HomeMy WebLinkAbout18- Change Order 1 - Knife River Belgrade - East Tamarack Street Reconstruction Change Order
No. 1
Date of Issuance: September 10,2018 Effective Date: September 10, 2018
Project: East Tamarack Street Owner: City of Bozeman Owner's Contract No.: N/A
Reconstruction
Contract: East Tamarack Street Reconstruction Date of Contract: July 18,2018
Contractor: Knife River- Belgrade Engineer's Project No.: 16417100
The Contract Documents are modified as follows upon execution of this Change Order:
Description:
Add Unit Price for"Geo-Grid Only"for use in lieu of Item 214 Subgrade Stabilization, when the Geo-Grid is
Directed for use without over-excavation of 7"with additional Subbase material @$4.25/SY. (358 SY-$1,521.50)
Attachments (list documents supporting change):
Serial Letter-04 from Knife River with cost of the Work.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: .Working ❑ Calendar days
Substantial completion(days or date):
$ 1,627,588.00 Ready for final payment(days):
[Increase] [Decrease] from previously approved Increase fi•om previously approved Change Orders
Change Orders No. to No. No. to No.
Substantial completion(days):
$ N/A Ready for fmal payment(days): N/A
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion(days or date): N/A
$ 1,627,588.00 Ready for final payment(days):
Increase of this Change Order: Increase of this Change Order:
Substantial completion(days or date): N/A
$ 1,521.50 Ready for final payment(days):
Contract Price incorporating this Change Contract Times with all approved Change Orders:
Substantial completion(days or date): N/A
$ 1,629,109.50 Ready for final payment(date):
RECO ED: ACCEP D: ACCEPTED: ,rt
By: By: By: ,�avGd
Engineer uthor ed Signature) Owner(Authorized Sign Lure) Contractor(Authorized Signature)
Date: ZS� Date: tom% t`% l` Date:
Approved by Funding Agency(if applicable):
Date:
EJCDC C-941 Change Order
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute.
Page 1 of 2