HomeMy WebLinkAbout18- Change Order 1 - Knife River Belgrade - East Tamarack Street Reconstruction Change Order No. 1 Date of Issuance: September 10,2018 Effective Date: September 10, 2018 Project: East Tamarack Street Owner: City of Bozeman Owner's Contract No.: N/A Reconstruction Contract: East Tamarack Street Reconstruction Date of Contract: July 18,2018 Contractor: Knife River- Belgrade Engineer's Project No.: 16417100 The Contract Documents are modified as follows upon execution of this Change Order: Description: Add Unit Price for"Geo-Grid Only"for use in lieu of Item 214 Subgrade Stabilization, when the Geo-Grid is Directed for use without over-excavation of 7"with additional Subbase material @$4.25/SY. (358 SY-$1,521.50) Attachments (list documents supporting change): Serial Letter-04 from Knife River with cost of the Work. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: .Working ❑ Calendar days Substantial completion(days or date): $ 1,627,588.00 Ready for final payment(days): [Increase] [Decrease] from previously approved Increase fi•om previously approved Change Orders Change Orders No. to No. No. to No. Substantial completion(days): $ N/A Ready for fmal payment(days): N/A Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial completion(days or date): N/A $ 1,627,588.00 Ready for final payment(days): Increase of this Change Order: Increase of this Change Order: Substantial completion(days or date): N/A $ 1,521.50 Ready for final payment(days): Contract Price incorporating this Change Contract Times with all approved Change Orders: Substantial completion(days or date): N/A $ 1,629,109.50 Ready for final payment(date): RECO ED: ACCEP D: ACCEPTED: ,rt By: By: By: ,�avGd Engineer uthor ed Signature) Owner(Authorized Sign Lure) Contractor(Authorized Signature) Date: ZS� Date: tom% t`% l` Date: Approved by Funding Agency(if applicable): Date: EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. Page 1 of 2