Loading...
HomeMy WebLinkAbout18355 Narrative & PlansAugust 2018 V W S Master Site Plan (MSP) Applica#on V W PUD Valley West Square Master Site Plan Applicaon Table of Contents I. Master Site Plan Applicaon Forms & Checklists: (A1, N1, MSP, SP1, PLS) II. Project Team III. Response to Concept Review Comments IV. Master Site Plan Narrave A. Project Narrave B. Site Plan Elements V. Legal & Guiding Documents Appendices: Appendix A: Dra/ Shared Use Agreement for Parking and Stormwater Drainage Appendix B: Approved Use & Design Standards for Commercial Lots: Valley West PUD Appendix C: Project Locaon within Valley West PUD Appendix D: Site Lighng Package Appendix E: Stormwater Design Report & Drainage Area Map Appendix F: Stormwater Maintenance Plan Appendix G: Exempt Well Le4er Appendix H: Traffic Impact Study Appendix I: Valley West Square Dra/ Design Manual Appendix J: Valley West Square By-Laws Appendix K: Valley West Square Declaraon Plan Set: A 1.0 Cover Sheet C 1.0 Mater Site Plan C 2.0 Grading & Drainage Plan C 3.0 Civil Details L 1.0 Landscape Master Plan L 1.1 Landscape Notes and Legends PM 1.0 Lighng and Photometric Plan Valley West Square Master Site Plan Applicaon II. Project Team PROJECT Kardar, LLC OWNER 2001 Stadium Drive Bozeman, MT 59715 p: 406.556.7704 PROJECT TEAM Planning Intrinsik Architecture, inc. 111 N. Tracy Avenue, Bozeman, MT 59715 p: 406.582.8988 Engineering C&H Engineering and Surveying, inc. 1091 Stoneridge Drive, Bozeman, MT 59718 p: 406.587.1115 Landscape Design 5, LLC Architecture 37 E. Main Street, Suite 10 Bozeman, MT 59715 p: 406.587.4873 Valley West Square Master Site Plan Applicaon III. Responses to Concept Review (CONR) 18-010, February 5, 2018 Planning Division: 1. On January 4, 2018 the City Commission finally approved changes to Chapter 38 of Bo- zeman Municipal Code. The changes are effec#ve on March 31, 2018. Any applica#on that does not receive adequacy, as defined by this chapter, prior to March 31, 2018 will be re- viewed under revised Chapter 38. Response: Applicant is aware and understands this project will be reviewed under re- vised Chapter 38. This understanding is reflected in the Master Site Plan applicaon. 2. The subject property is zoned B-1. Response: Applicant is designing the project to conform with B-1 zoned uses. 3. The subject property is within the Valley West Planned Unit Development and designat- ed as a commercial area. Response: Applicant is designing the project to reflect Valley West PUD standards where applicable. 4. Prior to submiEng Preliminary Plat Applica#on a subdivision Pre-App Applica#on is re- quired. Response: Applicant understands this as part of the entlements process, see Item 5 for further informaon. 5. Master Site Plan (MSP) approval is required prior to subdivision approval due to recipro- cal parking and access/building pad configura#on. The Master Plan submiHal must include all relevant and applicable use, design, and area standards associated with the Valley West PUD commercial area. Please provide the following documenta#on with the MSP sub- miHal: A. Approved use tables for the commercial lots within the Valley West PUD and anal- ysis showing proposed uses conform to the intent of the PUD. B. Approved design standards for commercial buildings in the Valley West PUD and analysis showing conformance with the design standards. Response: Applicant understands this and is submiGng the MSP applicaon prior to beginning the subdivision approval process. As part of the MSP applicaon, the re- Valley West Square Master Site Plan Applicaon quested tables from the Valley West PUD are provided in the applicaon. 6. A site plan applica#on is required for each subsequent phase of the development. All drive access and parking areas will be required to be constructed with the first phase of de- velopment. Response: Applicant is aware and understands this requirement. See narrave for phas- ing informaon. 7. Please consider the rela#onship between each step in the en#tlement process and how it might relate to the desired comple#on of each phase of development. For example, prior to submiEng a site plan applica#on for any building in the development the subdivision final plat must be complete. Response: Applicant has considered this and has developed a meline to address the entlements process for this project. This Master Site Plan applicaon is being submi4ed first, per City comments and recommendaons. The process is outlined further in the narrave. 8. With the Master Site Plan submiHal please detail proposed uses for Building 5. According to Ar#cle V, Sec#on 4, part A of the Valley West Protec#ve Covenants and Restric#ons limits uses to those allowed in the B-1 zoning district. This sec#on also details building placement and yards (setbacks). Based on preliminary analysis of the proposed use the drive through uses and/or convenience uses the proposed use may be prohibited by the base zoning. Al- lowed uses and restric#ons apply to all proposed uses within the development. A. Coffee shop w/drive through defined as Convenience Use or Convenience Food Res- taurant. Convenience Uses are not allowed in the B-1 district. B. Drive throughs are also not allowed in the B-1 district. Please refer to tables in sec- #on 38.310.040.A and their associated defini#ons. Response: A drive through is no longer allowed or proposed as part of the applicaon. This is further addressed in the narrave and Appendix B contains the approved uses and de- sign informaon for the Valley West PUD. 9. Grease interceptors are recommended for all buildings. Response: The applicant is not construcng building s at this me. However, grease inter- ceptors will be included with each building that requires an interceptor. These will be included with subsequent site plan submi4als for each building. 10. Extend one pedestrian pathway through the parking lot to Stafford. Assure pedestrian pathways are wide enough to accommodate path of travel and vehicle overhang. Valley West Square Master Site Plan Applicaon Response: There are three (3) pedestrian pathways that connect through the parking lot to Stafford Avenue and others for comprehensive connecvity. See Sheet C1.0 for more detail. 11. An interior fire hydrant is required. Response: Applicant has sited a fire hydrant internally in the northeast secon of the property, within a landscape area of Lot 5. See Sheet C1.0 for locaon. 12. Alley must be upgraded to 24’ minimum paved width and access at Stafford Response: The alley is currently a 16’ wide paved surface which results in two 8’ wide travel lanes with no parking on either side. The exisng alley cannot be expanded to the north due to an exisng driveway and house. There is an exisng storm inlet and exisng ulity boxes to the south of the exisng access that would be disturbed if the alley were to be expanded to the south. Although 16’ is narrow, it does allow for two way traffic. In addion, there is a 4’ gravel secon provided to the south of the exisng pavement that allows for vehicles to make room for two way traffic in the case of larger vehicles passing one another within the alley. 13. NorthWest Energy a. There are exis#ng underground u#li#es along Stafford and the Alley. Please provide a minimum 10’ easement in that loca#on. b. There are overhead power lines on CoHonwood that must be considered with future development to insure separa#on and other poten#al standards. Response: Applicant is aware and understands these condions. An easement is called out on Sheet C1.0 and will be included with the plat. The overhead power lines are noted on the survey and sheet C 1.0. They are also addressed with respect to plant materials in the design regulaons. 14. City Forester requires small species trees approved for plan#ng under power lines along CoHonwood. See tree guide. Ensure spacing is met between services and buildings. Response: Applicant is aware and will meet these condions. Engineering Division: 1. The City is planning a street upgrade of CoHonwood Road between Babcock Street and Durston Road including an upgrade of the intersec#on of CoHonwood Road and Babcock Valley West Square Master Site Plan Applicaon Street. The following items of the street upgrades apply to the proposed project: a. The applicant is responsible for the local cost share of the street improvements including one vehicular travel lane, curb and guHer, and sidewalk adjacent to the property boundary on CoHonwood Road. b. The applicant must coordinate water and sanitary sewer services connec#ons with the City Engineering Division (Bob Murray) design of CoHonwood Road Im- provements. Pavement cuts in newly constructed asphalt in CoHonwood Road will not be allowed aOer the CoHonwood Road improvements. c. If the applicant’s project proceeds prior to City improvements to CoHonwood Road, the applicant must pay cash-in-lieu of infrastructure per Bozeman Munici- pal Code (BMC) 38.39.070 for the applicant’s share of CoHonwood Road improve- ments prior to site plan approval. Response: a. The applicant is aware of this responsibility. b. All water and sanitary sewer services are to be installed prior to the improvements to Co4onwood Road. Therefore, no street cuts will be necessary within new pavement. c. The project is ancipated to proceed prior to the Co4onwood Road improvements. This applicaon is just for Master Site Plan approval and does not include any construc- on. Any required cash-in-lieu of infrastructure will be paid prior to individual site plan approvals. 2. The proposed project may not exceed sanitary sewer flows allocated to the property in the Valley West Sewer Trunk Main. The applicant must analyze the project flows and com- pare the project flows to the sewer flow alloca#on for the property in the Design Report for Valley West Sewer Trunk Line (1998) Morrison-Maierle, Inc. If the project flows exceed the alloca#on, a downstream sanitary sewer main upgrade will be required prior to site plan approval(s). Response: The wastewater generaon for the proposed project has been analyzed based on the City of Bozeman Design Standards and it has been found that the pro- posed project does not exceed the sanitary sewer flows allocated to the property in the Valley West Sewer Trunk Main. Therefore, no upgrade to the downstream sanitary sewer main will be needed. 3. The proposed drive access to CoHonwood Road will only be allowed as a right-in, right- out restricted movements access. A full drive access at this loca#on does not meet the ac- cess separa#on standard in BMC 38.24.090 for an arterial street. Response: A right-in, right-out median has been added to the drive approach from Co4onwood Road. Valley West Square Master Site Plan Applicaon 4. The applicant must widen the alley on the northern edge of the property to use the alley as a two-way access. Response: The exisng alley is currently a 16’ wide paved surface which results in two 8’ wide travel lanes with no parking on either side. The alley cannot be expanded to the north due to an exisng driveway and house. There is an exisng storm inlet and ex- isng ulity boxes to the south of the exisng access that would be disturbed if the alley were to be expanded to the south. Although 16’ is narrow, it does allow for two way traffic. In addion, there is a 4’ gravel secon provided to the south of the exisng pave- ment that allows for vehicles to make room for two way traffic in the case of larger vehi- cles passing one another within the alley. 5. The applicant must provide a public access easement for the driveway that connects the alley to CoHonwood Road. Response: A public access easement has been shown on the master site plan. The ease- ment will be executed with the Subdivision Applicaon. 6. The applicant must analyze the capacity of the exis#ng stormwater conveyance and deten- #on system to accommodate the proposed project. If the stormwater system capacity is inad- equate, the applicant must provide stormwater deten#on or reten#on on-site for the excess stormwater runoff beyond the exis#ng system design capacity. Response: The exisng stormwater conveyance and detenon system was originally de- signed to accommodate the proposed project, however a C-factor of 0.35 was used over the whole site. With the proposed layout, the C-factor for the project is 0.80, which will produce more runoff than what was originally allocated. A combinaon of a small reten- on pond/pre-treatment bay and underground infiltraon chambers have been pro- posed with this project to handle the addional runoff. Please see the a4ached Storm- water Design Report for more details. 7.The applicant is advised that a grease interceptor, conforming to the latest adopted edi- #ons of the Uniform Plumbing Code must be installed with any development responsible for food prepara#on. The proposed coffee shop will require a grease interceptor. The applicant is also advised to install grease interceptors for any other buildings that are likely to have food prepara#on facili#es as it is difficult to retrofit sites for grease interceptors aOer the site is constructed. Response: Grease interceptors will be provided for any building that is likely to have food preparaon facilies. These grease interceptors will be placed and designed with individual site plans for each building. Valley West Square Master Site Plan Applicaon 8.The applicant must abandon any unused water services to the property at the main per City Water and Sewer Department requirements. Response: There are no known abandoned or unused water services to the property. 9. The applicant must abandon any unused sanitary sewer services to the property per City Water and Sewer Department requirements. Response: There are no known abandoned or unused sanitary sewer services to the property. 10. Any trenching in CoHonwood Road or in Babcock Street will require flowable fill in the full depth of the trench. Response: The applicant understands this requirement and will comply. 11. Adequate snow storage areas must be designated outside the sight triangle but on the subject property. Response: Adequate snow storage will be provided and is shown on the Master Site Plan. 12. The proposed development falls within a known area of high groundwater. No crawl spaces or basements may be constructed such that sump pumps are required to pump water from these spaces. Sump pumps are not allowed to be connected to the drainage system. Water from sump pumps may not be discharged onto streets, such as into the curb and guHers where they may create a safety hazard for pedestrians and vehicles. Response: This condion is noted and a note stang this will be on the plat. 13. The applicant must contact the City Engineering Division (Brian Heaston) for an analysis of CIL of water rights and pay any CIL of water rights prior to site plan approval. Response: Brian Heaston has been contacted regarding the CIL of water rights. No CIL of water rights has been paid for the subject property. Therefore, for each subsequent site plan for the building sites, any required CIL of water rights will be paid prior to site plan approval. 14. The applicant must execute and file shared parking and drainage path easements prior to Master Site Plan approval. Response: A shared parking and drainage path easement exists over the enrety of the Valley West Square Master Site Plan Applicaon IV. Master Site Plan Narrative A. Project Narrative This project proposes a commercial subdivision development, Valley West Square, located at the northeast corner of West Babcock Street and North Co4onwood Road and will subdivide the current Lot 3A into 6 commercial lots. The 2.65 acre subject site is part of the Valley West Neighborhood (PUD) and is zoned B-1. This Master Site Plan (MSP) details the division of the subject site into six (6) parcels. Per City recommenda#ons and keeping with the entlements process, the MSP applicaon is being submi4ed concurrently with the subdivision process. A subdivision pre-applica#on will be submiHed approximately two to threes weeks a/er this MSP applicaon. The applicant understands that subsequent development of each lot will require a Site Plan Applicaon. Addionally, the applicant has included a dra/ shared use agreement for the drainage easements to be signed and executed upon final approval (Appendix A). The proposed entlement period for this MSP is five (5) years. The intent of Valley West Square is to create a contribung neighborhood commercial center. Upon compleon, the project will provide approximately 38,000 square feet of commercial space, as a mix of office and some oponal retail. The project will also create an opon for a small coffee shop that is walkable to the Valley West neighborhood and surrounding areas. As part of Phase I, the applicant plans to develop Lot 6, which is proposed as common parking and circulaon to serve the other five lots and buildings. Given the shared access for Lots 1-5, it is understood that Lot 6 must be developed as part of Phase I. Lots 1-4 are Valley West Square Master Site Plan Applicaon yet to be determined commercial space. Lot 5 has been designated to allow a coffee shop or small eatery. Please see Appendix B for a list of allowable uses per the Valley West PUD. All proposed buildings in Lots 1-5 will be oriented to the perimeters of the parcel per the Valley West PUD, with maximum building heights at 38’. The coffee shop (Lot 5) will be sited in the NE corner of the parcel. Any lots pursuing ground floor office space will apply have to apply for a condional use permit. See Sheet C 1.0 for phasing boundaries. Lots 1-5 will be developed in future phasing as the market responds and will require individual site plans. The site will incorporate landscaping and buffering as required, to migate visual impacts for the residenal uses adjacent to the site. Landscaping and site plan elements will also be incorporated to enhance pedestrian use and experience and increase connecvity to adjacent sites. All landscape and architectural requirements to meet the intent of the Master Site Plan and meet the Bozeman Municipal Code are detailed later in the guiding documents secon of this narrave. The site will be accessed from the northwest corner, off of North Co4onwood Road, as well as from the east via Stafford Avenue, which is aligned with the alley to the east, see Appendix C for site locaon within to the Valley West PUD. No access is allowed from West Babcock Street. The plan proposes a connecon with the exisng adjacent alley on the north as well. Upon approval of this Master Site Plan, individual site plans will be submi4ed for each lot within Valley West Square. All applicaons and development will be consistent with the approved Master Site Plan and is subject to all review criteria in Chapter 38 of the Bozeman Municipal Code. B. Site Plan Elements ZONING Currently, the project site is an originally planned but currently undeveloped vacant lot and Valley West Square Master Site Plan Applicaon is part of the Valley West PUD and is zoned B-1, Neighborhood Business District. It is adjacent to R-3, Residenal Medium Density, to the north and east. Directly south and west the property is bordered by B-1 zoned parcels. Further southeast of the project site, across W. Babcock, land is zoned RO. VALLEY WEST PUD Valley West Square is located within the Valley West PUD and is classified as a Type III Lot, Co4onwood Shop Front, see Appendix B for this secon of the PUD. Permi4ed uses are those that are permi4ed under the Bozeman Municipal Code. This secon of the PUD dictates maximum building heights (38’) and footprints, parking calculaons and other site elements. Due to the ulies and exisng easements, buildings on-site will be setback more than 4 feet from property lines. It should be noted that these PUD regulaons were wri4en 14 years ago and design/planning pracces and codes have since evolved. The site plan calls for commercial buildings with mulple pedestrian oriented spaces and plazas. The intent is to create a vibrant commercial development, respect the 5,000 square feet maximum building footprint requirements, and engage streets through the pedestrian plazas across the campus. The applicant feels this meets the spirit of the 75% building street façade requirement by connecng buildings with urban open spaces across the campus. PARKING Valley West Square will develop Lot 6 as a common parking lot for Lots 1-5. Lot 5 may include seven parking spaces (4 to serve Lot 5 and 3 for Lot 1). The final build out of the project will be constrained by the amount of parking provided. No building foot print can exceed 5,000 square feet and nor exceed 38’ in height. The applicant is ancipang 38,000 square feet of commercial space upon full build out and has based the parking calculaons on that figure. Per the approved Valley West PUD and its associated parking relaxaons (1 Valley West Square Master Site Plan Applicaon space per 400 square feet of commercial), 95 parking spaces will be required. This includes the required ADA parking spaces. The site plan provides 101 parking spaces as shown on the Master Site Plan (Sheet C1.0). TABLE 1: Valley West Square Parking Calculations SETBACKS & UTILITIES Private ulies are already installed adjacent to the subject parcel. Underground electric, natural gas and telecommunicaons run along the eastern property line. Overhead electric and natural gas also run north-south along N. Co4onwood adjacent to the property line. Exisng water and sanitary sewer lines run along N. Co4onwood Road, W. Babcock Street and Stafford Avenue. A 20’ ulity easement runs along N. Co4onwood and W. Babcock and a 10’ setback runs along Stafford Avenue and the alley to the north. See sheet C 1.0 for all ulity informaon and locaons. Individual lot setbacks are noted on the site plan and further detailed in the Valley West Square Dra/ Design Manual. PARKING CALCS LOT SIZE FACTOR SPACES REQ’D SPACES PROVIDED 1 13,000 S.F. 1 per 400 S.F. 32.5 33, Lots 5 and 6 2 8,000 S.F. 1 per 400 S.F. 20 20, Lot 6 3 8,000 S.F. 1 per 400 S.F. 20 20, Lot 6 4 7,500 S.F. 1 per 400 S.F. 18.75 19, Lot 6 5 1,500 S.F. 1 per 400 S.F. 3.75 4, Lot 5 TOTAL 95 ADA spaces listed below ADA (*Count toward minimum parking) Parking lots with 75-100 spaces 4* 4 (1 van accessible), Lot 6 TOTAL PROVIDED 101 97 STANDARD, 4 ADA Valley West Square Master Site Plan Applicaon STORMWATER Stormwater will generally drain to the northwest poron of the site. An inlet will be ulized to discharge stormwater into an underground storage system. An exisng stormwater line exists along the northern poron of the property as part of the Valley West PUD stormwater plan. Please see Appendix E for the Stormwater Design Report and Appendix F for a Stormwater Maintenance Plan. PARKLAND & AFFORDABLE HOUSING Not applicable to this site and applicaon. SITE LIGHTING Surface parking lots and access drives will be lit to Bozeman UDC requirements and standards with Kim lighng fixtures. These fixtures offer the ability to customize heights and light distribuon, while liming glare and brightness and compliment fixtures used through the Valley West PUD. Building lighng is addressed further in the Dra/ Design Manual. The Project will incorporate bollards through the pedestrian pathways and open spaces for its pedestrian lighng. The ‘Pavilion’ bollard from Kim Lighng will be used to provide a common element to the site design. Addionally, the Kim Lighng ’Archetype’ fixture will be used for parking lot lighng per the Valley West PUD design regulaons. A total of 30 bollards and 13 parking lot fixtures will be sited through the development. See Sheet PM 1.0, the Photometric Plan for locaons and placement of all site lighng. Appendix D includes details and specificaons for lighng fixtures to be installed. WATER & WATER RIGHTS Brian Heaston has been contacted regarding the CIL of water rights. No CIL of water rights Valley West Square Master Site Plan Applicaon has been paid for the subject property. Therefore, for each subsequent site plan for the building sites, CIL of water rights will be paid prior to site plan approval. EXEMPT WELL The Valley West Square Subdivision will use an exempt well for irrigaon. A le4er dated May 10, 2018; transmi4ed via email, from the DNRC is included as Appendix G. TRAFFIC IMPACT STUDY City Engineering was contacted via email with preliminary calculaons of vehicle trips for the project site. The applicant was nofied that the Traffic Impact Study requirement had been waived. An email, dated June 8, 2018 is included as Appendix H. CONCURRENT CONSTRUCTION, DEVIATIONS, DEPARTURES The applicant does not intend to apply for concurrent construcon. No deviaons or departures are requested at this me. V. Legal & Guiding Documents As part of the Master Site Plan the applicant has prepared and respecRully submits dra/s of the legal and guiding documents for Valley West Square Subdivision. No buildings are being constructed at this me, however, these documents will enable the applicant to ensure that future site plans, construcon and site development meet the intent of the Valley West Square Subdivision. The design manual will apply to all construcon and site development and provide a framework to create a cohesive character for Valley West Square while complimenng the adjacent neighborhoods. The dra/ design manual is included as Appendix I. The Valley West Square dra/ By-Laws and Covenants are also included in this applicaon. These documents will outline the establishment of a Property Owner’s Associaon, Valley West Square Master Site Plan Applicaon provisions of responsibility for maintenance and upkeep of the subdivision and other policies and regulaons for ownership within the subdivision. The dra/ By-laws and Covenants can be found in Appendices J and K, respecvely. As menoned earlier in the applicaon and per City requirements, the shared use informaon regarding the parking area (Lot 6) is detailed in the Covenants. A separate, shared use agreement will be filed for the drainage path easements upon approval of the Master Site Plan. A dra/ of this agreement can be found in Appendix A. Valley West Square - Master Site Plan Applicaon APPENDICES