HomeMy WebLinkAboutTalbach House - Fire Line pNTAty
Matthew B. o
LEGEND
� Cotterman
PL PROPERTY LINE
15873ES
ADJOI6"FIRE ING SERVICE
LINE LINE Fy 77CENSEO c4J�
6"FIRE SERVICE LINE C
-4"WATER SERVICE LINE m W�� , u �u ��I Ir,' „� I /�E P�O w DG w WATER VALVE ILA- IL�J
ss ,ss 4"SEWER SERVICE LINE R
-----------EASEMENT LINE 3p 1 ICI It'
------SETBACK LINE NI I�„
--.--.--S-UNDERGROUND ELECTRICAL LINE I I T INSTALL REFUSE ENCLOSURE O
dj WITH MAN DOOR 0 20
PP
OVERHEAD POWER LINE I I Ili SEE ARCH DETAIL)
4 POWER POLE SCALE IN FEET
.i, GUYANCHOR WIRE CONTOUR INTERVAL 1'
1 11 LI1� 0 -------- ----------
-4-S-UNDERGROUND GAS LINE $ ,jl iI 0 O w w w E STN K ---------------_
-s UNDERGROUND COMMUNICATION LINE CITY OF BOZEMAN REQUIREMENTS FOR INSTALLATION OF
n M UNDERGROUND CABLE TV LINE
DOUBLE CHECK VALVE ASSEMBLY o
,zw ,zw WATER LINE YY"YrI
Y'f FIRE HYDRANT 1.The FIRST fitting inside of the building shall be a UL listed flanged �, T it e '
pd WATER VALVE Kennedy or Mueller OS&Y valve the same size as the fire service line.
00020
® WATER SERVICE CURB STOP
_ SANITARY SEWER LINE 2.All Double Check Valve Assemblies shall be:
j IJ 6
SANITARY SEWER MANHOLE a.ULlisted.
b.Approved
by the University of Southern California Foundation for
Cross Connection Control and Hydraulic Research(USCFCCCHR)for w
operation in the proposed position(vertical or horizontal)as shown on Y b it I I s o
approved plans. FL., i� I VALVE IN MECH FEOOM G Z w
c.Installed as shown on the approved plans.
3.AFlow detection device shall be installed immediately following theI�F
Double Check Valve Assembly(alarm check valve,flow sensor/alarm, ^„ it °iDWz' 6"FIRE SERVICE w
meter,etc.)as shown on the approved plans.Paddle-type flow alarms not W 1 ® r 4 5
permitted on dry systems. Q D �•/ .J
O 4"WATER SERVICE
4.A Double Detector Check Valve Assembly may be used with a standard
City of Bozeman meter.The meter loop of the Double Detector Check ���--���111 " s W NSTALL H/C
Valve shall have a Double Check Valve Assembly installed which meets AccEs
W I I� ° i. o00 000 0 o RAMPS IN IN S I-61
VICINITY MAP NJ
the same installation criteria specified above in requirement number two. Iiz 90 0 000 00o a o0o s w sT
till[:Al='z0 = `su A°so�so� EDETAIL 3)
„ w _ 20 FRON
c 5.Horizontal installations must be a minimum of 2'above the finished W -- � o
I I ------�-u-a°su �, .... ,` SEORAGE
4F 4F 4F :. .
i flDDr. � so
C 2`�`�E 6.The fire service riser must be a minimum of 2'from any outside wall, I --- 10 ry
VV. I J I III y O - SEiBPCK:Y ---_-_- _- ABANDO and a minimum of 1'from any interior wall. i NT VAR >
J I iO F -S t S-afXIS PING®'B(,L-S S S -S-G rT
7.The incoming fire service line shall be a minimum 6.5',and amax- I it - _ _ - P- 4 PL s P PL
ITE mum of 7.5'below the finished grade. 'III L- 0 uTlu BpsE p=11°00'04" SERVICE LINES&BECAP
x .;; INSTALL
i I UT D
PA L
_GR._gF_yt:; ? 8.All fire service line appurtenances shall have a minimum pressure I i F�Lrl I I __ _ 'PAD a
rating of 175 PSI. " -
I 'r S XISTIN(Pi 8"WATE '
w 1 I oI SERVICE LINE
9.All fire service lines 4"and larger shall be Class 51 Ductile Iron Pipe. d I s _ J--------_19_
m _-_-=---------- --�- ----='--------
I:nRI:-nR - 10.Line sizing:The Double Check Valve Assembly shall be equal in size T il� sIDEW --__
rI d E7(ISTING 5' �,
to both the incoming pipe diameter(upstream)and outgoing pipe diameter 1 __ _-- 5
T (downstream) - __�____-- T---,--
_ ----- _,�
NOT TO SCALE GRAFSTR I ��` _- -- - - Azµ
(COLLECTOR) O
STREET -�zsv
h VISION C-'
TRIANGLE
w
----- ---
w N
Cn Y � �' O
zw a 0 c,5 U
CAy
N. Z
"gW�Jz w
"'may I--t
IGwo w�
ONLY FITTINGS ALLOWED EAND BCKFLBETWEEN NO PRESSURE GAUGES OR PRESSURE GAUGE FITTINGS WILL BE �W Q-Z. pF ZF pF pF
FIRST OS&Y VALVEAND BACKFLOW Kew O F��ylll
SEE NOTE ALLOWED ON THE TEST PORTS OF ANY SACKFLOWASSEMBLV Imr4-HLL z2 z z2 z2
ASSEMBLY TO BE 90°BEND. .1 IQsu wa� w� o� o� Zz�O I�1
w
FLANGE TO BE THREADED ON STANDPIPE, wa JQw20i o� aW � �`� ow
M.J.TO FLANGE ADAPTORS NOTACCEPTABLE o�'02Zrrc rQVr`1,
(TYPICAL FOR ALL RISER CONFIGURATIONS) +��Wz Wq +~i - - g
4"ORLARGER CLASS 51 1 LEGEND '//pw�O +Z +Z?
DUCTILE IRON PIPE(TYPJ 1'MIN,TMAKABOVE Z1O'�z "Sw3 M O Vl
z� z w
FLOOR FINISHED FLOOR ^$FLANGED OS VALVE 4980 4980
' F MIN.,2'MAX. �•
X DOUBLE CHECK VALVE _ E -- ---- WTI
MECHANICAL 3/4"MIN R d R d INSTALLED IN MIN REQUIREMENT) FF ELEV
JOINTS EVERY OTHER AVAILABLE M.J. / - _ _ __ __ _ -- EXI TINGG OE
MAIN BOLT HOLES II
(TYPICAL) AS INDICATED ON -_-- -_-_- __ - OR
p APPROVED PLANS) 4975 -- ---- ------ - ----- ---- ---- ----- 4975 '^;
-518"RODS ACCEPTABLE FOR 4"LINES ISTING `V
TURE 6"STORM
FIBER-OPTIC
S WER CR SSING
THRUST e FBI O
BLOCK 90°BEND WITH THRUST BLOCK S A 0-00 STA 3 6.18
6.5' IN. ) INSTALL D326.1 LF OF 6"CLASS 5 DUCTIL IRON PI E ELEVATION(.CONNECTIONASSUMED 'y.5
TAPPING TEE&VALVE, PROVIDE FLEXIBLE, CONTRACTOR TO VERIFY I 1 L F+"1
OR INSTALL VALVE AT WATER-TIGHT CONNECTION (AB)EXISTING MAIN APPROX.ELEV=49]0' \� C�
PROPERTY LINE(TYPICAL FOR ALL WALL OR FLOOR 4970 4970 It
FOR ALL RISER CONFIGURATIONS) PIPE PENETRATIONS. Y�1
STA 3+0.66 STA 0+5 7 a I.t O
MIN.FL 9.67 FL=6&71 MIN.FL 69.45
OSTANDARDET7 FIRE SERVICE LINE INSTALLATION " <FL=6772 f S o e a m n e A
Fi '
5 > > > 44 co44
49%+40 3+20 3+00 2+80 2+60 2+40 2+20 2+00 1+80 1+60 1+40 1+20 1+00 0+80 0+60 0+40 0+20 0+00965 1.-,
(t1FIRE LINE PLAN&PROFILE U
SCALE:1"=20'HORIZONTAL,1"=5'VERTICAL O
aC
a
GENERAL NOTES:
1. ALL CONSTRUCTION SHALL CONFORM TO THE ACCOMPANYING PLANS AND SPECIFICATIONS.
2. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL BURIED UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION. REV. DATE
3. TYPE 1 OR TYPE 2 TRENCH EXCAVATION MAY BE USED AT THE DISCRETION OF THE CONTRACTOR. 0 09/04/15
4. TRENCH BACKFILL SHALL BE TYPE A,FOR ALL AREAS TO BE PAVED. Io/o6/L,5
5. THE ENGINEER AND THE CITY OF BOZEMAN SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO BEGINNING CONSTRUCTION. g oq%2o%1j
6. ACCORDING TO CITY OF BOZEMAN REQUIREMENTS,APPROVED DOUBLE CHECK BACKFLOW PREVENTION DEVICE MUST BE
INSTALLED BY THE OWNER FOR THE NEW BUILDING(S)SHOWN IN ACCORDANCE WITH COB DRAWING NO.2660-13.
7. FIRE LINE INSTALLATION SHALL CONFORM WITH THE REQUIREMENTS OF THE CITY OF BOZEMAN FIRE SERVICE LINE STANDARD.
8. A LICENSED CONTRACTOR SHALL INSTALL THE LINE FROM THE MAIN UP TOAND INCLUDING THE FIRST CONTROL VALVE(OS&Y) DRAWING DATE:
AND DOUBLE CHECK VALVE INSIDE THE BUILDING.THE WATER DEPARTMENT SHALL TAP THE MAIN AT THE OWNER'S EXPENSE
AND INSPECT THE LINE UNDERLINE PRESSURE BEFORE IT IS BACKFILLED. 4 2p 17
9. APPLICATIONS FOR WATER SERVICES MUST BE MADE BY CONTRACTOR/OWNER AND APPROVED BY COB BEFORE THE FIRE
SERVICE LINE AND DOMESTIC SERVICE LINE CAN BE INSTALLED.
1D. THE 6.5 MINIMUM COVER OVER THE NEW FIRE LINE MUST BE IN PLACE OR SUFFICIENT INSULATION INSTALLED OVER THE FIRE SHEET
LINE IF 5.5'OF COVER CAN NOT BE MAINTAINED,BEFORE THE LINE WILL BE ACTIVATED.
11. THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCEMP DANCE WITH D SUBSEQUENT
PUBLIC WORKS STANDARD SPECIFICATIONS, 6TH
EDITION", 2010 SHALL
NUMBERS WITHORDPREFIX),ANDONTANA PUBLIC WORKS STANDARD
"CITY OF BOZEMAN
MODIFICATIONS TO MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS,6TH EDITION,MARCH 2O11&ADDENDUM NO.1
APPROVED AUGUST 2013." F1
12. FIRE LINE ISA CLASS3. THE CONTRACTOR 51SOLELY RESPONSIBLE FOR ENSURING THAT THE PROJECT MEETS OSHAANDALLAPPLICABLE SAFETY AS-CONSTRUCTED
REQUIREMENTS.
*14082 RECORD DRAWING