HomeMy WebLinkAbout18- Change Order 2 - Vertex Electric, Inc. - Lyman Spring Junction Box Control and Monitoring Change Order
NO. 2
8/8/2018 Effective Date:
Date of Issuance:
Owner's Contract No.:
Owner:
Project: Lyman Spring Junction Box Control and Mon City Of Bozeman
Date of Contract:
Contract: 71912018
Lyman Spring Junction Box Control and Mon
Engineer's Project No.:
Contractor: P05097-2014-004
Vertex Electric
The Contract Documents are modified as follows upon execution of this Change Order:
Description: Solar Array pole described in drawing E6 was not specified to be schedule 40 or schedule 80-steel.Original bid Included$950 for a schedule 40 steel
pole powder coated.It was discovered that schedule 80 was desired.The total cost for a schedule 80 powder coated pole was$1741(contractors cost)
Additional 4-20mA Cable from the Level Transmitter in Lyman Spring]-BOX to the PLC&the 4-20mA cable from the Level Transmitter
In Pars hall Flum on Lo per L man Creek to the PLC Control Ps at
Attachments: (List documents supporting change):
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIMES:
Original Contract Times: ❑ Working days ❑ Calendar days
Original Contract Price:
Substantial completion(days or date):
130,000 Ready for final payment(days or date):
[Increase][Decrease]from previously approved Change [Increase][Dcrease]ecreasto from previously approved Change Orders
Orders No.-1 to No..:
Substantial completion(days):
$134,625.00 Ready for final payment(days):
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date):
$ 134,625.00 Ready for final payment(days or date):
[Increase] of this Change Order: [Increase][Decrease]of this Change Order:
Substantial completion(days or date):
$ 791.00 Ready for final payment(days or date):
Contract Price incorporating this Change Order: Contract Times
with all approved
(day d date):
Change
Orders:
Subs
$ 135,416 Ready for final payment(days or date):
COMMENDED:
ACCEPT D: ACCE ED:
By:
By; By. Con actor(Authorized Signature)
RE
Owner(Authorized Sig lure)
Engineer(A thor d Signature) y I r
O Q4 / Date: 1
I Date:
Date:
Date:
Approved by Funding Agency(if applicable):
April 2018
Lyman Spring M&C Improvements 00 63 63 - 1 Change Order Form
Bozeman, Montana