Loading...
HomeMy WebLinkAbout10-15-18 City Commission Packet Materials - C11. Res 4967 Approval of CO 1 to Baxter Ln - 7th to 19th Project Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Approve Resolution 4967 authorizing Change Order No. 1 to the Baxter Lane – 7th to 19th Project. MEETING DATE: October 15, 2018 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution 4967 authorizing Change Order No. 1 to the Baxter Lane – 7th to 19th Project. BACKGROUND: Attached is a copy of resolution 4967 and change order number 1 for the above referenced project. The design included a short section of the extension of North 15th Avenue to the south. It was anticipated that the proposed hotel at this intersection would continue the extension of 15th yet this year, but that did not occur. Since it will stay as a short dead end street at least through the winter, dead end barricades need to be added in accordance with city standards. This change is for the installation of the six dead end signs and will increase the contract price by $2,700.00. There is no change to contract time. The final recommended change in cost and time for these items is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: This change order increases the contract amount by $2,700.00 from $2,409,992.23 to $2,412,692.23. Attachments: Resolution No 4967, Change Order No 1 Report compiled on: 10/3/18 122 COMMISSION RESOLUTION NO. 4967 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH SIME CONSTRUCTION, INC., BELGRADE, MONTANA. WHEREAS, the City Commission did, on the 2nd day of April 2018, authorize award of the bid for the City of Bozeman Baxter Lane from North 7th to North 19th project, to Sime Construction, Inc., Bozeman, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Sime Construction, Inc., as contained in Change Order No. 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 123 PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 15th day of October, 2018. ______________________________________ CYNTHIA L. ANDRUS Mayor ATTEST: ________________________________________ ROBIN CROUGH City Clerk APPROVED AS TO FORM: ______________________________________ GREG SULLIVAN City Attorney 124 125 126 127 128