HomeMy WebLinkAbout17583 Application & Plans
Memo
To:
Matthew Madsen, MPH
City of Bozeman Community Development
From: Trever McSpadden
cc: Islands, LLC PO Box 12037 Bozeman, MT 59719
Date: September 21, 2018
Re: West Winds SW Affordable Housing Plan
Matthew,
We are forwarding for your review, an Affordable Housing Plan for the above referenced
subdivision proposal. The content of this plan is outlined below and includes the application
forms along with the supplemental information necessary to facilitate your review. The items are
as follows:
Development Review Application Form (A1)
Affordable Housing Plan Application Form (AH)
West Winds SW Subdivision Lot Index
Affordable Housing Unit Building Plans
Please feel free to contact me with any questions that you may have and let me know if you
need any additional materials.
Thanks.
A1
Development Review Application A1 Page 1 of 3 Revision Date 01-04-16
Required Forms: Varies by project type Recommended Forms: Presentation of submitted plans and specifications
DEVELOPMENT REVIEW APPLICATION
1. PROJECT
Development
Name:
Description:
2. PROPERTY OWNER
Name:
Full Address:
Phone:
Email:
3. APPLICANT
Name:
Full Address:
Phone:
Email:
4. REPRESENTATIVE
Name:
Full Address:
Phone:
Email:
5. PROPERTY
Full Street
Address:
Full Legal
Description:
Current
Zoning:
Current Use:
Community
Plan
Designation:
Development Review Application A1 Page 2 of 3 Revision Date 01-04-16
Required Forms: Varies by project type Recommended Forms: Presentation of submitted plans and specifications
Overlay
District: Neighborhood Conservation Entryway Corridor None
Urban
Renewal
District:
Downtown North 7th Avenue Northeast None
6. STATISTICS (ONLY APPLICATION TYPES 2-12, 17, 24 AND 26)
Gross Area: Acres: Square Feet:
Net Area: Acres: Square Feet:
Dwelling
Units:
Nonresidential
Gross Building
Square Feet:
7. APPLICATION TYPES
Check all that apply, use noted forms. Form Form
1. Pre-application Consultation None 17. Informal Review INF
2. Master Site Plan MSP 18. Zoning Deviation None
3. Site Plan SP 19. Zoning or Subdivision
Variance
Z/SVAR
4. Subdivision pre-application PA 20. Conditional Use Permit CUP
5. Subdivision preliminary plat PP 21. Special Temporary Use
Permit
STUP
6. Subdivision final plat FP 22. Comprehensive Sign Plan CSP
7. Subdivision exemption SE 23. Regulated Activities in
Wetlands
RW
8. Condominium Review CR 24. Zone Map Amendment (non
Annexation)
ZMA
9. PUD concept plan PUDC 25. UDC Text Amendment ZTA
10. PUD preliminary plan PUDP 26. Growth Policy Amendment GPA
11. PUD final plan PUDFP 27. Modification/Plan
Amendment
MOD
12. Annexation and Initial Zoning ANNX 28. Extension of Approved Plan EXT
13. Administrative Interpretation
Appeal
AIA 29. Reasonable Accommodation RA
14. Administrative Project Decision
Appeal
APA 30. Other:
15. Commercial Nonresidential COA CCOA
1 6. Historic Neighborhood
Conservation Overlay COA
NCOA
8. APPLICATION FEES AND MATERIALS
A. Fees are to be provided based upon the adopted fee schedule FS. Contact our office for an
estimate.
Development Review Application A1 Page 3 of 3 Revision Date 01-04-16
Required Forms: Varies by project type Recommended Forms: Presentation of submitted plans and specifications
B. Application materials shall be submitted for each application as shown in the specific guidance
and checklists that is provided for each application type. A common development review application
form and common notice materials may be provided for an application that includes more than one
application type. All other application materials shall be submitted for each individual application
type per the project guidance and checklists.
9. CERTIFICATIONS AND SIGNATURES
This application must be signed by both the applicant(s) and the property owner(s) (if different) for
all application types before the submittal will be accepted. The only exception to this is an informal
review application that may be signed by the applicant(s) only.
As indicated by the signature(s) below, the applicant(s) and property owner(s) submit this
application for review under the terms and provisions of the Bozeman Municipal Code. It is further
indicated that any work undertaken to complete a development approved by the City of Bozeman
shall be in conformance with the requirements of the Bozeman Municipal Code and any special
conditions established by the approval authority. I acknowledge that the City has an Impact Fee
Program and impact fees may be assessed for my project. Further, I agree to grant City personnel
and other review agency representative’s access to the subject site during the course of the review
process (Section 38.34.050, BMC). I (We) hereby certify that the above information i s true and
correct to the best of my (our) knowledge.
Certification of Completion and Compliance – I understand that conditions of approval may be
applied to the application and that I will comply with any conditions of approval or make necessary
corrections to the application materials in order to comply with municipal code provisions.
Statement of Intent to Construct According to the Final Plan – I acknowledge that construction
not in compliance with the approved final plan may result in delays of occupancy or costs to correct
noncompliance.
Applicant
Signature:
Printed Name:
Owner
Signature:
Printed Name:
Owner
Signature
Printed Name:
If signing as a corporation, please provide the title and position of the individual signing on behalf of the
corporation. Attach separate sheets for additional owner signatures.
CONTACT US
Alfred M. Stiff Professional Building
20 East Olive Street 59715 (FED EX and UPS Only)
PO Box 1230
Bozeman, MT 59771
phone 406-582-2260
fax 406-582-2263
planning@bozeman.net
www.bozeman.net
COPY
1RWH+RXVLQJSURGXFWVDUHDVVXPHGIRUWKHSXUSRVHVRIWKLVSODQ,QGLYLGXDOORWGHYHORSPHQWPD\
YDU\RYHUWLPH
COPY
LOT
8
3,850
sq.ft.
LOT
11
3,850
sq.ft.
LOT
8
6,692
sq.ft.
R=14.0'OAK STREET
1/4 COR
BETWEEN SEC 2
AND SEC 3 FND
1" IRON PIPE
LOT
6
4,983
sq.ft.
LOT
7
4,995
sq.ft.
LOT
2
4,936
sq.ft.
LOT
3
4,948
sq.ft.
LOT
4
4,960
sq.ft.
LOT
5
4,971
sq.ft.
LOT
17
5,407
sq.ft.
LOT
16
5,407
sq.ft.
LOT
15
5,407
sq.ft.
LOT
14
5,407
sq.ft.
LOT
13
5,407
sq.ft.
LOT
12
5,407
sq.ft.
LOT
2
5,407
sq.ft.
LOT
3
5,407
sq.ft.
LOT
4
5,407
sq.ft.
LOT
5
5,407
sq.ft.
LOT
6
5,407
sq.ft.
LOT
7
5,407
sq.ft.
LOT
14
5,408
sq.ft.
LOT
15
5,425
sq.ft.
LOT
16
5,443
sq.ft.
LOT
17
5,460
sq.ft.
LOT
12
5,373
sq.ft.
LOT
13
5,391
sq.ft.
LOT
1
6,674
sq.ft.
LOT
1
6,985
sq.ft.
LOT
11
3,867
sq.ft.
LOT
7
5,373
sq.ft.
LOT
6
5,391
sq.ft.
LOT
5
5,408
sq.ft.
LOT
4
5,425
sq.ft.
LOT
3
5,443
sq.ft.
LOT
2
5,460
sq.ft.
LOT
3
3,143
sq.ft.
LOT
11
3,255
sq.ft.
LOT
4
3,791
sq.ft.
LOT
12
3,925
sq.ft.
LOT
5
3,809
sq.ft.
LOT
6
3,186
sq.ft.
LOT
14
3,228
sq.ft.
LOT
7
3,199
sq.ft.
LOT
8
3,858
sq.ft.
LOT
16
3,582
sq.ft.
LOT
1
3,742
sq.ft.
LOT
9
3,876
sq.ft.
LOT
2
3,130
sq.ft.
LOT
10
3,242
sq.ft.
LOT
2
3,465
sq.ft.
LOT
1
4,356
sq.ft.
LOT
5
3,465
sq.ft.
LOT
4
3,465
sq.ft.
LOT
3
3,465
sq.ft.
LOT
2
5,247
sq.ft.
LOT
6
6,785
sq.ft.
LOT
1
6,764
sq.ft.
LOT
5
5,247
sq.ft.
LOT
4
5,247
sq.ft.
LOT
18
6,985
sq.ft.
LOT
6
4,293
sq.ft.
LOT
1
7,080
sq.ft.
LOT
18
7,080
sq.ft.
LOT
9
3,766
sq.ft.
LOT
13
3,889
sq.ft.
LOT
15
3,161
sq.ft.
LOT
9
3,719
sq.ft.
LOT
10
3,719
sq.ft.
LOT
3
5,247
sq.ft.
LOT
8
3,727
sq.ft.
LOT
10
3,626
sq.ft.
LOT
84
126,712
sq.ft.WINDWARD AVENUEZEPHYR WAYNEW HOLLAND DRIVEBORA WAYMISTRAL WAY
WEST OAK STREETDAVIS LANEBREEZE LANE
MISTRAL WAY
S
S
S
SSSS
S
SD
SS
SS SS
S
S
S
SWVWV
WVWVWVWVWVWVWVWV
WV
WV WV
WV WV
WV WV
WV WV
WV
90
0 40 80 120
SCALE
AFFORDABLE
HOUSING LOT
AFFORDABLE
HOUSING LOT
AFFORDABLE
HOUSING LOT
AFFORDABLE
HOUSING LOT
AFFORDABLE
HOUSING LOT
AFFORDABLE
HOUSING LOT
Date
Sheet
Project #
2018-09-18
BOZEMAN, MONTANA
WEST WINDS SW
A1-0.1
AFH SITE PLAN
1611.00
TRUE
NORTH
1" = 40'-0"1 SITE PLAN
TOTAL FOOTPRINT:1984 GSF
TOTAL LOT AREA:7493 SF
TOTAL LOT COVERAGE:26%
FLOOR AREA RATIO:TBD
SITE DETAILS
AREA ANALYSIS
ZONING:R3
PARCEL # LOT 8 & 9 OF BLOCK 6
OCCUPANCY:R-3
CONSTRUCTION TYPE:TYPE V
FIRE SUPPRESSION:NOT-REQUIRED
IRRIGATION:REQUIRED
ZONING
DISTRICT: R-3
MINIMUM
AREA
MAXIMUM LOT
COVERAGE MAXIMUM
HEIGHT
PROPERTY SETBACKS
FRONT
15'-0"
COMPLIED
REAR SIDE
COMPLIED COMPLIED
20 FEET 5 FEET38' -0 "ABV. EX. GRADE
0' -0 "ABV. EX. GRADE
50% FOR TOWNHOUSE
NA
3,000 LIVABLE SF
6,742 LIVABLE SF
REQUIRED
ACTUAL
SQUARE FOOT: As defined by ANSI Z765-2003: Livable floor area as
measured from exterior dimensions including thickness of all walls, interior and
exterior, excluding fireplace bump-outs, mechanical spaces, garage spaces,
and unfinished basement and/or attic space.
GROSS SQUARE FOOT: Total building area as measured from exterior
dimensions including thickness of all walls, interior and exterior, mechanical
spaces, garage spaces, and accessible un-fished space; does NOT include
crawl spaces, patios and decks.
GARAGE
20 FEET
VICINITY MAP
NOT TO SCALE
N
WINDWARD AVE.
DAVIS LANE
BREEZE LANE
PROJECT LOCATION
AB anchor bolt
ABV above
AAC autoclaved aerated concrete
ADJ adjacent
AFF above finished floor
AGG aggregate
ALUM aluminum
ALT alternate
ARCH architect (ural)
ASPH asphalt
A/C air conditioning
AVG average
BD board
BLDG building
BLK block
BLKG blocking
BO bottom of
BOT bottom
BR bedroom
BRG bearing
BSMT basement
BUR built up roofing
C channel
CAB cabinet
CB catch basin
CG corner guard
CTR center
CI cast iron
CJ control joint
CLG ceiling
CL closet
CLR clear (ance)
CMU concrete masonry unit
CMA carbon monoxide alarm
CO clean out
COL column
CONC concrete
CONST construction
CONT continuous or continue
CORR corridor
CPT carpet (ed)
CSMT casement
CT ceramic tile
CY clothes dryer
CW clothes washer
DBL double
DF drinking fountain
DH double hung
DIAG diagonal
DIAM diameter
DIM dimension (s)
DISP dispenser
DL dead load
DN down
DP drain disposal
DR door
DS downspout
DTL detail
DW dish washer
DWG drawing
DWR drawer
E east
EA each
EHD electric hand dryer
EJ expansion joint
EL elevation
ELEC electric (al)
EPDM elastomeric membrane
EQ equal
EQPT equipment
EWC electric water cooler
EXIST existing
EXH exhaust
EXT exterior
FC faucet
FD floor drain
FDTN foundation
FE fire extinguisher
FEC fire extinguisher cabinet
FF factory finish
FFE finished floor elevation
FIN finish
FLG flashing
FLR floor (ing)
FLUR fluorescent
FND feminine napkin dispenser
FNV feminine napkin vendor
FOC face of concrete
FOF face of finish
FOM face of masonry
FOS face of stud
FRMG framing
FT foot
FTG footing
FUT future
GA gage, gauge
GAL gallon
GB grab bar
GC general contract
GDO garage door opener
GI galvanized iron
GL glass, glazing
GWB gypsum wall board
GV galvanized
GYP gypsum
HAS headed anchor stud
HB hose bibb
HBD hardboard
HC hollow core
HCP handicap (ped)
HDR header
HDW hardware
HM hollow metal
HOR horizontal
HP horsepower
HT height
HTG heating
HWD hardwood
HVAC heat/ventilate/air condition
ID inside diameter
INCL include (d) (ing)
INSUL insulate (d) (ion)
INT interior
IRC international residential code
INV invert
JST joist
JT joint
KIT kitchen
KO knockout
L length, angle
LAB laboratory
LAM laminate (d)
LAV lavatory
LB pound
LBL label
LF lineal feet
LL live load
LT light
LWC lightweight concrete
MAS masonry
MATL material (s)
MAX maximum
MC medicine cabinet
MECH mechanic (al)
MTL metal
MFR manufacture (r)
MH manhole
MIN minimum
MISC miscellaneous
ML microlam
MLD molding, moulding
MMB membrane
MO masonry opening
MOV movable
MT mount (ed) (ing)
MW microwave oven
N north
NAT natural
NIC not in contract
NOM nominal
NTS not to scale
OBS obscure
OC on center (s)
OD outside diameter
OFD overflow drain
OH overhead
OPG opening
OPH opposite hand
OPP opposite
PC pumice-crete
PERF perforate
PERIM perimeter
PL plaster
PLAM plastic laminate
PLAS plastic
PLF pounds per lineal feet
PLT plate
PNL panel
PNT paint (ed)
PR pair
PSF pounds per square foot
PSI pounds per square inch
PTD paper towel dispenser
PTN partition
PVC polyvinyl chloride
PVMT pavement
PWD plywood
QT quarry tile
R riser, radius
R/A return air
RB rubber base
RCP reflected ceiling plan
RD roof drain
RE reference
RF refrigerator
RG range
REG register
REINF reinforce (d) (ing)
REQD required
REV revision (s), revised
RFG roofing
RM room
RO rough opening
ROW right of way
RS rough sawn
RUB rubber
RW refrigerator drawers
S south
SA smoke alarm
S/A supply air
SAG suspended acoustic grid
SC solid core
SCH schedule
SD storm drain
SECT section
SHT sheet
SHTG sheathing
SIM similar
SN sink
SPD soap dispenser
SPEC specification
SPKR speaker
SQ square
SSK service sink
SS sanitary sewer
ST steel
STD standard
STN stone
STIFF stiffener
STO storage
STR structural
SUSP suspended
SV stacked ovens
T tread
TB towel bar
TC terra cotta
TEL telephone
THK thick (ness)
TO top of
TOC top of concrete
TOS top of steel
TOW top of wall
TPD toilet paper dispenser
TPH toilet paper holder
TR trash compactor
TS tube steel
TV television
TYP typical
T&G tongue and groove
UBC uniform building code
UE underground electric
UL underwriters laboratory
UNO unless noted otherwise
VCT vinyl composition tile
VERT vertical
VR vapor retarder
W west, wide, width
W/with
WC watercloset
WD wood
WDW window
WF wide flange
WG wire glass
WI wrought iron
W/O without
WP waterproof (ing)
WR warming drawer
WWF welded wire fabric
ABBREVIATIONS
NA
OWNER/BUILDER
OWNER:
EASTON DEVELOPMENT
19 INTREPID DRIVE
BOZEMAN, MT. 59718
406.587.0806
BUILDER:
COMPANY
ADDRESS
BOZEMAN, MT. 59718
PHONE #
WEST OAK STREE
BAXTER LANE
PROJECT SQUARE FOOTAGE
SF
SF
SF
SF
SF
GSF
GSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
TOTAL
TOTAL
ROOF TOP DECKS
PATIOS (NOT INCLUDING WALKWAYS)GSF
992
0
19841984
992
0
0
0
0 0
UNIT A 992 0
0 0
0
0
UNIT B
NA
NA
NA
992
0
0
0
0
0
0
0
0
MAIN LEVEL NA NA
0 0 0
0
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A0.00
COVER SHEET
1611.00
SITE MANAGEMENT NOTES INSULATION SPECIFICATION
GENERAL NOTES
1. EASTON DEVELOPMENT IS NOT RESPONSIBLE FOR ANY UNAUTHORIZED CHANGES MADE TO THESE DRAWINGS.
2.ALL CONSTRUCTION INCLUDED UNDER THIS CONTRACT SHALL BE IN COMPLIANCE WITH ALL APPLICABLE
FEDERAL, STATE & LOCAL CODES, STANDARDS, REGULATIONS, ORDINANCES, SPECIFICATIONS AND ANY APPLICABLE
DESIGN OR ARCHITECTURAL REVIEW COMMITTEES. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
OBTAINING ALL NECESSARY PERMITS APPLICABLE TO THIS PROJECT.
3.GENERAL CONTRACTOR/CONSTRUCTION MANAGER AS WELL AS SUB-CONTRACTORS SHALL BE FAMILIAR
WITH & COMPLY TO ALL PROCEDURES SET FORTH BY FEDERAL, STATE, AND LOCAL GOVERNING AGENCIES IN THE
CONSTRUCTION OF THIS PROJECT. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO FURNISH ALL AFFIDAVITS,
CERTIFICATES, & REPORTS THAT MAY BE REQUIRED BY ANY & ALL AGENCIES INCLUDING ANY APPLICABLE DESIGN OR
ARCHITECTURAL REVIEW COMMITTEES UPON REQUEST.
4. ALL FEES, TAXES, PERMITS, APPLICATIONS, CERTIFICATES OF INSPECTIONS, AND THE FILING OF ALL WORK
WITH GOVERNMENTAL AGENCIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
5.ANY AMBIGUITIES, DISCREPANCIES, OR CONFLICTS DISCOVERED THROUGHT THE USE OF THESE DRAWINGS
SHALL BE REPORTED TO THE ARCHITECT IMMEDIATLEY. FAILURE TO PROVIDE NOTICE TO THE ARCHITECT PRIOR TO ANY
SUBSEQUENT CONSTRUCTION ACTIVITY SHALL RELIEVE THE ARCHITECT OF ALL LIABILITIES AND/OR ANY OTHER
CONSEQUENCE.
6.CONTRACTORS SHALL COMPLY WITH ALL CONSTRUCTION DOCUMENTS, INCLUDING OUTLINE SPECIFICATIONS.
DO NOT SCALE DRAWINGS! FOLLOW DIMENSIONS AS PER PLANS. NOTIFY ARCHITECT OF ANY CONFLICTS.
7.SPECIFICATIONS AND DRAWINGS INDICATE FINISHED STRUCTURE. BUILDER SHALL BE RESPONSIBLE FOR
CONSTRUCTION METHODS, PROCEDURES, AND CONDITIONS (INCLUDING SAFETY), EXCEPT AS SPECIFICALLY
INDICATED OTHERWISE IN THE CONTRACT DOCUMENTS.
8.ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE, TRUE, AND IN PROPER ALIGNMENT.
9.THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTIONS OF WORK, FOR WORK INSTALLED IN
CONFLICT WITH THE CONTRACT DOCUMENTS, AT NO EXPENSE TO THE ARCHITECT.
10.PRIOR TO MATERIAL FABRICATION, SHOP DRAWINGS SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER FOR
CONFORMANCE TO DESIGN. REFER TO NOTES BELOW ON "SHOP DRAWINGS" AS WELL AS STRUCTURAL ENGINEERS
GENERAL NOTES FOR FURTHER INFORMATION.-THE CHECKING OF SHOP DRAWINGS BY THE ARCHITECT OR ENGINEER
IN NO WAY RELIEVES THE CONTRACTOR OF FULL RESPONSIBILITY FOR ACCURATE COMPLETION OF THE WORK AS
DRAWN AND SPECIFIED.
1.BUILDING FOOTPRINT SHALL BE LOCATED BY A CERTIFIED SURVEYOR & TO BE REVIEWED AND APPROVED BY
OWNER/ARCHITECT BEFORE COMMENCING WORK.
2.CONTRACTOR SHALL REMOVE ALL VEGETATION, TREES, STUMPS, DEBRIS AND EXISTING STRUCTURES,
INCLUDING PAVEMENT, SIDEWALK, BUILDING FOUNDATION, ABANDONED UTILITIES AND EXISTING TOPSOIL IN ALL
AREAS OF DEVELOPMENT.
3.DO NOT DISTURB SITE BEYOND CONSTRUCTION LIMITS AS SET FORTH WITHIN THIS DRAWING SET.
4.ALL SURFACES DISTURBED DURING CONSTRUCTION SHALL BE REPAIRED AND OR RE-LANDSCAPED AS SET
FORTH IN THE LANDSCAPING PLAN OR TO MATCH EXISTING WHERE NOT NOTED, SUCH THAT THEY BECOME
INDISTINGUISHABLE FROM ADJACENT UNDISTURBED NATURAL AREAS.
5.NOTICE TO ALL CONTRACTORS AND SUBCONTRACTORS: PROTECT NATURAL VEGETATION , TERRAIN, ROCKS,
ETC. FROM STUCCO, PAINT, ROOFING FOAM, CONCRETE OR OTHER DAMAGE BY COVERING WITH PLASTIC OR AS
REQUIRED. PROVIDE A 4'-0" HIGH BARRIER WITHIN BUILDING ENVELOPE (WHEN APPLICABLE). KEEP MATERIALS AND
WORKMEN WITHIN THE FENCE TO PREVENT DAMAGE TO NATURAL TERRAIN AND VEGETATION. THE COST OF
RECLAIMING OR REPAIRING ANY DAMAGE DUE TO NEGLIGENCE WILL BE AT THE CONTRACTOR'S / SUBCONTRACTOR'S
EXPENSE.
6.ANY AREAS EXTENDING BEYOND THE IMMEDIATE BUILDING SITE THAT ARE DISTURBED DURING CONSTRUCTION
INCLUDING BUT NOT LIMITED TO, DRAINAGE FACILITIES AND UTILITY (SEWER, WATER, ELECTRIC, ETC.) TRENCHES
SHALL BE RESTORED TO THEIR NATURAL STATE.
7.ALL TRADES SHALL BE RESPONSIBLE TO COMPLETE SITE INVESTIGATION TO IDENTIFY SCOPE OF MATERIALS TO
BE REMOVED AND NEW MATERIALS REQUIRED TO MATCH EXISTING CONSTRUCTION.
8.ALL PROPERTY AND BUILDING LINES AS WELL AS ALL SPOT ELEVATIONS SUCH AS TOP OF PWD IN RELATION TO
EXISTING GRADE, SHALL BE FIELD VERIFIED AND APPROVED BY ARCHITECT PRIOR TO CONSTRUCTION.
9.HOUSE ADDRESS MARKING: A HOUSE NUMBER SHALL BE DISPLAYED IN A PROMINENT MANNER, SO THAT IT IS
REASONABLY VISIBLE TO ENABLE EMERGENCY VEHICLES TO LOCATE THE RESIDENCE.
10.ALL RETAINING WALLS TO HAVE DRAIN TILE SURROUNDED BY 3/4" CRUSHED GRAVEL WRAPPED IN GEOTEXTILE
BEHIND WALL AND WEEPS @ 4'-0" OC. (TYP). REFER TO SOILS REPORT FOR FURTHER INFORMATION.
UTILITIES
1.CONTRACTOR SHALL CONFIRM WITH EACH APPLICABLE AGENCY THAT ALL UTILITIES (SEWER, POWER,
WATER, ETC.) ARE LOCATED AS SHOWN AND THAT SEWER TAP IS LOW ENOUGH TO SERVE ALL PLUMBING DRAINS.
2.CONTRACTORS SHALL NOTIFY UTILITY LOCATOR A MINIMUM OF (3) WORKING DAYS PRIOR TO COMMENCING
WORK TO DETERMINE HOW RESPECTIVE UTILITIES WILL BE EFFECTED BY CONSTRUCTION.
3.ALL UTILITIES ARE TO BE BURIED, AND SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL ORDINANCES.
4.UTILITY ROUTING AND CONDUIT TRENCH LOCATIONS SHALL CONFORM TO ALL APPLICABLE BUILDING CODES
WITH REFERENCE TO HORIZONTAL AND VERTICAL SEPARATION.
5.ELECTRICAL METER SHALL HAVE THE ABILITY TO BE READ REMOTELY BY POWER COMPANY.
6.WATER SUPPLY LINE SHALL BE 11/2" OD POLYETHYLENE AND 8'-0" BELOW GRADE, UNLESS NOTED
OTHERWISE.
EXCAVATION
1.ANY EXCAVATION SHALL BE CONDUCTED IN ACCORDANCE WITH RECOMMENDATIONS SET FORTH IN
GEOTECHNICAL REPORT.
2.FINISH GRADE SHALL BE A MINIMUM OF 8 INCHES BELOW WOOD FRAMING AT BUILDING EXTERIOR.
3.FINISH GRADE TO SLOPE AWAY FROM STRUCTURE FOR A MINIMUM DISTANCE OF 10'-0" AND AT A MINIMUM
SLOPE OF 1:10 AND A MAXIMUM SLOPE OF 1:2 UNLESS NOTED OTHER WISE. -GEOTECHNICAL REPORT TO SUPERCEDE
ANY FURTHER CONFLICTS.
4.THERE SHALL BE AN EVEN SLOPE BETWEEN NEW GRADES. UNLESS NOTED OTHERWISE , MEET EXISTING
GRADES AT A MAXIMUM SLOPE OF 1'-0" VERTICAL TO 2'-0" HORIZONTAL AND A RECOMMENDED SLOPE OF 1'-0"
VERTICAL TO 10'-0" HORIZONTAL. ALL FINISHED EARTH GRADES TO BE 1" BELOW ADJACENT WALKS AND DRIVES
UNLESS OTHERWISE NOTED. DITCHES TO HAVE SMOOTH CONTOURS TO FACILITATE USE OF LAWN MOWERS WHERE
APPLICABLE.
5.THE UNDER FLOOR GRADE SHALL BE CLEANED OF ALL VEGETATION AND ORGANIC MATERIAL. ALL WOOD
FORMS USED FOR PLACING CONCRETE SHALL BE REMOVED, AND ALL CRAWL SPACES SHALL BE CLEANED OF ALL
CONSTRUCTION DEBRIS BEFORE STRUCTURE IS OCCUPIED.
FIRE SUPPRESSION
1.FIRE SUPPRESSION SYSTEM IS NOT REQUIRED, SPRINKLER SYSTEM DESIGN AND LAYOUT SHALL BE
SUBMITTED TO ARCHITECT FOR REVIEW PRIOR TO COMMENCING INSTALLATION.
2.FIRE SUPPRESSION ENGINEER OF RECORD SHALL BE CONTACTED BY GENERAL CONTRACTOR TO PERFORM
ON-SITE OBSERVATION VERIFYING THE INSTALLATION IS IN ACCORDANCE WITH PLANS PROVIDED
EROSION AND SEDIMENT STOP CONTROL
1.IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO MAINTAIN A COMPLIANT JOB SITE IN ACCORDANCE
WITH THE COB STORM WATER DEPARTMENT, AND MDEQ.
2.GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING A STABALIZED CONSTRUCTION ENTRACE TO THE SITE.
3.GENERAL CONTRACTOR SHALL INSTALL APPROPRIATE EROSION CONTROL BMP'S AS NEEDED BEFORE START OF
CONSTRUCTION.
4.CONTRACTORS SHALL CONDUCT THEIR WORK IN SUCH A MANNER THAT ALL SOIL, FUELS, OILS, BITUMINOUS
MATERIALS, CHEMICALS, SANITARY SEWAGE, AND OTHER HARMFUL MATERIALS ARE CONFINED WITHIN THE PROJECT
LIMITS AND PREVENTED FROM ENTERING STORM SEWERS, WATER COURSES, RIVERS, LAKES OR RESERVOIRS.
5.THE CONTRACTOR SHALL PLACE A FILTER OR BARRIER COMPOSED OF STRAW, STONE, FILTER FABRIC ON
DRAINAGE STRUCTURE GRATES OR OTHER APPROVED MATERIAL AROUND ALL DRAINAGE COURSES TO PREVENT
SEDIMENTATION IN THESE AREAS. AFTER THE CONSTRUCTION OPERATIONS ARE COMPLETED, THE CONTRACTOR SHALL
REMOVE THESE FILTERS AND CLEAN ALL THE SEDIMENT AND DEBRIS FROM THE CATCH BASINS OR OTHER DRAINAGE
STRUCTURES.
6.SEE SITE DETAIL'S FOR RECOMMENDED SEDIMENT STOP INSTALLATION. GC TO COORDINATE WITH CIVIL ENGINEER
OR COB FOR ANY FURTHER SWPPPS REQUIREMNTS AND BMP'S
7.INTRODUCED DRAINAGE FEATURES SHALL BE NATURAL APPEARING, DESIGNED TO EMULATE INDIGENOUS
SWALES AND WASHES AND SHALL CONFORM TO ALL DRAINAGE EASEMENTS.
8.A "STORM WATER POLLUTION PROTECTION PLAN" (SWPPP) AND PERMIT IS REQUIRED FOR ANY PROJECT WHICH
THE AREA OF DISTURBANCE IS GREATER THAN 1 ACRE. FURTHERMORE, THE GOVERNING DEVELOPMENT MAY REQUIRE A
SWPPP REGARDLESS OF SIZE OF AREA OF DISTURBANCE.
STAGING NOTES
1.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING FINAL APPROVAL FROM ANY APPLICABLE ARCHITECTURAL
REVIEW COMMITTEE FOR ALL CONSTRUCTION STAGING IN THE FIELD PRIOR TO CONSTRUCTION.
2.THE CONTRACTOR IS RESPONSIBLE FOR KEEPING ALL CLEARING AND EXCAVATION WITHIN EXISTING PROPERTY
LINE BOUNDARIES AND GENERAL EASEMENTS.
3.THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ANY REVISIONS OR ALTERATIONS TO THE CONSTRUCTION
STAGING PLAN PRIOR TO CONSTRUCTION.
4.THE CONTRACTOR IS TO INSTALL STRAW BALES IN ADDITION TO SILT FENCE AT LOCATIONS OF POTENTIAL RUN-
OFF INTO WETLAND AREAS AS INDICATED ON SITE PLAN.
5.ANY DAMAGE TO THE EXISTING ROADWAY, INCLUDING THE ASPHALT SURFACE, SHOULDER GRAVEL, ROADSIDE
DITCH, EXISTING CULVERTS, AND EXISTING VEGETATION AND EROSION CONTROL MEASURES SHALL BE REPAIRED BY THE
GENERAL CONTRACTOR TO THE SATISFACTION OF THE DEVELOPMENT.
6.GRAVEL CONSTRUCTION ENTRANCE IS TO BE CONSTRUCTED WITH A MIN. OF 2" OF 3/4"SCREENED ROCK TO
COVER ALL DRIVEWAYS, PARKING, AND LAY DOWN AREAS TO BE PLACED AT START OF CONSTRUCTION, AND A
RECOMMENDATION OF A MIN. OF (8)" MINUS 3" PITRUN OVER A GEOTECHNICAL SEPARATION FABRIC.
7.ANY USE OF ANY FIRE HYDRANT IS PROHIBITED FOR USE BY ANY OTHER THAN THE GOVERNING FIRE
DEPARTMENT.
8.ALL WASTE SHALL BE CONTAINED ON SITE AND PROPERLY DISPOSED OF AT PROJECT COMPLETION. FURTHER,
CONCRETE WASHOUT WITHIN THE ROADSIDE DITCHES IS STRICTLY PROHIBITED.
9.GENERAL CONTRACTOR IS TO PROVIDE ONE LOCATION FOR CONCRETE TRUCK WASHOUT. CONCRETE WASHOUT
WITHIN THE ROADSIDE DITCHES IS STRICTLY PROHIBITED.
10.ALL MATERIALS AND EQUIPMENT STAGED ON OR OFF SITE SHALL BE PROTECTED FROM WEATHER DAMAGE.
LANDSCAPE
1.LANDSCAPE CONTRACTOR SHALL REVIEW GEOTECHNICAL REPORT PRIOR TO INSTALLATION, COPIES OF REPORT
AVAILABLE UPON REQUEST. RE: ARCHITECT/GENERAL CONTRACTOR/OWNER.
2.REFERENCE LANDSCAPE PLAN FOR ADDITIONAL LANDSCAPE NOTES.
3.ALL LANDSCAPEING IS TO BE INSTALLED PER COB, PLANTING STANDARDS.
RADON SYSTEMS
NOTE: RADON PLAN TO BE SUBMITTED, BY CONTRACTOR, TO ARCHITECT FOR
REVIEW. RADON MEASURED IN PICO CURRIES PER LITER pCi/L
-4 pCi/L = ACTION REQUIRED LEVEL
-2 pCi/L = ACCEPTABLE LEVEL
-2pCi/L > RADON LEVEL GOAL
RADON MITIGATION -CRAWLSPACE PASSIVE SUB-MEMBRANE
DEPRESSURIZATION SYSTEM
FOUNDATION WALL -ALL CONTROL JOINTS, ISOLATION JOINTS & OTHER
JOINTS SHOULD BE CALKED WITH AN ELECTROMETRIC SEALANT SUCH AS
POLYURETHANE CAULK, DAMP PROOF FOUNDATION WALL AND SEAL ANY
PENETRATIONS THROUGH THE WALL.
CRAWLSPACE SHEETING TO BE HIGH-DENSITY CROSS-LAMINATED
POLYETHYLENE. COLOR TO BE WHITE. OVERLAY W. EPDM RUBBERIZED
ROOFING MEMBRANE AT HIGH TRAFFIC AREAS AND ALONG EXPECTED TRAFFIC
ROUTES. OVERLAP SHEETS BY 12" AND SEAL SHEETING USING A 1/2" WIDE
BEAD OF CAULK. WIRE BRUSH 12" ABOVE CRAWLSPACE FLOOR TO REMOVE
ANY DIRT AND SECURE PLASTIC TO WALL @ 12" ABOVE CRAWLSPACE FLOOR
WITH 1/2" WIDE BEAD OF CAULK.
SEAL AROUND ALL VERTICAL PENETRATIONS. SEAL FLOOR-TO-WALL JOINTS,
SEAL CONTROL JOINTS.
AIR HANDLING SYSTEMS IN CRAWLSPACE TO MAINTAIN CONTINUOUS POSITIVE
PRESSURE WITHIN THE DUCTWORK. THIS IS TO PREVENT RADON FROM BEING
DRAWN INTO THE DUCTWORK AND THEN DISTRIBUTED THROUGHOUT THE
HOUSE.
RISER PIPE TO BE SCHEDULE 40 PVC OR ABS, CONNECT TO 3 OR 4 INCH
DIAMETER CORRUGATED AND PERFORATED COLLECTION PIPE 5'+ OR A STRIP
OF GEOTEXTILE DRAIN MATTING ON THE SOIL AT THE RISER LOCATION
BENEATH THE PLASTIC SHEETING.
ACCESS DOORS AND OTHER OPENINGS OR PENETRATIONS BETWEEN FLOORS
AND ADJOINING CRAWLSPACES SHOULD BE CLOSED, GASKETED OR
OTHERWISE SEALED TO PREVENT AIR LEAKAGE.
LABEL RISER AT ALL VISIBLE LOCATIONS SO IT IS NOT CONFUSED WITH ANY
OTHER PLUMBING. LABEL PLASTIC SHEETING TO STATE THAT THE PLASTIC
SHOULD NOT BE REMOVED AND, IF CUT, IT SHOULD BE PATCHED OR
REPLACED. AFTER CONSTRUCTION IS COMPLETED, INSPECT THE SHEETING
FOR DAMAGE AND REPAIR AS NECESSARY.
PROVIDE FOR FUTURE FAN IF NEEDED. FAN CANNOT BE INSIDE THE LIVING
SPACE OR CRAWLSPACE. FANS ARE MOST OFTEN LOCATED IN ATTICS OR
GARAGES (UNLESS THERE IS A LIVING SPACE ABOVE THE GARAGE.) FANS
REQUIRE A 30-INCH VERTICAL RUN OF PIPE FOR INSTALLATION. FANS REQUIRE
AN UNSWITCHED ELECTRICAL JUNCTION BOX.
CAVITY
INSULATION SCHEDULE
R -VALUE
MINIMUM
R-49ROOFS OVER HEATED SPACES
R-20EXTERIOR WALLS
-INTERIOR WALLS
R-30FLOORS OVER UNHEATED SPACES
R-15/19BASEMENT WALL
R-10/13UNDER CONC. SLAB
R-20CRAWL SPACE R-15/19
LID
WALL
NOTES:
1.ARCHITECT'S RECOMMENDATION FOR ALL EXTERIOR EAVES AND RAKES TO RECEIVE MIN. OF 3" BLOWN IN
POLYURETHANE INSULATION UNLESS NOTED OTHERWISE.
2.DEDUCT ALTERNATE AS APPROVED BY ARCHITECT TO REPLACE 4" SPRAY APPLIED POLYURETHANE INSULATION AT
EXTERIOR WALLS WITH AN R-11 MINERAL FIBER BATT OVER TOP OF 2" SPRAY APPLIED POLYURETHANE INSULATION.
3.ARCHITECTS RECOMMENDATION FOR BASEMENT FURRING WALLS TO RECEIVE 3.5" BLOWN IN POLYURETHANE
INSULATION IN PLACE OF R-19 BATT.
4.DEDUCT ALTERNATE AS APPROVED BY ARCHITECT TO REPLACE 2" NCFI SPRAY APPLIED POLYURETHANE INSULATION
UNDER CONCRETE SLAB WITH 2" POLY-ISOCYANURATE RIGID FOAM INSULATION.
5.GENERAL CONTRACTOR TO PROVIDE COST COMPARISON FOR BLOWN-IN WET CELLULOSE PRODUCT TO REPLACE
BATT INSULATION IN EXTERIOR WALLS AND FLOORS.
6.AT A MINIMUM, ALL INTERIOR WALLS SEPARATING BEDROOMS AND/OR BATHROOMS SHALL BE INSULATED AS
SPECIFIED ABOVE. IT IS STRONGLY RECOMMENDED THAT ALL INTERIOR WALLS BE INSULATED.
8.FOAM INSULATING SEALANT AT ALL WINDOWS AND DOORS.
BLOWN IN INSULATION
FIBERGLASS BATT INSULATION W/ 6 MIL. VAPOR BARRIER
RECOMMENDED 4" BLOWN IN CELLULOSE -DAMP SPRAYED OR EQUIVALENT MINERAL FIBER BATT SOUND
INSULATION
6" MIN. OF SPRAY APPLIED POLYURETHANE INSULATION
R-19 BATT INSULATION -WHERE STUD BAY EXISTS 3.5"-2" POLYURETHANE TAPER ELSEWHERE
2" OF 'NCFI' SPRAY APPLIED POLYURETHANE INSULATION WITH VAPOR BARRIER BELOW OR 2" RIGID
INSULATION W/ TAPED SEAMS AND VAPOR BARRIER BELOW.
3 1/2" MINERAL FIBER BATT INSULATION IN FLOORS OVER HEATED SPACES FOR SOUND
INSULATIONFLOORS OVER HEATED SPACES -
3.5" OF SPRAY APPLIED POLYURETHANE INSULATION OR R-20 VINYL WRAPPED BLANKET INSUATION FASTENED TO FLOOR JOIST
4" OF SPRAY APPLIED POLYURETHANE INSULATION OR R-20 VINYL WRAPPED BLANKET INSUATION FASTENED TO FLOOR JOIST
GENERAL SITE NOTES
GEOTECHNICAL REPORT NOTES
NOTES REGARDING THE GEOTECHNICAL REPORT PROVIDED HERE ARE IN NO WAY INTENDED TO SERVE AS A SUPPLEMENT
TO THE GEOTECHNICAL REPORT. IT IS REQUIRED THAT THE GENERAL CONTRACTOR AS WELL AS ANY APPLICABLE SUB
CONTRACTORS RECEIVE AND REVIEW THE GEOTECHNICAL REPORT.
A FULL GEOTECHNICAL ANALYSIS AND REPORT HAS BEEN PREPARED FOR THIS PROPERTY BY: ALLIED ENGINEERING
SERVICES, DATED: JANUARY, 2014, PROJECT # 13-157
1.SURFACE & SUBSURFACE DRAINAGE SHALL CONFORM TO THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS
AS SET FORTH IN THE REFERENCED GEOTECHNICAL REPORT.
2.PROPER DRAINAGE SHOULD BE PROVIDED IN THE FINAL DESIGN AND DURING CONSTRUCTION. THE ARCHITECT
SHALL BE NOTIFIED OF ANY ISSUES OR CONFLICTS NOT ACCOUNTED FOR WITHIN THESE DRAWINGS OR THE REFERENCED
GEOTECHNICAL REPORT.
3.SITE PREPARATION PROCEDURES AND FOUNDATION EXCAVATIONS TO BE OBSERVED BY THE GEOTECHNICAL
ENGINEER TO ASSESS THAT THE ADEQUATE BEARING CONDITIONS EXIST AND THAT PLACEMENT OF ENGINEERED FILL HAS
BEEN PERFORMED SATISFACTORILY. IF THE SOIL CONDITIONS ENCOUNTERED DIFFER SIGNIFICANTLY FROM THOSE
PRESENTED IN THE GEOTECHNICAL REPORT, SUPPLEMENTAL RECOMMENDATIONS MAY BE REQUIRED.
4.POSITIVE DRAINAGE SHALL BE PROVIDED DURING CONSTRUCTION AND MAINTAINED THROUGHOUT THE LIFE OF
THE PROPOSED DEVELOPMENT. INFILTRATION OF WATER INTO UTILITY OR FOUNDATION EXCAVATIONS MUST BE
PREVENTED DURING CONSTRUCTION.
5.STRIP AND REMOVE ANY EXISTING VEGETATION, ORGANIC TOPSOILS, DEBRIS AND ANY OTHER DELETERIOUS
MATERIALS FROM THE BUILDING AREAS. THE BUILDING AREAS ARE DEFINED AS THAT AREA WITHIN THE BUILDING
FOOTPRINT PLUS 5 FEET BEYOND THE PERIMETER OF THE FOOTPRINT. ALL EXPOSED SURFACES SHOULD BE FREE OF
MOUNDS AND DEPRESSIONS THAT COULD PREVENT UNIFORM COMPACTION.
6.FROZEN SOILS SHOULD NOT BE USED AS FILL OR BACKFILL.
7.EXISTING SOILS REMOVED AT BUILDING FOOTPRINT EXCAVATION MAY BE REUSED IN LANDSCAPE AREAS, AS
LONG AS IN ACCORDANCE OF THE REFERENCED GEOTECHNICAL REPORT.
8.ALL IMPORT FILL AND ONSITE BACKFILL SHOULD BE APPROVED BY THE GEOTECHNICAL ENGINEER. WHERE FILL IS
TO BE PLACED, LOOSE OR OTHERWISE UNSUITABLE MATERIAL SHOULD BE REMOVED PRIOR TO PLACEMENT OF NEW FILL.
9.GEOTECHNICAL ENGINEER OF RECORD SHALL BE CONTACTED BY THE GENERAL CONTRACTOR AT COMPLETION
OF EXCAVATION AND PRIOR TO ANY FILL BEING PLACED TO PERFORM A REVIEW OF EXCAVATION AND SUBSURFACE SOIL
CONDITIONS IN COMPARISON WITH THE FINDINGS IN THE GEOTECHNICAL REPORT.Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A0.01
GENERAL NOTES
1611.00
LOT
8
3,850
sq.ft.
LOT
11
3,850
sq.ft.
LOT
8
6,692
sq.ft.
FND
OPC
(HKM)
FND
OPC
(HKM)
FND
OPC
(HKM)
FND
OPC
(HKM)
OPEN SPACE
5,187
sq.ft.
LOT
6
4,983
sq.ft.
LOT
7
4,995
sq.ft.
LOT
2
4,936
sq.ft.
LOT
3
4,948
sq.ft.
LOT
4
4,960
sq.ft.
LOT
5
4,971
sq.ft.
LOT
17
5,407
sq.ft.
LOT
16
5,407
sq.ft.
LOT
15
5,407
sq.ft.
LOT
14
5,407
sq.ft.
LOT
13
5,407
sq.ft.
LOT
12
5,407
sq.ft.
LOT
2
5,407
sq.ft.
LOT
3
5,407
sq.ft.
LOT
4
5,407
sq.ft.
LOT
5
5,407
sq.ft.
LOT
6
5,407
sq.ft.
LOT
7
5,407
sq.ft.
LOT
14
5,408
sq.ft.
LOT
15
5,425
sq.ft.
LOT
16
5,443
sq.ft.
LOT
17
5,460
sq.ft.
LOT
12
5,373
sq.ft.
LOT
13
5,391
sq.ft.
LOT
1
6,674
sq.ft.
LOT
1
6,985
sq.ft.
LOT
11
3,867
sq.ft.
LOT
7
5,373
sq.ft.
LOT
6
5,391
sq.ft.
LOT
5
5,408
sq.ft.
LOT
4
5,425
sq.ft.
LOT
3
5,443
sq.ft.
LOT
2
5,460
sq.ft.
LOT
3
3,143
sq.ft.
LOT
11
3,255
sq.ft.
LOT
4
3,791
sq.ft.
LOT
12
3,925
sq.ft.
LOT
5
3,809
sq.ft.
LOT
6
3,186
sq.ft.
LOT
14
3,228
sq.ft.
LOT
7
3,199
sq.ft.
LOT
8
3,858
sq.ft.
LOT
16
3,582
sq.ft.
LOT
1
3,742
sq.ft.
LOT
9
3,876
sq.ft.
LOT
2
3,130
sq.ft.
LOT
10
3,242
sq.ft.
LOT
2
3,465
sq.ft.
LOT
1
4,356
sq.ft.
LOT
5
3,465
sq.ft.
LOT
4
3,465
sq.ft.
LOT
3
3,465
sq.ft.
LOT
2
5,247
sq.ft.
LOT
6
6,785
sq.ft.
LOT
1
6,764
sq.ft.
LOT
5
5,247
sq.ft.
LOT
4
5,247
sq.ft.
LOT
18
6,985
sq.ft.
LOT
6
4,293
sq.ft.
LOT
1
7,080
sq.ft.
LOT
18
7,080
sq.ft.
LOT
13
3,889
sq.ft.
LOT
15
3,161
sq.ft.
LOT
9
3,719
sq.ft.
LOT
10
3,719
sq.ft.
LOT
3
5,247
sq.ft.
LOT
10
3,626
sq.ft.
LOT
84
126,712
sq.ft.
LOT
85
2,133
sq.ft.WINDWARD AVENUEZEPHYR WAYNEW HOLLAND DRIVEBORA WAYMISTRAL WAY
WEST OAK STREETDAVIS LANEBREEZE LANE
MISTRAL WAY S
S
S
S
SS
SSSS
S
SHYD
HYDHYD HYDHYDHYD
D
S
S SSSS S
S SS
S
S
S S
S
SWVWV
WVWVWVWVHYD WVWVWVWV
WV
WV WV
WV WV
WV WV
WV WV
WVHYDHYDHYDHYDHYD
90
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A0.02
OVERALL SITE
1611.00
1/32" = 1'-0"1 SITE PLAN
WWWWWWWWWWWWWSSSSSSSSSSSSSSSSSSSSWWWSSSSSSSSSSSSSSSSSSSSSSSSSSWWWWWWWWWWWUE UEUE UEUEUEUEUEUEUEUEGAS GASGAS GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS GAS
UEUEUEUEUEUEUEUEUEUE UEUE SSSSSSSSSSSSSSSSSSSSWWWWWWWWWWWWWWWWWWWWWWWWWWWSS SS SS SS SSS
SSSSSSSUEUEUEUEUEUEUEUEUEUEUE
GASGASGASGASGASGASGASGASGASGASGAS
GASGASGASGASGASGASGASGASGASGASGAS
UEUEUEUEUEUEUEUEUEUEUEUEFRONT SETBACK15' - 0"53.81'53.00'70.01'53.49'53.81'70.00'51.81'55.00'70.00'55.49'51.81'
LOT 8
BLOCK 6
3,727ft2
LOT 9
BLOCK 6
3,766ft2
LOT 10
BLOCK 6
3,626ft2
LOT 11
BLOCK 6
3,867ft2
BREEZE LANE
BORA WAYSIDE SETBACK
15' - 0"REAR SETBACK 20' - 0"SIDE SETBACK
5' - 0"
EASEMENT
10' - 0"EASEMENT10' - 0"CONCRETE SIDEWALK
CONCRETE SIDEWALK2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MI
N.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.LEGEND
DRAINAGE
LIMITS OF CONSTRUCTION
EROSION CONTROL
DRAINTILE
NEW WATER LINE
NEW SEWER LINE
NEW ELECTRICAL LINE
NEW PHONE LINE
LIMITS OF EXCAVATION
METAL PLANTING BORDER
SNOW MELT LOCATIONS
ASPHALT
CONCRETE
SNOW STORAGE
NEW GRADE LINE
PREVIOUS GRADE LINE
FO FO FO
UE UE UE
EX SS EX SS
WATR WATR
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A1-0.1
SITE PLAN
1611.00
1/8" = 1'-0"1 SITE PLAN
TRUE
NORTH
UNIT A UNIT B
GENERAL NOTES:
KEY NOTES:
1 TBD
1. ALL DIMENSIONS ARE TO FRAMING UNLESS NOTED
OTHERWISE.
2. CENTER ALL DOORS ABOUT WALL SPACE UNLESS
INDICATED OTHERWISE
3. THE GENERAL CONTRACTOR AND/OR WINDOW
SUPPLIER SHALL BE RESPONSIBLE FOR INSURING
THAT SAFTEY GLASS IS PROVIDED WHERE APPLICABLE
IN ACCORDANCE WITH 2012 IRC SECTION R308.4
4. RADON MITIGATION SYSTEMS SHALL BE INSTALLED
UNDER ALL CONCRETE SLABS. (TYP)
5. ANY AND ALL POST AND BEAM SIZES SHALL BE
CROSS CHECKED WITH STRUCTURAL DRAWINGS,
NOTIFY ARCHITECT OF ANY DISCREPANCIES. (TYP)
6. WATER SUPPLY (W.S.) TO BE LOCATED ON NON-
VISIBLE SIDE OF TOILET (TYP)
PROJECT SQUARE FOOTAGE
SF
SF
SF
SF
SF
GSF
GSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
TOTAL
TOTAL
ROOF TOP DECKS
PATIOS (NOT INCLUDING WALKWAYS)GSF
992
0
19841984
992
0
0
0
0 0
UNIT A 992 0
0 0
0
0
UNIT B
NA
NA
NA
992
0
0
0
0
0
0
0
0
MAIN LEVEL NA NA
0 0 0
0
WALL & COLUMN LEGEND
CONVENTIONAL WOOD FRAMING
-STANDARD THICKNESS 2x4 U.N.O.
CONCRETE WALL
-STANDARD THICKNESS 8" U.N.O.
STONE MASONRY TYPE 'A'
-STANDARD THICKNESS OF 6" U.N.O.
INDICATES ARCHITECTURAL WOOD COLUMN
(WOOD TYPE 'A' U.N.O.)
INDICATES STRUCTURAL WOOD COLUMN,
(WOOD TYPE 'A2' U.N.O.) VERIFY SIZE AND
GRADE WITH STRUCTURAL DRAWINGS.
(TYP)
INDICATES STRUCTURAL COLUMN.
VERIFY SIZE AND TYPE WITH STRUCTURAL
DRAWINGS TYP.
EXPOSED STAINED CONCRETE
-VERIFY STAIN AND FINISH WITH ARCH.
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
11
22
33
44
66
-
---
3' - 3"15' - 1"12' - 4"5' - 0"12' - 4"15' - 1"3' - 3"5' - 6"24' - 6"2' - 0"32' - 0"66' - 4"1' - 2"4' - 9"4' - 0"20' - 1"2' - 0"32' - 0"3' - 3"15' - 1"12' - 4"5' - 0"12' - 4"15' - 1"3' - 3"
33' - 2"33' - 2"
66' - 4"
33' - 2"33' - 2"
1/4:12 1/4:12 1/4:121/4:12T.O.W. 100' - 0"
T.O.F. 96' - 4"
T.O.W. 100' - 0"
T.O.F. 96' - 4"
T.O.W. 100' - 0"
T.O.F. 96' - 4"
T.O.W. 100' - 0"
T.O.F. 96' - 4"
PROVIDE CRAWL
SPACE ACCESS
PROVIDE CRAWL
SPACE ACCESS
T.O.P. 99' - 6"
T.O.F. 96' - 4"
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A1-1.0
FOUNDATION PLAN
1611.00
TRUE
NORTH
PLAN
NORTH
1/4" = 1'-0"1 T.O. FOOTING
A2-0.1
3
3
A2-0.1
2
2
A2-0.1
1
1
A2-0.1
4
4
STACKED
W/D
DW
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
1
1
22
33
44
66
STACKED
W/D
DW1' - 2"4' - 9"4' - 0"5' - 1 1/2"14' - 11 1/2"2' - 0"3' - 3"9' - 7"5' - 6"2' - 3"7' - 10"2' - 3"5' - 0"2' - 3"7' - 10"2' - 3"5' - 9"9' - 4"3' - 3"
3' - 3"15' - 1"2' - 0"7' - 9"2' - 7"5' - 0"2' - 7"7' - 9"2' - 0"15' - 1"3' - 3"2' - 0"1' - 2"33' - 2"33' - 2"2' - 0"9' - 4 1/2"5' - 10 1/2"4' - 9 1/2"4' - 5 1/2"2' - 9"2' - 9"1/4" / 12"3' - 3"15' - 1"12' - 4"2' - 6"2' - 6"12' - 4"15' - 1"3' - 3"
33' - 2"33' - 2"2' - 0"24' - 6"5' - 6"-
---
UNIT A UNIT B
32' - 0"101B
101 102 103
104 105
108
105A
104A
103A
102A
101A
107A
109 110
111 113
108A
108B
108C
109A
111A
113A
108D
112A
LIVING ROOM
101
LAMINATE
BEDROOM
102
CARPET
BATH
103
LVT TILE
BEDROOM
104
CARPET
KITCHEN
105
LAMINATE
MECH
106
?
106107
105B
104B12' - 5 1/2"3' - 1"3' - 1"12' - 5 1/2"112
LIVING ROOM
108
LAMINATE
KITCHEN
109
LAMINATE
MECH
110
LVT TILE
BEDROOM
111
CARPET
BATHROOM
112
LVT TILE
BEDROOM
113
CARPET
113B
114
3' - 4 1/2"1' - 7"2' - 0 1/2"12' - 5 1/2"6' - 2"12' - 5 1/2"1151164' - 6"4' - 6"4' - 6"4' - 6"1' - 2"5' - 0"5' - 0"1' - 2"2' - 0 1/2"1' - 7"3' - 4 1/2"
2
A1-3.0
102B 111B
PROVIDE 2'-0" X 2'-6"
CRAWL ACCESS
PROVIDE 2'-0" X 2'-6"
CRAWL ACCESS
PROJECT SQUARE FOOTAGE
SF
SF
SF
SF
SF
GSF
GSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
TOTAL
TOTAL
ROOF TOP DECKS
PATIOS (NOT INCLUDING WALKWAYS)GSF
992
0
19841984
992
0
0
0
0 0
UNIT A 992 0
0 0
0
0
UNIT B
NA
NA
NA
992
0
0
0
0
0
0
0
0
MAIN LEVEL NA NA
0 0 0
0
1/4" = 1'-0"1 MAIN LEVEL PLAN
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A1-1.1
MAIN LEVEL PLAN
1611.00
ROOF MATERIALS LEGEND
GAF TIMBERLINE ASPHALY SHINGLE OR
EQ. EQUIVALENTS. COLOR:
PRE-FINISHED SEAMLESS GUTTER, AND
DOWNSPOUT
NOTE:
REFER TO PROJECT SPECIFICATIONS FOR
FURTHER INFORMATION ON MATERIAL
TYPES AND INSTALLATION REQUIREMENTS
R1
ROOF PLAN GENERAL NOTES
SHINGLE ROOFS:INSTALL SINGLE LAYER OF SLOPESHIELD OVER
'MIRADRI' ICE & WATER UNDERLAYMENT OR EQ. TO COVER ALL
PWD SHEATHING WHERE SHINGLE ROOFS ARE LOCATED. LAP
OVER HIPS, RIDGES, AND THROUGH VALLEYS, TYP.
UNDERLAYMENT SHALL BE LAPPED 6" VERTICALLY (END OR SIDE
LAP) AND 2" HORIZONTALLY (HEAD LAP).
INSTALL SINGLE LAYER OF 15# MIN. FELT PAPER AT EVERY
COARSE SHINGLE COARSE, TYP.
ALL HIPS AND RIDGES TO RECEIVE 'PROTECTO WRAP' HIP
AND RIDGE SEAL AS SPECIFIED, TYP.
1. ALL ROOFS TO ACHIEVE A CLASS 'A' FIRE RATING BY
INSTALLING REQUIRED ROOFING UNDERLAYMENT AT ALL
LOCATIONS WHERE PRIMARY ROOF MATERIAL DOES NOT
ACHIEVE CLASS 'A' RATING GC TO VERIFY COMPLIANCE, TYP.
2. ALL RAKE AND EAVE DIMENSIONS TO BE HORIZONTAL
DIMENSIONS, NOT ALONG THE PITCH.
3. COORDINATE LAYOUT OF ROOF FRAMING WITH EXPOSED
RAFTERS WHERE APPLICABLE, SEE REFLECTED CEILING PLAN
FOR LOCATIONS, (TYP.)
4. VERIFY ALL GUTTER & DOWNSPOUT LOCATIONS AND TYPES
WITH ARCHITECT PRIOR TO INSTALLATION
5. LIGHTNING PROTECTION IS RECOMMENDED, REFER TO
MANUFACTURER FOR LIGHTNING ROD AND GROUND ROD
LOCATIONS AS IMPLEMENTED.
6. ALL ROOF PENETRATION LOCATIONS INCLUDING, BUT NOT
LIMITED TO; FLUES, VENTILATION PIPES AND STACKS SHALL BE
SUBMITTED TO ARCHITECT AND ROOFING MFR. FOR REVIEW.
(NOTE: NOT ALL ROOF PENETRATIONS MAY BE SHOWN ON PLAN)
7. DIVERTER FLASHING SHALL BE INSTALLED WHERE A LOWER
SLOPED ROOF TERMINATES AGAINST A VERTICAL WALL,
CHIMNEY CHASE, OR FRAMED COLUMN.
CRICKET DIMENSION TABLE
ROOF SLOPE
12 : 12
8 : 12
6 : 12
4 : 12
3 : 12
H
1/2 OF W
1/3 OF W
1/4 OF W
1/6 OF W
1/8 OF W
A2-0.1
3
3
A2-0.1
2
2
A2-0.1
1
1
A2-0.1
4
4
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
11
22
33
44
66
1' - 4"
-
---8:128:12
R1
R1
R1R18:128:12R14:12R1 R18:128:12R1 4:128:128:12R1
3' - 3"1' - 4"
1' - 4"15' - 1"1' - 4"
1' - 4"27' - 5"1' - 4"1' - 4"1' - 4"27' - 5"1' - 4"
1' - 4"15' - 1"1' - 4"
1' - 4"3' - 3"1' - 4"1' - 4"1' - 4"28' - 10"2' - 0"1' - 4"30' - 0"7 5/8"1' - 4"1' - 4"15' - 1"1' - 4"
1' - 4"27' - 5"1' - 4"1' - 4"27' - 5"1' - 4"
1' - 4"15' - 1"1' - 4"
2
A1-3.0
CONTINUOUS RIDGE VENT, TYP.CONTINUOUS RIDGE VENT, TYP.
VENTED ROLLEX SOFFIT
RE: EXT. ELEV. FOR SIDING MATERIAL
PRE-FINISHED METAL GUTTER
METAL DRIP EDGE
ROOF SHEATHING RE: STR
ROOF MATERIAL RE: ROOF PLAN
1X8 COMPOSITE FASCIA, PAINT
INSULATION BAFFLE
RE: ROOFPLAN
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A1-3.0
ROOF PLAN
1611.00
1/4" = 1'-0"1 A3-1.0 ROOF PLAN
3/4" = 1'-0"2 TYP. EAVE DETAIL
T.O. MAIN LEVEL
100' -0"
T.O. PLATE
109' -1 1/8"
ABCDEFGH
12
8
12
8
12
8
12
8
12
8
12
8
T.O.W. 107' - 0" TYP.
12
4
12
4
113 112 111 110 109 105 104 103 102 101
S2
S1
S1
S2
S2
S2
S1
S1
S2
R1
1X10 MIRATEC SKIRT
BOARD, PAINTED TYP.S2
1X12 MIRATEC SKIRT
BOARD, PAINTED TYP.
T.O. MAIN LEVEL
100' -0"
T.O. PLATE
109' -1 1/8"
1346
T.O.W. 107' - 0" TYP.
R1
S1 S2
S1 ---
-
114
108A
T.O. MAIN LEVEL
100' -0"
T.O. PLATE
109' -1 1/8"
A B C D E F G H
T.O.W. 107' - 0" TYP.---
-
S2 S1
S2
R1
R1
R1
S2
S2
S2 S1 S2S1
S2
S1
12
8
12
8
12
8
12
8
12
8
12
8
12
8
12
8
12
4
109A
115116
105A
107 106
T.O. MAIN LEVEL
100' -0"
T.O. PLATE
109' -1 1/8"
1 2 3 4 6
T.O.W. 107' - 0" TYP.
101A
108
12
8
S2 S1S1
12
8
R1
NOTE:
EXTERIOR MATERIALS LEGEND
ASPHALT SHINGLE
MFR: GAF -TIMBERLINE ULTRA HD
COLOR: BARKWOOD
REFER TO PROJECT SPECIFICATIONS FOR FURTHER INFORMATION ON
MATERIAL TYPES AND INSTALLATION REQUIREMENTS.
5" REVEAL FIBER CEMENT LAP
SIDING, METAL SIDING CORNERS, TYP.
R1
S1
FIBER CEMENT BOARD & BATTEN
SIDING, BATTENS @ 16" O.C. TYP.S2
1X8 PAINTED FASCIA
**ALL SKIRT BOARD, AND DOOR AND WINDOW TRIM**
TO BE MIRATEC OR EQL. RE: DOOR AND WINDOW
SCHEDULE FOR TRIM DETAILS
F1
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A2-0.1
EXTERIOR
ELEVATIONS
1611.00
1/4" = 1'-0"1 BUILDING ELEVATION
1/4" = 1'-0"2 BUILDING ELEVATION
1/4" = 1'-0"3 BUILDING ELEVATION
1/4" = 1'-0"4 BUILDING ELEVATION
GENERAL NOTES:
1.RAFTERS AND FLOOR JOIST ARE A GRAPHIC
REPRESENTATION ONLY AND MAY NOT CCURATELY
REFLECT ACTUAL RAFTER OR JOIST. REFERENCE
STRUCTURAL FRAMING PLANS FOR ALL RAFTER / JOIST
SPECIFICATIONS. (TYP)
2.FOUNDATIONS, FOOTERS, AND STEM WALLS
MAY NOT ACCURATELY REFLECT ACTUAL SIZE.
REFERENCE STRUCTURAL FOUNDATION PLANS AND
DETAILS FOR ALL FOUNDATION SPECIFICATIONS. (TYP)
3.FRAMING DETAILS INCLUDING BUT NOT
LIMITED TO STRUCTURAL POSTS AND BEAMS,
STRUCTURAL CONNECTION DETAILS, BLOCKING
LOCATIONS , ETC. MAY DIFFER. REFERENCE
STRUCTURAL FRAMING PLANS FOR ALL STRUCTURAL
CONNECTIONS
4.PERIMETER DRAINAGE IS SHOWN AS A
GRAPHIC REPRESENTATION AND MAY DIFFER
SLIGHTLY FROM ACTUAL CONDITIONS AS
RECOMMENDED BY THE GEOTECHNICAL ENGINEER OF
RECORD. IT SHALL BE THE G.C.'S RESPONSIBILITY TO
REFERENCE THE GEOTECHNICAL REPORT FOR ANY
AND ALL DETAILS PERTAINING TO SUBSURFACE AND
SURFACE DRAINAGE. THE GEOTECHNICAL ENGINEER
OF RECORD SHALL OBSERVE INSTALLATION. (TYP)
5.SUB-GRADE MATERIAL IS SHOWN AS A
GRAPHIC REPRESENTATION ONLY AND IS NOT
INDICATIVE OF ACTUAL FILL OR BEDROCK MATERIAL,
RE: GEOTECHNICAL REPORT FOR SUB-GRADE EXISTING
CONDITIONS AND RECOMMENDATIONS FOR
DRAINAGE, FOUNDATION BEARING AND STRUCTURAL
FILL REQUIREMENTS, (TYP)
6.PROVIDE RADON MITIGATION SYSTEM IN
COMPLIANCE WITH 2012 IRC. SECTION 'AF'-RADON
ZONE 1
T.O. MAIN LEVEL
100' -0"
T.O. PLATE
109' -1 1/8"
A B C D E F G H
T.O. FOOTING
96' -4"
A3-0.1
2
KITCHEN
105
LAMINATE
BATH
103
LVT TILE
BATHROOM
112
LVT TILE
KITCHEN
109
LAMINATE
12
4
12
8
12
4
12
8
WALL ASSEMBLY
• SIDING RE: ELEVATIONS
• ENVIRO DRI VAPOR BARRIER
• FRAMING/SHEATHING RE:STR
• R-21 BATT INSULATION
• 6 MIL VAPOR BARRIER
• 1/2" GWB, PAINT FINISH
CRAWL SPACE WALL ASSEMBLY
• FLUID APPLIED DAMPROOFING
• FOUNDATION RE: STR
• POLY VAPOR BARRIER, CONTINUE UP WALL
12" AND FASTEN WITH WOOD CLEAT.
• R-20 VINYL WRAPPED BLANKET INSULATION
FASTENED TO FLOOR JOIST WITH WOOD CLEAT
ROOF ASSEMBLY
• ASPHALT SHINGLES
• ICE AND WATER EXTENDING 24"
MIN. BEYOND INTERIOR WALL LINE .
• FRAMING/SHEATHING RE: STR
• 12" (R-38) BLOWN IN LOOSE FILL INSULATION
• VAPOR BARRIER
• 5/8" GWB, PAINT FINISH
FLOOR ASSEMBLY
• FINISHED FLOORING
• FRAMING/SHEATHING RE:STR
• INSUALTION
MIRROR LINE
T.O. MAIN LEVEL
100' -0"
T.O. PLATE
109' -1 1/8"
T.O. FOOTING
96' -4"
NOTE:
THERE SHALL BE NO PENETRATIONS THROUGH THE
4'-0" ZONE OF EACH SIDE OF THE FIREWALLS. THIS
SHALL INCLUDE BUT NOT BE LIMITED TO PLUMBING
STACK, ATTIC VENTS, NOR EXHAUST FAN DUCTS,
NOR RANGE HOODS, DRAFT STOPPING REQ'D EVERY
10'-0" HORIZONTALLY AND VERTICALLY. ALL
ELECTRICAL DEVICES, CONDUITS AND CONDUCTORS
IN THE 1 HR FIREWALLS SHALL BE LISTED AND
INSTALLED IN ACCORDANCE WITH THE FIRE RATING.
PT SILL PLATE W/ SILL SEAL
FOUNDATION RE:STR
GLUE AND CAULK BASE PLATE
2HR WALL PER GA 3820
• (2) LAYER 5/8" TYPE X GWB -OFFSET SEAMS
• 2X4 STUD WALL W/ INSULATION
• 1" AIR SPACE
• 2X4 STUD WALL W/ INSUALTION
• (2) LAYERS TYPE X GWB -OFFSET SEAMS
CEILING 5/8" TYPE X GWB
• FIRE RATED ROOF SHEATHING 4'-0"
EACH SIDE OF MIRROR LINE.
• NO ROOF PENETRATIONS WITHIN
4'-0" OF MIRROR LINE.
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A3-0.1
BUILDING SECTION
1611.00
1/4" = 1'-0"1 BUILDING SECTION
1/2" = 1'-0"2 2HR FIRE RATED WALL
A A A
C
B
D A B C5 1/2"3/4"W 3/4"
3 1/2"
EXTERIOR EXTERIOR 5 1/2"3/4"W 3/4"
3 1/2"
3/4"W 3/4"3 1/2"3 1/2"3 1/2"3 1/2"
3/4"W 3/4"
**NOTE**
• DOOR AND WINDOW DIMENSIONED TO UNIT SIZES, FRAME ROUGH OPENING TO WINDOW MRFG. SPECIFICATIONS
• ALL GLAZING IN DOORS TO BE SAFTEY GLAZING
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A6-1.1
DOOR & WINDOW
SCHEDULE
1611.00
WINDOW SCHEDULE
WINDOW # Type Width Height Head Height Operation Comments
101 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
102 B 4' - 0" 4' - 0"7' - 0" FIXED
103 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
104 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
105 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
106 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
107 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
108 C 3' - 0" 2' - 0"7' - 0" AWNING
109 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
110 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
111 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
112 B 4' - 0" 4' - 0"7' - 0" FIXED
113 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
114 C 3' - 0" 2' - 0"7' - 0" AWNING
115 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
116 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
Grand total: 16
DOOR SCHEDULE
Door # Type Mark Width Height Head Height Operation Comments
101A A 3' - 0" 7' - 0" 7' - 0"EXT. SWING RE: PLAN FOR SWING
101B B 2' - 6" 7' - 0" 7' - 0"INT. SWING
102A B 2' - 6" 7' - 0" 7' - 0"INT. SWING
102B C 5' - 8" 7' - 0" 7' - 0"CLOSET
103A B 2' - 6" 7' - 0" 7' - 0"INT. SWING
104A B 2' - 6" 7' - 0" 7' - 0"INT. SWING
104B C 5' - 8" 7' - 0" 7' - 0"CLOSET
105A D 5' - 8" 7' - 0" 7' - 0"EXT. SLIDING
105B B 2' - 4" 7' - 0" 7' - 0"SWING
107A B 2' - 6" 7' - 0" 7' - 0"INT. SWING
108A A 3' - 0" 7' - 0" 7' - 0"EXT. SWING
108B B 2' - 6" 7' - 0" 7' - 0"INT. SWING
108C B 2' - 6" 7' - 0" 7' - 0"INT. SWING
108D B 2' - 4" 7' - 0" 7' - 0"SWING
109A D 5' - 8" 7' - 0" 7' - 0"EXT. SLIDING
111A B 2' - 6" 7' - 0" 7' - 0"INT. SWING
111B C 5' - 8" 7' - 0" 7' - 0"CLOSET
112A B 2' - 6" 7' - 0" 7' - 0"INT. SWING
113A B 2' - 6" 7' - 0" 7' - 0"INT. SWING
113B C 5' - 8" 7' - 0" 7' - 0"CLOSET
SA
Switch, Dimmer
Switch, Motion Sensor
Duplex Receptacle 15 AMP, 125V AC
Switch, Water Proof
Switch, Single Pole, 15 AMP, 120-277V AC
Switch, Remote Control
Floor Receptacle 15 AMP, 125V AC
Breaker Panel
Ceiling Fan
Garage Door Opener
Ceiling Exhust Fan Panasonic Whisper Ventilation Fan
Carbon Monoxide Alarm, Hard Wired, Battery Back-Up
T.V. / Data / Telephone
208 / 230V Receptacle (Verify Blade Configuration)
Photo Sensor
R Remote
Switched Receptacle 15 AMP, 125V AC
Supply Fan
GFI Receptacle 15 AMP, 120V AC
Switch, 3-Way, 15 AMP, 120-277V AC
Switch, 4-way, 15 AMP, 120-277V AC
3
Direct Wire to Major Appliances
P
Gas Line
Smoke Alarm, Hard Wired, Battery Back-Up
Central Vacuumcv
ELECTRICAL SYMBOL LEGEND
4
D
WP
MS
RC
CM/SD
GDO
240V AC Receptacle (Verify Blade Configuration)
Decorative Pendant Fixture
(may be several types, coord. w/ owner)
Recessed Downlight 6" Dia.
Type Symbol Fixture #MRFG DescriptionLamp
R TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
Low Voltage Recessed Lensed Downlight
Water ProtectR2WP
WM
SM
Interior Wall Sconce -Bathroom
P1
TBD TBDCF Ceiling Fan
NOTE:
1. LIGHTING TYPE DESIGNATIONS ARE GENERIC, ALL FIXTURE TYPES
ARE TO BE CONFIRMED BY OWNER/CONTRACTOR.
2. NOT ALL FIXTURE TYPES MAY BE USED.
LIGHT FIXTURE SCHEDULE
TBD
TBD TBD TBDEW Exterior Wall Mount Sconce
Surface Mounted
A2-0.1
3
3
A2-0.1
2
2
A2-0.1
1
1
A2-0.1
4
4
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
1
1
22
33
44
66
-
---
GAS & ELECTRIC SERVICEGAS & ELECTRIC SERVICE
BREAKER PANELBREAKER PANEL 3333333 333333333CM/SD
CM/SD
CM/SD
CM/SD
CM/SD
CM/SD
CM/SD
CM/SD
STACKED
W/DSTACKED
W/D
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
E1-1.1
LIGHTING PLAN
1611.00
1/4" = 1'-0"1 MAIN LEVEL PLAN
TOTAL FOOTPRINT:1984 GSF
TOTAL LOT AREA:7493 SF
TOTAL LOT COVERAGE:26%
FLOOR AREA RATIO:TBD
SITE DETAILS
AREA ANALYSIS
ZONING:R3
PARCEL # LOT 8 & 9 OF BLOCK 6
OCCUPANCY:R-3
CONSTRUCTION TYPE:TYPE V
FIRE SUPPRESSION:NOT-REQUIRED
IRRIGATION:REQUIRED
ZONING
DISTRICT: R-3
MINIMUM
AREA
MAXIMUM LOT
COVERAGE MAXIMUM
HEIGHT
PROPERTY SETBACKS
FRONT
15'-0"
COMPLIED
REAR SIDE
COMPLIED COMPLIED
20 FEET 5 FEET38' -0 "ABV. EX. GRADE
0' -0 "ABV. EX. GRADE
50% FOR TOWNHOUSE
NA
3,000 LIVABLE SF
6,742 LIVABLE SF
REQUIRED
ACTUAL
SQUARE FOOT: As defined by ANSI Z765-2003: Livable floor area as
measured from exterior dimensions including thickness of all walls, interior and
exterior, excluding fireplace bump-outs, mechanical spaces, garage spaces,
and unfinished basement and/or attic space.
GROSS SQUARE FOOT: Total building area as measured from exterior
dimensions including thickness of all walls, interior and exterior, mechanical
spaces, garage spaces, and accessible un-fished space; does NOT include
crawl spaces, patios and decks.
GARAGE
20 FEET
VICINITY MAP
NOT TO SCALE
N
WINDWARD AVE.
DAVIS LANE
BREEZE LANE
PROJECT LOCATION
AB anchor bolt
ABV above
AAC autoclaved aerated concrete
ADJ adjacent
AFF above finished floor
AGG aggregate
ALUM aluminum
ALT alternate
ARCH architect (ural)
ASPH asphalt
A/C air conditioning
AVG average
BD board
BLDG building
BLK block
BLKG blocking
BO bottom of
BOT bottom
BR bedroom
BRG bearing
BSMT basement
BUR built up roofing
C channel
CAB cabinet
CB catch basin
CG corner guard
CTR center
CI cast iron
CJ control joint
CLG ceiling
CL closet
CLR clear (ance)
CMU concrete masonry unit
CMA carbon monoxide alarm
CO clean out
COL column
CONC concrete
CONST construction
CONT continuous or continue
CORR corridor
CPT carpet (ed)
CSMT casement
CT ceramic tile
CY clothes dryer
CW clothes washer
DBL double
DF drinking fountain
DH double hung
DIAG diagonal
DIAM diameter
DIM dimension (s)
DISP dispenser
DL dead load
DN down
DP drain disposal
DR door
DS downspout
DTL detail
DW dish washer
DWG drawing
DWR drawer
E east
EA each
EHD electric hand dryer
EJ expansion joint
EL elevation
ELEC electric (al)
EPDM elastomeric membrane
EQ equal
EQPT equipment
EWC electric water cooler
EXIST existing
EXH exhaust
EXT exterior
FC faucet
FD floor drain
FDTN foundation
FE fire extinguisher
FEC fire extinguisher cabinet
FF factory finish
FFE finished floor elevation
FIN finish
FLG flashing
FLR floor (ing)
FLUR fluorescent
FND feminine napkin dispenser
FNV feminine napkin vendor
FOC face of concrete
FOF face of finish
FOM face of masonry
FOS face of stud
FRMG framing
FT foot
FTG footing
FUT future
GA gage, gauge
GAL gallon
GB grab bar
GC general contract
GDO garage door opener
GI galvanized iron
GL glass, glazing
GWB gypsum wall board
GV galvanized
GYP gypsum
HAS headed anchor stud
HB hose bibb
HBD hardboard
HC hollow core
HCP handicap (ped)
HDR header
HDW hardware
HM hollow metal
HOR horizontal
HP horsepower
HT height
HTG heating
HWD hardwood
HVAC heat/ventilate/air condition
ID inside diameter
INCL include (d) (ing)
INSUL insulate (d) (ion)
INT interior
IRC international residential code
INV invert
JST joist
JT joint
KIT kitchen
KO knockout
L length, angle
LAB laboratory
LAM laminate (d)
LAV lavatory
LB pound
LBL label
LF lineal feet
LL live load
LT light
LWC lightweight concrete
MAS masonry
MATL material (s)
MAX maximum
MC medicine cabinet
MECH mechanic (al)
MTL metal
MFR manufacture (r)
MH manhole
MIN minimum
MISC miscellaneous
ML microlam
MLD molding, moulding
MMB membrane
MO masonry opening
MOV movable
MT mount (ed) (ing)
MW microwave oven
N north
NAT natural
NIC not in contract
NOM nominal
NTS not to scale
OBS obscure
OC on center (s)
OD outside diameter
OFD overflow drain
OH overhead
OPG opening
OPH opposite hand
OPP opposite
PC pumice-crete
PERF perforate
PERIM perimeter
PL plaster
PLAM plastic laminate
PLAS plastic
PLF pounds per lineal feet
PLT plate
PNL panel
PNT paint (ed)
PR pair
PSF pounds per square foot
PSI pounds per square inch
PTD paper towel dispenser
PTN partition
PVC polyvinyl chloride
PVMT pavement
PWD plywood
QT quarry tile
R riser, radius
R/A return air
RB rubber base
RCP reflected ceiling plan
RD roof drain
RE reference
RF refrigerator
RG range
REG register
REINF reinforce (d) (ing)
REQD required
REV revision (s), revised
RFG roofing
RM room
RO rough opening
ROW right of way
RS rough sawn
RUB rubber
RW refrigerator drawers
S south
SA smoke alarm
S/A supply air
SAG suspended acoustic grid
SC solid core
SCH schedule
SD storm drain
SECT section
SHT sheet
SHTG sheathing
SIM similar
SN sink
SPD soap dispenser
SPEC specification
SPKR speaker
SQ square
SSK service sink
SS sanitary sewer
ST steel
STD standard
STN stone
STIFF stiffener
STO storage
STR structural
SUSP suspended
SV stacked ovens
T tread
TB towel bar
TC terra cotta
TEL telephone
THK thick (ness)
TO top of
TOC top of concrete
TOS top of steel
TOW top of wall
TPD toilet paper dispenser
TPH toilet paper holder
TR trash compactor
TS tube steel
TV television
TYP typical
T&G tongue and groove
UBC uniform building code
UE underground electric
UL underwriters laboratory
UNO unless noted otherwise
VCT vinyl composition tile
VERT vertical
VR vapor retarder
W west, wide, width
W/with
WC watercloset
WD wood
WDW window
WF wide flange
WG wire glass
WI wrought iron
W/O without
WP waterproof (ing)
WR warming drawer
WWF welded wire fabric
ABBREVIATIONS
NA
OWNER/BUILDER
OWNER:
EASTON DEVELOPMENT
19 INTREPID DRIVE
BOZEMAN, MT. 59718
406.587.0806
BUILDER:
COMPANY
ADDRESS
BOZEMAN, MT. 59718
PHONE #
WEST OAK STREE
BAXTER LANE
PROJECT SQUARE FOOTAGE
SF
SF
SF
SF
SF
GSF
GSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
TOTAL
TOTAL
ROOF TOP DECKS
PATIOS (NOT INCLUDING WALKWAYS)GSF
992
0
19841984
992
0
0
0
0 0
UNIT A 992 0
0 0
0
0
UNIT B
NA
NA
NA
992
0
0
0
0
0
0
0
0
MAIN LEVEL NA NA
0 0 0
0
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A0.00
COVER SHEET
1611.00
SITE MANAGEMENT NOTES INSULATION SPECIFICATION
GENERAL NOTES
1. EASTON DEVELOPMENT IS NOT RESPONSIBLE FOR ANY UNAUTHORIZED CHANGES MADE TO THESE DRAWINGS.
2.ALL CONSTRUCTION INCLUDED UNDER THIS CONTRACT SHALL BE IN COMPLIANCE WITH ALL APPLICABLE
FEDERAL, STATE & LOCAL CODES, STANDARDS, REGULATIONS, ORDINANCES, SPECIFICATIONS AND ANY APPLICABLE
DESIGN OR ARCHITECTURAL REVIEW COMMITTEES. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
OBTAINING ALL NECESSARY PERMITS APPLICABLE TO THIS PROJECT.
3.GENERAL CONTRACTOR/CONSTRUCTION MANAGER AS WELL AS SUB-CONTRACTORS SHALL BE FAMILIAR
WITH & COMPLY TO ALL PROCEDURES SET FORTH BY FEDERAL, STATE, AND LOCAL GOVERNING AGENCIES IN THE
CONSTRUCTION OF THIS PROJECT. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO FURNISH ALL AFFIDAVITS,
CERTIFICATES, & REPORTS THAT MAY BE REQUIRED BY ANY & ALL AGENCIES INCLUDING ANY APPLICABLE DESIGN OR
ARCHITECTURAL REVIEW COMMITTEES UPON REQUEST.
4. ALL FEES, TAXES, PERMITS, APPLICATIONS, CERTIFICATES OF INSPECTIONS, AND THE FILING OF ALL WORK
WITH GOVERNMENTAL AGENCIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
5.ANY AMBIGUITIES, DISCREPANCIES, OR CONFLICTS DISCOVERED THROUGHT THE USE OF THESE DRAWINGS
SHALL BE REPORTED TO THE ARCHITECT IMMEDIATLEY. FAILURE TO PROVIDE NOTICE TO THE ARCHITECT PRIOR TO ANY
SUBSEQUENT CONSTRUCTION ACTIVITY SHALL RELIEVE THE ARCHITECT OF ALL LIABILITIES AND/OR ANY OTHER
CONSEQUENCE.
6.CONTRACTORS SHALL COMPLY WITH ALL CONSTRUCTION DOCUMENTS, INCLUDING OUTLINE SPECIFICATIONS.
DO NOT SCALE DRAWINGS! FOLLOW DIMENSIONS AS PER PLANS. NOTIFY ARCHITECT OF ANY CONFLICTS.
7.SPECIFICATIONS AND DRAWINGS INDICATE FINISHED STRUCTURE. BUILDER SHALL BE RESPONSIBLE FOR
CONSTRUCTION METHODS, PROCEDURES, AND CONDITIONS (INCLUDING SAFETY), EXCEPT AS SPECIFICALLY
INDICATED OTHERWISE IN THE CONTRACT DOCUMENTS.
8.ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE, TRUE, AND IN PROPER ALIGNMENT.
9.THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTIONS OF WORK, FOR WORK INSTALLED IN
CONFLICT WITH THE CONTRACT DOCUMENTS, AT NO EXPENSE TO THE ARCHITECT.
10.PRIOR TO MATERIAL FABRICATION, SHOP DRAWINGS SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER FOR
CONFORMANCE TO DESIGN. REFER TO NOTES BELOW ON "SHOP DRAWINGS" AS WELL AS STRUCTURAL ENGINEERS
GENERAL NOTES FOR FURTHER INFORMATION.-THE CHECKING OF SHOP DRAWINGS BY THE ARCHITECT OR ENGINEER
IN NO WAY RELIEVES THE CONTRACTOR OF FULL RESPONSIBILITY FOR ACCURATE COMPLETION OF THE WORK AS
DRAWN AND SPECIFIED.
1.BUILDING FOOTPRINT SHALL BE LOCATED BY A CERTIFIED SURVEYOR & TO BE REVIEWED AND APPROVED BY
OWNER/ARCHITECT BEFORE COMMENCING WORK.
2.CONTRACTOR SHALL REMOVE ALL VEGETATION, TREES, STUMPS, DEBRIS AND EXISTING STRUCTURES,
INCLUDING PAVEMENT, SIDEWALK, BUILDING FOUNDATION, ABANDONED UTILITIES AND EXISTING TOPSOIL IN ALL
AREAS OF DEVELOPMENT.
3.DO NOT DISTURB SITE BEYOND CONSTRUCTION LIMITS AS SET FORTH WITHIN THIS DRAWING SET.
4.ALL SURFACES DISTURBED DURING CONSTRUCTION SHALL BE REPAIRED AND OR RE-LANDSCAPED AS SET
FORTH IN THE LANDSCAPING PLAN OR TO MATCH EXISTING WHERE NOT NOTED, SUCH THAT THEY BECOME
INDISTINGUISHABLE FROM ADJACENT UNDISTURBED NATURAL AREAS.
5.NOTICE TO ALL CONTRACTORS AND SUBCONTRACTORS: PROTECT NATURAL VEGETATION , TERRAIN, ROCKS,
ETC. FROM STUCCO, PAINT, ROOFING FOAM, CONCRETE OR OTHER DAMAGE BY COVERING WITH PLASTIC OR AS
REQUIRED. PROVIDE A 4'-0" HIGH BARRIER WITHIN BUILDING ENVELOPE (WHEN APPLICABLE). KEEP MATERIALS AND
WORKMEN WITHIN THE FENCE TO PREVENT DAMAGE TO NATURAL TERRAIN AND VEGETATION. THE COST OF
RECLAIMING OR REPAIRING ANY DAMAGE DUE TO NEGLIGENCE WILL BE AT THE CONTRACTOR'S / SUBCONTRACTOR'S
EXPENSE.
6.ANY AREAS EXTENDING BEYOND THE IMMEDIATE BUILDING SITE THAT ARE DISTURBED DURING CONSTRUCTION
INCLUDING BUT NOT LIMITED TO, DRAINAGE FACILITIES AND UTILITY (SEWER, WATER, ELECTRIC, ETC.) TRENCHES
SHALL BE RESTORED TO THEIR NATURAL STATE.
7.ALL TRADES SHALL BE RESPONSIBLE TO COMPLETE SITE INVESTIGATION TO IDENTIFY SCOPE OF MATERIALS TO
BE REMOVED AND NEW MATERIALS REQUIRED TO MATCH EXISTING CONSTRUCTION.
8.ALL PROPERTY AND BUILDING LINES AS WELL AS ALL SPOT ELEVATIONS SUCH AS TOP OF PWD IN RELATION TO
EXISTING GRADE, SHALL BE FIELD VERIFIED AND APPROVED BY ARCHITECT PRIOR TO CONSTRUCTION.
9.HOUSE ADDRESS MARKING: A HOUSE NUMBER SHALL BE DISPLAYED IN A PROMINENT MANNER, SO THAT IT IS
REASONABLY VISIBLE TO ENABLE EMERGENCY VEHICLES TO LOCATE THE RESIDENCE.
10.ALL RETAINING WALLS TO HAVE DRAIN TILE SURROUNDED BY 3/4" CRUSHED GRAVEL WRAPPED IN GEOTEXTILE
BEHIND WALL AND WEEPS @ 4'-0" OC. (TYP). REFER TO SOILS REPORT FOR FURTHER INFORMATION.
UTILITIES
1.CONTRACTOR SHALL CONFIRM WITH EACH APPLICABLE AGENCY THAT ALL UTILITIES (SEWER, POWER,
WATER, ETC.) ARE LOCATED AS SHOWN AND THAT SEWER TAP IS LOW ENOUGH TO SERVE ALL PLUMBING DRAINS.
2.CONTRACTORS SHALL NOTIFY UTILITY LOCATOR A MINIMUM OF (3) WORKING DAYS PRIOR TO COMMENCING
WORK TO DETERMINE HOW RESPECTIVE UTILITIES WILL BE EFFECTED BY CONSTRUCTION.
3.ALL UTILITIES ARE TO BE BURIED, AND SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL ORDINANCES.
4.UTILITY ROUTING AND CONDUIT TRENCH LOCATIONS SHALL CONFORM TO ALL APPLICABLE BUILDING CODES
WITH REFERENCE TO HORIZONTAL AND VERTICAL SEPARATION.
5.ELECTRICAL METER SHALL HAVE THE ABILITY TO BE READ REMOTELY BY POWER COMPANY.
6.WATER SUPPLY LINE SHALL BE 11/2" OD POLYETHYLENE AND 8'-0" BELOW GRADE, UNLESS NOTED
OTHERWISE.
EXCAVATION
1.ANY EXCAVATION SHALL BE CONDUCTED IN ACCORDANCE WITH RECOMMENDATIONS SET FORTH IN
GEOTECHNICAL REPORT.
2.FINISH GRADE SHALL BE A MINIMUM OF 8 INCHES BELOW WOOD FRAMING AT BUILDING EXTERIOR.
3.FINISH GRADE TO SLOPE AWAY FROM STRUCTURE FOR A MINIMUM DISTANCE OF 10'-0" AND AT A MINIMUM
SLOPE OF 1:10 AND A MAXIMUM SLOPE OF 1:2 UNLESS NOTED OTHER WISE. -GEOTECHNICAL REPORT TO SUPERCEDE
ANY FURTHER CONFLICTS.
4.THERE SHALL BE AN EVEN SLOPE BETWEEN NEW GRADES. UNLESS NOTED OTHERWISE , MEET EXISTING
GRADES AT A MAXIMUM SLOPE OF 1'-0" VERTICAL TO 2'-0" HORIZONTAL AND A RECOMMENDED SLOPE OF 1'-0"
VERTICAL TO 10'-0" HORIZONTAL. ALL FINISHED EARTH GRADES TO BE 1" BELOW ADJACENT WALKS AND DRIVES
UNLESS OTHERWISE NOTED. DITCHES TO HAVE SMOOTH CONTOURS TO FACILITATE USE OF LAWN MOWERS WHERE
APPLICABLE.
5.THE UNDER FLOOR GRADE SHALL BE CLEANED OF ALL VEGETATION AND ORGANIC MATERIAL. ALL WOOD
FORMS USED FOR PLACING CONCRETE SHALL BE REMOVED, AND ALL CRAWL SPACES SHALL BE CLEANED OF ALL
CONSTRUCTION DEBRIS BEFORE STRUCTURE IS OCCUPIED.
FIRE SUPPRESSION
1.FIRE SUPPRESSION SYSTEM IS NOT REQUIRED, SPRINKLER SYSTEM DESIGN AND LAYOUT SHALL BE
SUBMITTED TO ARCHITECT FOR REVIEW PRIOR TO COMMENCING INSTALLATION.
2.FIRE SUPPRESSION ENGINEER OF RECORD SHALL BE CONTACTED BY GENERAL CONTRACTOR TO PERFORM
ON-SITE OBSERVATION VERIFYING THE INSTALLATION IS IN ACCORDANCE WITH PLANS PROVIDED
EROSION AND SEDIMENT STOP CONTROL
1.IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO MAINTAIN A COMPLIANT JOB SITE IN ACCORDANCE
WITH THE COB STORM WATER DEPARTMENT, AND MDEQ.
2.GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING A STABALIZED CONSTRUCTION ENTRACE TO THE SITE.
3.GENERAL CONTRACTOR SHALL INSTALL APPROPRIATE EROSION CONTROL BMP'S AS NEEDED BEFORE START OF
CONSTRUCTION.
4.CONTRACTORS SHALL CONDUCT THEIR WORK IN SUCH A MANNER THAT ALL SOIL, FUELS, OILS, BITUMINOUS
MATERIALS, CHEMICALS, SANITARY SEWAGE, AND OTHER HARMFUL MATERIALS ARE CONFINED WITHIN THE PROJECT
LIMITS AND PREVENTED FROM ENTERING STORM SEWERS, WATER COURSES, RIVERS, LAKES OR RESERVOIRS.
5.THE CONTRACTOR SHALL PLACE A FILTER OR BARRIER COMPOSED OF STRAW, STONE, FILTER FABRIC ON
DRAINAGE STRUCTURE GRATES OR OTHER APPROVED MATERIAL AROUND ALL DRAINAGE COURSES TO PREVENT
SEDIMENTATION IN THESE AREAS. AFTER THE CONSTRUCTION OPERATIONS ARE COMPLETED, THE CONTRACTOR SHALL
REMOVE THESE FILTERS AND CLEAN ALL THE SEDIMENT AND DEBRIS FROM THE CATCH BASINS OR OTHER DRAINAGE
STRUCTURES.
6.SEE SITE DETAIL'S FOR RECOMMENDED SEDIMENT STOP INSTALLATION. GC TO COORDINATE WITH CIVIL ENGINEER
OR COB FOR ANY FURTHER SWPPPS REQUIREMNTS AND BMP'S
7.INTRODUCED DRAINAGE FEATURES SHALL BE NATURAL APPEARING, DESIGNED TO EMULATE INDIGENOUS
SWALES AND WASHES AND SHALL CONFORM TO ALL DRAINAGE EASEMENTS.
8.A "STORM WATER POLLUTION PROTECTION PLAN" (SWPPP) AND PERMIT IS REQUIRED FOR ANY PROJECT WHICH
THE AREA OF DISTURBANCE IS GREATER THAN 1 ACRE. FURTHERMORE, THE GOVERNING DEVELOPMENT MAY REQUIRE A
SWPPP REGARDLESS OF SIZE OF AREA OF DISTURBANCE.
STAGING NOTES
1.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING FINAL APPROVAL FROM ANY APPLICABLE ARCHITECTURAL
REVIEW COMMITTEE FOR ALL CONSTRUCTION STAGING IN THE FIELD PRIOR TO CONSTRUCTION.
2.THE CONTRACTOR IS RESPONSIBLE FOR KEEPING ALL CLEARING AND EXCAVATION WITHIN EXISTING PROPERTY
LINE BOUNDARIES AND GENERAL EASEMENTS.
3.THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ANY REVISIONS OR ALTERATIONS TO THE CONSTRUCTION
STAGING PLAN PRIOR TO CONSTRUCTION.
4.THE CONTRACTOR IS TO INSTALL STRAW BALES IN ADDITION TO SILT FENCE AT LOCATIONS OF POTENTIAL RUN-
OFF INTO WETLAND AREAS AS INDICATED ON SITE PLAN.
5.ANY DAMAGE TO THE EXISTING ROADWAY, INCLUDING THE ASPHALT SURFACE, SHOULDER GRAVEL, ROADSIDE
DITCH, EXISTING CULVERTS, AND EXISTING VEGETATION AND EROSION CONTROL MEASURES SHALL BE REPAIRED BY THE
GENERAL CONTRACTOR TO THE SATISFACTION OF THE DEVELOPMENT.
6.GRAVEL CONSTRUCTION ENTRANCE IS TO BE CONSTRUCTED WITH A MIN. OF 2" OF 3/4"SCREENED ROCK TO
COVER ALL DRIVEWAYS, PARKING, AND LAY DOWN AREAS TO BE PLACED AT START OF CONSTRUCTION, AND A
RECOMMENDATION OF A MIN. OF (8)" MINUS 3" PITRUN OVER A GEOTECHNICAL SEPARATION FABRIC.
7.ANY USE OF ANY FIRE HYDRANT IS PROHIBITED FOR USE BY ANY OTHER THAN THE GOVERNING FIRE
DEPARTMENT.
8.ALL WASTE SHALL BE CONTAINED ON SITE AND PROPERLY DISPOSED OF AT PROJECT COMPLETION. FURTHER,
CONCRETE WASHOUT WITHIN THE ROADSIDE DITCHES IS STRICTLY PROHIBITED.
9.GENERAL CONTRACTOR IS TO PROVIDE ONE LOCATION FOR CONCRETE TRUCK WASHOUT. CONCRETE WASHOUT
WITHIN THE ROADSIDE DITCHES IS STRICTLY PROHIBITED.
10.ALL MATERIALS AND EQUIPMENT STAGED ON OR OFF SITE SHALL BE PROTECTED FROM WEATHER DAMAGE.
LANDSCAPE
1.LANDSCAPE CONTRACTOR SHALL REVIEW GEOTECHNICAL REPORT PRIOR TO INSTALLATION, COPIES OF REPORT
AVAILABLE UPON REQUEST. RE: ARCHITECT/GENERAL CONTRACTOR/OWNER.
2.REFERENCE LANDSCAPE PLAN FOR ADDITIONAL LANDSCAPE NOTES.
3.ALL LANDSCAPEING IS TO BE INSTALLED PER COB, PLANTING STANDARDS.
RADON SYSTEMS
NOTE: RADON PLAN TO BE SUBMITTED, BY CONTRACTOR, TO ARCHITECT FOR
REVIEW. RADON MEASURED IN PICO CURRIES PER LITER pCi/L
-4 pCi/L = ACTION REQUIRED LEVEL
-2 pCi/L = ACCEPTABLE LEVEL
-2pCi/L > RADON LEVEL GOAL
RADON MITIGATION -CRAWLSPACE PASSIVE SUB-MEMBRANE
DEPRESSURIZATION SYSTEM
FOUNDATION WALL -ALL CONTROL JOINTS, ISOLATION JOINTS & OTHER
JOINTS SHOULD BE CALKED WITH AN ELECTROMETRIC SEALANT SUCH AS
POLYURETHANE CAULK, DAMP PROOF FOUNDATION WALL AND SEAL ANY
PENETRATIONS THROUGH THE WALL.
CRAWLSPACE SHEETING TO BE HIGH-DENSITY CROSS-LAMINATED
POLYETHYLENE. COLOR TO BE WHITE. OVERLAY W. EPDM RUBBERIZED
ROOFING MEMBRANE AT HIGH TRAFFIC AREAS AND ALONG EXPECTED TRAFFIC
ROUTES. OVERLAP SHEETS BY 12" AND SEAL SHEETING USING A 1/2" WIDE
BEAD OF CAULK. WIRE BRUSH 12" ABOVE CRAWLSPACE FLOOR TO REMOVE
ANY DIRT AND SECURE PLASTIC TO WALL @ 12" ABOVE CRAWLSPACE FLOOR
WITH 1/2" WIDE BEAD OF CAULK.
SEAL AROUND ALL VERTICAL PENETRATIONS. SEAL FLOOR-TO-WALL JOINTS,
SEAL CONTROL JOINTS.
AIR HANDLING SYSTEMS IN CRAWLSPACE TO MAINTAIN CONTINUOUS POSITIVE
PRESSURE WITHIN THE DUCTWORK. THIS IS TO PREVENT RADON FROM BEING
DRAWN INTO THE DUCTWORK AND THEN DISTRIBUTED THROUGHOUT THE
HOUSE.
RISER PIPE TO BE SCHEDULE 40 PVC OR ABS, CONNECT TO 3 OR 4 INCH
DIAMETER CORRUGATED AND PERFORATED COLLECTION PIPE 5'+ OR A STRIP
OF GEOTEXTILE DRAIN MATTING ON THE SOIL AT THE RISER LOCATION
BENEATH THE PLASTIC SHEETING.
ACCESS DOORS AND OTHER OPENINGS OR PENETRATIONS BETWEEN FLOORS
AND ADJOINING CRAWLSPACES SHOULD BE CLOSED, GASKETED OR
OTHERWISE SEALED TO PREVENT AIR LEAKAGE.
LABEL RISER AT ALL VISIBLE LOCATIONS SO IT IS NOT CONFUSED WITH ANY
OTHER PLUMBING. LABEL PLASTIC SHEETING TO STATE THAT THE PLASTIC
SHOULD NOT BE REMOVED AND, IF CUT, IT SHOULD BE PATCHED OR
REPLACED. AFTER CONSTRUCTION IS COMPLETED, INSPECT THE SHEETING
FOR DAMAGE AND REPAIR AS NECESSARY.
PROVIDE FOR FUTURE FAN IF NEEDED. FAN CANNOT BE INSIDE THE LIVING
SPACE OR CRAWLSPACE. FANS ARE MOST OFTEN LOCATED IN ATTICS OR
GARAGES (UNLESS THERE IS A LIVING SPACE ABOVE THE GARAGE.) FANS
REQUIRE A 30-INCH VERTICAL RUN OF PIPE FOR INSTALLATION. FANS REQUIRE
AN UNSWITCHED ELECTRICAL JUNCTION BOX.
CAVITY
INSULATION SCHEDULE
R -VALUE
MINIMUM
R-49ROOFS OVER HEATED SPACES
R-20EXTERIOR WALLS
-INTERIOR WALLS
R-30FLOORS OVER UNHEATED SPACES
R-15/19BASEMENT WALL
R-10/13UNDER CONC. SLAB
R-20CRAWL SPACE R-15/19
LID
WALL
NOTES:
1.ARCHITECT'S RECOMMENDATION FOR ALL EXTERIOR EAVES AND RAKES TO RECEIVE MIN. OF 3" BLOWN IN
POLYURETHANE INSULATION UNLESS NOTED OTHERWISE.
2.DEDUCT ALTERNATE AS APPROVED BY ARCHITECT TO REPLACE 4" SPRAY APPLIED POLYURETHANE INSULATION AT
EXTERIOR WALLS WITH AN R-11 MINERAL FIBER BATT OVER TOP OF 2" SPRAY APPLIED POLYURETHANE INSULATION.
3.ARCHITECTS RECOMMENDATION FOR BASEMENT FURRING WALLS TO RECEIVE 3.5" BLOWN IN POLYURETHANE
INSULATION IN PLACE OF R-19 BATT.
4.DEDUCT ALTERNATE AS APPROVED BY ARCHITECT TO REPLACE 2" NCFI SPRAY APPLIED POLYURETHANE INSULATION
UNDER CONCRETE SLAB WITH 2" POLY-ISOCYANURATE RIGID FOAM INSULATION.
5.GENERAL CONTRACTOR TO PROVIDE COST COMPARISON FOR BLOWN-IN WET CELLULOSE PRODUCT TO REPLACE
BATT INSULATION IN EXTERIOR WALLS AND FLOORS.
6.AT A MINIMUM, ALL INTERIOR WALLS SEPARATING BEDROOMS AND/OR BATHROOMS SHALL BE INSULATED AS
SPECIFIED ABOVE. IT IS STRONGLY RECOMMENDED THAT ALL INTERIOR WALLS BE INSULATED.
8.FOAM INSULATING SEALANT AT ALL WINDOWS AND DOORS.
BLOWN IN INSULATION
FIBERGLASS BATT INSULATION W/ 6 MIL. VAPOR BARRIER
RECOMMENDED 4" BLOWN IN CELLULOSE -DAMP SPRAYED OR EQUIVALENT MINERAL FIBER BATT SOUND
INSULATION
6" MIN. OF SPRAY APPLIED POLYURETHANE INSULATION
R-19 BATT INSULATION -WHERE STUD BAY EXISTS 3.5"-2" POLYURETHANE TAPER ELSEWHERE
2" OF 'NCFI' SPRAY APPLIED POLYURETHANE INSULATION WITH VAPOR BARRIER BELOW OR 2" RIGID
INSULATION W/ TAPED SEAMS AND VAPOR BARRIER BELOW.
3 1/2" MINERAL FIBER BATT INSULATION IN FLOORS OVER HEATED SPACES FOR SOUND
INSULATIONFLOORS OVER HEATED SPACES -
3.5" OF SPRAY APPLIED POLYURETHANE INSULATION OR R-20 VINYL WRAPPED BLANKET INSUATION FASTENED TO FLOOR JOIST
4" OF SPRAY APPLIED POLYURETHANE INSULATION OR R-20 VINYL WRAPPED BLANKET INSUATION FASTENED TO FLOOR JOIST
GENERAL SITE NOTES
GEOTECHNICAL REPORT NOTES
NOTES REGARDING THE GEOTECHNICAL REPORT PROVIDED HERE ARE IN NO WAY INTENDED TO SERVE AS A SUPPLEMENT
TO THE GEOTECHNICAL REPORT. IT IS REQUIRED THAT THE GENERAL CONTRACTOR AS WELL AS ANY APPLICABLE SUB
CONTRACTORS RECEIVE AND REVIEW THE GEOTECHNICAL REPORT.
A FULL GEOTECHNICAL ANALYSIS AND REPORT HAS BEEN PREPARED FOR THIS PROPERTY BY: ALLIED ENGINEERING
SERVICES, DATED: JANUARY, 2014, PROJECT # 13-157
1.SURFACE & SUBSURFACE DRAINAGE SHALL CONFORM TO THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS
AS SET FORTH IN THE REFERENCED GEOTECHNICAL REPORT.
2.PROPER DRAINAGE SHOULD BE PROVIDED IN THE FINAL DESIGN AND DURING CONSTRUCTION. THE ARCHITECT
SHALL BE NOTIFIED OF ANY ISSUES OR CONFLICTS NOT ACCOUNTED FOR WITHIN THESE DRAWINGS OR THE REFERENCED
GEOTECHNICAL REPORT.
3.SITE PREPARATION PROCEDURES AND FOUNDATION EXCAVATIONS TO BE OBSERVED BY THE GEOTECHNICAL
ENGINEER TO ASSESS THAT THE ADEQUATE BEARING CONDITIONS EXIST AND THAT PLACEMENT OF ENGINEERED FILL HAS
BEEN PERFORMED SATISFACTORILY. IF THE SOIL CONDITIONS ENCOUNTERED DIFFER SIGNIFICANTLY FROM THOSE
PRESENTED IN THE GEOTECHNICAL REPORT, SUPPLEMENTAL RECOMMENDATIONS MAY BE REQUIRED.
4.POSITIVE DRAINAGE SHALL BE PROVIDED DURING CONSTRUCTION AND MAINTAINED THROUGHOUT THE LIFE OF
THE PROPOSED DEVELOPMENT. INFILTRATION OF WATER INTO UTILITY OR FOUNDATION EXCAVATIONS MUST BE
PREVENTED DURING CONSTRUCTION.
5.STRIP AND REMOVE ANY EXISTING VEGETATION, ORGANIC TOPSOILS, DEBRIS AND ANY OTHER DELETERIOUS
MATERIALS FROM THE BUILDING AREAS. THE BUILDING AREAS ARE DEFINED AS THAT AREA WITHIN THE BUILDING
FOOTPRINT PLUS 5 FEET BEYOND THE PERIMETER OF THE FOOTPRINT. ALL EXPOSED SURFACES SHOULD BE FREE OF
MOUNDS AND DEPRESSIONS THAT COULD PREVENT UNIFORM COMPACTION.
6.FROZEN SOILS SHOULD NOT BE USED AS FILL OR BACKFILL.
7.EXISTING SOILS REMOVED AT BUILDING FOOTPRINT EXCAVATION MAY BE REUSED IN LANDSCAPE AREAS, AS
LONG AS IN ACCORDANCE OF THE REFERENCED GEOTECHNICAL REPORT.
8.ALL IMPORT FILL AND ONSITE BACKFILL SHOULD BE APPROVED BY THE GEOTECHNICAL ENGINEER. WHERE FILL IS
TO BE PLACED, LOOSE OR OTHERWISE UNSUITABLE MATERIAL SHOULD BE REMOVED PRIOR TO PLACEMENT OF NEW FILL.
9.GEOTECHNICAL ENGINEER OF RECORD SHALL BE CONTACTED BY THE GENERAL CONTRACTOR AT COMPLETION
OF EXCAVATION AND PRIOR TO ANY FILL BEING PLACED TO PERFORM A REVIEW OF EXCAVATION AND SUBSURFACE SOIL
CONDITIONS IN COMPARISON WITH THE FINDINGS IN THE GEOTECHNICAL REPORT.Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A0.01
GENERAL NOTES
1611.00
LOT
8
3,850
sq.ft.
LOT
11
3,850
sq.ft.
LOT
8
6,692
sq.ft.
FND
OPC
(HKM)
FND
OPC
(HKM)
FND
OPC
(HKM)
FND
OPC
(HKM)
OPEN SPACE
5,187
sq.ft.
LOT
6
4,983
sq.ft.
LOT
7
4,995
sq.ft.
LOT
2
4,936
sq.ft.
LOT
3
4,948
sq.ft.
LOT
4
4,960
sq.ft.
LOT
5
4,971
sq.ft.
LOT
17
5,407
sq.ft.
LOT
16
5,407
sq.ft.
LOT
15
5,407
sq.ft.
LOT
14
5,407
sq.ft.
LOT
13
5,407
sq.ft.
LOT
12
5,407
sq.ft.
LOT
2
5,407
sq.ft.
LOT
3
5,407
sq.ft.
LOT
4
5,407
sq.ft.
LOT
5
5,407
sq.ft.
LOT
6
5,407
sq.ft.
LOT
7
5,407
sq.ft.
LOT
14
5,408
sq.ft.
LOT
15
5,425
sq.ft.
LOT
16
5,443
sq.ft.
LOT
17
5,460
sq.ft.
LOT
12
5,373
sq.ft.
LOT
13
5,391
sq.ft.
LOT
1
6,674
sq.ft.
LOT
1
6,985
sq.ft.
LOT
11
3,867
sq.ft.
LOT
7
5,373
sq.ft.
LOT
6
5,391
sq.ft.
LOT
5
5,408
sq.ft.
LOT
4
5,425
sq.ft.
LOT
3
5,443
sq.ft.
LOT
2
5,460
sq.ft.
LOT
3
3,143
sq.ft.
LOT
11
3,255
sq.ft.
LOT
4
3,791
sq.ft.
LOT
12
3,925
sq.ft.
LOT
5
3,809
sq.ft.
LOT
6
3,186
sq.ft.
LOT
14
3,228
sq.ft.
LOT
7
3,199
sq.ft.
LOT
8
3,858
sq.ft.
LOT
16
3,582
sq.ft.
LOT
1
3,742
sq.ft.
LOT
9
3,876
sq.ft.
LOT
2
3,130
sq.ft.
LOT
10
3,242
sq.ft.
LOT
2
3,465
sq.ft.
LOT
1
4,356
sq.ft.
LOT
5
3,465
sq.ft.
LOT
4
3,465
sq.ft.
LOT
3
3,465
sq.ft.
LOT
2
5,247
sq.ft.
LOT
6
6,785
sq.ft.
LOT
1
6,764
sq.ft.
LOT
5
5,247
sq.ft.
LOT
4
5,247
sq.ft.
LOT
18
6,985
sq.ft.
LOT
6
4,293
sq.ft.
LOT
1
7,080
sq.ft.
LOT
18
7,080
sq.ft.
LOT
13
3,889
sq.ft.
LOT
15
3,161
sq.ft.
LOT
9
3,719
sq.ft.
LOT
10
3,719
sq.ft.
LOT
3
5,247
sq.ft.
LOT
10
3,626
sq.ft.
LOT
84
126,712
sq.ft.
LOT
85
2,133
sq.ft.WINDWARD AVENUEZEPHYR WAYNEW HOLLAND DRIVEBORA WAYMISTRAL WAY
WEST OAK STREETDAVIS LANEBREEZE LANE
MISTRAL WAY S
S
S
S
SS
SSSS
S
SHYD
HYDHYD HYDHYDHYD
D
S
S SSSS S
S SS
S
S
S S
S
SWVWV
WVWVWVWVHYD WVWVWVWV
WV
WV WV
WV WV
WV WV
WV WV
WVHYDHYDHYDHYDHYD
90
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A0.02
OVERALL SITE
1611.00
1/32" = 1'-0"1 SITE PLAN
WWWWWWWWWWWWWSSSSSSSSSSSSSSSSSSSSWWWSSSSSSSSSSSSSSSSSSSSSSSSSSWWWWWWWWWWWUE UEUE UEUEUEUEUEUEUEUEGAS GASGAS GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS GAS
UEUEUEUEUEUEUEUEUEUE UEUE SSSSSSSSSSSSSSSSSSSSWWWWWWWWWWWWWWWWWWWWWWWWWWWSS SS SS SS SSS
SSSSSSSUEUEUEUEUEUEUEUEUEUEUE
GASGASGASGASGASGASGASGASGASGASGAS
GASGASGASGASGASGASGASGASGASGASGAS
UEUEUEUEUEUEUEUEUEUEUEUEFRONT SETBACK15' - 0"53.81'53.00'70.01'53.49'53.81'70.00'51.81'55.00'70.00'55.49'51.81'
LOT 8
BLOCK 6
3,727ft2
LOT 9
BLOCK 6
3,766ft2
LOT 10
BLOCK 6
3,626ft2
LOT 11
BLOCK 6
3,867ft2
BREEZE LANE
BORA WAYSIDE SETBACK
15' - 0"REAR SETBACK 20' - 0"SIDE SETBACK
5' - 0"
EASEMENT
10' - 0"EASEMENT10' - 0"CONCRETE SIDEWALK
CONCRETE SIDEWALK2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MI
N.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.2% SLOPE MIN.LEGEND
DRAINAGE
LIMITS OF CONSTRUCTION
EROSION CONTROL
DRAINTILE
NEW WATER LINE
NEW SEWER LINE
NEW ELECTRICAL LINE
NEW PHONE LINE
LIMITS OF EXCAVATION
METAL PLANTING BORDER
SNOW MELT LOCATIONS
ASPHALT
CONCRETE
SNOW STORAGE
NEW GRADE LINE
PREVIOUS GRADE LINE
FO FO FO
UE UE UE
EX SS EX SS
WATR WATR
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A1-0.1
SITE PLAN
1611.00
1/8" = 1'-0"1 SITE PLAN
TRUE
NORTH
UNIT A UNIT B
GENERAL NOTES:
KEY NOTES:
1 TBD
1. ALL DIMENSIONS ARE TO FRAMING UNLESS NOTED
OTHERWISE.
2. CENTER ALL DOORS ABOUT WALL SPACE UNLESS
INDICATED OTHERWISE
3. THE GENERAL CONTRACTOR AND/OR WINDOW
SUPPLIER SHALL BE RESPONSIBLE FOR INSURING
THAT SAFTEY GLASS IS PROVIDED WHERE APPLICABLE
IN ACCORDANCE WITH 2012 IRC SECTION R308.4
4. RADON MITIGATION SYSTEMS SHALL BE INSTALLED
UNDER ALL CONCRETE SLABS. (TYP)
5. ANY AND ALL POST AND BEAM SIZES SHALL BE
CROSS CHECKED WITH STRUCTURAL DRAWINGS,
NOTIFY ARCHITECT OF ANY DISCREPANCIES. (TYP)
6. WATER SUPPLY (W.S.) TO BE LOCATED ON NON-
VISIBLE SIDE OF TOILET (TYP)
PROJECT SQUARE FOOTAGE
SF
SF
SF
SF
SF
GSF
GSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
TOTAL
TOTAL
ROOF TOP DECKS
PATIOS (NOT INCLUDING WALKWAYS)GSF
992
0
19841984
992
0
0
0
0 0
UNIT A 992 0
0 0
0
0
UNIT B
NA
NA
NA
992
0
0
0
0
0
0
0
0
MAIN LEVEL NA NA
0 0 0
0
WALL & COLUMN LEGEND
CONVENTIONAL WOOD FRAMING
-STANDARD THICKNESS 2x4 U.N.O.
CONCRETE WALL
-STANDARD THICKNESS 8" U.N.O.
STONE MASONRY TYPE 'A'
-STANDARD THICKNESS OF 6" U.N.O.
INDICATES ARCHITECTURAL WOOD COLUMN
(WOOD TYPE 'A' U.N.O.)
INDICATES STRUCTURAL WOOD COLUMN,
(WOOD TYPE 'A2' U.N.O.) VERIFY SIZE AND
GRADE WITH STRUCTURAL DRAWINGS.
(TYP)
INDICATES STRUCTURAL COLUMN.
VERIFY SIZE AND TYPE WITH STRUCTURAL
DRAWINGS TYP.
EXPOSED STAINED CONCRETE
-VERIFY STAIN AND FINISH WITH ARCH.
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
11
22
33
44
66
-
---
3' - 3"15' - 1"12' - 4"5' - 0"12' - 4"15' - 1"3' - 3"5' - 6"24' - 6"2' - 0"32' - 0"66' - 4"1' - 2"4' - 9"4' - 0"20' - 1"2' - 0"32' - 0"3' - 3"15' - 1"12' - 4"5' - 0"12' - 4"15' - 1"3' - 3"
33' - 2"33' - 2"
66' - 4"
33' - 2"33' - 2"
1/4:12 1/4:12 1/4:121/4:12T.O.W. 100' - 0"
T.O.F. 96' - 4"
T.O.W. 100' - 0"
T.O.F. 96' - 4"
T.O.W. 100' - 0"
T.O.F. 96' - 4"
T.O.W. 100' - 0"
T.O.F. 96' - 4"
PROVIDE CRAWL
SPACE ACCESS
PROVIDE CRAWL
SPACE ACCESS
T.O.P. 99' - 6"
T.O.F. 96' - 4"
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A1-1.0
FOUNDATION PLAN
1611.00
TRUE
NORTH
PLAN
NORTH
1/4" = 1'-0"1 T.O. FOOTING
A2-0.1
3
3
A2-0.1
2
2
A2-0.1
1
1
A2-0.1
4
4
STACKED
W/D
DW
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
1
1
22
33
44
66
STACKED
W/D
DW1' - 2"4' - 9"4' - 0"5' - 1 1/2"14' - 11 1/2"2' - 0"3' - 3"9' - 7"5' - 6"2' - 3"7' - 10"2' - 3"5' - 0"2' - 3"7' - 10"2' - 3"5' - 9"9' - 4"3' - 3"
3' - 3"15' - 1"2' - 0"7' - 9"2' - 7"5' - 0"2' - 7"7' - 9"2' - 0"15' - 1"3' - 3"2' - 0"1' - 2"33' - 2"33' - 2"2' - 0"9' - 4 1/2"5' - 10 1/2"4' - 9 1/2"4' - 5 1/2"2' - 9"2' - 9"1/4" / 12"3' - 3"15' - 1"12' - 4"2' - 6"2' - 6"12' - 4"15' - 1"3' - 3"
33' - 2"33' - 2"2' - 0"24' - 6"5' - 6"-
---
UNIT A UNIT B
32' - 0"101B
101 102 103
104 105
108
105A
104A
103A
102A
101A
107A
109 110
111 113
108A
108B
108C
109A
111A
113A
108D
112A
LIVING ROOM
101
LAMINATE
BEDROOM
102
CARPET
BATH
103
LVT TILE
BEDROOM
104
CARPET
KITCHEN
105
LAMINATE
MECH
106
?
106107
105B
104B12' - 5 1/2"3' - 1"3' - 1"12' - 5 1/2"112
LIVING ROOM
108
LAMINATE
KITCHEN
109
LAMINATE
MECH
110
LVT TILE
BEDROOM
111
CARPET
BATHROOM
112
LVT TILE
BEDROOM
113
CARPET
113B
114
3' - 4 1/2"1' - 7"2' - 0 1/2"12' - 5 1/2"6' - 2"12' - 5 1/2"1151164' - 6"4' - 6"4' - 6"4' - 6"1' - 2"5' - 0"5' - 0"1' - 2"2' - 0 1/2"1' - 7"3' - 4 1/2"
2
A1-3.0
102B 111B
PROVIDE 2'-0" X 2'-6"
CRAWL ACCESS
PROVIDE 2'-0" X 2'-6"
CRAWL ACCESS
PROJECT SQUARE FOOTAGE
SF
SF
SF
SF
SF
GSF
GSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
TOTAL
TOTAL
ROOF TOP DECKS
PATIOS (NOT INCLUDING WALKWAYS)GSF
992
0
19841984
992
0
0
0
0 0
UNIT A 992 0
0 0
0
0
UNIT B
NA
NA
NA
992
0
0
0
0
0
0
0
0
MAIN LEVEL NA NA
0 0 0
0
1/4" = 1'-0"1 MAIN LEVEL PLAN
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A1-1.1
MAIN LEVEL PLAN
1611.00
ROOF MATERIALS LEGEND
GAF TIMBERLINE ASPHALY SHINGLE OR
EQ. EQUIVALENTS. COLOR:
PRE-FINISHED SEAMLESS GUTTER, AND
DOWNSPOUT
NOTE:
REFER TO PROJECT SPECIFICATIONS FOR
FURTHER INFORMATION ON MATERIAL
TYPES AND INSTALLATION REQUIREMENTS
R1
ROOF PLAN GENERAL NOTES
SHINGLE ROOFS:INSTALL SINGLE LAYER OF SLOPESHIELD OVER
'MIRADRI' ICE & WATER UNDERLAYMENT OR EQ. TO COVER ALL
PWD SHEATHING WHERE SHINGLE ROOFS ARE LOCATED. LAP
OVER HIPS, RIDGES, AND THROUGH VALLEYS, TYP.
UNDERLAYMENT SHALL BE LAPPED 6" VERTICALLY (END OR SIDE
LAP) AND 2" HORIZONTALLY (HEAD LAP).
INSTALL SINGLE LAYER OF 15# MIN. FELT PAPER AT EVERY
COARSE SHINGLE COARSE, TYP.
ALL HIPS AND RIDGES TO RECEIVE 'PROTECTO WRAP' HIP
AND RIDGE SEAL AS SPECIFIED, TYP.
1. ALL ROOFS TO ACHIEVE A CLASS 'A' FIRE RATING BY
INSTALLING REQUIRED ROOFING UNDERLAYMENT AT ALL
LOCATIONS WHERE PRIMARY ROOF MATERIAL DOES NOT
ACHIEVE CLASS 'A' RATING GC TO VERIFY COMPLIANCE, TYP.
2. ALL RAKE AND EAVE DIMENSIONS TO BE HORIZONTAL
DIMENSIONS, NOT ALONG THE PITCH.
3. COORDINATE LAYOUT OF ROOF FRAMING WITH EXPOSED
RAFTERS WHERE APPLICABLE, SEE REFLECTED CEILING PLAN
FOR LOCATIONS, (TYP.)
4. VERIFY ALL GUTTER & DOWNSPOUT LOCATIONS AND TYPES
WITH ARCHITECT PRIOR TO INSTALLATION
5. LIGHTNING PROTECTION IS RECOMMENDED, REFER TO
MANUFACTURER FOR LIGHTNING ROD AND GROUND ROD
LOCATIONS AS IMPLEMENTED.
6. ALL ROOF PENETRATION LOCATIONS INCLUDING, BUT NOT
LIMITED TO; FLUES, VENTILATION PIPES AND STACKS SHALL BE
SUBMITTED TO ARCHITECT AND ROOFING MFR. FOR REVIEW.
(NOTE: NOT ALL ROOF PENETRATIONS MAY BE SHOWN ON PLAN)
7. DIVERTER FLASHING SHALL BE INSTALLED WHERE A LOWER
SLOPED ROOF TERMINATES AGAINST A VERTICAL WALL,
CHIMNEY CHASE, OR FRAMED COLUMN.
CRICKET DIMENSION TABLE
ROOF SLOPE
12 : 12
8 : 12
6 : 12
4 : 12
3 : 12
H
1/2 OF W
1/3 OF W
1/4 OF W
1/6 OF W
1/8 OF W
A2-0.1
3
3
A2-0.1
2
2
A2-0.1
1
1
A2-0.1
4
4
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
11
22
33
44
66
1' - 4"
-
---8:128:12
R1
R1
R1R18:128:12R14:12R1 R18:128:12R1 4:128:128:12R1
3' - 3"1' - 4"
1' - 4"15' - 1"1' - 4"
1' - 4"27' - 5"1' - 4"1' - 4"1' - 4"27' - 5"1' - 4"
1' - 4"15' - 1"1' - 4"
1' - 4"3' - 3"1' - 4"1' - 4"1' - 4"28' - 10"2' - 0"1' - 4"30' - 0"7 5/8"1' - 4"1' - 4"15' - 1"1' - 4"
1' - 4"27' - 5"1' - 4"1' - 4"27' - 5"1' - 4"
1' - 4"15' - 1"1' - 4"
2
A1-3.0
CONTINUOUS RIDGE VENT, TYP.CONTINUOUS RIDGE VENT, TYP.
VENTED ROLLEX SOFFIT
RE: EXT. ELEV. FOR SIDING MATERIAL
PRE-FINISHED METAL GUTTER
METAL DRIP EDGE
ROOF SHEATHING RE: STR
ROOF MATERIAL RE: ROOF PLAN
1X8 COMPOSITE FASCIA, PAINT
INSULATION BAFFLE
RE: ROOFPLAN
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A1-3.0
ROOF PLAN
1611.00
1/4" = 1'-0"1 A3-1.0 ROOF PLAN
3/4" = 1'-0"2 TYP. EAVE DETAIL
T.O. MAIN LEVEL
100' -0"
T.O. PLATE
109' -1 1/8"
ABCDEFGH
12
8
12
8
12
8
12
8
12
8
12
8
T.O.W. 107' - 0" TYP.
12
4
12
4
113 112 111 110 109 105 104 103 102 101
S2
S1
S1
S2
S2
S2
S1
S1
S2
R1
1X10 MIRATEC SKIRT
BOARD, PAINTED TYP.S2
1X12 MIRATEC SKIRT
BOARD, PAINTED TYP.
T.O. MAIN LEVEL
100' -0"
T.O. PLATE
109' -1 1/8"
1346
T.O.W. 107' - 0" TYP.
R1
S1 S2
S1 ---
-
114
108A
T.O. MAIN LEVEL
100' -0"
T.O. PLATE
109' -1 1/8"
A B C D E F G H
T.O.W. 107' - 0" TYP.---
-
S2 S1
S2
R1
R1
R1
S2
S2
S2 S1 S2S1
S2
S1
12
8
12
8
12
8
12
8
12
8
12
8
12
8
12
8
12
4
109A
115116
105A
107 106
T.O. MAIN LEVEL
100' -0"
T.O. PLATE
109' -1 1/8"
1 2 3 4 6
T.O.W. 107' - 0" TYP.
101A
108
12
8
S2 S1S1
12
8
R1
NOTE:
EXTERIOR MATERIALS LEGEND
ASPHALT SHINGLE
MFR: GAF -TIMBERLINE ULTRA HD
COLOR: BARKWOOD
REFER TO PROJECT SPECIFICATIONS FOR FURTHER INFORMATION ON
MATERIAL TYPES AND INSTALLATION REQUIREMENTS.
5" REVEAL FIBER CEMENT LAP
SIDING, METAL SIDING CORNERS, TYP.
R1
S1
FIBER CEMENT BOARD & BATTEN
SIDING, BATTENS @ 16" O.C. TYP.S2
1X8 PAINTED FASCIA
**ALL SKIRT BOARD, AND DOOR AND WINDOW TRIM**
TO BE MIRATEC OR EQL. RE: DOOR AND WINDOW
SCHEDULE FOR TRIM DETAILS
F1
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A2-0.1
EXTERIOR
ELEVATIONS
1611.00
1/4" = 1'-0"1 BUILDING ELEVATION
1/4" = 1'-0"2 BUILDING ELEVATION
1/4" = 1'-0"3 BUILDING ELEVATION
1/4" = 1'-0"4 BUILDING ELEVATION
GENERAL NOTES:
1.RAFTERS AND FLOOR JOIST ARE A GRAPHIC
REPRESENTATION ONLY AND MAY NOT CCURATELY
REFLECT ACTUAL RAFTER OR JOIST. REFERENCE
STRUCTURAL FRAMING PLANS FOR ALL RAFTER / JOIST
SPECIFICATIONS. (TYP)
2.FOUNDATIONS, FOOTERS, AND STEM WALLS
MAY NOT ACCURATELY REFLECT ACTUAL SIZE.
REFERENCE STRUCTURAL FOUNDATION PLANS AND
DETAILS FOR ALL FOUNDATION SPECIFICATIONS. (TYP)
3.FRAMING DETAILS INCLUDING BUT NOT
LIMITED TO STRUCTURAL POSTS AND BEAMS,
STRUCTURAL CONNECTION DETAILS, BLOCKING
LOCATIONS , ETC. MAY DIFFER. REFERENCE
STRUCTURAL FRAMING PLANS FOR ALL STRUCTURAL
CONNECTIONS
4.PERIMETER DRAINAGE IS SHOWN AS A
GRAPHIC REPRESENTATION AND MAY DIFFER
SLIGHTLY FROM ACTUAL CONDITIONS AS
RECOMMENDED BY THE GEOTECHNICAL ENGINEER OF
RECORD. IT SHALL BE THE G.C.'S RESPONSIBILITY TO
REFERENCE THE GEOTECHNICAL REPORT FOR ANY
AND ALL DETAILS PERTAINING TO SUBSURFACE AND
SURFACE DRAINAGE. THE GEOTECHNICAL ENGINEER
OF RECORD SHALL OBSERVE INSTALLATION. (TYP)
5.SUB-GRADE MATERIAL IS SHOWN AS A
GRAPHIC REPRESENTATION ONLY AND IS NOT
INDICATIVE OF ACTUAL FILL OR BEDROCK MATERIAL,
RE: GEOTECHNICAL REPORT FOR SUB-GRADE EXISTING
CONDITIONS AND RECOMMENDATIONS FOR
DRAINAGE, FOUNDATION BEARING AND STRUCTURAL
FILL REQUIREMENTS, (TYP)
6.PROVIDE RADON MITIGATION SYSTEM IN
COMPLIANCE WITH 2012 IRC. SECTION 'AF'-RADON
ZONE 1
T.O. MAIN LEVEL
100' -0"
T.O. PLATE
109' -1 1/8"
A B C D E F G H
T.O. FOOTING
96' -4"
A3-0.1
2
KITCHEN
105
LAMINATE
BATH
103
LVT TILE
BATHROOM
112
LVT TILE
KITCHEN
109
LAMINATE
12
4
12
8
12
4
12
8
WALL ASSEMBLY
• SIDING RE: ELEVATIONS
• ENVIRO DRI VAPOR BARRIER
• FRAMING/SHEATHING RE:STR
• R-21 BATT INSULATION
• 6 MIL VAPOR BARRIER
• 1/2" GWB, PAINT FINISH
CRAWL SPACE WALL ASSEMBLY
• FLUID APPLIED DAMPROOFING
• FOUNDATION RE: STR
• POLY VAPOR BARRIER, CONTINUE UP WALL
12" AND FASTEN WITH WOOD CLEAT.
• R-20 VINYL WRAPPED BLANKET INSULATION
FASTENED TO FLOOR JOIST WITH WOOD CLEAT
ROOF ASSEMBLY
• ASPHALT SHINGLES
• ICE AND WATER EXTENDING 24"
MIN. BEYOND INTERIOR WALL LINE .
• FRAMING/SHEATHING RE: STR
• 12" (R-38) BLOWN IN LOOSE FILL INSULATION
• VAPOR BARRIER
• 5/8" GWB, PAINT FINISH
FLOOR ASSEMBLY
• FINISHED FLOORING
• FRAMING/SHEATHING RE:STR
• INSUALTION
MIRROR LINE
T.O. MAIN LEVEL
100' -0"
T.O. PLATE
109' -1 1/8"
T.O. FOOTING
96' -4"
NOTE:
THERE SHALL BE NO PENETRATIONS THROUGH THE
4'-0" ZONE OF EACH SIDE OF THE FIREWALLS. THIS
SHALL INCLUDE BUT NOT BE LIMITED TO PLUMBING
STACK, ATTIC VENTS, NOR EXHAUST FAN DUCTS,
NOR RANGE HOODS, DRAFT STOPPING REQ'D EVERY
10'-0" HORIZONTALLY AND VERTICALLY. ALL
ELECTRICAL DEVICES, CONDUITS AND CONDUCTORS
IN THE 1 HR FIREWALLS SHALL BE LISTED AND
INSTALLED IN ACCORDANCE WITH THE FIRE RATING.
PT SILL PLATE W/ SILL SEAL
FOUNDATION RE:STR
GLUE AND CAULK BASE PLATE
2HR WALL PER GA 3820
• (2) LAYER 5/8" TYPE X GWB -OFFSET SEAMS
• 2X4 STUD WALL W/ INSULATION
• 1" AIR SPACE
• 2X4 STUD WALL W/ INSUALTION
• (2) LAYERS TYPE X GWB -OFFSET SEAMS
CEILING 5/8" TYPE X GWB
• FIRE RATED ROOF SHEATHING 4'-0"
EACH SIDE OF MIRROR LINE.
• NO ROOF PENETRATIONS WITHIN
4'-0" OF MIRROR LINE.
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A3-0.1
BUILDING SECTION
1611.00
1/4" = 1'-0"1 BUILDING SECTION
1/2" = 1'-0"2 2HR FIRE RATED WALL
A A A
C
B
D A B C5 1/2"3/4"W 3/4"
3 1/2"
EXTERIOR EXTERIOR 5 1/2"3/4"W 3/4"
3 1/2"
3/4"W 3/4"3 1/2"3 1/2"3 1/2"3 1/2"
3/4"W 3/4"
**NOTE**
• DOOR AND WINDOW DIMENSIONED TO UNIT SIZES, FRAME ROUGH OPENING TO WINDOW MRFG. SPECIFICATIONS
• ALL GLAZING IN DOORS TO BE SAFTEY GLAZING
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
A6-1.1
DOOR & WINDOW
SCHEDULE
1611.00
WINDOW SCHEDULE
WINDOW # Type Width Height Head Height Operation Comments
101 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
102 B 4' - 0" 4' - 0"7' - 0" FIXED
103 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
104 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
105 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
106 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
107 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
108 C 3' - 0" 2' - 0"7' - 0" AWNING
109 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
110 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
111 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
112 B 4' - 0" 4' - 0"7' - 0" FIXED
113 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
114 C 3' - 0" 2' - 0"7' - 0" AWNING
115 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
116 A 2' - 6" 4' - 0"7' - 0" DOUBLE HUNG
Grand total: 16
DOOR SCHEDULE
Door # Type Mark Width Height Head Height Operation Comments
101A A 3' - 0" 7' - 0" 7' - 0"EXT. SWING RE: PLAN FOR SWING
101B B 2' - 6" 7' - 0" 7' - 0"INT. SWING
102A B 2' - 6" 7' - 0" 7' - 0"INT. SWING
102B C 5' - 8" 7' - 0" 7' - 0"CLOSET
103A B 2' - 6" 7' - 0" 7' - 0"INT. SWING
104A B 2' - 6" 7' - 0" 7' - 0"INT. SWING
104B C 5' - 8" 7' - 0" 7' - 0"CLOSET
105A D 5' - 8" 7' - 0" 7' - 0"EXT. SLIDING
105B B 2' - 4" 7' - 0" 7' - 0"SWING
107A B 2' - 6" 7' - 0" 7' - 0"INT. SWING
108A A 3' - 0" 7' - 0" 7' - 0"EXT. SWING
108B B 2' - 6" 7' - 0" 7' - 0"INT. SWING
108C B 2' - 6" 7' - 0" 7' - 0"INT. SWING
108D B 2' - 4" 7' - 0" 7' - 0"SWING
109A D 5' - 8" 7' - 0" 7' - 0"EXT. SLIDING
111A B 2' - 6" 7' - 0" 7' - 0"INT. SWING
111B C 5' - 8" 7' - 0" 7' - 0"CLOSET
112A B 2' - 6" 7' - 0" 7' - 0"INT. SWING
113A B 2' - 6" 7' - 0" 7' - 0"INT. SWING
113B C 5' - 8" 7' - 0" 7' - 0"CLOSET
SA
Switch, Dimmer
Switch, Motion Sensor
Duplex Receptacle 15 AMP, 125V AC
Switch, Water Proof
Switch, Single Pole, 15 AMP, 120-277V AC
Switch, Remote Control
Floor Receptacle 15 AMP, 125V AC
Breaker Panel
Ceiling Fan
Garage Door Opener
Ceiling Exhust Fan Panasonic Whisper Ventilation Fan
Carbon Monoxide Alarm, Hard Wired, Battery Back-Up
T.V. / Data / Telephone
208 / 230V Receptacle (Verify Blade Configuration)
Photo Sensor
R Remote
Switched Receptacle 15 AMP, 125V AC
Supply Fan
GFI Receptacle 15 AMP, 120V AC
Switch, 3-Way, 15 AMP, 120-277V AC
Switch, 4-way, 15 AMP, 120-277V AC
3
Direct Wire to Major Appliances
P
Gas Line
Smoke Alarm, Hard Wired, Battery Back-Up
Central Vacuumcv
ELECTRICAL SYMBOL LEGEND
4
D
WP
MS
RC
CM/SD
GDO
240V AC Receptacle (Verify Blade Configuration)
Decorative Pendant Fixture
(may be several types, coord. w/ owner)
Recessed Downlight 6" Dia.
Type Symbol Fixture #MRFG DescriptionLamp
R TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
Low Voltage Recessed Lensed Downlight
Water ProtectR2WP
WM
SM
Interior Wall Sconce -Bathroom
P1
TBD TBDCF Ceiling Fan
NOTE:
1. LIGHTING TYPE DESIGNATIONS ARE GENERIC, ALL FIXTURE TYPES
ARE TO BE CONFIRMED BY OWNER/CONTRACTOR.
2. NOT ALL FIXTURE TYPES MAY BE USED.
LIGHT FIXTURE SCHEDULE
TBD
TBD TBD TBDEW Exterior Wall Mount Sconce
Surface Mounted
A2-0.1
3
3
A2-0.1
2
2
A2-0.1
1
1
A2-0.1
4
4
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
1
1
22
33
44
66
-
---
GAS & ELECTRIC SERVICEGAS & ELECTRIC SERVICE
BREAKER PANELBREAKER PANEL 3333333 333333333CM/SD
CM/SD
CM/SD
CM/SD
CM/SD
CM/SD
CM/SD
CM/SD
STACKED
W/DSTACKED
W/D
Date:
Sheet
Project #
AUGUST 1, 2018
BOZEMAN, MONTANA
WEST WINDS AFH UNIT
E1-1.1
LIGHTING PLAN
1611.00
1/4" = 1'-0"1 MAIN LEVEL PLAN
LOT
8
3,850
sq.ft.
LOT
11
3,850
sq.ft.
LOT
8
6,692
sq.ft.
R=14.0'OAK STREET
1/4 COR
BETWEEN SEC 2
AND SEC 3 FND
1" IRON PIPE
LOT
6
4,983
sq.ft.
LOT
7
4,995
sq.ft.
LOT
2
4,936
sq.ft.
LOT
3
4,948
sq.ft.
LOT
4
4,960
sq.ft.
LOT
5
4,971
sq.ft.
LOT
17
5,407
sq.ft.
LOT
16
5,407
sq.ft.
LOT
15
5,407
sq.ft.
LOT
14
5,407
sq.ft.
LOT
13
5,407
sq.ft.
LOT
12
5,407
sq.ft.
LOT
2
5,407
sq.ft.
LOT
3
5,407
sq.ft.
LOT
4
5,407
sq.ft.
LOT
5
5,407
sq.ft.
LOT
6
5,407
sq.ft.
LOT
7
5,407
sq.ft.
LOT
14
5,408
sq.ft.
LOT
15
5,425
sq.ft.
LOT
16
5,443
sq.ft.
LOT
17
5,460
sq.ft.
LOT
12
5,373
sq.ft.
LOT
13
5,391
sq.ft.
LOT
1
6,674
sq.ft.
LOT
1
6,985
sq.ft.
LOT
11
3,867
sq.ft.
LOT
7
5,373
sq.ft.
LOT
6
5,391
sq.ft.
LOT
5
5,408
sq.ft.
LOT
4
5,425
sq.ft.
LOT
3
5,443
sq.ft.
LOT
2
5,460
sq.ft.
LOT
3
3,143
sq.ft.
LOT
11
3,255
sq.ft.
LOT
4
3,791
sq.ft.
LOT
12
3,925
sq.ft.
LOT
5
3,809
sq.ft.
LOT
6
3,186
sq.ft.
LOT
14
3,228
sq.ft.
LOT
7
3,199
sq.ft.
LOT
8
3,858
sq.ft.
LOT
16
3,582
sq.ft.
LOT
1
3,742
sq.ft.
LOT
9
3,876
sq.ft.
LOT
2
3,130
sq.ft.
LOT
10
3,242
sq.ft.
LOT
2
3,465
sq.ft.
LOT
1
4,356
sq.ft.
LOT
5
3,465
sq.ft.
LOT
4
3,465
sq.ft.
LOT
3
3,465
sq.ft.
LOT
2
5,247
sq.ft.
LOT
6
6,785
sq.ft.
LOT
1
6,764
sq.ft.
LOT
5
5,247
sq.ft.
LOT
4
5,247
sq.ft.
LOT
18
6,985
sq.ft.
LOT
6
4,293
sq.ft.
LOT
1
7,080
sq.ft.
LOT
18
7,080
sq.ft.
LOT
9
3,766
sq.ft.
LOT
13
3,889
sq.ft.
LOT
15
3,161
sq.ft.
LOT
9
3,719
sq.ft.
LOT
10
3,719
sq.ft.
LOT
3
5,247
sq.ft.
LOT
8
3,727
sq.ft.
LOT
10
3,626
sq.ft.
LOT
84
126,712
sq.ft.WINDWARD AVENUEZEPHYR WAYNEW HOLLAND DRIVEBORA WAYMISTRAL WAY
WEST OAK STREETDAVIS LANEBREEZE LANE
MISTRAL WAY
S
S
S
SSSS
S
SD
SS
SS SS
S
S
S
SWVWV
WVWVWVWVWVWVWVWV
WV
WV WV
WV WV
WV WV
WV WV
WV
90
0 40 80 120
SCALE
AFFORDABLE
HOUSING LOT
AFFORDABLE
HOUSING LOT
AFFORDABLE
HOUSING LOT
AFFORDABLE
HOUSING LOT
AFFORDABLE
HOUSING LOT
AFFORDABLE
HOUSING LOT
Date
Sheet
Project #
2018-09-18
BOZEMAN, MONTANA
WEST WINDS SW
A1-0.1
AFH SITE PLAN
1611.00
TRUE
NORTH