Loading...
HomeMy WebLinkAbout10-15-18 City Commission Packet Materials - C12. Res 4968 Approval of CO 1 to Baxter Ln - Davis Ln to N. 19th Project Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Approve Resolution 4968 authorizing Change Order No. 1 to the Baxter Lane – Davis Lane to N. 19th Project. MEETING DATE: October 15, 2018 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution 4968 authorizing Change Order No. 1 to the Baxter Lane – Davis Lane to N. 19th Project. BACKGROUND: Attached is a copy of resolution 4968 and change order number 1 for the above referenced project. As discussed in the Commission memo for the project award, the original bid was over the amount budgeted for the project. There were a number of items identified that could be eliminated/altered in order to reduce the contract amount below the budget amount. This change order will formalize those alterations. Additionally, there were a two driveways that needed to be adjusted from the original design as a result of changes in ownership of the properties. A complete summary of each of the items and resulting changes in project costs is included in a table in the change order. The result of all of the items is a decrease in the contract price of $272,166.00. There is no change to contract time. The final recommended change in cost and time for these items is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: This change order decreases the contract amount by $272,166.00 from $4,147,364.00 to $3,875,198.00. Attachments: Resolution No 4968, Change Order No 1 Report compiled on: 10/3/18 129 COMMISSION RESOLUTION NO. 4968 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH KNIFE RIVER - BELGRADE, BELGRADE, MONTANA. WHEREAS, the City Commission did, on the 16th day of July 2018, authorize award of the bid for the City of Bozeman Baxter Lane from Davis Lane to North 19th project, to Knife River - Belgrade, Belgrade, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Knife River - Belgrade, as contained in Change Order No. 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 130 PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 15th day of October, 2018. _____________________________________ CYNTHIA L. ANDRUS Mayor ATTEST: ____________________________________ ROBIN CROUGH City Clerk APPROVED AS TO FORM: ______________________________________ GREG SULLIVAN City Attorney 131 132 133 134 135 136 137 138