Loading...
HomeMy WebLinkAbout09-10-18 City Commission Packet Materials - C10. Amendment to PSA with KLJ Engineering for East Tamarack Street Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brit Fontenot, Director of Economic Development SUBJECT: Amendment to Professional Services Agreement with KLJ Engineering for Engineering Services in the Northeast Urban Renewal District for the completion of the construction management and oversight for the reconstruction of East Tamarack Street. MEETING DATE: September 10, 2018 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign an amendment to Professional Services Agreement with KLJ Engineering for engineering services in the Northeast Urban Renewal District for the completion of the construction management and oversight for the reconstruction of East Tamarack Street. BACKGROUND: In the early summer of 2015, after a request for qualifications and selection process, the Northeast Urban Renewal District Board (the “Board”) selected KLJ Engineers as the preferred firm to work with, and assist the Board in prioritizing, planning and executing on multiple projects within the District. On August 4, 2015 the Northeast Urban Renewal voted unanimously to recommend to the City Commission to authorize the City Manager to sign a professional services agreement with KLJ Engineering for engineering services in the Northeast Urban Renewal District for a term of three years. (Attachments 1 and 2) The contract was approved by the Commission. In 2017, well into the three-year term contract with KLJ, the Board recommended, and the Commission authorized, the bonding of the District in the amount of approximately $1.4 million dollars to complete as many authorized projects as possible. The Commission approved the following projects to be funded by bond proceeds: • Reconstruction of East Peach Street; • Reconstruction of East Tamarack Street; • Reconstruction of North Ida Avenue; • Reconstruction of Front Street; and 152 • Construction of a Pedestrian Bridge across Bozeman Creek. The East Peach Street project was completed in spring, 2018 and the Tamarack Street reconstruction project is underway. It is likely that the bond will be mostly, or completely, drawn down at the conclusion of the East Tamarack Street reconstruction project. The project, however, was barely underway as the expiration of the KLJ term contract came around in August, 2018. It is in the best interest of the residents, the District and the City to maintain continuity and consistency with the street design, construction, inspection and handover to the City. Therefore, staff is requesting an amendment to extend the KLG contract until the completion of the East Tamarack Street reconstruction project. The Urban Renewal District Manager, David Fine, is in the process of soliciting proposals for comprehensive engineering and other services in the City’s urban renewal and technology districts. UNRESOLVED ISSUES: None ALTERNATIVES: As proposed by the City Commission FISCAL EFFECTS: The contract terms are based on time and materials and identify a cost not to exceed $125,000 to complete the construction management of the East Tamarack project. The construction management portion of the contract includes oversight on the construction, or reconstruction, of the street surface and subgrade, curbs, gutters and sidewalks where necessary, as well as portions of sanitary sewer, stormwater improvements and fiber optic conduit installation. A portion of the administrative and oversight cost will be borne by sewer and stormwater funds proportional to the services provided by KLJ. The Board budgeted the required funds to cover the costs of managing the street and conduit improvements. ATTACHMENTS: 1) City Commission Packet Material August 17, 2018; 2) KLJ Engineering Term Contract with the NURD; 3) Amendment to the KLJ Engineering Term Contract with the NURD; and 4) Exhibit A to the Amendment to the KLJ Engineering Term Contract with the NURD. Report compiled on Thursday, August 30, 2018. 153 1 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brit Fontenot, Director of Economic Development SUBJECT: Professional Services Agreement with KLJ Engineering for Engineering Services in the Northeast Urban Renewal District for a Term of Three Years MEETING DATE: August 17, 2015 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to Sign a Professional Services Agreement with KLJ Engineering for Engineering Services in the Northeast Urban Renewal District for a Term of Three Years BACKGROUND: In the early summer of 2015, after a request for qualifications and selection process, the Northeast Urban Renewal District Board selected KLJ Engineers as the preferred firm to work with and assist the Board in prioritizing, planning and executing on multiple projects within the District. On August 4, 2015 at its regularly scheduled meeting, the Northeast Urban Renewal voted unanimously to recommend to the City Commission to authorize the City Manager to sign a professional services agreement with KLJ Engineering for engineering services in the Northeast Urban Renewal District for a term of three years. (Attachment 1) UNRESOLVED ISSUES: None at this time. ALTERNATIVES As directed by the Commission. FISCAL EFFECTS 95154 2 The District presented its FY16 Budget to the Commission June 1, 2015. The budget was approved through the regular budget process. (Attachment 2) ATTACHMENTS: 1) Professional Services Agreement with KLJ Engineering for Engineering Services in the Northeast Urban Renewal District for a Term of Three Years; and 2) Northeast Urban Renewal District FY 16 Budget. Report prepared on August 6, 2015 96155 97156 98157 99158 100159 101160 102161 103162 104163 105164 106165 107166 108167 109168 110169 111170 1 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brit Fontenot, Director of Economic Development SUBJECT: Northeast Urban Renewal Board FY 16 Work Plan and Budget DATE: June 1, 2015 AGENDA ITEM TYPE: Action RECOMMENDATION: Review the attached materials, listen to the Board presentation, ask questions and provide direction on the proposed FY 16 Northeast Urban Renewal Board (NURB) Work Plan and Budget. (EXHIBITS 1 - 4) If approved by the City Commission, the NURB FY 16 Work Plan and Budget Proposal will be adopted as part of the City of Bozeman’s FY16 Budget. BACKGROUND: On May 5, 2015 the Northeast Urban Renewal Board unanimously approved the attached FY16 work plan and budget. The total amount of budgeted money for FY 16 is $501,800 (including carry over from previous years and not including the undesignated reserve). FY 16 Proposed Budget Summary: Priority I $ 95,000 Priority II $ 243,002 Priority III $ 40,000 Staff time $ 10,000 Noticing and Administrative Services $ 33,000 Undesignated Reserve $ 80,798 Budget Total $ 501,800 The NURB proposes a work plan and budget and submits a report on an annual basis per Section 7-15-4237 of the 2009 Montana Code Annotated (MCA): 113171 2 (1) An agency authorized to transact business and exercise powers under this part and part 43 shall file with the local governing body, on or before September 30 of each year, a report of its activities for the preceding fiscal year. (2) The report shall include a complete financial statement setting forth its assets, liabilities, income, and operating expenses as of the end of the fiscal year. UNRESOLVED ISSUES: State-wide Reappraisal of Property Values In November the City received preliminary data for the property reappraisal that the State of Montana is conducting and implementing for our FY16 fiscal year (2015 tax year). We will not receive the final Certified Taxable Values until July 2015; this necessitates using the preliminary information for a calculation of property tax levies in our budget. The State has projected a dramatic decrease in assessed values for both commercial (19.25% decrease) and residential (3.52% decrease) property in Bozeman. They attribute this change to the timing of appraisal cycles and the Great Recession. Under existing laws, the City is both allowed and required to increase its number of mills in order to off-set decreased tax dollar collections that come about from decreased assessed property values. The State estimates that the value of one mill, levied city-wide after Tax Increments are excluded, will be $80,331 in FY16. This represents an 8.6% decrease in the city’s mill value in FY15. For levies that are required to be established at certain dollar values (i.e. debt service), we will need to raise our mills to bring in the same number of dollars. For levies that were approved at set mill amounts (i.e. Fire Capital & Equipment levy), we will yield fewer dollars due to reappraisal. FISCAL EFFECTS: Statewide reappraisal will have a negative impact on the value of the District. If approved by the City Commission, the NURB FY 16 Work Plan and Budget Proposal will be adopted as part of the City of Bozeman Annual Budget Exhibits: 1. NURB FY 16 Proposed Work Plan; 2. NURB FY 16 Proposed Budget; 3. May 5, 2015 NURB Meeting Minutes; and 4. Map of the NURD. Report compiled on: May 21, 2015 114172 Northeast Urban Renewal Board Annual Work Plan and Budget FY16 1 59771 NORTHEAST URBAN RENEWAL BOARD BUDGET FY 2016 PROPOSAL TO THE BOZEMAN CITY COMMISSION In 2005, the Bozeman City Commission adopted Ordinance No. 1655 which formally enacted the Northeast Urban Renewal Plan. The stated mission of the plan and general goals are as follows: DISTRICT PLAN MISSION/VISION “This Plan is the City’s response to remedy the conditions of blight found in the August 2005 [Blight] Report. The Plan also addresses other issues important to the District. The Plan’s purpose is to ensure the vitality of the Northeast Urban Renewal District (NURD) the vitality of the NURD for generations to come and to make the NURD an area in which its citizens can take exceptional pride. The Plan envisions a mixed use neighborhood that is user friendly, safe, secure and healthy. While this Plan envisions a District with diversity of housing businesses and amenities, it intends to maintain the unique ambiance and historic character of the District”. Nine principles were developed for the plan. Each of the principles has one or more goals associated with the plan, some of which specifically relate to this work plan while others represent general objectives and directives. The Northeast Urban Renewal Board (NURB) goals are as follows: GENERAL GOALS:  Outdated or insufficient infrastructure should be repaired, replaced, or otherwise improved.  Provide public utilities to the area efficiently in ways that are not visually or physically obtrusive.  Encourage a land use pattern that facilitates all modes of transportation – vehicular, bicycle, pedestrian, mass transit, and commercial – for safe, efficient and convenient access for residential, commercial, and industrial uses.  Harmonize commercial and industrial development with residential quality of life.  New structures should be designed and built keeping in mind the public values of durability, flexibility, and simplicity. Thoughtful consideration of design, materials, and massing in the construction of new private buildings will add strength and character to the built environment. To the degree that the private sector can be influenced by a public partner in development, the community ought to strongly encourage excellence in urban design as a basis of partnership.  Promote sustainable building practices and design within the district  Procure new land for park and open space  Improve landscaping in existing public spaces  Neither the City of Bozeman nor any of its subdivisions shall use eminent domain to take private property for private use in the implementation of an urban renewal project or similar redevelopment plan. 115173 Northeast Urban Renewal Board Annual Work Plan and Budget FY16 2  Encourage the City to help ensure the success of the Northeast Urban Renewal Plan by giving a high priority to the Northeast District in its capital improvements plan.  Work with neighborhoods and businesses to ensure actions taken in the district are compatible with adjacent developed areas.  Work with the City to ensure actions taken outside of the District are compatible with projects inside of the District BACKGROUND In 2010, the Northeast Urban Renewal Board began implementing plans and projects reflecting their three funding priorities: 1) Parks, Trails and Greenspace; 2) Infrastructure and 3) Neighborhood Development Plan. 2015 AT-A-GLANCE In FY 2015, the Board continued to work on these priorities. With assistance from Morrison- Maierle, the final special design standards for East Tamarack Street/Front Street/North Ida Avenue within the district have been completed. The next step in the process will be the consulting engineer, City staff and this Board shepherding an ordinance adopting these standards as well as the special design standards for East Peach Street through the review and approval process. The Board continued to demonstrate its commitment to preserving the District’s historic character by monitoring any proposals that might impact historic properties; and it was particularly frustrated by demolition of the Brewery Wall on North Wallace Avenue because of the negative impacts that its demolition may have on the Brewery Historic District. The Board also continued to monitor any potential for preservation and possible re-use of the Depot. The Board is vigilant in monitoring new proposed development within the District, to ensure its compatibility with the historic mixed use character of the area. MOVING FORWARD – FY2016 The Board continues to support opportunities to work with Montana Rail Link and Burlington Northern Santa Fe on preservation and rehabilitation projects for the passenger depot. Additional TIF funding has been contributed to the Pedestrian Bridge project. The Board plans to actively pursue the issuance of bonds to fund construction of the East Peach Street and East Tamarack Street improvements in accordance with the special design standards once they are adopted by the City Commission. During a presentation to the Board, Director of Public Service Craig Woolard identified improvements to North Wallace Avenue as one of the community’s highest priorities, particularly with the impending improvements to North Rouse Avenue and development of the Story Mill Park. The Board has agreed to work with City staff and a consulting engineer on special design standards for those improvements. The Board will commit funds to cover the costs of designing improvements within the district boundaries and, if a special improvement district for the entire project is created, is willing to commit tax increment funds to cover the costs of those assessments for impacted property owners within the district. The Board continues to be interested in improvements to the East Peach Street and East Tamarack Street bridges in a manner that demarcates the entrance ways to this district. The Board has also continued to add monies to the budget for construction of a pedestrian bridge across Bozeman Creek 116174 Northeast Urban Renewal Board Annual Work Plan and Budget FY16 3 at a location yet to be determined (but probably about mid-point between East Tamarack Street and East Peach Street); and has set aside additional monies to undertake that project during this fiscal year. Also, a lighting study and plan are to be undertaken this fiscal year. The study is to be two-pronged, and the plan is to include both a short-term option to retrofit existing street lights to include dark skies compliant heads and a long-term option that includes the installation of new street lights unique to this district and that just meet minimum public safety standards without negatively impacting the current character of the district. PRIORITIES I, II & III– IN DETAIL I. PARKS, TRAILS AND GREENSPACE District Trails and Depot Pocket Park Area Maintenance $ 5,000 The original trail, landscaping and bench installation were completed in 2012. Landscaping maintenance, including mowing and weed spraying, is on-going. Water is provided, as needed, from an adjacent property. The Board proposes continuing the operation of the temporary irrigation system, weed control and general maintenance. Weed control and general maintenance may also be needed in other District trail areas. The Board is considering additional irrigation improvements to enhance maintenance possibilities as well as an aggressive program to eliminate knapweed in the East Aspen Street right-of-way. Front Street Trail Extension $ 20,000 The Gallatin Valley Land Trust (GVLT) has presented its plan to construct a trail extension from North Rouse Avenue along the existing Front Street right-of-way to North Wallace Avenue, connecting to the existing depot trail, which is located within this urban renewal district. This trail segment connects the pedestrian way that runs along Oak Street between North 7th Avenue and North Rouse Avenue with both the depot trail and the Story Mill pathway. Because of the benefit this trail extension will provide for this district, this budgeted amount is a donation of up to $20,000 for the final capital allocation needed to complete the project in Fiscal Year 2016. Pedestrian Bridge $ 60,000 Board members previously identified the need for a pedestrian bridge at the terminus of East Aspen Street and the North Church Avenue trail east of North Rouse Avenue. East Aspen Street comes to an end at Bozeman Creek. The use along this section of East Aspen Street is largely residential with a retail store (butcher shop) at the southeast corner of North Rouse Avenue and East Aspen Street. During FY11, the NURB received positive feedback from the Northeast Neighborhood Association (NENA) on the project and Gaston Engineering completed a feasibility study and cost estimates. Construction of the bridge is estimated between $52,470 and $57,715. While the budgeted amount is for construction, the Board has previously determined it might be appropriate to use a small portion of the monies to host a design competition for the bridge as an option to purchasing and installing a prefabricated bridge. The NURB has continued to increase the monies budgeted for this project over the past few years and now has sufficient monies to cover the total costs of bridge installation. In light of the presentation from the 117175 Northeast Urban Renewal Board Annual Work Plan and Budget FY16 4 Bozeman Creek Enhancement Committee a couple of years ago, the Board has determined it wishes to leave its options for location of the pedestrian bridge open, thus ensuring the best pedestrian crossing can be provided. Streambank Restoration $ 10,000 The Board recognizes the importance of enhancing the natural amenities within the district, including the Bozeman Creek corridor. The Bozeman Creek Enhancement Committee has studied the entire length of the creek as it runs through the city, and has assigned a category to each segment of the creek based on its current state and the level of desired improvements. The Board has set aside monies to use as a match for those property owners wishing to enhance the streambank adjacent to their properties. It recognizes that a portion of these monies may need to be used in conjunction with installation of the pedestrian bridge budgeted above. Priority I Total $ 95,000 Priority I Rationale: The park, trail and greenspace improvements meet Guiding Principle 4 and Goals A & B under Principle 4 of the adopted Northeast Urban Renewal District Plan: • Guiding Principle, “Public open space is essential to a healthy and appealing urban environment” • Goal A, “Procure new land for parks and public open space” • Goal B, “Improve landscaping in existing public spaces.”- to include enhancing boulevards and public rights-of-way by planting and maintaining trees where appropriate and controlling weeds The spending of TIF funds on park and open space improvements is allowed under 7-15-4255, Authority to provide or contract for services related to urban renewal, of the Montana Code Annotated. Specifically, item (1b) states that “Every municipality shall have power to install, construct, and reconstruct streets, utilities, parks, playgrounds, and other public improvements” II. INFRASTRUCTURE Poor pedestrian connectivity within the District is well documented. Lack of street improvements including missing curb, gutter, pavement and sidewalks creates an unwelcoming and potentially unsafe environment for pedestrians and bicyclists. A lack of stormwater drainage facilities leads to the ponding of water in public rights-of-way, encouraging pedestrians to walk in the street and emphasizing the need for street improvements. The District has a historic mix of light manufacturing and residential uses creating a more urban environment on the streets, especially during business hours. Modest improvements to pedestrian facilities to create safer more welcoming routes for pedestrians will reduce conflict between users. The lack of street delineation/improvements and stormwater facilities has caused an unknown number of individuals to use some sections of the District as dumping grounds for unwanted appliances and furniture. Street improvements coupled with improvements to trails and parks and the landscaping of public spaces will improve conditions for pedestrians and bicyclists and reduce, if not eliminate, dumping in the public right-of-way. 118176 Northeast Urban Renewal Board Annual Work Plan and Budget FY16 5 Making improvements to sidewalks on unimproved streets comes with some difficulty especially if elevation differences are present across the width of the right-of-way and if a need to improve stormwater drainage is warranted as well. What seems like a rather simple project turns into a large scale street improvement project. Without additional information, moving forward on these improvements is difficult, so survey and design is the first step. Regarding design, the Board recognizes that creative solutions are needed to enhance the public right-of-way for two very different user types in the District. In support of improvements to these streets, the Board has allocated a portion of the budget to the following deficient street sections in the District: East Peach Street – Sidewalks, Storm Water control, Landscaping Construction $ 88,912 Survey and the design for East Peach Street improvements have been completed. The Board approved the design in November 2011. The Pedestrian and Traffic Safety Board and the Bozeman Area Transportation Coordinating Committee have reviewed the proposed design standard. The Commission has approved the design, but it has not yet been adopted by ordinance. The monies remaining in this line item after the design has been completed and adopted will be used for street improvements. East Tamarack Street, Front Street and North Ida Avenue Construction $ 89,090 Morrison-Maierle has completed the survey and design for these special street standards; and this Board approved those designs at its September 2014 meeting. The final design is to be submitted to advisory boards for comment and then to the Commission for its action. After the Commission approves the design standards for these roadways, the next step will be preparation of an ordinance that adopts the special design standards for these roadways and those for East Peach Street. The monies remaining in this line item after the design has been adopted will be used for street improvements. North Wallace Avenue Engineering/Design $ 25,000 Because of its existing condition and the impending North Rouse Avenue reconstruction project, the Director of Public Service has identified reconstruction of North Wallace Avenue between East Lamme Street and L Street as a high priority. These monies will cover the costs of engineering services to design the improvements for that portion of the roadway lying within the district boundaries; and the Director of Public Service has committed a similar amount of monies to cover the design costs outside this district. Entranceway Enhancements $ 20,000 For years, the Board has felt enhancing the rights-of-way that enter the District, providing visual or aesthetic enhancement, is important. During presentation of the East Tamarack Street special design standards, the potential for implementing some pedestrian enhancements on the bridge was identified, particularly in light of the additional right-of-way width at the bridge. The Board recognizes that, in addition to the East Tamarack Street bridge, the East Peach Street bridge 119177 Northeast Urban Renewal Board Annual Work Plan and Budget FY16 6 would lend itself to similar enhancements. The Board stresses, however, that these are only two of several entrances to the District and that all points of entry should be considered. East Aspen Street right-of-way survey between North Rouse Avenue and Bozeman Creek $ 10,000 The Board realizes that the right-of-way for East Aspen Street and the location of the street within that right-of-way need to be identified in light of the potential for future infrastructure improvements. Since this is an older part of town, original corner pins are typically not easily found. A survey will identify the edges of the street right-of-way and make future street improvements easier to design as well as allow property owners to know exactly where their property lines are located. This information may also help with the future improvements to North Rouse Avenue. Street lighting study $ 10,000 The existing street lights within the district are outdated and do not meet the dark skies standards set forth under the guiding principles, goals and implementation actions. A request for proposals will result in the selection of a consultant to assist with both updating the current light fixtures to meet dark skies standards and developing a comprehensive street lighting plan for the district. Priority II Total $ 243,002 Priority II Rationale: The infrastructure improvements meet Guiding Principle 1 and Goals A & B under Principle 1 of the adopted Northeast Urban Renewal District Plan: • Guiding Principle, “Ensure the health, safety, and security of the District” • Goal A, “Outdated or insufficient infrastructure should be repaired, replaced or otherwise improved.” • Goal B, “Encourage a land use pattern that facilitates all modes of transportation – vehicular, bicycle, pedestrian, mass transit, and commercial – for safe, efficient and convenient access for residential, commercial, and industrial uses.” The spending of TIF funds on infrastructure improvements is allowed under Section 7-15-4288, MCA which states, “Costs that may be paid by tax increment financing” allows the municipality to use tax increments to pay the following costs of or incurred in connection with an urban renewal project: (1) land acquisition; (2) demolition and removal of structures; (3) relocation of occupants; (4) the acquisition, construction, and improvement of infrastructure;… and 5) costs incurred in connection with the redevelopment activities allowed under 7-15-4233… III. NEIGHBORHOOD DEVELOPMENT PLANNING Redevelopment Incentives $ 25,000 The NURB has set aside funds to offset the costs of upgrading public infrastructure in conjunction with redevelopment activities which implement the District’s guiding principles emphasized in the District’s Neighborhood Plan. To date, no one has applied for use of these funds, so the Board is trying to find ways to encourage use of the program. 120178 Northeast Urban Renewal Board Annual Work Plan and Budget FY16 7 Depot Rehabilitation Project $ 15,000 The Northeast Urban Renewal Board recognizes the importance of the depot within the district. Stabilization of the depot was accomplished this year through the use of private funds and private labor to reroof the building. If permission can be obtained from the railroad, the Board has expressed its strong interest in taking any necessary steps to preserve and rehabilitate the structure. Priority III Total $ 40,000 Priority III Rationale: Neighborhood Development Planning meets Guiding Principle 2 and the Goal under Principle 2 of the adopted Northeast Urban Renewal District Plan: • Guiding Principles, “Balance commerce and livability in the District within the mixed- use framework” AND “Honor the unique character and vitality of the District” • Goal, “Harmonize commercial and industrial development with residential quality of life” • Implementation Action, “Where historic structures are affected by public or private development, seek out the advice and assistance of local, state, or federal historic preservation professionals for opportunities to renovate existing historic structures.” This funding proposal is for Neighborhood Plan implementation activities which are meant to encourage developers to build on parcels within the Northeast Urban Renewal District. It recognizes the complexities of redeveloping parcels which have existing substandard buildings and infrastructure and was created to offset the costs of those complexities with grants for those proposing work which eliminates blight and advances the implementation of the District Plan. Board proposes to award grants to reimburse developers for costs allowable under Section 7-15- 4288, MCA, but limited to public infrastructure. These proposed expenditures are allowable under Section 7-15-4233, subsection (1)(a), MCA, which grants the City the power to formulate and coordinate a workable program as specified in Section 7-15-4209, MCA, which states : (1) A municipality may formulate a workable program for utilizing appropriate private and public resources: (a) to eliminate and prevent the development or spread of blighted areas; (b) to encourage needed urban rehabilitation; (c) to provide for the redevelopment of such areas; or (d) to undertake such of the aforesaid activities or other feasible municipal activities as may be suitably employed to achieve the objectives of such workable program. (2) Such workable program may include, without limitation, provision for: (b) the rehabilitation of blighted areas or portions thereof by re-planning, removing congestion, providing parks, playgrounds, and other public improvements; by encouraging voluntary 121179 Northeast Urban Renewal Board Annual Work Plan and Budget FY16 8 rehabilitation; and by compelling the repair and rehabilitation of deteriorated or deteriorating structures; and (c) the clearance and redevelopment of blighted areas or portions thereof. Additionally, Section 7-15-4288, MCA states, “Costs that may be paid by tax increment financing” allows the municipality to use tax increments to pay the following costs of or incurred in connection with an urban renewal project: (1) land acquisition; (2) demolition and removal of structures; (3) relocation of occupants; (4) the acquisition, construction, and improvement of infrastructure;… and 5) costs incurred in connection with the redevelopment activities allowed under 7-15-4233… IV. ADMINISTRATION Part-time staff and other Administrative Services $ 13,000 The Board needs staff to assist with District Plan implementation. $10,000 is to be transferred to the Economic Development Division to offset the cost of staff time used to assist the NURB with District Plan implementation. $3,000 is budgeted to cover administrative services. This money is a permissible use under state statute 7-15-4288, (5), “costs incurred in connection with the redevelopment activities allowed under 7-15-4233 and 7-15-4288 (7) “administrative costs associated with the managements of the urban renewal area…” The Board has requested money for public noticing and mailings in the District. The purpose of the noticing and mailings is to inform property owners about and request feedback on NURB implementation and activities. This money is a permissible use under state statute 7-15-4233, “Powers which may be exercised by urban renewal agency or authorized department…(f) to disseminate blight clearance and urban renewal information;” Bond Counsel services $ 30,000 The Board has determined the most effective way to accomplish the street improvements on East Peach Street and East Tamarack Street/Front Street/North Ida Avenue is through the issuance of bonds. The first step in the sale of bonds is the retention of bond counsel to ensure State statutes are met and to provide ease in the process of selling bonds. The upfront costs of the bond issue must be covered prior to the sale of bonds. This process will not be undertaken until after the reappraisal figures are released, which is anticipated in August. Section 7-15-4290, MCA states “(1)(a) The tax increment derived from an urban renewal area may be pledged for the payment of revenue bonds issued for urban renewal projects or of general obligation bonds, revenue bonds or special assessment bonds issued to pay urban renewal costs described in 7-15-4288 and 7-15-4289.” Undesignated Reserve $ 80,798 Not all of the monies received to date have been budgeted, and the Board has not earmarked all of the monies received to date plus the anticipated FY16 revenues. As a result, the balance is 122180 Northeast Urban Renewal Board Annual Work Plan and Budget FY16 9 being placed in an Undesignated Reserve, with those monies to be used to cover any shortages in funding for items listed above. Because it is anticipated that the property reappraisal will result in lowered values, the amount of revenues projected for FY16 is approximately 85 percent of the property tax revenues actually received in FY14 and FY15. Any new information received prior to the City Commission hearing will be forwarded to the Commission, if time allows, or provided at the meeting. SUMMARY: FY 16 PROPOSED BUDGET Priority I $ 95,000 Priority II $ 243,002 Priority III $ 40,000 Staff time $ 10,000 Noticing and Administrative Services $ 33,000 Undesignated Reserve $ 80,798 Overall Budget Total $ 501,800 123181 Revenues:2015-16 Budget Estimated Beginning Balance $415,000.00 FY2015 Tax Increment $85,000.00 Delinquent increment State shared/entitlement Interest $1,800.00 Total Estimated Revenues $501,800.00 Expenditures Budgeted: Trails Maintenance $5,000.00 Front Street trail $20,000.00 Donation Pedestrian Bridge $60,000.00 Added $20,000 this year Streambank Restoration $10,000.00 East Peach Street $88,912.00 East Tamarack/Front/North Ida $89,090.00 North Wallace Avenue $25,000.00 Design costs split with City Bond costs $30,000.00 Dorsey-Whitney Entranceway Enhancements $20,000.00 East Aspen Street ROW survey $10,000.00 Street lighting study $10,000.00 Redevelopment Incentives $25,000.00 Depot Rehabilitation Project $15,000.00 Planning Staff support $10,000.00 Increased to $10,000 per staff request Administrative Services $3,000.00 Increased to $3,000 per staff request Undesignated Reserve $80,798.00 Total Expenditures $501,800.00 Northeast Urban Renewal District 124182 NURB Meeting – May 5, 2015 1 Northeast Urban Renewal Board (NURB) Regular Meeting Tuesday, May 5, 2015 The Northeast Urban Renewal Board met in regular meeting at 6:30 p.m. on Tuesday, May 5, 2015, in the Conference Room, Professional Building, 20 East Olive Street, Bozeman, Montana. Present: Absent: Voting Members: Tom Noble, Chair Daniel Doehring (arrived at 6:40 p.m.) Erik Nelson Robert Pavlic Jeanne Wesley-Wiese Non-Voting Members: John Usher Commissioner Liaison: I-Ho Pomeroy Staff: Brit Fontenot, Economic Development Director Robin Sullivan, Recording Secretary Guests: Kevin Jacobsen, Morrison-Maierle John How, KLJ Dustin Johnson, KLJ Chris Nixon, 719 North Wallace Avenue Call to Order – Chair Tom Noble called the meeting to order at 6:35 p.m. Public Comment – No comment was received under this agenda item. Consent Items – Approve minutes from April 7, 2015 meeting. It was moved by Jeanne Wesley- Wiese, by Erik Nelson, that the minutes of the meeting April 7, 2015, be approved as submitted. The motion carried on a 4-0 vote. Discussion/Action Items – Discussion/set budget for Fiscal Year 2015-2016. Recording Secretary Sullivan distributed copies of the draft budget and work plan for Fiscal Year 2015-2016. 125183 NURB Meeting – May 5, 2015 2 Chair Noble expressed interest in funding the balance of the Front Street trail project, but stated he does not support funding for a kiosk. He noted that the shortfall is currently estimated at just under $20,000. Erik Nelson suggested the Gallatin Valley Land Trust (GVLT) may be willing to install a sign with the donation, even if it doesn’t fund a kiosk. He then asked where the budget shortfall lies and when the trail is to be completed. Chair Noble stated he does not have a breakdown of the GVLT’s costs for the trail, so does not know where the shortfall lies. Economic Development Director Brit Fontenot stated the GVLT is currently negotiating with Kenyon-Noble regarding removal of their encroachments into the street right-of-way. He noted that a corner of the building may actually be at or in the edge of the right-of-way. Erik Nelson asked if the Board could stipulate its monies are to close the funding gap for the project. Chair Noble stated he would like to make the trail a priority, stating he feels it would be a benefit to this tax increment financing district. In response to questions from John Usher, it was noted that the budgeted monies would not be expended until the project moves forward. Economic Development Director Fontenot noted that the kiosk would be located inside the district boundary if the Board chooses to fund one. He then stated the Board could budget monies as a donation of the final monies needed to complete the project. Jeanne Wesley-Wiese stated information from the GVLT revealed the bridge across the creek will cost just over $62,000, with $3,000 of that to cover the costs of removing debris from the streambank. In light of that information, she suggested that with the addition of $20,000 for the pedestrian bridge project, there would be sufficient monies in the budget to complete that project during this fiscal year. Responding to Chair Noble, the Economic Development Director stated this project could be included in the term contract for engineering services. Dan Doehring noted that, if any streambank restoration is needed in conjunction with installation of the pedestrian bridge, monies in the budget for that purpose could be used. Erik Nelson noted that the draft work plan and budget are the result of Board work over an extended period of time, and he feels the result is sound and should be forwarded to the Commission. 126184 NURB Meeting – May 5, 2015 3 Chair Noble voiced his agreement, noting that there is nothing in the work plan that has not been discussed several times. It was moved by Erik Nelson, seconded by Jeanne Wesley-Wiese, that the Board adopt the draft work plan and budget as amended to include an additional $10,000 from the undesignated reserve fund for the Front Street trail and eliminate funding for a kiosk in conjunction with that project. The motion carried on a 5-0 vote. Economic Development Director Brit Fontenot announced that this budget presentation will be made to the Commission at its June 1 meeting and asked Board members to attend that meeting if possible. Miscellaneous discussion. John How, KLJ Engineering, announced that the firm has been selected to look at the conservation overlay districts in the community. As part of the public outreach component, the firm is meeting with as many neighborhood groups and tax increment financing boards as possible to determine what should possibly be added or changed. He then expressed an interest in making a presentation at the Board’s June 2 meeting if it chooses not to cancel that meeting. Economic Development Director Brit Fontenot stated the RFQ for engineering services has been released; and he has received several questions and input about the services to be provided under the contract. He then stressed the City has a specific process to be followed for choosing a firm, which includes a selection committee that is involved at all steps in the review and selection process. He asked that two Board members be included, noting they will serve with someone from the Engineering Department, David Fine and himself. He noted Chair Noble has expressed concern that he may not be able to attend all of the selection committee meetings, but that Erik Nelson has indicated a willingness to serve. Responding to the Director, John Usher voiced an interest in participating on the selection committee. Set agenda for June 2, 2015 meeting or cancel meeting. Chair Noble asked that the presentation from KLJ Engineering be placed on the agenda, along with an update on street lights. Jeanne Wesley-Wiese stated she would like to talk about the railroad crossing, expressing concern about pedestrian safety in light of the Story Mill Park improvements and the new trail connection. Responding to Erik Nelson, Director Fontenot stated he can research possible federal funds for improving the crossing. He cautioned, however, that railroads tend to have a different view of crossings. He suggested one option is to invite Matt Jones, public relations with BNSF, to come to a Board meeting to discuss the crossing concerns. 127185 NURB Meeting – May 5, 2015 4 Chair Noble noted the first step may be to engineer the street right-of-way at the railroad crossing to determine how much space may be available. Economic Development Director Fontenot indicated he will be prepared to give an update on the RFP process at next month’s meeting. Chair Noble asked for an update on engaging bond counsel. Director Fontenot responded that the City Attorney has given approval for engaging Dorsey Whitney when the Board is ready to do so. Neighborhood News. Dan Doehring stated more wood chips are needed around the boulder in depot park. Jeanne Wesley-Wiese stated the depot trail needs to be mowed; and there is a lot of garbage in the trail. Chris Nixon announced the NENA meeting is to be held at 7:00 p.m. on Tuesday, May 12, in the Commission Room. He then distributed neighborhood newsletters to Board members. Responding to Jeanne Wesley-Wiese, Director Fontenot stated the Commission expressed some concerns about the survey process that Director of Public Service Woolard has been using as the first step in possibly creating a special improvement district. As a result, he is fine tuning the process he is using to receive property owner feedback. Jeanne Wesley-Wiese noted a lot of misinformation is floating around the neighborhood about the potential special improvement district and the street improvements to be made. Adjournment – 7:15 p.m. There being no further business to come before the Board at this time, Chair Noble adjourned the meeting. Tom Noble, Chair Northeast Urban Renewal Board City of Bozeman 128186 129187 PROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT is made and entered into thi, 114 day of, 2015, byjidt and between the CITY OF BOZEMAN, MONTANA, a self governing mun'cipal corporation organized and existing under its Charter and the laws of the State ofMontana, 121 North Rouse Street, Bozeman, Montana, with a mailing address of PO Box 1230, Bozeman, MT 59771, hereinafter referred to as "City," and, KLJ Engineering, a private contractor, hereinafter referred to as Contractor." In consideration of the mutual covenants and agreements herein contained, the receipt and sufficiency whereof being hereby acknowledged, the parties hereto agree as follows: 1. Purpose: City agrees to enter this Agreement with Contractor to perform for City services described in the Scope of Services attached hereto as Attachment "A" and by this reference made a part hereof. 2. Term/Effective Date: This Agreement is effective upon the date of its 2015 execution and will terminate on the same day in 2018. 3. Scone of Work: Contractor will perform the work and provide the services in accordance with the requirements ofthe Scope of Services. For conflicts between this Agreement and the Scope of Services, unless specifically provided otherwise, the Agreement governs. 4. Payment: City agrees to pay Contractor the amount specified in the Scope of Services. Any alteration or deviation from the described services that involves additional costs above the Agreement amount will be performed by Contractor after written request by the City, and will become an additional charge over and above the amount listed in the Scope of Services. The City must agree in writing upon any additional charges. 5. Contractor's Representations: To induce City to enter into this Agreement, Contractor makes the following representations: a. Contractor has familiarized itself with the nature and extent of this Agreement, the Scope of Services, and with all local conditions and federal, state and local laws, ordinances, rules, Professional Services Agreement for NURD Engineering Services 3 yr Term Contract August, 2015 — August, 2018 Page 1 of 10 188 and regulations that in any manner may affect cost, progress or performance ofthe Scope of Services. b. Contractor represents and warrants to City that it has the experience and ability to perform the services required by this Agreement; that it will perform said services in a professional, competent and timely manner and with diligence and skill; that it has the power to enter into and perform this Agreement and grant the rights granted in it; and that its performance of this Agreement shall not infringe upon or violate the rights of any third party, whether rights ofcopyright, trademark, privacy, publicity, libel, slander or any other rights of any nature whatsoever, or violate any federal, state and municipal laws. The City will not determine or exercise control as to general procedures or formats necessary to have these services meet this warranty. 6. Independent Contractor Status/Labor Relations: The parties agree that Contractor is an independent contractor for purposes of this Agreement and is not to be considered an employee of the City for any purpose. Contractor is not subject to the ternis and provisions of the City's personnel policies handbook and may not be considered a City employee for workers' compensation or any other purpose. Contractor is not authorized to represent the City or otherwise bind the City in any dealings between Contractor and any third parties. Contractor shall comply with the applicable requirements of the Workers' Compensation Act, Title 39, Chapter 71, MCA, and the Occupational Disease Act of Montana, Title 39, Chapter 71, MCA. Contractor shall maintain workers' compensation coverage for all members and employees of Contractor's business, except for those members who are exempted by law. Contractor shall furnish the City with copies showing one of the following: (1) a binder for workers' compensation coverage by an insurer licensed and authorized to provide workers' compensation insurance in the State of Montana; or (2) proof of exemption from workers' compensation granted by law for independent contractors. Contractor shall indemnify, defend, and hold the City harmless from any and all claims, demands, costs, expenses, damages, and liabilities arising out of, resulting from, or occurring in connection with any labor problems or disputes or any delays or stoppages of work associated with such problems or disputes. Contractor shall post a legible statement of all wages and fringe benefits to be paid to the Contractor's employees and the frequency of such payments (i.e., hourly wage employees shall be paid weekly). Such posting shall be made in a prominent and accessible location at the Contractor's normal place of business and shall be made no later than the first day of services provided under this Agreement. Such posting shall be removed only upon expiration or termination of this Agreement. Professional Services Agreement for NURD Engineering Services 3 yr Term Contract August, 2015 — August, 2018 Page 2 of 10 189 Contractor shall indemnify, defend, and hold the City harmless from any and all claims, demands, costs, expenses, damages, and liabilities arising out of, resulting from, or occurring in connection with any labor problems or disputes or any delays or stoppages of work associated with such problems or disputes and for any claims regarding underpaid prevailing wages. 7. Indemnity/Waiver of Claims/Insurance: For other than professional services rendered, to the fullest extent permitted by law, Contractor agrees to release, defend, indemnify, and hold harmless the City, its agents, representatives, employees, and officers (collectively referred to for purposes of this Section as the City) from and against any and all claims, demands, actions, fees and costs (including attorney's fees and the costs and fees of and expert witness and consultants), losses, expenses, liabilities (including liability where activity is inherently or intrinsically dangerous) or damages of whatever kind or nature connected therewith and without limit and without regard to the cause or causes thereof or the negligence of any party or parties that may be asserted against, recovered from or suffered by the City occasioned by, growing or arising out of or resulting from or in any way related to: (i) the negligent, reckless, or intentional misconduct of the Contractor; (ii) any negligent, reckless, or intentional misconduct of any of the Contractor's agents. For the professional services rendered, to the fullest extent permitted by law, Contractor agrees to indemnify and hold the City harmless against claims, demands, suits, damages, losses, and expenses, including reasonable defense attorney fees, to the extent caused by the negligence or willful misconduct ofthe Contractor or Contractor's agents or employees. Such obligations shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity that would otherwise exist. The indemnification obligations of this Section must not be construed to negate, abridge, or reduce any common-law or statutory rights of the indemnitee(s) which would otherwise exist as to such indemnitee(s). Contractor's indemnity under this Section shall be without regard to and without any right to contribution from any insurance maintained by City. Should any indemnitee described herein be required to bring an action against the Contractor to assert its right to defense or indemnification under this Agreement or under the Contractor's applicable insurance policies required below the indemnitee shall be entitled to recover reasonable costs and attorney fees incurred in asserting its right to indemnification or defense but only if a court of competent jurisdiction determines the Contractor was obligated to defend the claim(s) or was obligated to indemnify the indemnitee for a claim(s) or any portion(s) thereof. In the event of an action filed against City resulting from the City's performance under this Professional Services Agreement for NURD Engineering Services 3 yr Term Contract August, 2015 — August, 2018 Page 3 of 10 190 Agreement, the City may elect to represent itself and incur all costs and expenses of suit. Contractor also waives any and all claims and recourse against the City or its officers, agents or employees, including the right of contribution for loss or damage to person or property arising from, growing out of, or in any way connected with or incident to the performance of this Agreement except "responsibility for his own fraud, for willful injury to the person or property of another, or for violation of law, whether willful or negligent" as per 28-2-702, MCA. These obligations shall survive termination of this Agreement and the services performed hereunder. In addition to and independent from the above, Contractor shall at Contractor's expense secure insurance coverage through an insurance company or companies duly licensed and authorized to conduct insurance business in Montana which insures the liabilities and obligations specifically assumed by the Contractor in this Section. The insurance coverage shall not contain any exclusion for liabilities specifically assumed by the Contractor in subsection (a) ofthis Section. The insurance shall cover and apply to all claims, demands, suits, damages, losses, and expenses that may be asserted or claimed against, recovered from, or suffered by the City without limit and without regard to the cause therefore and which is acceptable to the City and Contractor shall furnish to the City an accompanying certificate of insurance and accompanying endorsements in amounts not less than as follows: Workers' Compensation — statutory; Employers' Liability - $1,000,000 per occurrence; $2,000,000 annual aggregate; Commercial General Liability - $1,000,000 per occurrence; $2,000,000 annual aggregate; Automobile Liability - $1,000,000 property damage/bodily injury; $2,000,000 annual aggregate; and Professional Liability - $1,000,000 per claim; $2,000,000 annual aggregate. The above amounts shall be exclusive of defense costs. The City of Bozeman, its officers, agents, and employees, shall be endorsed as an additional or named insured on a primary non- contributory basis on both the Commercial General and Automobile Liability policies. The insurance and required endorsements must be in a form suitable to City and shall include no less than a sixty 60) day notice of cancellation or non -renewal. The City must approve all insurance coverage and endorsements prior to the Contractor commencing work. Contractor shall notify City within two (2) Professional Services Agreement for NURD Engineering Services 3 yr Term Contract August, 2015 — August, 2018 Page 4 of 10 191 business days of Contractor's receipt ofnotice that any required insurance coverage will be terminated or Contractor's decision to terminate any required insurance coverage for any reason. The City must approve all insurance coverage and endorsements prior to the Contractor commencing work. 8. Termination for Contractor's Fault: a. IfContractor refuses or fails to timely do the work, or any pant thereof, or fails to perform any of its obligations under this Agreement, or otherwise breaches any terms or conditions of this Agreement, the City may, by written notice, terminate this Agreement and the Contractor's right to proceed with all or any part of the work ("Termination Notice Due to Contractor's Fault"). The City may then take over the work and complete it, either with its own resources or by re -letting the contract to any other third party. b. In the event of a termination pursuant to this Section 8, Contractor shall be entitled to payment only for those services Contractor actually rendered. C. Any termination provided for by this Section 8 shall be in addition to any other remedies to which the City may be entitled under the law or at equity. d. In the event of termination under this Section 8, Contractor shall, under no circumstances, be entitled to claim or recover consequential, special, punitive, lost business opportunity, lost productivity, field office overhead, general conditions costs, or lost profits damages of any nature arising, or claimed to have arisen, as a result of the termination. 9. Termination for City's Convenience: a. Should conditions arise which, in the sole opinion and discretion of the City, make it advisable to the City to cease performance under this Agreement City may terminate this Agreement by written notice to Contractor ("Notice of Termination for City's Convenience"). The termination shall be effective in the manner specified in the Notice of Termination for City's Convenience and shall be without prejudice to any claims that the City may otherwise have against Contractor. b. Upon receipt of the Notice of Termination for City's Convenience, unless otherwise directed in the Notice, the Contractor shall immediately cease performance under this Agreement and make every reasonable effort to refrain from continuing work, incurring Professional Services Agreement for NURD Engineering Services 3 yr Term Contract August, 2015 — August, 2018 Page 5 of 10 192 additional expenses or costs under this Agreement and shall immediately cancel all existing orders or contracts upon terms satisfactory to the City. Contractor shall do only such work as may be necessary to preserve, protect, and maintain work already completed or immediately in progress. C. In the event of a termination pursuant to this Section 13, Contractor is entitled to payment only for those services Contractor actually rendered on or before the receipt of the Notice of Termination for City's Convenience. d. The compensation described in Section 13(c) is the sole compensation due to Contractor for its performance of this Agreement. Contractor shall, under no circumstances, be entitled to claim or recover consequential, special, punitive, lost business opportunity, lost productivity, field office overhead, general conditions costs, or lost profits damages of any nature arising, or claimed to have arisen, as a result ofthe termination. 10. Limitation on Contractor's Damages; Time for Asserting Claim: a. In the event of a claim for damages by Contractor under this Agreement, Contractor's damages shall be limited to contract damages and Contractor hereby expressly waives any right to claim or recover consequential, special, punitive, lost business opportunity, lost productivity, field office overhead, general conditions costs, or lost profits damages of any nature or kind. b. In the event Contractor wants to assert a claim for damages of any kind or nature, Contractor shall provide City with written notice of its claim, the facts and circumstances surrounding and giving rise to the claim, and the total amount of damages sought by the claim, within ten (10) days of the facts and circumstances giving rise to the claim. In the event Contractor fails to provide such notice, Contractor shall waive all rights to assert such claim. 11. Representatives: a. City's Representative: The City's Representative for the purpose of this Agreement shall be the Director of Economic Development or such other individual as City shall designate in writing. Whenever approval or authorization from or communication or submission to City is required by this Agreement, such communication or submission shall be directed to James Goehrung as the City's Representative and approvals or authorizations shall be issued only by such Representative; provided, however, that in exigent circumstances when Professional Services Agreement for NU" Engineering Services 3 yr Term Contract August, 2015 — August, 2018 Page 6 of 10 193 City's Representative is not available, Contractor may direct its communication or submission to other designated City personnel or agents as listed above and may receive approvals or authorization from such persons. b. Contractor's Representative: The Contractor's Representative for the purpose of this Agreement shall be John How or such other individual as Contractor shall designate in writing. Whenever direction to or communication with Contractor is required by this Agreement, such direction or communication shall be directed to Contractor's Representative; provided, however, that in exigent circumstances when Contractor's Representative is not available, City may direct its direction or communication to other designated Contractor personnel or agents. 12. Permits: Contractor shall provide all notices, comply with all applicable laws, ordinances, mules, and regulations, obtain all necessary permits, licenses, including a City of Bozeman business license, and inspections from applicable governmental authorities, and pay all fees and charges in connection therewith. 13 Laws and Regulations: Contractor shall comply fully with all applicable state and federal laws, regulations, and municipal ordinances including, but not limited to, all workers' compensation laws, all environmental laws including, but not limited to, the generation and disposal of hazardous waste, the Occupational Safety and Health Act (OSHA), the safety rules, codes, and provisions of the Montana Safety Act in Title 50, Chapter 71, MCA, all applicable City, County, and State building and electrical codes, the Americans with Disabilities Act, and all non-discrimination, affirmative action, and utilization of minority and small business statutes and regulations. 14. Nondiscrimination: The Contractor will have a policy to provide equal employment opportunity in accordance with all applicable state and federal anti -discrimination laws, regulations, and contracts. The Contractor will not refuse employment to a person, bar a person from employment, or discriminate against a person in compensation or in a term, condition, or privilege of employment because of race, color, religion, creed, political ideas, sex, age, marital status, national origin, actual or perceived sexual orientation, gender identity, physical or mental disability, except when the reasonable demands of the position require an age, physical or mental disability, marital status or sex distinction. The Contractor shall be subject to and comply with Title VI of the Civil Rights Act of 1964; Section 140, Title 2, United States Code, and all regulations promulgated thereunder. The Contractor shall require these nondiscrimination terms ofits sub -Contractors providing services under this agreement. 15. Intoxicants, DOT Drug and Alcohol Regulations/Safety and Training: Contractor Professional Services Agreement for NURD Engineering Services 3 yr Term Contract August, 2015 — August, 2018 Page 7 of 10 194 shall not permit or suffer the introduction or use of any intoxicants, including alcohol or illegal drugs, by any employee or agent engaged in services to the City under this Agreement while on City property or in the performance of any activities under this Agreement. Contractor acknowledges it is aware of and shall comply with its responsibilities and obligations under the U. S. Department ofTransportation DOT) regulations governing anti-drug and alcohol misuse prevention plans and related testing. City shall have the right to request proof of such compliance and Contractor shall be obligated to furnish such proof. The Contractor shall be responsible for instructing and training the Contractor's employees and agents in proper and specified work methods and procedures. The Contractor shall provide continuous inspection and supervision of the work performed. The Contractor is responsible for instructing his employees and agents in safe work practices. 16. Modification and Assignability: This Agreement may not be enlarged, modified or altered except by written agreement signed by both parties hereto. The Contractor may not subcontract or assign Contractor's rights, including the right to compensation or duties arising hereunder, without the prior written consent of City. Any subcontractor or assignee will be bound by all of the terms and conditions ofthis Agreement. 17. Reports/Accountability/Public Information: Contractor agrees to develop and/or provide documentation as requested by the City demonstrating Contractor's compliance with the requirements of this Agreement. Contractor shall allow the City, its auditors, and other persons authorized by the City to inspect and copy its books and records for the purpose of verifying that the reimbursement of monies distributed to Contractor pursuant to this Agreement was used in compliance with this Agreement and all applicable provisions of federal, state, and local law. The Contractor shall not issue any statements, releases or information for public dissemination without prior approval of the City. 18. Non -Waiver: A waiver by either party any default or breach by the other party of any terms or conditions of this Agreement does not limit the other party's right to enforce such term or conditions or to pursue any available legal or equitable rights in the event of any subsequent default or breach. 19. Attorney's Fees and Costs: That in the event it becomes necessary for either Party of this Agreement to retain an attorney to enforce any of the terms or conditions of this Agreement or to give any notice required herein, then the prevailing Party or the Party giving notice shall be entitled to reasonable attorney's fees and costs, including fees, salary, and costs of in-house counsel to include City Attorney. Professional Services Agreement for NURD Engineering Services 3 yr Term Contract August, 2015 — August, 2018 Page 8 of 10 195 20. Taxes: Contractor is obligated to pay all taxes of any kind or nature and make all appropriate employee withholdings. 21. Dispute Resolution: a. Any claim, controversy, or dispute between the parties, their agents, employees, or representatives shall be resolved first by negotiation between senior -level personnel from each party duly authorized to execute settlement agreements. Upon mutual agreement of the parties, the parties may invite an independent, disinterested mediator to assist in the negotiated settlement discussions. b. If the parties are unable to resolve the dispute within thirty (30) days from the date the dispute was first raised, then such dispute may only be resolved in a court of competent jurisdiction in compliance with the Applicable Law provisions of this Agreement. 22. Survival: Contractor's indemnification shall survive the termination or expiration of this Agreement for the maximum period allowed under applicable law. 23. Headings: The headings used in this Agreement are for convenience only and are not be construed as a part of the Agreement or as a limitation on the scope of the particular paragraphs to which they refer. 24. Severability: Ifany portion ofthis Agreement is held to be void or unenforceable, the balance thereof shall continue in effect. 25. Applicable Law: The parties agree that this Agreement is governed in all respects by the laws of the State of Montana. 26. Binding Effect: This Agreement is binding upon and inures to the benefit ofthe heirs, legal representatives, successors, and assigns of the parties. Professional Services Agreement for NURD Engineering Services 3 yr Term Contract August, 2015 — August, 2018 Page 9 of10 196 27. No Third -Party Beneficiary: This Agreement is for the exclusive benefit of the parties, does not constitute a third -party beneficiary agreement, and may not be relied upon or enforced by a third party. 28. Counterparts: This Agreement may be executed in counterparts, which together constitute one instrument. 29. Integration: This Agreement and all Exhibits attached hereto constitute the entire agreement of the parties. Covenants or representations not contained therein or made a part thereof by reference, are not binding upon the parties. There are no understandings between the parties other than as set forth in this Agreement. All communications, either verbal or written, made prior to the date ofthis Agreement are hereby abrogated and withdrawn unless specifically made a part of this Agreement by reference. END OF AGREEMENT EXCEPT FOR SIGNATURES * * * * IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year first above written. CITY OF BOZEMAN, MONTANA By Chris Kukulski, City Manager APPROVED AS TO FORM: Bye a. Gregivan, Bozeman City Attorney Print Name: Steve Synhorst Print Title: Division Leader Professional Services Agreement for KURD Engineering Services 3 yr Term Contract August, 2015 — August, 2018 Page 10 of 10 197 ATTACHMENT A NORTHEAST URBAN REVEWAL DISTRICT (KURD) 3 YEAR TERM CONTRACT (2015 — 2018) SCOPE OF ENGINEERING SERVICES STREET, INTERSECTION, TRANSPORTATION, LIGHTING, TELECOMMUNICATIONS AND STORMWATER ENGINEERING SERVICES This scope of work is Attachment A to the Professional Services Agreement to provide professional engineering and other related services for various designated and undesignated projects in the NURD. The City requires engineering services for specific TIF -related projects broadly defined by the NURD work-plan(s) and this scope of work. Specific projects will require authorization to proceed based on a required task order. The Consultant's hourly rate for individuals working on this contract include: Project Assistant I ...............................$65.00 Project Assistant II..............................$81.00 CADD Tech I ......................................$78.00 CADD Tech II.....................................$99.50 Engineer I ..........................................$103.25 Engineer II ........................................$122.50 Engineer III.......................................$149.25 Engineer IV ....................................... 172.00 Engineering Tech II ..........................$117.50 Environmental Planner I .....................$90.00 Environmental Planner II..................$106.00 Environmental Planner III.................$128.75 GIS Analyst I ......................................$89.00 GIS Analyst II...................................$105.00 Planner I ..............................................$98.25 Planner II...........................................$120.00 Planner III .........................................$144.50 Surveyor I ............................................$86.25 1 of4 198 Surveyor II ........................................$115.50 Surveyor III.......................................$155.00 Deliverables include projects identified on the KURD workplan(s). The general scope of engineering services is itemized below but may include other engineering water, sewer, power, etc.) and planning services not specifically listed. 1. STREET, TRANSPORTATION, AND STORMWATER: Basic Proiect Criteria a. Pre -design services including: project scope definition, preparation of design alternatives and preliminary cost estimates, preliminary layouts, utility conflict and encroachment analysis, and basic hydraulics. b. Familiarity with Federal, State, and Local design standards and applicable specifications. C. Design and construction surveys, including coordination with aerial surveying firms. d. Soils and pavement design evaluations, including soils testing and analysis. e. Design alternatives for street storm drainage systems, including hydrologic and hydraulic analyses. f. Design report preparation. g. Preparation of preliminary and final plans and specifications, contract documents, and construction cost estimates in accordance with applicable City standards. h. Plan review and approval coordination with State, County, and other local agencies. i. Analyze and recommend alternative pavement design. j. Identify and secure any necessary, 124, 310, 404, MPDES permit, other permits needed for design and construction. k. ADA requirements in concert with master planned street and highway improvements. 1. Coordinate with Montana Department of Transportation for improvements on designated state and urban routes. in. Bid period and post -bid period activities coordination. n. Construction administration and inspection including surveying, soils, pavement, and materials testing, construction certification and warranty inspection. 2. STREET, TRANSPORTATION, AND STORMWATER: Complex Project Criteria in addition to basic project criteria) a. Right-of-way and easement research and complete acquisition services. b. Utility relocation coordination. C. Complex alignment and geometric design issues. d. Environmental Impact Assessments. e. Detailed structural designs (i.e. bridges, reinforced walls, culverts, channels, levees) f. Signal, roundabout, and sign warrant analyses. g. Plans and specifications in accordance with Montana Department ofTransportation design standards (i.e. utilize Intergraph, etc.). h. Comprehensive traffic studies including developing traffic projections and modeling. 2 of4 199 i. Construction administration and inspection services including surveying, asphalt and soils materials testing/certification, construction certification and warranty inspection for large and complex projects. j. Comprehensive geologic and geotechnical services. k. Mitigate adverse impacts to wetlands or other sensitive lands. 1. Pedestrian/trail/bike route studies and AASHTO requirements. In. Pavement management systems. n. Preparation of transportation and stormwater facility plans. o. Complex flood studies and floodplain map amendments. p. Coordination and procurement of EPA Phase II Stormwater permitting. q. Coordinate with Montana Department of Transportation for improvements on designated state and urban routes. r. Development and implementation of public involvement plans and leadership of informational/community meetings. 3. INTERSECTION IMPROVEMENTS a. Predesign services including: defining project scope, design alternatives (including roundabouts), preliminary cost estimate, preliminary layouts, identification of utility conflicts, encroachment and preliminary right-of-way requirements. b. Right-of-way and easement research and complete acquisition services. C. Signal, roundabout and signage warrant analyses. d. Evaluation of existing Transportation Facility Plan intersection improvement recommendations. e. Design alternatives including roundabouts, signals, intersection geometry, signal operation, drainage, utilities and control devices. Prepare design surveys, design reports, and comprehensive traffic studies. g. Environmental Impact Assessments. h. Coordinate with Montana Department of Transportation for intersection improvements on designated state and urban routes. i. Preparation of plans, specifications and estimates in accordance with City, State and Federal design standards. j. Bid period and post -bid period activities coordination. k. Construction administration and inspection including surveying, soils, pavement and materials testing, signal operation, construction certification and warranty inspection. 1. Traffic calming and pedestrian crossings. M. Roundabout design and construction administration. n. Development and implementation of public involvements plans and leadership of information/community meetings. 4. LIGHTING IMPROVEMENTS: Basic Project Criteria a. Site Evaluation — the Contractor will conduct a site evaluation to determine existing conditions within the NEURD. i. Engineering Survey — The Contractor will use a combination of the City's GIS information, aerial photography, and in field surveying to establish a base map for 3 of 4 200 the entire NEURD. The base map will include ROW location, easements, and property boundaries. The base map will also include, but not be limited to, the location of existing sidewalks, curbs, driveway accesses, ADA accessible ramps, lighting fixtures, locations of electrical power for lighting, traffic signals, and additional utilities that would impact location ofpedestrian facilities and potential lighting locations. b. Lighting Studies - i. Street and Pedestrian Lighting Study — The Contractor will prepare a lighting study to determine the locations best suited to adequately illuminate all street and pedestrian corridors within the NEURD. The study shall identify existing pole heights, an evaluation ofthe existing lighting levels, determination of existing power routing, possible types of lighting designs, and a utility conduit design. ii. Lighting Plan — The Contractor will work with the NURB to discuss options for developing a lighting plan that utilizes the existing lighting and provides for increased lighting levels where required or desired through a combination of street, pedestrian and traffic lighting that meet the criteria of the Board for developing the sense of character for the NEURD. The Contractor will also work with the NEURD to identify locations where overhead power for existing lighting can be located underground. iii. Coordination with Northwestern Energy (NWE) — The Contractor will have preliminary discussions with NWE (Linda Gale) regarding the potential ofputting power lines underground. Discussions will include the power for the lighting as well as transmission lines within the NEURD. iv. Coordination with the City ofBozeman - The Contractor will have discussions with the City of Bozeman regarding the potential for utilizing LED lighting within the NEURD. c. Cost Estimate — The Contactor will prepare a cost estimate based on the findings of the street, pedestrian and traffic lighting studies and the initial site investigation. The estimate will include, but is not necessarily limited to: lighting, cost of right of way acquisition, infill of sidewalk or equivalent pedestrian infrastructure missing from the District. 5. TELECOMMUNICATION IMPROVEMENTS: Basic Project Criteria a. Fiber Optic Engineering i. Pre -design services including: project scope definition, preparation of design alternatives and preliminary cost estimates, preliminary layouts, and utility conflict and encroachment analysis. ii. Familiarity with Federal, State, and Local design standards and applicable 4 of4 201 specifications. iii. Design and construction surveys, including coordination with surveying firms. iv. Design report preparation. V. Preparation of preliminary and final plans and specifications, contract documents, and construction cost estimates in accordance with applicable City standards. vi. Plan review and approval coordination with State, County, and other local agencies. vii. Bid period and post -bid period activities coordination viii. Construction project management, administration and inspection The above -referenced general scope may be applied to several projects within the NURD and may require additional approvals and subsequent task orders which may be negotiated over a period of time. 5 of4 202 Page 1 of 2 AMENDMENT TO ENGINEER-OWNER AGREEMENT Amendment No. 1 Background Data a. Effective Date of Engineer-Owner Agreement: 8-17-15 b. Engineer: Kadrmas, Lee & Jackson, Inc. (KLJ) c. Owner: City of Bozeman, MT d. Project: Professional Services Agreement e. This Part of the Project: Term/Effective Date Nature of Amendment (check all that apply) Additional services to be performed by Engineer Modifications to services of Engineer Modifications to responsibilities of Owner Modifications to payment to Engineer Modifications to time(s) for rendering Services Description of Modifications Extension of the Term (Paragraph 2) of the Professional Services Agreement until such time as the Engineer's duties are completed as they pertain to the construction services for the E. Tamarack Street Reconstruction Project. Agreement Summary a. Original agreement amount: $N/A - Time and Material. b. Net change for prior amendments: $N/A c. This amendment amount: $Not to exceed $125,000 d. Adjusted Agreement amount: $N/A 203 Page 2 of 2 Engineer and Owner hereby agree to modify the above-referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is 8/17/2018. ENGINEER: Kadrmas Lee & Jackson, Inc. OWNER: City of Bozeman, MT By: Steve Synhorst By: Andrea Surratt Title: Division Leader Title: City Manager Date Signed: Date Signed: 204 Page 1 of 2 Exhibit A – Engineer’s Services EXHIBIT A Professional Services Agreement – Amendment 1 3 Year Term Contract – Scope of Engineering Services The Agreement is supplemented to include the following agreement of the parties. Engineer shall provide Modified and Additional Services as set forth below. PART 1 – MODIFIED SERVICES A1.01 Construction Phase Services A. Unless otherwise stated, Engineer’s Services are limited to the necessary construction phase services described below for construction of the East Tamarack Street Reconstruction Project until such time as the project has obtained final completion and Engineer has provided Record Drawings of the completed Project to the City and the Montana Department of Environmental Quality. The anticipated cost of construction phase engineering services including Construction Administration, Resident Project Representative and Construction Staking, as described below shall not exceed $125,000. 1. Construction Administration a. Review and approve project submittals/shop drawings for materials incorporated in the Work. b. Review and recommend approval of authorized changes in the Work. c. Provide Work Change Directives, Change Orders, etc., as necessary, for execution for authorized changes in the Work. d. Review and recommend payment for Contractor’s Applications for Payment. e. Review and approve actual quantities and classifications of Unit Price Work performed by the Contractor. f. Administer the Project’s Contract Documents and make recommendations on Contract requirements and acceptability of Work. g. Determine Project Substantial Completion h. Prepare Project punch list noting deficiencies and/or corrections in the Work required prior to final completion. i. Provide final inspection of the Work. j. Attend the Final Walk-Through with Contractor and City. k. Maintain Project records. l. Prepare and provide Project Record Drawings to the City in accordance with City requirements. m. Prepare and provide Project Record Drawings to Montana Department of Environmental Quality (DEQ) in accordance with DEQ requirements. 205 Page 2 of 2 Exhibit A – Engineer’s Services 2. Resident Project Representative a. Provide observation of the Work as described in the Project’s Contract Documents. b. Observe and monitor quality control and quality assurance testing to ensure Work is constructed in accordance with the Project’s Contract Documents. 3. Construction Staking a. Provide required construction survey staking as prescribed in the Project’s Contract Documents. PART 2 – ADDITIONAL SERVICES A2.01 Additional Services Requiring Owner’s Written Authorization A. If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional Services of the types requested by the Owner. Using the procedures set forth in Paragraph 4 of the Professional Services Agreement, Owner shall pay Engineer based on the amount of cumulative hours charged to such requested Additional Services by each class of Engineer’s employees; plus reimbursable expenses and Engineer’s consultants’ charges, if any. 206