Loading...
HomeMy WebLinkAboutResolution 4967 Approving Change Order 1 with Sime Construction, Inc. for the Baxter Lane, N. 7th to N. 19th Project Ott----88--- 9atN CO.00� RESOLUTION NO. 4967 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH SIME CONSTRUCTION,INC., BELGRADE, MONTANA. WHEREAS,the City Commission did, on the 2"d day of April 2018, authorize award of the bid for the City of Bozeman Baxter Lane from North 7th to North 191h project, to Sime Construction, Inc., Bozeman, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS,it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana,that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Sime Construction, Inc., as contained in Change Order No. 1, attached hereto,be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 15"' day of October, 2018. CYNT A L. A DRUS�-�j Mayor ATTEST: Bog ROBIN CROUGH City Clerk - •z� 1883 APPROVED AS FORM: GRE ULLIVAN City Attorney