Loading...
HomeMy WebLinkAbout18- Change Order 1 - Highland Construction Services - Baxter Lane, Cottonwood to Ferguson Project CHANGE ORDER No. 1 DATE OF ISSUANCE OLA4 4- 14n, , 2015� EFFECTIVE DATE OWNER City of Bozeman CONTRACTOR Highland Construction Contract: Baxter Lane,from Cottonwood to Ferguson Project: Baxter Lane, from Cottonwood to Ferguson OWNER's Contract No. ENGINEER RPA ENGINEER's Contract No. 14510.000 You are directed to make the following changes in the Contract Documents: Description: #1 -Asphalt Removal with saw cutting areas—placed for winter shutdown in November 2017 and agreed to by the City of Bozeman at a cost share of 50% for the asphalt removal. #2-Remove 13 CY of buried concrete and flowable fill under the Flanders Mill and Baxter intersection, with an active phone line through the concrete. #3 -Farmer's Irrigation Pipe Replacement of 12"C-900 pipe,two coupler connections,bedding and backfill. #4-Revise electrical service from underground at Flanders Mill to overhead at Riatta per Northwestern Energy. The service location shift of 250' requires upsizing 3,000' of 2 wires from AWG No. 10 to AWG No 8. #5 -Add additional oversized Speed Limit signs along the Baxter Meadows park area. #6 -Extra work days for roadway and sidewalk subexcavation, haul-off of unsuitable materials, and placing replacement materials. This work was completed with Contract bid items. #7 - Extra work days for water line unsuitable native trench backfill, haul-off of unsuitable materials, and placing replacement bedding materials. This work was completed with Contract bid items. #8 -Additional traffic control days for item#6. #9- Extra work days for project delay of the Centurylink phone conflict located in the road. #10- Add 4"PVC stubs under sidewalk for irrigation per Flanders Mill Reason for Change Order: Utility conflicts,site conditions encountered,Northwestern Energy revised service location, and coordination with adjacent projects Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times: Substantial Completion: 90 calendar days $ 1,139,702.00 Ready for final payment: (days or dates Net Increase(Decrease)from previous Change Net change from previous Change Orders No._to Orders No._to_ No._ Substantial Completion: $ Ready for final payment: (days) Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: 90 calendar days $ 1,139,702.00 Ready for final payment: (days or dates Net increase(decrease)of this Change Order: Net increase(decrease)this Change Order: Substantial Completion: 25 calendar days $ 26,416.11 Ready for final payment: (days) Contract Price with all approved Change Orders: Contract Times with all approved Change Orders: Substantial Completion: 115 calendar days $1,166,118.11 Ready for final payment: (days or dates) CHANGE ORDER FORM Page 1 of 3 Contractor certifies and agrees that there are no additional costs or claims for extra work,additional time,delays or omitted items,of any nature whatsoever,associated with the subject change order items,except as identified and set forth herein and unless expressly stated otherwise in the Change Order. And further,that the price agreed-upon herein represents the full cost and value for the subject work performed and the materials supplied under the terms of the contract and that the work quantities and value were properly determined and are correct. ��_7 ///v a �/a s, J CONTRACT R� Autho d ignature) Date RECOMMENDED BY: APPROVED BY: ( GMEER- Signature) Date OWNER(Authorized Signature) Dat I CHANGE ORDER FORM Page 2 of 3 CHANGE ORDER INSTRUCTIONS A. GENERAL INFORMATION This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a subsequent Change Order if they affect Price or Times. Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice of accumulating Change Orders to reduce the administrative burden may lead to unnecessary disputes. If Milestones have been listed in the Agreement,any effect of a Change Order thereon should be addressed. For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times, a Field Order should be used. B. COMPLETING THE CHANGE ORDER FORM Engineer normally initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or both. Once Engineer has completed and signed the form, all copies should be sent to Owner or Contractor for approval, depending on whether the Change Order is a true order to the Contractor or the formalization of a negotiated agreement for a previously performed change. After approval by one contracting party, all copies should be sent to the other party for approval. Engineer should make distribution of executed copies after approval by both parties. If a change only applies to price or to times, cross out the part of the tabulation that does not apply. CHANGE ORDER FORM Page 3 of 3 CHANGE ORDER #1 PROJECT TITLE: Baxter Lane from Cottonwood to Ferguson CHANGE ORDERED ITEMS Item Description Quantity Units Unit Price Amount Extra Basis of Unit Price No. Work Days 1 Asphalt Removal (50%Cost) 388 SY $5.75 50% $1,115.50 1 Negotiated with With Saw Cutting Areas 923 LF $4.00 $3,692.00 Contractor 2 Remove 13 CY Concrete (buried 1 LS See below $2,084.88 1 Time & Materials at Flanders Mill with phone line 3 Farmer's Irrigation Pipe 1 LS See below $15,173.23 1 Time & Materials Re lacement Sta. 213+82 4 Revise Electrical Service to 1 LS See next $1,900.50 0 Negotiated with Overhead & upsize wire to 8AWG page Contractor due to Northwestern Energy service location change 5 Oversized speed limit signs 1 LS See next $500.00 0 Negotiated with requested by City page Contractor 6 Roadway&Sidewalk N/A N/A Per Contract N/A 10 Per RPA Inspector subexcavation of poor subgrade Schedule of materials, haul off& replacement Items material 7 Water line unsuitable native N/A N/A Per Contract N/A 5 Per RPA Inspector trench backfill, haul off& Schedule of re lacement trench material Items 8 Additional Traffic Control days for 10 Days $125 see $1,250.00 0 Time& Materials item #6 next page 9 Centurylink delay& utility conflict N/A N/A N/A N/A 7 Per RPA Inspector within roadway section 10 4" PVC under sidewalk for 7 EA $100 $700 0 Negotiated with irrigation, er Flanders Mill Contractor Total Change Ordered Amount= $26,416.11 Extra Work Days Granted= 25 days Item #2 Cost Breakdown: • Case 903OB: 4 hours at$130/hour without operator = $520.00 • Operator: 4 hours at$52.50/hour(wage, overhead &markup) = $210.00 • Laborer: 2 men for 4 hours at$43.84/hour (wage, overhead &markup) = $350.72 • Concrete haul off: 2 loaded dump trucks for 2 hours at$70/hour = $140.00 • Concrete haul off: Truck drive for 2 hours at$51.43 (wage, overhead &markup) = $102.86 • Dump fees: $206.00 for load 1 and $116.00 for load @ at 15% markup = $370.30 (invoice attached) • Flowable Fill around phone line in concrete: 4 CY at$85/CY plus 15% markup = $391.00 Item #3 Cost Breakdown: • Sub-contractor Rocky Mountain Dirt Detail (invoice attached) plus 5% markup = $3,265.50 • Pipe and couplings from Core&Main (invoice attached) plus 5% markup = $8,153.94 • Flowable Fill: 5.5 CY at$85/CY plus 15% markup = $537.62 (invoice attached) • Laborer: 5 hours at$43.84/hour(wage, overhead &markup) =$219.20 • Dump truck haul off for 4 hours at$70/hour = $280.00 Change Order Page 1 • Truck driver for 4 hours at$51.43 (wage, overhead &markup) _ $205.72 • Separation Geotextile 63 SY at $2.00/SY = $126.00 (bid item #33) • Bedding and Backfill 63 CY at $18.43/CY plus 15% markup = $1,335.25 • Mustang excavator for 3 hours at$85/hour = $255.00 • Mobilization of Mustang excavator for 1.5 at $120/hour = $180.00 • Komatsu Loader for 3 hours at $100/hour = $300 • Operator for 6 hours at$52.50/hour(wage, overhead &markup) =$315.00 Item #4 Cost Breakdown: • Montana Line sub-contractor at$1,810.00 plus 5% markup = $1,900.50 (invoice attached) Item #5 Cost Breakdown: • Mountain West Holding Company (invoice attached) _ $500 Item #8 Cost Breakdown: • Mountain West Holding Company Traffic Control Devices 10 days at$125/day(invoice attached) _ $1,250 Change Order Page 2 6/6/2018 3"Road Mix Baxter Lane Highland Construction#4 25.04 $4.95 $123.96 ` 6/6/2018 3"Road Mix Baxter Lane Highland Construction#4 24.11 S4.95 $119.34 6/612018 3"Road Mix Baxter Lane Highland Construction 44 24.36 $4.95 $120.58 616/2018 3"Road Mix Baxter Lane DLM Unit 13 24.89 $4.95 $123.21 6l6/2018 3"Road Mix Baxter Lane Highland Construction#4 26.14 $4.95 $129.39 6/612018 3"Road Mix Baxter Lane Highland Construction#4 25.68 $4.95 $127.12 6/6/2018 3"Road Mix Baxter Lane DLM Unit 13 25.74 $4.96 $127.41 6/6/2018 3"Road Mix Baxter Lane DLM Unit 13 24,90 $4.95 $123.26 6/6/2018 3"Road Mix Baxter Lane D&D#6 28.50 $4.95 $141.08 6/612018 3"Road Mix Baxter Lane D&D#6 26.64 $4.95 $131.87 6/712018 3"Road Mix Baxter Lane Highland Construction#4 26.85 $4.95 $127.96 6f7/2018 3"Road Mix Baxter Lane Highland Construction#4 25.05 $4.96 $124.00 &712018 3"Road Mix Baxter Lane Highland Construction#4 26.02 $4.95 $123.85 6/7/2018 3"Road Mix Baxter Lane Highland Construction#4 23.99 $4.95 $118.75 6/7/2018 3"Road Mix Baxter Lane Highland Construction#4 24.D7 $4.95 $119.15 6f7/2018 3"Road Mix Baxter Lane Highland Construction#4 24.51 $4.96 $121.32 6f7/2D18 3"Road Mix Baxter Lane Highland Construction 114 26.06 $4.95 $124.05 6/7/2018 3"Road Mix Baxter Lane Highland Construction#4 25.12 $4.95 $124.34 6/7/2018 3"Road Mix Baxter Lane Highland Construction#4 24.94 $4.95 $123.45 6/7/2018 3"Road Mix Baxter Lane Highland Construction 04 25.17 $4.95 S124.59 6/7/2018 3"Road Mix Baxter Lane Highland Construction#4 24.38 $4.95 $120.68 6M2018 3"Road Mix Baxter Lane Highland Construction#4 25.17 $4.95 $124.59 Subtotal Product 3820.98 Subtotal:$18,913.94 6/7/2018 3/4"Road Mix Baxter Lane Highland Construction#4 24.37 $6.05 $147.44 6/15/2018 3/4"Road Mix Baxter Lane Highland Construction#4 22.76 $6.05 $137.70 6/15/2018 3/4"Road Mix Baxter Lane Highland Construction#4 24.70 $6.05 $149.44 6115/2018 3/4"Road Mix Baxter Lane Highland Construction#4 25.36 $6.05 $153.43 6/16/2018 3/4"Road Mix Baxter Lane Highland Construction#4 24.56 $6.05 $148.59 6/16/2018 3/4"Road Mix Baxter Lane Highland Construction#4 24.90 $6.05 $150.66 Subtotal Product 146.65 Subtotal:$887.26 F 6/8/2018 3/4"Screened Bedding Baxter Lane Highland Construction#4 24.76 $10.76 $266.17 1 6/8/2018 3/4"Screened Bedding Baxter Lane Highland Construction#4 24.00 $10.75 $258.00 /11/2018 3/4"Screened Bedding Baxter Lane Highland Construction fi4 25.65 $10.75 $275.74 Subtotal Product 74.41 Subtotal:$799.91 6/14/2018; Concrete Disposal`, Baxter Lane HCS(Green IHC) 8.24 $25.00 $206.00 6/14/201 1 Concrete Disposal �. Baxter Lane HCS(Green IHC) 4.64 $25.00 I $116.00 Subtotal Product 12.88 Subtotal:$322.00 Date Truck Destination Memo Hours Rate Price 6/1/2018 Big X Baxter Lane Includes 3 Ids haul off 13 100 $300.00 6/1/2018 D&D 117 Baxter Lane Includes 3 Ids haul off 3 105 $315.00 6/412018 Big X Baxter Lane Includes 11 Ids haul off 10 100 $1,000.00 6/412018 DLM Unit 13 Baxter Lane Includes 11 Ids haul off 10 105 $1,050.00 6/4/2018 D&D#6 Baxter Lane Includes 9 Ids haul off 8 105 $840.00 6/5/2018 MCM Baxter Lane Includes 6 Ids haul off 11.5 105 $1.207.50 6/612018 D&D#6 Baxter Lane Includes 7 Ids haul off 9 105 $945.00 6/5/2018 DLM Unit 13 Baxter Lane Includes 3 Ids haul off 4 105 $420.00 1 6/6/2018 DLM Unit 13 Baxter Lane Includes 2 Ids haul off 9.5 105 $997.50 6/6/2018 D&D#6 Baxter Lane ! 7 105 $735.00 Subtotal Product Subtotal:$7,810.00 674 s.ra - Griffin Drive In voice l Boze, -- ,n, M'I* 59715 HInT DETFUL DatcInvoice It 6/29/2018 1145 Bill To 'rernis I lighkilld COIISIRICIi011 '-)C['\"iCCS- 1-1-C P.O. Box 141 DLIC 011 1'eCCij)I 13 c I g rad c. M'1' 5 9'/14 Service Date Quantity Unit Description Price AIIIOLIIIt 06/18/19 9 hr/s Operator Labor 65.00 595.00 .9 III./s Add Im Prevailed Wage 15,00 13 i.()() 9 111A Regular 50.00 450.00 Q hr/s Add Im Prevailed Wlj-lc 15,00 135.00 1 (IIN,/s John Deere 35 G 250.00 250.00 06/19/18 9 III./s Operator Labor 65.00 585.00 9 III./s Add Im Prevailed 15.00 135.00 9 III./s Regular Labor 50.00 450.00 9 III./s Add flor Prevailed Wage 15.00 135.00 1 day/s John Deere 3% 250.00 250.00 Scope ol'Work: Strip out fiber and Irrigation pipe. prep 1,61, new pipe. place IICw pilic. set Collars and tighten. heel and backlill with washed rock. Total $3.110.00 Phone I/ E-mail 406-55 1-2232 Invoice# 1952476 COR C ; Invoice Date 6/19118 INVOICE Account// 236363 Sales Rep BELGRADE HOUSE Phone# 406.388.5980 1830 Craig.-_ k COUrt Branch# 693 Belgrade,MT St.Louis,MO 63146 Total Amount Due $7,766.66 Remit To: CORE&MAIN LP PO BOX 28330 ST.LOUIS,MO 63146 7..6 1 MB 0.424 E0005X 1007 03734271494 S2 P5462466 0001:0001 �rI111111111d11111Ir1lrirrr Jill'I III I11111111111"111111-1111rll Shipped to: HIGHLAND CONSTRUCTION SERVICES 2017 BAXTER LANE IMPROVEMENTS PO BOX 141 BAXTER LANE BETWEEN HARPER BELGRADE MT 59714-0141 PUCKETT RD&FLANDERS MILL RD BOZEMAN,MT CUSTOMER JOB- BAXTER 2017 BAXTER LN —---- ------------------- -...---- ......-- ------........--- ------ ------------------------- ----------._------------_ ----...- ------- —- -------------------------------------- Thank you for the opportunity to serve youl We appreciate your prompt payment, Date Ordered Date Shipped Customer PO# Job Name Job# Bill of Lading Shipped Via Invoice# 5/30/18 6/18/18 IRRIGATION 2017 BAXTER LN BAXTER CORE&MAIN LP 1952476 _ Quantity Product Code Description Ordered Shipped B/O Price UM Extended Price 022418E 24 C900 DR18 PVC PIPE(G)BLU 60 60 72.67000 FT 4,360.20 PC235 /54015320135 RC400-27.95 X 25.80 1/012 1 1 1720.13000 EA 1,720.13 /54015320137 TC400-25.80 X 24.80 1/4X10 1 1 1685.33000 EA 1,685.33 Effective 8/29/2017 Available on the new website Visit:core main.com CORE • New W-9 for forms(see right) • Formal name change letter • FAQ for customers&vendors Freight Delivery Handling Restock Misc. Subtotal: 7,765.66 Other: 0.00 Terms; NET 30 Ordered By:JIM Tax: 0.00 Invoice Total: $7,765.66 This transaction is governed by and subject to CORE&MAIN's standard terms and conditions,which are incorporated by reference and accepted. To review these terms and conditions,please visit: littp:lltandc.coreandmain.com/. (1091:0001 Page 1 of 1 -..."••V-"nanuc.Coreandnlain.cOg1I. ..�, ­ —v ano accepted, KNIFE ftNV��t P.O. f30xe INVOICE rA� DURESQURCESCOYi.Vfr (1El QRADF,MONTANA 59714 INVOICE NWARFR I'll. (4061 388.6832 saszzz INVOICE DATE PAGE VIii2Ut11i 1 of 1 Cutmil"11:11 NUMBER 216n7tt ---------------------- BRANCII PLANT ORIGINAL 2BO431 KR RFt(,,nAhr t:nmmur I nrl.cnAm BILL TO: HCs N.U. BOX 141 SALES ORDIEII NUMBEfI RFI GRADF IJT r)g71 1 60E1592 - -- CIIATOMPI't PA). 1 TENIAS NET OIIF J)ATE DELIVERY ADDIIrS Nut 101h 07.00'1 B I W ER I UCKETT TO EIAXI LI1 j � SPECIAL INSTRUCTIONS IICKkT ITEMi DESCRIPTION TnUCK ' OUANTITY 14;UNIT.PRICE S FXTENI�l±p: tl: PRICE-. . . 414360 FLOFI. FI Ol ml.F Fit l 254717 b.bV C:Y ab.WVV 467.60 Subtotal Product b.bU CY 467-W I • I i i I i TAXABLE AMOUNT: 6UR i OIA1. :• RAI FS TAX nI5C01lNT TOTAL NONTAXABLC Af,10UNT: Oki/.W 467.60 467.50 TFRRIS-NFT- DIJr AND PAYAm.r nY mil Or!,M14TH FGLLOV.%NG PURCHASE. A finance charge of 1 per nwwith,rn it 1611imrnrt, I $I.nn, w II be made on the unpaid bafuncc ut the cnd of the fol'Utvrng r1jU11lh'3 bi lino uycl.. Ions i:=an ANNUAL_PERCENTACF RATF OF I Wo ressrvo the ri jhl tv viu m !iclr fur ali I.ib:.r dod mabtri 0 foru c•hetl cm Ilk.joh. I I I �1( 1 � l MONTANA LINES N Bozeman,MT i i Great Falls,MT 1 June 29, 2018 Jim Hall Highland Construction Services PO Box 141 Belgrade, MT 59714 RE: 2017 Baxter Lane Improvements-Bozeman Revised Electrical, Baxter from Harper Puckett to Ferguson Dear Jim, Montana Lines can complete the above referenced changes, replacing 3000 LF of AWG#10 with AWG#8 and changing the Underground Service to an Overhead Service for a Lump Sum of$ 1,810.00. Please let me know if you have any questions. Sincerely, Jodie Tooley Office Manager Enclosures PO Box 31793 (406)256-0199 Billings, MT 59107 Fax(406)256-8081 290 Pronghorn Trail#6 Bozeman,MT 59718 (406)522-3833 office (406)522-3943 fax Invoice No: 0892-003 Customer Date: 4-Jun-18 Highland Construction PO Box 141 Belgrade, MT 59714 Job: Baxter Lane Improvements Jim Hall Dates: 5/14-6/1/2018 ITEM # DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL 1 TC Initial Setup LSA 1 $ 3,500.00 $ 3,500.00 2 Traffic Control Day $ 850.00 $ - 3 Traffic Control Devices Day 19 $ 125.00 $ 2,375.00 Flagging (If Needed) HR $ 42.50 $ - TC Device Maintenance Day 1 $ 125.00 $ 125.00 45 Signing LS $ 7,600.00 $ - COB Add on 25 MPH sign CA 1 $ 500.00 $ 500.00 Total: $ 6,500.00 Conditions: Payment is due upon receipt Please remit payment to: Mountain West Holding Company PO Box 31793 Billings, MT 59107 Call the office with any questions. Thank you for your business.