-2) (.S (see) (.S (see) potential Capacity, cp (Fig. 10-3) cpa = "1 (.,0 pcph Cpll = 4SS pcph Percent of cp Utilized (VB/Cpa) X 100 = O.S % (Vl\/Cpll) X 100 = OS % ,Impedance Factor, P (Fig. 10-5) P = o,CJ5 Pll = 0:=7'7 a Actual Capacity, cm cma = cp8 X P I X P 4 Cm 11 = Cp II X P I X P 4 "\'?, - 4(,,0 X ~3l.. ',.- a.SS X 0.99 X 0.9<...:. (pcph) 0.'9<.0 X o .'7'7 (pcph) STEP 4: LT From Minor Street lV7 Lvlo Conflicting Flows, V ( V<8 (step 3) + Vll + V12 = V(7 V<ll (step 3) + V8 + V9 = V<IO 31L + --L- + 2- = -;'63 vph ~ + -..L + -z..s =.5.lli..... vph Critical Gap, T( (Tab, 10-2) 6.0 (sec) ~.O (sec) Potential Capacity, cp (Fig. 10-3) cp7 = ~1.S pcph cplO = ..0, CO pcph Actual Capacity, cm cm7 = cp7 X P I X P 4 X P 11 X P 12 CmlO = CplO X P 4 X PIX PBX P 9 "39(0 = 41.5 X 6.99x 3Bb =~X O.9CaX ~X O.99X~(pcph) 0.99 X~X 0.'7~ (pcph) 10-36 S X ~-Ti URBAN STREETS \ ';""Ie:.... '-' WORKSHEET FOR FOUR-LEG INTERSECTIONS Page 3 SHARED~LANE CAPACITY vj+vj where 2 movements share a lane CSH = (vJcmi) + (vi/cm;) v1+vj+v" where 3 movements share a lane CSH = (Vi /cmJ + (V/Cmj) + (V,,/Cm,,) , MINOR STREET APPROACH MOVEMENTS 7, 8, 9 Movement v(pcph) cm(pcph) csH(pcph) CR = CSH - V LOS 7 '7 3 '7 Co Co\ 9 Co\O A 8 2- I 4. "'S I Co \ '7 Co. \1 A 9 '2.~ B\O Cc \9 S9<:::\ A MINOR STREET APPROACH MOVEMENTS 10,11,11 , Movement v(pcph) cm(pcph) csH(pcph) cR = CSH - v LOS 10 I 3'3'5 4L\c.o d,~9 A 11 \ ~;'L. L\L\e:, ~LI,S A 12 "3 \7-0 A~lo I .:; 4~ \ A :MAJOR STREET LEFT TURNS 1,-4 Movement v (pcph) Cm (pcph) CR = Cm - v LOS 1 \ geo 6t9 A 4 "10 '790 9'2.0 A COMMENTS: , '~" " ' , \. ,. ( " --' UNSIGNALIZED INTERSECTIONS 10-35 '? \-.\ A ~ G:. ::L WORKSHEET FOR FOUR-LEG INTERSECTIONS Page 2 STEP 1: RT From Minor Street r V9 j VI2 Conflicting Flows, V ~ 1/2 V J + V 2 = Ve9 1/2 Vb + Vs = Vel2 zS ...1.. e '2:> = \\3 vph ~+ '2..03= 7..0$ vph -,- Critical Gap, Te (Tab, 10-2) (p,S (sec) G..~ (sec) Potential Capacity, cp (Fig. 10-3) cp9 = SoO pcph cp12 = T2..0 pcph Percent of cp Utilized (v9/~p9) X 100 = Co % (vI2/cpI2) X 100 = o. \ % Impedance Factor, P (Fig, 10-S) P9 = 0,% PI2 = O.'~9 Actual Capacity, cm Cm9 = cp9 = sea pc ph Cml2 = Cpl2 = (GO pcph STEP 2: LT From Major Street I V~ --.J VI Conflicting Flows, Ve V J + V 2 = V c~ Vb+V;=Vel Sb ...1.. '2>e:. = \"33. vph 3 ...!... Z03 = z:o<o vph -'- -,- Critical Gap, Te (Tab. 10-2) S,S (sec) 5,S (sec) Potential Capacity, cp ('fig. 10-3) cp~ = 9,0 pcph cpl = 8eo pcph Percent of cp Utilized (v ~/cp4) X 100 = ---1..3_ % (vl/ep') X 100 = 0.\ % Impedance Factor, P (Fig. 10-5) P = 0.9::' P = 0.99 ~ I Actual Capacity, Cm cm~ = cp~ = <=;), 0 pcph Cml = cpl = 8/i:S(:) pcph , STEP 3: 11i From Minor Street \ Vs I VII Conflicting Flows, Ve 1/2VJ+V 2+VI+V b+V5+V~=Ves 1/2V b+V s+V ~+V J+V2+V I=Vell ZS + ee, +---1-+ z. ...!...W>...1..\~0...1.. _'_1_1 ~ + 'Z.o~ + \30 = 6.9) vph SO + 5'0+ --1-- =.sJS... vph Critical Gap, Te (Tab. 10-2) r.c; (sec) {.S (sec) Potential Capacity, cp (Fig, 10-3) cps = ~-z..O pcph Cpll = <:\0$ pcph Percent of cp Utilized (va/cps) X 100 = \ % (vll/cpll) X 100 = D.C; % ,Impedance Factor, P (Fig. 10-5) P = 0.'7'7 PII = 0.9"7 s Actual Capacity, cm cmB = cps X P I X P ~ Cmll = cpl! X PI X P~ 3Br = a. '2..0 X :'\3 = 4,o~ X 0.99 X 0, '73 (pcph) 0.9-"3 X 0.99 (pcph) STEP 4: LT From Minor Street lV7 LVlo Conflicting Flows, Ve V~B (step 3) + VII + V12 = Ve7 Vel I (step 3) + Vs + V9 = VelO 4SD+~+~= 4.SS" vph ~+~+SS;- =S:?;,?, vph Critical Gap, Te (Tab. 10-2) B.O (sec) 8,0 (sec) Potential Capacity, cp (Fig. 10-3) cp7 = 31'5 pcph cplO =~O pcph Actual Capacity, cm cm7 = cpi" X P I X P ~ X P II X P 12 Cm10 = CplO X p~ X PI X Ps X P9 ?:,~ = ~($ X 0.99X 1.96 =~oxQ23.x 0,9-:' X 0.99 x..0.22. (pcph) 0.99 X 0.99 X 0.9c'a(pcph) " 10.34 V HAS!;;. URB....N STREETS WORKSHEET FOR FOUR-LEG INTERSECTIONS Page 1 S-\-o t"'-; t'f\\\\ "'2:; o....h Location: B.nc,,,,~, c"""i v ("'I \:)r;v r" Name: Br;d...,c:.c- C("'~c\:::. s..},=d.~....... \ \.\' v.. .. .. HOURLY VOLUMES Grade 0:'> % 1 CD . STOPD 1ll2N-O! N YLELDD j" I" t \. V~ '3 N=D , Vs z.o~ N=D ( V~ '1." G..-ade ~% ) GI"2.de 0.<;" % - \ v, T major road - e.9> V2 {; ~I ~~~ c......t-l Yc.>>-l ViZlVI;; . L40 V, 1 I rr STOP 0 '\ f N=D v, Va V9 YIELD 0 \ I I --- Date of counts: minor road Zt.. .6, ~o Time Period: 'S:TO '2... "i N'\\~ Average Running Speed: ~f>.C> PHF: Grade oS % r VOLUME ADJUSTMENTS Movement No. \ 1 2 \ 31 4 5 \ 6 \ 7 8 \9\10\11\12 Volume (vph) \ \ eel CoO \'39 ' I \ 'Z.L \(,,0\ '1 Is '2.031 "3- .:1 3. Vol. (pcph), see Table 10-1 I ~ i ~!\Ss; lZ.q \4 I~~\I 3 \J VOLUMES IN PCPH ~ 2-.l2. L ~v" 1. v~ 1 \. NA v~ NA 1 Vs , \ ...J V4 \53 NA VI ( I V2 NA ~' V, Va v, 1 --- : 'Z..q .::\ f.Jb i ~L "......... / t " .. UNSIGNALlZED INTERSECTIONS 10-35 ?' \--\ ~c;. G.S \ ~. '- . . . <, WORKSHEET FOR FOUR-LEG INTERSECTIONS Page 2 l stEP 1: RT From Minor Street r V9 j VI2 Conflicting Flows, Ve 1/2VJ+V2=Ve9 1/2 V6 + Vs = VeU ::.0 + ae = I Ie vph ~+ZO~= zoS" vph Critical Gap, Te (Tab, 10-2) (,.S (see) c....S (see) Potential Capacity, cp (Fig, 10-3) c = ADo pcph Cpl2 = 1"2..0 peph p9 Percent of ep Utilized (V9/eplf) X 100 = B % (VU/CpI2) X 100 = o. \ % Impedance Factor, P (Fig. 10-5) P9 = 0.9<::\ P12 = 0.'79 Actual Capacity, cm cm9 = cp9 = BOO pcph Cml2 = Cpl2 = 17..0 pcph STEP 2: LT From Major Street I V~ --.-J VI Conflicting Flows, Ve VJ+V!=Vo V6+V5=Vel J.2.Q... + 66 = \<:::\5 vph ---2- + W~ = 'lOCo vph Critical Gap, Te (Tab. 10-2) S,S (sec) s..s. (sec) Potential Capacity, cp (fig, 10-3) cp~ = 9SO pcph epl = Bea pcph Percent of cp Utilized (v ~/ cP',) X 100 = \S % (VI/Cpl) X 100 = 0.1 % . Impedance Factor, P (Fig, 10-5) P = 0,90 P = 0.99 ~ I Actual Capacity, cm Cm~ = ep~ = ~SO pcph Cml = Cpl = Beo pcph , STEP 3: TH From Minor Street \ Vs \ V1I Conflicting Aows, Ve 1/2V3+V2+V I+V b+VS+V~=VeB 1/2V6+V 5+V ~+V J+V2+V I=Vell 30 + ~€> +-L+ ~+ 2.0;"+ \S3+ ~+'Z.03 +~= -4"18vph LoO + -06+ --L-= SOlvph Critical Gap. Te (Tab. 10-2) -'S (sec) l'S (see) Potential Capacity, cp (Fig, 10-3) cpB = -41 D pcph Cpll = ~BC) pcph Percent of cp Utilized (vs/cps) X 100 = \ % (VII/Cp1l) X 100 = \ % .Impedance Factor, P (Fig. 10-5) Ps= 0,'79 PI\ = 0,99 Achlal Capacity, Cm CmS = 'pB X P I X P ~ 'mIl = Cpll X PI X p~ '3CoS - .0.\0 X 3"St = 360 X 0.99 X 0.90 (pcph) 0.., 9 X 0.90 (pcph) STEP 4: LT From Minor Street lV7 LVlo Conflicting Aows, Ve Ves (step 3) + VII + V12 = Ve7 Vel I (step 3) + Vs + V9 = Vela 4,e, +2-+2-=4eA vph SOl + ~ + &i..o = Sit vph Critical Gap. Te (Tab. 10-2) B,O (see) e..O (see) Potential Capacity, 'p (Fig. 10-3) 'p7 = ~c..o pcph 'pIO= s"2...0 pcph Actual Capacity, 'm cm7 = cp7 X P I X P ~ X P II X P 11 cmlO = cplO X P ~ X PIX P s X P 9 ~14 =~wxQ1.2.x 'Z.c" b = :''2.0 x...9:.22. X .Q.;jQX~X 0.'79 (pcph) 0:'19 X~X 0.94 (pcph) 10..36 Y"v\",~ ~ \ -\.. 1._ URBAN STREETS WORKSHEET FOR FOUR-LEG INTERSECTIONS . Page 3 - SHARED-LANE CAP AClTY vi+vj where 2 movements share a lane CSH = (vJcmi) + (v/cmj) v,,; + vj + vk where 3 movements share a lane CSH = (Vi /cmJ + (v/cmj) + (Vk/Cmk) - MINOR STREET APPROACH MOVEMENTS 7, 8, 9 Movement v(pcph) cm(pcph) csH(pcph) cR = CSH - v I LOS 7 '2.~ 3\~ 55'S S"2.9 I A.. 8 \ .:1 \ ~C.os;. I ss"s \ S4.9 I ~ 9 ("Co 900 SS3 I Li".73 \ A.. MINOR STREET APPROACH MOVEMENTS 10, 11, 12 Movement v(pcph) cm(pcph) csH(pcph) cR = CSH - v I LOS 10 \ I ZCo<; \ 37..'7 \ :SZ""L \ B 11 3 SSI 3"2.'7 37.Co \ b 12 \ '3 \ l'Z-O "S2'7 \ 3 -z.. (0 1 b MAJOR STREET LEFT TURNS 1,,4 .' Movement v (pcph) cm(pcph) I LOS cR = cm - v 1 \ BBO 2>1'3 \ A 4 \S-S \ )<:;0 r91 I A COMMENTS: .I ~"""...... ~ " ; I, i i", ... UNSIGNALtZED INTERSECTIONS 10.35 "?\4AS.~S. \ I Z ~. :; , , . .. .' WORKSHEET FOR FOUR-LEG INTERSECTIONS Page 2 STEP 1: RT From Minor Street r V9 j V12 Conflicting Flows, Ve 1/2 V) + V 2 = Ve9 1/2 V6 + Vs = Vel2 4"2.. + 5'6 = \~ vph ~+ L..O~ = 'Los. vph Critical Gap, Te (Tab. 10-2) cP.S (sec) Co.<; (sec) Potential Capacity, cp (Fig, 10-3) cp9 = 1"10 pcph c = .'2..0 pcph 1'12 - - \ \ Percent of cp Utilized (V9/C;9) X 100 = % (V12/CpI2) X 100 = 0. \ % Impedance Factor, P (Fig. 10-5) P9 = 0.'73 PI2 = 0.'79 Actual Capacity, em Cm9 = Cp9 = 1'70 pcph Cml2 = cp12 = I 7..0 pcph STEP 2: LT From Major Street f V~ -.-J VI Ccnflicting Flows, Ve V) -+- V! = V C~ Vb-+-Vs=Ve1 64 -+- 88 = \\'L vph ~+W~ = zoc,,:, vph Critical Gap, Te (Tab. 10-2) 5.S (sec) S,S (see) Potential Capacity, cp (fig. 10-3) cp~ = "7'L0 pcph cpl = eea pcph Percent of cp Utilized' (V4/Cp4) X 100 = "2.3 % (Vl/Cp1) X 100 = o. \ % ,Impedance Factor, P (Fig. 10-S) P = o. Be; P = 0.'" . I Actual Capacity, cm cm4 = cp4 = 9Z.0 pcph cml = Cpl = 0'00 pcph I STEP 3: TH From Minor Street ,\ Va \ VII Conflicting F1ows, Ve 1/2V)+V2+VI+V b+VS+V.=Vea 1/2V 6+V s+V .+V )+V 2+V I=V ell .1,'"L + 6e, +~+ ~+ W3 +~+ ...2.....- + '2..0;' + 'Z' S = S S 1... vph ~ + B2.>+.....L-= S<r1vph Critical Gap, Te (Tab, 10-2) 1.<; (sec) "S (see) Potential Capacity, cp (Fig, 10-3) cps = ;(00 peph Cpll = 3"S S pcph Percent of cp Utilized (V8/Cp8) X 100 = "Z. % (VII/Cpll) X 100 = \ % .Impedance Factor. P (Fig. 10-5) P = 0.'=1 5 PII = 0."1<3 B Actual Capacity, Cm CmS = cps X P I X p. Cm II = cp II X P I X p. ~;. = 3(,,0 X Z€l"2.. = 3'S$' X 0.99 X o. '2><;; (pcph) 0.9' X 0.9<; (pcph) STEP 4: LT From Minor Street lV7 Lv10 Conflicting Flows, Ve V.s (step 3) + VII + V12 = Ve7 Vol\ (step 3) + Va + Vq = VelO S,5"L + ~ +.l- = '5'5'7 vph .sll.. + ....l.... + 9 L = Cc> <] z.. vph Critical Gap, Te (Tab, 10-2) Q,.O (see) B.b (see) Potential Capacity, cp (Fig. 10-3) Cpt = ~ 7-0 pcph cplO = Zc.oO pcph Actual Capacity, cm cm] = cp7 X PIX p. X P 11 X P 12 cmlO = eplO X p. X PI X PB X Pq "'ZC04 - ~W X 2lYi.... X \"')9 - t.WJX~X ~ X 0.9'7 X o.c)~ (pcph) 0.95 X~X 0.'75 (pcph) - 10-36 "P""'&\,~e'::. \-3 URBAN STREETS WORKSHEET FOR FOUR-LEG lNTERSECTIONS . . Page 3 . SHARED~LANE CAPACITY . vi+vj where 2 movements share a lane CSH = (vJcmi) + (vi/crnj) v"j+v\+v\r. where 3 movements share a lane CSH (vi/cmJ + (v/cmj) + (V\r./Cmk) ,;. MINOR STREET APPROACH MOVEMENTS 7, 8, 9 Movement v(pcph) cm(pcph) csH(pcph) cR = CSH - v LOS 7 3~ 'l.C9~ .6. 9 :r L\CoCo A 8 \ l \ "'t,03 \ 4.9 ~~L A 9 '17... 190 I ~9~ I ~\01 A MINOR STREET APPROACH MOVEMENTS 10, 11, 11 Movement v(pcph) cm(pcph) csH(pcph) cR = CSH - v I LOS 10 I \9'7 ?. Co 'L -z.S;S \ c.. 11 ~ 'l8e Z-C.slc 'LSCO C 12 I '3 1'2-0 L.. Co L- \ 'Z.-c;9- \ c.. MAJOR STREET LEFT TURNS 1,,4 .' Movement v (pcph) cm (pcph) LOS cR = cm - v 1 \ 'dBO 819 ~ 4 '2.\(' '77.0 IOS A .. coM:MENTS: - . ..... , "- ......... ~ " ( , , , ... ~~ 5rd MONTANA HIGHWAY PLANNING SURVEY T,I.. j ~ ~ fI, PORTABLE COUNTER TRAFFIC EXPANSION FORM . ' COUNTY Gu_PrTIl\J STATlOH I . CO. STA. CO. STA, wEATHER M".e -h EI1IN<:rS,.,;rw wEATHER WEATHER LaC ATION S-r;::; t> v IYf (LL. ~. T l< s."- LOCATION LOCATION ;.)0. o I 512 I bGEi'... 1) e.. MONTH .uoc/ /1Iat/ I'thv ~tJ \tJ ~ )- /Jav /)M Alt/ /))...-' >< I ~~~ DATE 13 1'-1 IS /~ 78" /7 ;}o ......>- >w" 17 > ... .. -<~o -< " 0 -<~o DAY I ,r,e / .sliT StltJ rnolJ me. WE.D 'Tl+l-I.. Fel HOUR AM AM AM 12 -I 7 / lJ I :< / I 1 - 2 3 ::J ::J () I ,;) "3 I 2 - ~ -, 5 0 I 0 -2 -;) I 3' - 4 () 0 (') .? D I 0 I 4 - 5 n :l !J r 6- (")1 0 :s - 6 I I I 0 :; () ? V 1 6 - 7 II' I 7 ~ :3 ~ I 7 - 8 le;I Cj Lie. S:J :;?s '-17 I 6 - 9 31 c; ?"n f>'=> 2tf 9Z..1 I 9 - 10 ' looN 17 I r) q ~I 7~ (,< I I 10- II :;:0 Ie; qs- C3 ~c. b-1 11- 12 /.0 7( Lid U, crt. ~o -io I PM PM PM 12- I 31 / I () 3;). pc;. d.9 &3 Co3 I - 2 50 72 33 10"/ C;a 7(. ~/ I 2'- 3 >Po 70 5;1 73 2.., 6/ A'7 I 3 - 4 6;;" 741 q.q -97 ~p ~3 n I I 4 - 5 74'- '-1-0 34 qq. qc, 7'1 7( I I 5 - 6 43' .:Jcrl :J( 65 q:l '3 b3 I I 6 - 7 17 /7 f/ ~.si -")~ ;),3 027 7 - 8 :11 IU It. /9 II l:j S'3 e - 9 III 7; 10 Ie. f 1/ /S 9 - 10 3 Q 5 II ," 7 {, 10- It ID t./ 10 ~ "3 3 'i I II - 12 C; 5' 1 t! 3 -:2 (j. I AXLES VEHICLES Lifo' 7.J71~7~ /0/3 952 79? ?9D 't A,O,T. REp,(ARKS: REMARKS' REl.,(AR)(S' -- -- ~ -' C\f}- ,,;;0 ~r .-1X~ l;\\.... c-> [\~ A' MONTANA HIGHWAY PLANNING SURVEY I'. . ).. PORTABLE COUNTER TRAFFIC EXPANSION FORM COUHTY ~L.L.~.n II..J STATlOH 3 . co. STA. co, STA. WEATHER Fit 112.- -I-c &, tV <t- Sr.Jq uJ WEATHER WEATHER LOCATlOH /VI. C /LIII+-r"-;J..~ R2 ' LOCATI ON LOCATIOH ,,/ -r'rt,', (1;'ST oP .Yht:V Illlt-L l j MONTH VC>(/ Mt/ MV' /1/1 (/ t,o,I ~ )- jJO!.J l)dU lUo U VJV ~~>+ I QATE J-IC I 51"i-'i .fLIIJ mO~ ,. \oj ... "Tu.1? WEll ,-II u. -p.,el ,. \oj '" 1 ~~~ ..~c .( )C c .(~Q DAY 13 It.! liS It:> /7 If? 19 .;;J.o I HOUR AM AM AM 12 -1 0 0 7 0 0 0 0 1 - 2 I 1 I 0 p-, 0 () I 2 - :3 ! (1 0 () 0 0 () 3' - 4 11 0 n n 0 0 0 4 - ~ /'\1 I 0 (') () 0 0 S - 6 1 nl 0 0 n (? 3 I I I 6 - 7 I I I I 01 , nl 0 0 I 7 - 6 Cl d 10 10 -,? If 1 \ I s - 9 I 5 01 1/ q ;;1 l..:ll I I 9 - 10 91 ('") 19 9- II 5 I 10- II :J.o ifl 131 P .f I~ 11- 12 15 , ]J 17 II /0 :; PM PM PM 12- I ;:J /7 /if 7 5 -/1 7 ~ ,I - 2 .r..! 9 10 '7 -lei /0 17 2 '- 3 ,'3- I () ~ ,411 3 1;1. >; :3 -- " 91 1/ 19 ;)e,. 1'3 II It.! I 1 <\ - 5 I 171 /'1 16 I ( I /"3 .:J{ 17 5 - 6 (/ 7 I /0 ;J3 9 '11 6 - 7 ::;;>1 -tf 0 t/ tj C, 7 I I 7 - 8 .~ ;) ;2 0 0 0 <) 8 - 9 ( :;J 0 --z 0 11 I 9 - 10 0 Q 0 { 0 () I 10- II 0 0 C) n 0 0 () I II - 12 () (') (J 0 1"\ 0 () AXLES VE:H1CL~S '7." /3C, R9 Ie, 7 /::1..1 /25 13~ z.. A.D,T, R E ),I ARK 5 ~..- RE),IARKS: REMARKS' - . -- q). I~? I{Y'J . ,;; MONTANA HIGHWAY PLANNING SURVEY PORTt\t:3'LE COUNTER TRAFFIC EXPANSION FORM . ;. . COUHTY Gl;.L.L.Prr IV STATIOH d.. : co. STA. co. STA. . WEATHER J:A-If? ~ PA \11.) 't .5"NDW WEATHER WEATHER LOCATION SIi,eVt11/LL Rb .("771: LOCATION LOCATION No o~ MCJ IL tfAITArJ e6 MONTH /'JO 1/ /.J r:> (/ tVrJcI ))OtJ w~ ':- No"; Nd i/ /VdU PIJ tJ '" l&):;> DATE 13 It! IS- /1 If I~ ~o '" ",'" I I' >"," >",.. > '" 0( h?1 .rtTl Su,,) /'If4 IV o(): a Iu.~ w~ 7IIu -< ~ a 1 .. l< a DAY SIA,.,) HOUR AM AM AM 12 -I 4 0 ! 0 :3 0 0 I , - 2 0 I I 0 I .J... 1 2 - 3 / :; 01 I 0 :J -1 I 3 - 4 01 0 () ;}., 0 / () 4 - :; I 01 1 ;/1 I 0 0 () 5 - 6 01 0 0 / (') 0 0 I 6 - 7 ( I 01 0 I 1 3 I I 7 - a 41 3' '1'1 31 1 ( :;)0 I I ""'- 8 - 9 ;{O 7 3=3 Lje; 52 !S"9 I 9 - 10 ;/ 71 S( eo:.; 4c; 39 L/9 I 10- II I 3/ 3 bG. ,30 '3~ 3:? I I 11- I Z 35 (jl /31 ~r; 57 1./2 -Lf. if 1 PM PM PM 12- I It: 1;,/ II ;:;0 33 .lot 39 . i 1-2 .:;.g 39 1<1- &<1 5'7 Lira ..23 I ;:"- 3 40 Llo /16 t.l~ t../"? 40 '-II 3 - 4 37 42 1:5 _":?c; 53 37 '-Is I I I 4 - 5 tit! ';X 17 5q 54 33 5:1. I I 5 - 6 IS' gl /0 30 27 ;)0 .:)C:, I 6 - 7 3 I 5' (2 7 G. 5 I 7 - 8 2 (,.. 7 R -~ 7 I"? B - 9 :5 :; q tf L/ 0 ~ I 9 - 10 31 I .:( '" ~ 0 I 10- II n ~ L/- / 0 I _":3 I II - 12 1 t.,l\ () .:J 0 0 I AXLES VEHICLES :).;) 7 3C7 /t/.3 1550 5J~ 399 149 3 A,O,T, REMARKS. REMARKS: RE'-'ARI<S' ........ . .".u.. _ , . - - , ,. , ,<. Mor'J:~:'JA DEF.~lE" Jf 'N PDRTA~IDN . .' ". " -~. 1= C;-~...-v'\ TRAFFIC OPERATI~~~ ~~CCGJ~uu~I/TYPE REPORTS vleekl y Vol ume Summary '3 ~- \ ~ ***~*************************************************************************** Data File 11~09201.TRF Position 8 Station 2318 Ident 1612 Start Date Nov 18 ,1992 f S b End Date Nov 20 ,1992 Start Time 09~19. ~ End Time 08:13 Location ON ROUSE AVE.,SOUTH OF BRIDGER TRAILER CRT. ENTR. TOTAL TUBE ******~~************************************************************************ 16 17 18 19 20 21 15 Wkday Daily Begin Man Tue .Wed Thu Fri Sat Sun Avg. Avg. ----- ----- ----- ----- ----- ----- ----- (10:00 o 1 : 00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:(>0 13:00 14:00 15:00 16:00 17:00 1 S": 00 19:00 20:00 21:00 22:00 --23: 00 199 236 258 299 303 303 357 384 390 221 1?G 94 114 C' .JO 22 ----- ----- ----- ----- ----- ----- ----- . ------ 26 9 12 13 10 28 92 311 20 14 14 7 4 (> () ~"J.,,) f 1".Jl o ----- ----- ..,- .23 ..:.:.":'''' 12 12 13 13 10 10 7 7 14 14 46 46 156 156 343 343 ..-,-c-,.. ,..,-- ..:.......,-'\ ...:.:."::,,,,:;, 249 249 277 277 305 305 3fJ2 3/J2 301 301 354 354 382 382 386 386 225 225 143 143 106 106 1 12 1 12 68 68 +:-"...... -- .....'\....\ ..:..\...:.\ ----- ----- Totals 3365 4422 59 2615 2615 ******************************************************************************* % Avg Wkday 128.7 169.1 2~3 % Avg Day 128.7 169.1 2.3 AN Peak Hr AM Count 12:00 258 343 267 261 296 310 300 298 351) 379 382 229 156 118 110 . 79 43 L..f Lf 7- "2- 'f. . '9 f) 09:0(1 01:00 343 20 - w '3 "'<. /"\ - I .-J'-" PM Peak Hr 18:00 18:00 PM Count 390 382 ******************************************************************************* ,,--.--------- . . . . .' . .' '.':., . ',' .. "'.' 1_ _.. ""1.";;", "',~~ ~...~ _ ,_, w, .~' - . .. '.:.' .- - ~ POSTED ; '.' -.... ~ .. . ~- _...-....-..~:"""'"-. ..: :..:. ~. ... ~ MontfI].a f(eP,i1ment ~~~ of Transportation ... 2i01 Prospec: Avenue HeJena.MT 59620.9726 Stan S:2phens. Go\'err:or . i [ ... : May 29, 1992 Glenn A. \Vood MorrisonjMailerie CSSA P,O, Box 1113 601 Haggarty Lane Bozeman, MT 59771~11l3 Subject: Bridger CanYon Project - Bridger Bowl State Highwav No. 86 . In response to your request for information the following is provided: The roadway condition of Highway 86 between MP 4,0 and MP 16,0 is fair with existing minor pavement structural damage and moderate to heavy cracking throughout. A printout listing rutting depths and International Roughness Index for this highway from MP 0.0 to MP 18.6 is attached. Four areas, or cluster locations, along Highway 86 have been identified for field , safety review in 1992. These locations are MP 2.1~MP 2.5, MP 4.1-MP 4.7, MP 7,8~MP 8,2 and MP 13,9-MP 14.4. Corrective actions, if any, will be based on the results of the field safety review. The accident statistics for this section of highway from January 1, 1989 through December 31, 1991 are as follows: Accident Rate Severity Rate This Highway 2.43 1.50 Statewide Avera2:e 1.60 ~ 1.54 ..tn EQuill oooaftUnlc'!' Cr."::'I'tJ!t:f '.. ., ,. . ... I, ,.. . ,-- '" .' Glenn A. Wood Page 2 May 29, 1992 Highway 86 will accommodate service flow rates as follows: Actual Flow Rate Existing 222 vph 144 vph 375 vph 691 vph 1048 vph 2025 vph LOS B With Development 306 vph 144 vp h 375 vph 691 vph 1048 vph 2025 vph LOS B Year 2001 'With Develooment 378 vph 140 vph 363 vph 669 vph 1014 vph 1959 vph LOS C LOS A LOS B LOS C LOS D LOS E Expected Level of Service "'This analysis used rolling terrain 50 percent no passing Bridger Canyon Road, from milepost 3 to milepost 15, was built in 1973 with a 30-foot surfaced width. Under today's traffic volumes it continues to operate at LOS B. Our greatest concern is the possible deterioration of this LOS as development continues along Bridger Canyon, The analysis indicates that LOS B will still be maintained for some time considering the addition of the proposed development traffic. However, within ten years, as normal traffic increases occur, the level of service will drop into the C range. This is assuming a three percent per year growth rate on the facility. Developments such as the proposed Bridger Bowl expansion can and possibly will result in a significant drop in the level of service on this roadway. Methods to mitigate the affects of further development along Bridger Canyon Road are limited due to the terrain, rightvof-way and other constraints of the area. Reserve capacity is the difference between the flow rate at each level of service and the actual flow rate for the year and condition being studied. By examining the numbers, it can be seen that there is reserve capacity under the existing condition and some can be expected following full development at Bridger Bowl. Beyond that, toward year 2000, the level of service will fall from B to C and reserve capacity for the design level of service (B) will no longer exist. If I can be of further assistance, please feel free to contact me at 444-6103. ~jI)~ Don W. Cromer, Supervisor Statewide Planning DWC:DM:D:PP:jrh:4.dr Attachment /~, ,.. ., ',' , EXHIBIT liD" WAIVER OF RIGHT TO PROTEST CREATION OF SPECIAL IMPROVEMENT DISTRICTS FOR THE INSTALLATION OF A TRAFFIC SIGNAL LIGHT AT THE INTERSECTION OF BRIDGER DRIVE AND STORY MILL ROAD m~ 135 ?~n 788 I, the undersigned owner of the real property situated in the County of Gallatin, State of Montana, and more particularly described as follows: Certificate of Survey No. 1353 and Certificate of Survey No. 1353B, located in Section 31, Township 1 South, Range 6 East, Montana Principal Meridian, Gallatin County, Montana, and consisting of 287.5 acres. IN CONSIDERATION of receiving annexation approval from the City of Bozeman, along with accompanying rights and privileges and for other and valuable consideration, the receipt of which is hereby acknowledged, in recognition of the traffic that will be generated by the development of the above-described property on the the intersection of Bridger Drive and Story Mill Road, have waived and do hereby for ourselves, our heirs, personal representatives, successors and assigns, the right to protest the creation of one or more special improvement districts for the installation of a traffic signal light at the intersection of Bridger Drive and Story Mill Road, or to make any written protest against the proposed work or against the extent or creation of the districts to be assessed in response to a duly passed resolution of intention to create one or more special improvement districts which would include the above-described property. 1 )".1 "" J. , . t: EXHIBIT D, ANNEXATION AGREEMENT GOLF COURSE PARTNERS, INC. PAGE 2 OF 2 rlL~ 135 P,\CE 78!l This Waiver is limited to the Landowner's proportionate share of the costs of administration, engineering, inspection and construction of said traffic signal light at the intersection of Bridger Drive and Story Mill Road. This waiver shall be a covenant running wi th the land and shall not explre. I warrant that I am lawfully seized and possessed of the real property described above and that I have a lawful right to convey the property or any part of it. DATED this 7'1, day of Ju It , 1913. . - GOLF COURSE PARTNERS, INC. M~~ By: R...t)( d. t:.{f""" Title: 1',...4,;'/.",.-r STATE OF MONTANA :ss County of Gallatin ) -;-A On this 7 day __, 19 '?..!J, before me, a N~/~l),l.~ the k,;'oo;ntanat'o pe::ona~~y ~~pea~~= ~ of Golf Course Partners, Inc., the corporation that executed the foregoing Waiver of Right to Protest, and acknowledged to me that he/she executed the same for and on behalf of said corporation. have hereunto set my hand and set my above written. .' ~\O\'1 :io"';;~ ", -<-\).' ..,.....' '",,'" -". , );:.. ....\ \. " , ~) \ 1 8 () \"';; ,,' ('" . t,~ ; bJ ~,-':: \~, o{~!\' i 0\ \ _,;:~ / ,,~. ....>1 '~',., '.,., ~y.- .,,\, _, "" ","\1.. ":'I3N.) otary Public for S te f Montana Residin~ a~ Bozem~n, Mont~_~~ My CommlSSlon Explres: I 5 . 270598 2 State of Mont., County of Baffatln. ss Filed for record et 4'23 P fII ~d d' AU~llst 7') .19-2.J... . .. ail reccr eo 10 Book _ 135 of MISCELLANEOUS pa ~~lle~ M Cheney R d &..; ge 77 5 tee: $ . 0 . ecor er. By 01 t""Xh ~ G 11\rlt1L\ ~ Deputy Rt: City of Bozeman '" ~