HomeMy WebLinkAbout02-20-18 Downtown URD MinutesDowntown Tax Increment Finance
Board Meeting Minutes
February 20, 2018
Attending: Bobby Bear, Vonda Laird, Bob Hietala, Tony Renslow, Chris Naumann
Absent: Cory Lawrence, Bill Stoddart
Guests: Andrea Surratt, Craig Woolard, Brian Heaston
Public Comments: None
Minutes
ACTION: Bob Hietala moved to approve the January minutes as presented.
Vonda Laird seconded the motion.
All voted in favor.
Financial Report
Chris presented the current FY2018 finances. Chris reviewed the year-to-date income totaling
just over $670,000. Of particular note is the “COB Interlocal Share” which just 6 months into the
year already exceeds $400,000; the budgeted annual amount is $500,000.
He highlighted the expenses incurred over the last month totaling $3,798.
The board had no other questions regarding the finance report.
Executive Director’s Report
Technical Assistance Program Update—no changes
No grants have been awarded in FY2018. Two of the three grants left over from FY2017 were
recently completed. As a reminder, the Planning grants have a $7500 cap and the Façade
grants are capped at $3000.
Other Financial Program Updates
Streetscape Grants
Lark Hotel (along South Grand) 5 new streetlamps—Installed, pending completion
Life-Safety Grants
Dedicated Fire Line for 712-716 East Main—terminated due to no activity
Date Project Name Project Address Applicant Professional Type Value Completed
10/31/2016 Owenhouse 2nd Floor 26 East Main Larry Bowman Yellowstone Arch Planning $ 7,500 YES
10/31/2016 Owenhouse 2nd Floor 26 East Main Larry Bowman Yellowstone Arch Façade $ 3,000 YES
3/30/2017 23 East Main 23 East Main Mark Kehke Intrinsik Planning $ 7,500
Total $ 18,000
FY17 Budget $ 50,000
remaining $ 32,000
Technical Assistance Program FY2017 Report
Dedicated Fire Line for Lark Hotel—Pending
Hotel Incentive Grant
Etha Hotel—Pending
Lark Hotel—Pending
Fiber Connectivity Grant
Lark Hotel—Pending
Massive Studios—Pending
Building Project Updates—no changes
23 East Main (former Bozeman Angler) remodeling 1st
and 2nd
floor to be complete in
May 2018
223 East Main (former IOOF Building) constructing a 2-story building with first floor retail
and residential on second floor to be completed October 2018
Owenhouse redeveloping 2nd
floor as 8000+ square feet of office space to be completed
in September 2018
Lark Addition (corner of Grand and Main) 4 story building with 28 new Lark hotel rooms.
Construction began in December 2016 to be completed Spring 2018.
Etha Hotel (Armory building) Construction scheduled to resume in January 2018.
Black & Olive Apartments scheduled to begin construction Spring 2018.
“OSM” Building 5 story mixed use building proposed on southwest corner of Babcock
and Wallace—schedule unknown
BG Mill Building 5 story mixed use building proposed on southwest corner of
Mendenhall and Broadway—schedule unknown
New Businesses Update—no changes
• Montana Provisions—39 North Rouse—old Service Electric opening late winter
• Fire—243 East Main—former Artcraft Printers—being remodeled as wood-fired pizza
restaurant
• ???—19 South Willson—former Over the Tapas--???
• ???—23 East Main—former Bozeman Angler--???
• ???—23 East Main (second floor)—formerly vacant--???
• ???—223 East Main—formerly Lilly Lu at explosion site
Planning Updates
In this section, I will provide update about several ongoing City planning processes.
UDC Revisions http://bozeman.net/Projects/UDCCodeupdate/Home
Consultants: Makers (Seattle), Leland Group (Portland), Studio Cascade
(Spokane)
Update: adopted by the City Commission on January 4, 2018. A second small set
of revision were adopted February 12, 2018. New UDC will take effect April 2018.
City Strategic Plan
Consultants: HDR
Timeline: March 2016-2018
Update: draft plan adopted by CC on May 15, 2017. City Commission revised the
draft during several meetings this past month. Next consideration will be March 26,
2018.
2017 Community Plan (City Growth Policy) Update
Consultants: City release RFP for consultants January 2017
Timeline: October 2017 through late 2018
Update: Preliminary land use and demographic analysis completed by EPS
Consulting. The report can be found here:
https://www.bozeman.net/home/showdocument?id=5612
Downtown Strategic Parking Management Plan—no chages
Strategies 1 through 5 have been completed.
Strategies 6 (Cash-in-Lieu), 7 (UDC Parking Requirements), and 8 (SID 565) are scheduled to
be addressed in 2018 and I am working with City staff to develop a more specific timeline.
Strategy 10, focusing on data collection and analysis, was in part completed with the release of
the 2017 Downtown Parking Study as conducted by WTI.
https://www.bozeman.net/Home/ShowDocument?id=5335
Strategies 12, 13, and 14, which focus on signage, branding and wayfinding associated with
parking will be completed in 2018.
Significant progress is being made on Strategy 15 to upgrade the parking technology systems at
the garage and used for on-street management. The new T2 parking management system will
be implemented in May 2018.
Discussion and Decision Items
FEMA Floodplain Mapping Project
Brian Heaston (City Engineer) provided the board with an update that following the first phase of
the project with Allied Engineering which involved a 2-D floodplain analysis of Bozeman Creek.
After a lengthy period of correspondence with FEMA, the agency agreed to accept the data
generated by the 2-D work.
Craig Woolard explained that although FEMA has accepted the 2-D data they are requiring the
City to run the 2-D date through the FEMA 1D model. Brian said therefore an expanded scope
of work will need to be completed by Allied. He said the cost estimate is $60,000 noting that
$25,000 of that amount is earmarked for communication with FEMA to finalize the floodplain
map. He anticipates the entire $25,000 portion will not be needed.
The board asked why the cost of the second phase is as much as the first phase. Brian
explained that FEMA is requiring that the City expand the mapping analysis all the way to the
confluence of Bozeman Creek and the East Gallatin River.
The board agreed that the additional funding is warranted to ensure FEMA adopts the most
accurate map possible
ACTION: Bobby Bear moved to approve up to $60,000 of additional funds for the
Bozeman Creek floodplain mapping project in anticipation that the
Downtown Business Improvement District will contribute between $10,000
and $20,000 thus reducing the URD amount.
Bob Hietala seconded the motion.
All voted in favor.
Bozeman Strategic Plan Update
Chris reminded the board that he had provided a memo outlining the City Strategic Plan and the
process by which it will be finalized and adopted (attached below). Then he introduced the new
City Manager, Andrea Surratt. She thanked the board for the opportunity to give an overview of
the City Strategic Plan. She explained that the Plan is organized into seven broad categories of
vision statements. The Plan will serve as the foundation for updating the Community Plan also
referred to as the City’s growth policy.
Andrea explained the importance of maintaining downtown infill and economic vitality for the
health of the entire community. That is why the Strategic Plan specifically prescribes updating
the Downtown Improvement Plan, she continued. She emphasized that an updated Downtown
Plan will help guide other important plans such as the Community Plan and Neighborhood
Conservation Overlay District update.
The board acknowledged the advantages of updating the Downtown Plan sooner rather than
later. They asked Chris for his thoughts about the update process. He said as they have
discussed in previous meetings, he envisions an efficient RFP process followed by a very
focused planning process. In terms of costs, he reminded the board that the City Community
Development Department has agreed to be a funding partner.
The board asked about the next steps. Chris said he would provide a draft of the 2009
Downtown Plan Progress Report and a draft of the RFP for the 2018 update.
Meeting was adjourned at 1:05 pm
TO: BID and URD Boards
FR: Chris Naumann
DA: February 15, 2018
RE: City of Bozeman Strategic Plan
The City staff and the Commission have been developing the “Bozeman Strategic Plan” as an
overarching group of vision statements to provide a framework for all subsequent planning
processes and documents.
The City has a webpage dedicated to the Strategic Plan found at:
https://www.bozeman.net/city-projects/bozeman-strategic-plan
Process and Timeline
June 2016 Kickoff Event
December 2016 First Draft by Staff
March 2017 First Draft by City Commission
May 2017 First Draft for Public Review
November 2017 Second Draft
April 2018 Final Draft
March 26, 2018 Next City Commission meeting to consider Strategic Plan
Aspects indirectly relating to Downtown
Of course, the entire Strategic Plan will indirectly relate to downtown, but the section addressing
‘an innovative economy’ will support downtown regarding business retention, expansion, and
recruitment.
2. An Innovative Economy
We grow a diversified and innovative economy leveraging our natural amenities, skilled and
creative people, and educational resources to generate economic opportunities.
2.1 Business Growth - Support retention and growth of both the traded and local business
sectors while welcoming and encouraging new and existing businesses.
2.2 Infrastructure Investments - Strategically invest in infrastructure as a mechanism to
encourage economic development.
2.3 Workforce Development - Support education and workforce development initiatives to
improve the skills of our citizens.
2.4 Partnerships to Spur Economic Vitality - Pursue opportunities that connect creativity,
innovation, and the economic development, governance, and education to improve the
quality of life and enhance the business climate in Bozeman.
Aspects directly relating to Downtown
Section 4—“A Well-Planned City”—is germane to every aspect of downtown development and
vitality. Several sections refer specifically to downtown.
4. A Well-Planned City
We consistently improve our community’s quality of life as it grows and changes, honoring our
sense of place and the ‘Bozeman feel’ as we plan for a livable, affordable, more connected city.
4.1 Informed Conversation on Growth - Continue developing an in-depth understanding
of how Bozeman is growing and changing and proactively address change in a balanced and
coordinated manner.
a) Adopt a New Growth Policy Based on Sustainable Growth Principles. Direct and
guide sustainable growth through appropriate planning, annexation, land use, and a
streamlined development review process.
b) Develop and Align Infill Policies. Develop, adopt and align city policies for infill and
redevelopment, economic development and public infrastructure.
4.2 High Quality Urban Approach - Continue to support high-quality planning, ranging
from building design to neighborhood layouts, while pursuing urban approaches to issues
such as multimodal transportation, infill, density, connected trails and parks, and walkable
neighborhoods.
b) Complete Unified Development Code, Phase 2 to address parking standards and
affordable housing and sign code.
c) Parking Management by District. Develop a comprehensive, integrated approach to
parking management for the downtown, midtown, university, and other districts.
Consider a range of solutions including both on-street parking and parking garages.
e) Update Historic Preservation Guidelines. Update the Neighborhood Conservation
Overlay District (NCOD) guidelines for historic preservation in downtown, midtown,
and other commercial districts and neighborhood centers. Promote continued
investment in the city's inventory of historic structures relative to ongoing infill and
redevelopment.
4.3 Strategic Infrastructure Choices - Prioritize long-term investment and maintenance for
existing and new infrastructure.
4.4 Vibrant Downtown, Districts & Centers - Promote a healthy, vibrant Downtown,
Midtown, and other commercial districts and neighborhood centers – including higher
densities and intensification of use in these key areas.
a) Update the Downtown Plan
b) NCOD
4.5 Housing and Transportation Choices - Vigorously encourage, through a wide variety
of actions, the development of sustainable and lasting housing options for underserved
individuals and families and improve mobility options that accommodate all travel modes.
How the Strategic Plan relates to other ongoing planning processes
Most importantly, the Strategic Plan essentially sets the stage for the Community Plan (aka.
Growth Policy) update. Once the Strategic Plan is completed and adopted, the City will proceed
to kick off the Community Plan process. An initial land use analysis for the Community Plan was
just released and can be found here:
https://www.bozeman.net/home/showdocument?id=5612
Basically, here is how the planning hierarchy works:
100,000 feet Strategic Plan Vision
40,000 feet Community Plan Goals
10,000 feet Downtown Plan Strategies
Ground Zero Zoning/UDC Rules
Purpose of discussing at February board meetings
I am looking forward to hearing from the board about their thoughts regarding the Strategic Plan.
All of these plans (and subsequent community planning processes) will have an impact on the
future of downtown. I am hoping we—together—can play a leadership role in advocating for
downtown as the continued “heart and sole” of Bozeman.