HomeMy WebLinkAbout08-20-18 City Commission Packet Materials - OPH1. BSD7 Van Winkle Stadium Agency Exemption Hearing Commission Memo
Second Bozeman High School
Application: 18085 and 18265
August 20, 2018
Page 1 of 3
Report To: Mayor and City Commission
From: Courtney Johnson, Senior Planner
Marty Matsen, Director of Community Development
Subject: Bozeman School District #7 Van Winkle Stadium Agency Exemptions
Application 18192 and 18265
Meeting Date: August 20, 2018
Agenda Item Type: Other Public Hearing
Project Location: 205 North 11th Avenue, Bozeman, MT 59715
Recommended Motion: “Required Motion: None”.
Report Date: August 10, 2018
BACKGROUND:
The City Commission receives the Van Winkle Stadium Improvements Master and Phase 1 Site plan
application and conducts a public hearing on the agency exemptions the Bozeman School District 7 is
claiming under M.C.A. Section 76-2-402.” (Other than conducting a public hearing on the exemptions, no
official motion is required by the City Commission).
The new Bozeman School District multi-purpose stadium project is a Master Plan project of a 3,200-seat
stadium north of the existing Van Winkle Stadium located at 205 N 11th Avenue, Bozeman, MT 59715. The
District is claiming agency exemptions from compliance with certain zoning standards under Montana Code
Annotated (M.C.A.) Section 76-2-402. The development proposed will not meet several municipal zoning
standards required in the Unified Development Code, Article 38 of the Bozeman Municipal Code.
The areas included in the project are the relocated two softball fields and dugouts, relocated batting cage, a
new 5,576 sq. ft. team building and 2,624 sq. ft. fan (support) facilities including bathrooms and concessions,
turf field, corresponding pathways, fencing, Ruth Thibeault Way parent drop off traffic development with
roundabout, an expanded east parking lot, lighted pedestrian path to the south parking lot, demolition of
existing south Van Winkle Stadium bleachers, and demolition of the existing stadium lights.
Phase I of the project includes the 3,200 person stadium, the relocated two softball fields and dugouts,
relocated batting cage, a new 5,576 sq. ft. team building, a 2,624 fan (support) facilities including bathrooms
and concessions, turf field, corresponding pathways, fencing, an upgraded connection from the existing
northeast parking lot to the newly updated central parking lot, an expansion and modification to the central
parking lot and modifications to the parking connection to the existing Ruth Thibeault way. There is also a new
pedestrian crossing connecting the stadium to the west sidewalk at 15th street midblock. Two streamline bus
shelters will also be provided at existing Streamline stops.
Phase II of the project includes a roundabout at N 15th Ave. and W Beall St., an improved Ruth Thibeault turn
around and drop off with two one way drives and modifications to the east parking lot for integration into the
improved said drop off. This phase also includes a lighted pedestrian pathway connecting the stadium to the
south parking lot. Demolition of the existing Van Winkle south stadium bleacher and the existing stadium lights
will also be part of the Phase II.
249
Commission Memo
Second Bozeman High School
Application: 18085 and 18265
August 20, 2018
Page 2 of 3
Montana law (M.C.A. Section 76-2-402) addresses the relationship of municipal zoning regulations to a school
district’s use of land. The law requires a public hearing whenever land is to be used contrary to zoning
regulations. The statute expressly provides that a municipality “shall have no power to deny the proposed use
but shall act only to allow a public forum for comment on the proposed use.” The requirement for a public
hearing before the City Commission on such exemptions was specifically included in the 2012 Interlocal
Agreement executed between the School District and the City.
In this regard, the School District is claiming exemptions to the Bozeman Municipal Code provisions, with
provided rationale as follows:
1. Sec. 38.550.050 / B. Additional Screening Requirements - This requirement creates screening that we
(the Bozeman School District 7) feel like would decrease visibility on the property. The intent is to
provide a higher level of safety for students. In addition, because the location of the new parking lot is in
the middle of campus, there will be very limited visibility of the parking lot.
2. Sec. 38.550.050 / C. Parking Lot Landscaping Requires that parking lots with more than 15 spaces shall
have a minimum of 20 sf of landscape area within the parking lot for each off-street parking space in a
lot. It remains the Bozeman School District’s policy to provide uninterrupted paved areas within all
school parking lots. The intent is to provide better visual access and a higher level of safety for the
students within the parking lots. In addition, because the location of the new parking lot is in the middle
of campus, there will be very limited visibility of the lot from the surrounding city streets.
3. Sec. 38.520.050/ D. Vehicular Circulation and Parking Requires that street trees and sidewalks are
provided per standard roadway design for internal roadways as well as city streets. Due to existing site
features such as site fences and drainage conveyance, street trees and sidewalks cannot easily be
installed to city standards. Pedestrian circulation and landscaping are still implemented in the design
including existing trees and new trees planted along the roadway to the south and north of Ruth
Thibeault Way, but will not specifically adhere to city design standards.
4. Sec. 38.510.030/ C and 38.510.030/ G Block Frontage Designations - The block frontages for this site are
“other” and “mixed”. The mixed block frontage requires no more than 50% of site frontage shall be
parking of which is in conflict with the 100% of the existing street frontage as an existing 15th street
parking lot that will be used for the parking count calculations and traffic/ safety vehicle functions out of
the stadium onto 15th street. These block frontages also require building placement to be at the
sidewalk edge which is also in conflict with the placement of the existing parking lot. The stadium
buildings, at 245’ away from the street will also not comply with the requirement for façade transparency
and instead will be screened properly per plank wall treatment requirements.
5. Sec. 38.540.060.B.1 Joint Use of Parking Facilities - This section requires that parking facilities provided
by another building or use must be located within 1,000 feet of the entrance to the building or use which
the application being made. Parking for all uses and facilities within the Existing Bozeman High School
campus is provided on-site or on-street adjacent to school property, however, due to the size of the
campus, some of these parking facilities are great than 1,000 feet away from entrances to buildings on
campus. This exemption is applied only to walking distance between facilities and parking areas, total
spaces required for all uses within the joint use analysis are provided on or immediately adjacent to
school property and no required parking for any one facility or use is further than 1,600 feet from an
entrance.
6. Sec. 38.540.070.A.5 Off-site Parking The off-site parking for the school and stadium will not be
complying with the following mandatory parking provisions: Per Sec. 38.540.060.A.5 Off-site Parking –
requires that parking facilities provided by another building or use must be located within 1,000 feet of
250
Commission Memo
Second Bozeman High School
Application: 18085 and 18265
August 20, 2018
Page 3 of 3
the entrance to the building or use which the application is being made. Parking for all uses and facilities
within the Existing Bozeman High School campus is provided on-site or on-street adjacent to the school
property, however, due to the size of the campus, some of these parking facilities are greater than 1,000
feet away from entrances to the buildings on campus. This exemption is applied only to walking distance
between facilities and parking areas, total spaces required for all uses are provided on or immediately
adjacent to school property and no required parking for any one facility or use is further than 1,600 feet
from an entrance.
7. Sec. 38.520.040.C.4 Non-Motorized Circulation The parking for the school and stadium will be
requesting an exemption from the following mandatory provisions: Per Sec. 38.520.040.C.4 Non-
Motorized Circulation and Design, Internal Circulation - requires that parking lots provide pedestrian
paths through lots every four rows or a maximum of 200’.
Following the public hearing, Staff will complete the site plan application review process including the
claimed exemptions and prepare a staff report for consideration by the Director of Community Development.
Standard public noticing procedures were conducted for this Agency Exemption Public Hearing noticing.
UNRESOLVED ISSUES: None Identified.
FISCAL EFFECTS: None identified.
ATTACHMENTS: Applicant’s submittal materials
251
July 19, 2018
Courtney Johnson, AIA, NCARB
Senior Planner
City of Bozeman
20 E. Olive St.
PO Box 1230
Bozeman, MT 59771
RE: BSD7 High School Multi-Use Sports Stadium Master Site Plan Re-Submittal
Application No: 18192
Application Type: Site Plan
Project Address: 205 N. 11th Ave., Bozeman, MT 59715
Project Narrative: The new Bozeman School District multi-purpose stadium project is a Master Plan project of
a 3,200-seat stadium north of the existing Van Winkle Stadium. The areas included in the project are the
relocated two softball fields and dugouts, relocated batting cage, a new 5,576 sq. ft. team building and 2,624
sq. ft. fan (support) facilities including bathrooms and concessions, turf field, corresponding pathways,
fencing, Ruth Thibeault Way parent drop off traffic development with roundabout, an expanded east parking
lot, lighted pedestrian path to the south parking lot, demolition of existing south Van Winkle Stadium
bleachers, and demolition of the existing stadium lights.
Phase I of the project includes the 3,200 person stadium, the relocated two softball fields and dugouts,
relocated batting cage, a new 5,576 sq. ft. team building, a 2,624 fan (support) facilities including bathrooms
and concessions, turf field, corresponding pathways, fencing, an upgraded connection from the existing
northeast parking lot to the newly updated central parking lot, an expansion and modification to the central
parking lot and modifications to the parking connection to the existing Ruth Thibeault way. There is also a
new pedestrian crossing connecting the stadium to the west sidewalk at 15th street midblock. Two streamline
bus shelters will also be provided at existing Streamline stops. This phase also includes a lighted pedestrian
pathway connecting the stadium to the south parking lot.
Phase II of the project includes a roundabout at N 15th Ave. and W Beall St., an improved Ruth Thibeault turn
around and drop off with two one way drives and modifications to the east parking lot for integration into
the improved said drop off. Demolition of the existing Van Winkle south stadium bleacher and the existing
stadium lights will also be part of the Phase II.
PLANNING DIVISION
1.0 Phase 1 site plan will require pedestrian connections to all proposed parking. The pathway to main street
was not included in Phase 1. Please review and revise phasing of master site plan to provide adequate
pedestrain connections.
Response: The pedestrian pathway to main street has been reallocated to part of the Phase I
project, see sheets ES1-02 and ES1-03.
252
BSD7 High School Multi-Use Sports Stadium Final Site Plan Submittal
Bozeman, Montana
2
NE45 ARCHITECTURE, LLC
1627 W Main Street
Bozeman, MT 59715
406-599-6213
2.0 Parking
a. Joint Use of Parking Facilities - Please review the required conditions for joint use. Off-street parking must
be located within 1,000 feet as such parking facilities as measured by the route of travel from the nearest
parking space to the commonly used entrance of the principal use served. All pathways must be along a safe
and defined pedestrian pathway.This previous comment has not be addressed, parking distances exceed
1000 feet. (Sec. 38.540.060)
Response: An exemption is requested for the pedestrian path of travel distance to
parking facilities. Parking analysis has been modified to reflect this.
c. Off-Site Parking. Off-site parking for nonresidential uses may not be located more than 1,000 feet from the
entrance of the principal use. Please modify parking analysis. (Sec. 38.540.070.A.5.)
Response: An exemption is requested for the off-site parking for the school.
ENGINEERING DIVISION
The application is inadequate for further review. The applicant must provide a traffic impact study that meets
the requirements of Bozeman Municipal Code (BMC) 38.220.080.A.2.i, which subsequently references BMC
38.220.060.A.12. Additional review will be provided upon submittal of the traffic impact study.
Response: Traffic impact study is ccurently being updated and will be submitted to
engineering immediately upon completion
1. The applicant must construct the proposed mid-block crossing of N. 15th Avenue at the terminus of
the sidewalk on the east side of N. 15th Avenue instead of at the proposed location (BMC
38.400.110). The applicant must demonstrate this item on the master site plan drawings prior to
master site plan approval.
Response: The current crosswalk location was recommended by our transportation engineer
(Bob Marvin). If it is located at the terminus of the existing sidewalk on the east side of 15th
it will be in conflict with a residential driveway on the west side. The proposed location of
the crosswalk as currently shown is located as far as possible from residential driveways to
provide as much sight distance as possible to avoid pedestrian/vehicle conflicts.
NW ENERGY
1. Please contact Northwestern Energy for project review, which is separate from the City Review
process.
Response: See previous comment that describes we are in current coordination with
Northwestern Energy.
“The Northwestern Energy’s engineer Derek Westveer has been contacted and
coordinated with. Northwestern Energy has received a new service application.
Major Utility locations and routing has been coordinated with NWE for the Bid Set
drawings.”
2. Any transformer locations must maintain 10 feet separation from any combustible building surface
or 2 feet from a non-combustible building surface (non-combustible surface include brick, cinder
block, concrete, and stone. Stucco is considered combustible). Due to tight configuration of some
buildings please insure this separation can be met.
Response: See previous comment:
“The Utility transformer location is shown on Sheet ES1-02. This location is roughly
35ft from the nearest combustible or non-combustible building.”
3. Insure that adequate wall space is provided for the single and multiple gas meters; including but not
limited to a 3 foot radius from the regulator to any opening and/or 10 feet to a mechanical air
253
BSD7 High School Multi-Use Sports Stadium Final Site Plan Submittal
Bozeman, Montana
3
NE45 ARCHITECTURE, LLC
1627 W Main Street
Bozeman, MT 59715
406-599-6213
intake. Please contact the local NorthWestern Energy engineer to provide you with a schematic of
the gas meters layout.
Response: See previous comment:
“Natural gas meters are located within NW Energy’s parameters.”
4. Existing underground power line to the west of the new stadium needs to be relocated to provide
adequate separation from water lines to the north. Propose relocating along North 15th Street.
Response: See previous comment:
“The relocation of the existing single phase power line has been coordinated
directly with Northwestern Energy. The re-route will be provided by NWE and will
run between the existing parking lot and 15th Ave. as requested.”
5. Need Utility Easements shown for all existing and proposed utilities.
Response: Existing utility easements are shown on C4.0
EXEMPTIONS:
The above mentioned High School multi-use stadium per part I.1.d of the Interlocal Agreement
School District 7 – City of Bozeman dated November 12, 2012 permits an exemption from site
development standards inducing, but not limited to, landscaping, lighting, and parking. We have
taken efforts to comply with standards where possible; however, it has been determined that certain
conditions resulting from the standards would reduce the safety and security of the students using
the facility.
We are proposing the following exemptions:
Exemption Request:
Sec. 38.550.050 / B. Additional Screening Requirements
This requirement creates screening that we feel like would decrease visibility on the
property. The intent is to provide a higher level of safety for students. In addition, because the
location of the new parking lot is in the middle of campus, there will be very limited visibility of the
lot from the surrounding city streets.
Sec. 38.550.050 / C. Parking Lot Landscaping
Requires that parking lots with more than 15 spaces shall have a minimum of 20sf of
landscape area within the parking lot for each off-street parking space in a lot. It remains
the Bozeman School District’s policy to provide uninterrupted paved areas within all school
parking lots. The intent is to provide better visual access and a higher level of safety for the
students within the parking lots. In addition, because the location of the new parking lot is in the
middle of campus, there will be very limited visibility of the lot from the surrounding city streets.
Sec. 38.520.050/ D. Vehicular Circulation and Parking
Requires that street trees and sidewalks pe provided per standard roadway design for internal
roadways as well as city streets. Due to existing site features such as site fences and drainage
conveyance, street trees and sidewalks cannot easily be installed to city standards. Pedestrian
circulation and landscaping are still implemented in the design including existing trees and new trees
planted along the roadway to the south and north of Ruth Thibeault Way, but will not specifically
adhere to city design standards.
254
BSD7 High School Multi-Use Sports Stadium Final Site Plan Submittal
Bozeman, Montana
4
NE45 ARCHITECTURE, LLC
1627 W Main Street
Bozeman, MT 59715
406-599-6213
Sec. 38.510.030/ C and 38.510.030/ G Block Frontage Designations
The block frontage for this site are “other” and “mixed”. The mixed block frontage requires no more
than 50% of site frontage shall be parking of which is in conflict with the 100% of the existing street
frontage as an existing 15th street parking lot that will be used for the parking count calculations and
traffic/ safety vehicle functions out of the stadium onto 15th street. These block frontages also
require building placement to be at the sidewalk edge which is also in conflict with the placement of
the existing parking lot. The stadium buildings, at 245’ away from the street will also not comply
with the requirement for façade transparency and instead will be screened properly per plank wall
treatment requirements.
Sec. 38.540.060.B.1 Joint Use of Parking Facilities
This section requires that parking facilities provided by another building or use must be located
within 1,000 feet of the entrance to the building or use which the application being made. Parking
for all uses and facilities within the Existing Bozeman High School campus is provided on-site or on-
street adjacent to school property, however, due to the size of the campus, some of these parking
facilities are great than 1,000 feet away from entrances to buildings on campus. This exemption is
applied only to walking distance between facilities and parking areas, total spaces required for all
uses within the joint use analysis are provided on or immediately adjacent to school property and no
required parking for any one facility or use is further than 1,600 feet from an entrance.
Sec. 38.540.070.A.5 Off-site Parking
The off-site parking for the school and stadium will not be complying with the
following mandatory parking provisions: Per Sec. 38.540.060.A.5 Off-site Parking –
requires that parking facilities provided by another building or use must be located
within 1,000 feet of the entrance to the building or use which the application is being
made. Parking for all uses and facilities within the Existing Bozeman High School
campus is provided on-site or on-street adjacent to the school property, however,
due to the size of the campus, some of these parking facilities are greater than
1,000 feet away from entrances to the buildings on campus. This exemption is
applied only to walking distance between facilities and parking areas, total spaces
required for all uses are provided on or immediately adjacent to school property and
no required parking for any one facility or use is further than 1,600 feet from an
entrance.
Sec. 38.520.040.C.4 Non-Motorized Circulation
The parking for the school and stadium will be requesting an exemption from the
following mandatory provisions: Per Sec. 38.520.040.C.4 Non-Motorized Circulation
and Design, Internal Circulation - requires that parking lots provide pedestrian paths
through lots every four rows or a maximum of 200’.
255
BOZEMAN, GREAT FALLS, KALISPELL & SHELBY, MT | SPOKANE, WA | LEWISTON, ID | WATFORD CITY, ND | MEDIA, PA
406.586.0277
tdhengineering.com
234 East Babcock Street
Suite 3
Bozeman, MT 59715
MEMORANDUM
Date: July 26, 2018 TDH Job No.: B17-083
To: Courtney Johnson, Sr. Planner
From: Ahren Hastings, PE
Subject: Van Winkle Stadium- Parking and Landscaping Code Exemptions
The New Bozeman High School Stadium is located on the site bound by Main Street, 15th Avenue, 11th Avenue, and Durston Road. The design of the Bozeman High School Stadium will include renovations to Ruth Thibeault Way and construction of a new 121 stall parking lot immediately west of the existing school.
Per Part I.1.d of the Interlocal Agreement School District 7 – City of Bozeman Dated November 12, 2012 permits an exemption from site development standards including, but not limited to, landscaping, lighting, and parking. We have taken efforts to comply with
standards where possible; however, it has been determined that certain conditions resulting from the standards would reduce the safety and security of the students using the facility.
1. The new parking lot for the school and stadium will not be complying with the
following mandatory landscaping provisions: Per Sec. 38.550.050.C Parking Lot Landscaping - requires that parking lots with more than 15 spaces shall have a minimum of 20sf of landscape area within the parking lot for each off-street parking space in a lot. It remains the Bozeman School District’s policy to provide uninterrupted paved areas within all school parking lots. The intent is to provide better visual access and a higher level of safety for the students within the parking lots.
2. The new Ruth Thibeault Way will not be complying with the following mandatory
internal roadway design provisions: Per Sec. 38.520.050.D Vehicular Circulation and Parking - requires that street trees and sidewalks be provided per standard roadway design. Due to existing site features such as site fences and drainage conveyance, street trees and sidewalks cannot easily be installed to city standards. Pedestrian circulation and landscaping are still implemented in the design, but will not specifically adhere to city design standards.
3. The parking for the school and stadium will not be complying with the following mandatory parking provisions: Per Sec. 38.540.060.B.1 Joint Use of Parking Facilities – requires that parking facilities provided by another building or use must
be located within 1,000 feet of the entrance to the building or use which the application is being made. Parking for all uses and facilities within the Existing
256
PAGE NO. 2
tdhengineering.com
JULY 26, 2018
Bozeman High School campus is provided on-site or on-street adjacent to the school property, however, due to the size of the campus, some of these parking
facilities are greater than 1,000 feet away from entrances to the buildings on campus. This exemption is applied only to walking distance between facilities and parking areas, total spaces required for all uses within the joint use analysis are provided on or immediately adjacent to school property and no required parking for any one facility or use is further than 1,600 feet from an entrance.
4. The off-site parking for the school and stadium will not be complying with the following mandatory parking provisions: Per Sec. 38.540.070.A.5 Off-site Parking – requires that parking facilities provided by another building or use must be located within 1,000 feet of the entrance to the building or use which the application is being made. Parking for all uses and facilities within the Existing Bozeman High School campus is provided on-site or on-street adjacent to the school property, however, due to the size of the campus, some of these parking facilities are greater than 1,000 feet away from entrances to the buildings on campus. This exemption is applied only to walking distance between facilities and parking areas, total spaces
required for all uses are provided on or immediately adjacent to school prop erty and no required parking for any one facility or use is further than 1,600 feet from an entrance.
5. The parking for the school and stadium will be requesting an exemption from the following mandatory provisions: Per Sec. 38.520.040.C.4 Non-Motorized Circulation and Design, Internal Circulation - requires that parking lots provide pedestrian paths
through lots every four rows or a maximum of 200’.
6. Sec. 38.550.050 / B. Additional Screening Requirements – This section requires screening that we feel like would decrease visibility on the property. The intent is to provide a higher level of safety for students. In addition, because the location of the new parking lot is in the middle of campus, there will be very limited visibility of the lot from the surrounding city streets.
7. Sec. 38.510.030/ C and 38.510.030/ G Block Frontage Designations - The block
frontage for this site are “other” and “mixed”. The mixed block frontage requires no more than 50% of site frontage shall be parking of which is in conflict with the 100% of the existing street frontage as an existing 15th street parking lot that will be used for the parking count calculations and traffic/ safety vehicle functions out of the stadium onto 15th street. These block frontages also require building placement to be at the sidewalk edge which is also in conflict with the placement of the existing
parking lot. The stadium buildings, at 245’ away from the street will also not comply
with the requirement for façade transparency and instead will be screened properly per plank wall treatment requirements.
Sincerely,
Ahren Hastings PE Project Manager TD&H ENGINEERING
257
SHEET
DATE
SHEET TITLE
BSD7
Bozeman School District
Consultant #:1216 West Lincoln Street D, Bozeman, MT 59715404 West Main Street
Bozeman, MT 59715
REVIEWED BY:
DRAWN BY:BID DOCUMENTSFINAL SITE PLAN
REVIEW COVER
AG-01
05/25/18VAN WINKLE STADIUMRENOVATIONSAO
JL
BSD7# 17-41-36225 Franklin Street, Suite 1100Boston, MA 02110t 617.478.0300f 617.478.0321www.perkinswill.comVAN WINKLE STADIUM RENOVATIONS
PROJECT DIRECTORY
Architect:
NE45 ARCHITECTURE
1627 W. Main St., Suite 325
Bozeman, MT 59715
P: 406.599.6213
Owner:
PHASE 1 PLAN SUMMARY
Structural:
DCI+BCE Engineers
Bozeman School
District #7
Todd Swinehart
BSD7, Director of Facilities
todd.swinehart@bsd7.org
1289 Stoneridge Dr #1A
Bozeman, MT 59718
P: 406.556.8600
1. THE CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO ANY WORK AND SHALL BE RESPONSIBLE
FOR ALL WORK AND MATERIALS INCLUDING THOSE FURNISHED BY SUBCONTRACTORS
2. DIMENSIONS TAKE PRECEDENCE OVER DRAWINGS: DO NOT SCALE DRAWINGS TO DETERMINE ANY
LOCATIONS. THE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCY PRIOR TO CONTINUING WITH WORK.
3. GENERAL CONTRACTOR SHALL KEEP THE CONSTRUCTION SITE IN A BROOM CLEAN CONDITION AT ALL TIMES DURING THE
PROJECT.
4. THE CONTRACTOR SHALL REPORT TO THE ARCHITECT ANY ERRORS, INCONSISTENCIES OR OMISSIONS HE OR SHE MAY
DISCOVER. THE CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ERROR AFTER THE START OF CONSTRUCTION WHICH HAS
NOT BEEN BROUGHT TO THE ATTENTION OF THE ARCHITECT. THE MEANS OF CORRECTING ANY ERROR SHALL FIRST BE
APPROVED BY THE ARCHITECT.
5. ALL REQUIRED CITY AND/OR COUNTY LICENSE SHALL BE ACQUIRED AND PAID FOR BY THE INDIVIDUAL TRADE.
6. THE ARCHITECT WILL REVIEW SHOP DRAWINGS AND SAMPLES FOR CONFORMANCE WITH THE DESIGN CONCEPT OF THE
PROJECT. THE ARCHITECT'S REVIEW OF A SEPARATE ITEM SHALL NOT INDICATE APPROVAL OF AN ASSEMBLY IN WHICH THE ITEM
FUNCTIONS.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY LOCATION OF ALL EXISTING UTILITIES WHETHER SHOWN
HEREIN OR NOT AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSES OF REPAIR OR
REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS IN CONJUNCTION WITH THE EXECUTION OF THE
WORK.
8. CITY APPROVED PLANS SHALL BE KEPT IN A SECURE PLACE AND SHALL NOT BE USED BY WORKERS. THE CONTRACTOR SHALL
BE RESPONSIBLE THAT ALL SUBCONTRACTORS' CONSTRUCTION SETS REFLECT THE SAME, CURRENT AND MOST ACCURATE
INFORMATION. THE CONTRACTOR SHALL ALSO MAINTAIN, IN GOOD CONDITION, ONE COMPLETE SET OF STAMPED CITY APPROVED
PLANS WITH ALL REVISIONS, ADDENDUMS, AND CHANGE ORDERS ON THE PREMISES AT ALL TIMES. THERE ARE TO BE UNDER THE
CARE OF THE JOB SUPERINTENDENT AND MUST BE MADE AVAILABLE TO BUILDING AND FIRE INSPECTORS FOR REFERENCE DURING
THE CONSTRUCTION.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE SITE WHILE THE JOB IS IN PROGRESS AND
UNTIL JOB COMPLETION.
10. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF THE OCCUPANTS AND WORKERS
AT ALL TIMES.
11. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS AND METHODS AND SHALL MAINTAIN THE
STRUCTURAL INTEGRITY OF ANY CONSTRUCTION UNTIL ALL FINAL LATERAL AND VERTICAL LOAD CARRYING SYSTEMS ARE
COMPLETED.
12. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR AND SHALL REPLACE OR REMEDY ANY FAULTY, IMPROPER OR INTERIOR
MATERIALS OR WORKMANSHIP WHICH SHALL APPEAR, WITHIN ONE (1) YEAR AFTER THE COMPLETION AND ACCEPTANCE OF THE
WORK UNDER THIS CONTRACT.
13. CONTRACTOR TO PROVIDE BACKING OR BLOCKING AS REQUIRED FOR MOUNTING ALL WALL MOUNTED SHELVES, EQUIPMENT,
ACCESSORIES, CABINETS, ETC.
14. CONTRACTOR TO PROTECT ALL TRESS AND ROOTS NOT SLATED FOR REMOVAL DURING ONSTRUCTION.
15. GENERAL CONTRACTOR RESPONSIBLE FOR MAINTENANCE OF STAGING AREA, AND TO ENSURE THAT MATERIALS DELIVERY
AND STORAGE DO NOT INTERFERE WITH DAILY OPERATION OF ADJACENT PROPERTIES OR PUBLIC RIGHT-OF-WAY.
16. GENERAL CONTRACTOR RESPONSIBLE FOR CONSTRUCTION STAKING.
17. ALL DIMENSIONS ARE TAKEN FROM F.O. STUD OR COL CL U.N.O.
18. ALL DOOR/WINDOW DIMENSIONS ARE TO EDGE OF DOOR PANEL OR CL IF NO CL DIMENSION IS SHOWN FOR A PARTICULAR
DOOR/WINDOW TYPE, SEE SCHEDULE AND DOOR/WINDOW DETAILS FOR TYPICAL INSTALLATION DETAIL.
MEP:
Morrison-Maierle Inc.
2880 Technology Blvd W
Bozeman, MT 59718
P: 406.587.0721
Contractor:
Jackson Contractor
Group
80 Shire Trail
Bozeman, MT 59718
P: 406.577.2772
GENERAL NOTES
Jeff Lusin
jlusin@ne45arch.com
Aaron Overstreet
aoverstreet@ne45arch.com
Turf Consultant:
Millennium Sports
Technologies Inc.
1893 W. Kettle Ave.
Littleton, CO 80120
P: 303.730.1440
PERKINS + WILL
225 Franklin St.
Boston, MA 02110
P: 617.478.0300
IT/AV:
Access Consulting
2300 Regent St. Suite 207
Missoula, MT 59801
P: 406.327.0629
Civil:
TD&H Engineering
234 E Babcock St. #3
Bozeman, MT 59715
P: 406.586.0277
Landscape:
DHM Design
27 E Main St. Suite D
Bozeman, MT 59715
P: 406.219.2012
P: 406.522.6009
MASTER SITE PLAN PROJECT DESCRIPTION:NEW ±3,200-SEAT MULTI-PURPOSE STADIUM
WITH SPORTS LIGHTING NORTH OF THE EXISTING VAN WINKLE STADIUM WITH ±9,400
SUPPORT BUILDINGS CONSISTING OF TRAINING, FIRST AID, EQUIPMENT STORAGE, TEAM
ROOMS, AND TOILET FACILITIES FOR FANS, PLAYERS, COACHES, AND OFFICIALS. AREA
AFFECTED ALSO INCLUDES TWO SOFTBALL FIELDS, CORRESPONDING PATHWAYS, A MULTI-
PURPOSE TURF FIELD, FENCING, RUTH THIBEAULT WAY PARENT DROP OFF TRAFFIC
DEVELOPMENT, MINI ROUND ABOUT AT 15TH INTERSECTION, CORRESPONDING LIGHTING
AND DEMOLITION OF EXISTING SOUTH BLEACHERS AT VAN WINKLE STADIUM.
GROSS AREA = 65.322 ACRES (2,845,426.32 SQ. FT.)
GROSS EXISTING BUILDING AREA = 425,000 SF.(W/ SWIM CENTER)
GROSS NEW BUILDING AREA = 9,483 SQ. FT.
TOTAL FLOOR AREA RATIO = 15.26%
LEGAL DESCRIPTION:S12, T02 S, R05 E, ACRES 27.08, HIGH SCHOOL TRACT IN NW 4
AHJ:City of Bozeman (Building)/State of Montana (MEP)
APPLICABLE CODES:2012 International Building Code
2012 International Residential Code
2012 International Mechanical Code
2012 International Plumbing Code
2012 International Fuel Gas Code
2012 International Energy Conservation Code
20112 National Electric Code (NFPA 70)
2006 ICC/ANSI A117.1 Accessibility Standard
Americans with Disabilities Act (ADA)
ZONING: PLI
DESIGN CRITERIA:STRUCTURAL:SEE STRUCTURAL DRAWINGS
ENERGY:PERSCRIPTIVE
CONSTRUCTION TYPE:V-B
OCCUPANCY GROUP:ASSEMBLY A-5, GROUP B
Food Service:
H-C Design &
Consulting
614 Fergusun Ave., Ste. 1
Bozeman, MT 59718
P: 406.522.7700
REV. DESCRIPTION DATE
MASTER SITE PLAN PROGRAM AREA CALCULATIONS
GROSS AREA SITE = 65.322 ACRES (2,845,426.32 SQ. FT.)
BUILDINGS:
GROSS EXISTING BUILDING AREA = 425,000 SF.(W/ SWIM CENTER)
GROSS NEW BUILDING AREA = 9,483 SQ. FT.
TOTAL FLOOR AREA RATIO = 15.26%
DRIVEWAY CIRCULATION AND PARKING AREAS:
GROSS EXISTING AREA = 494,917 SQ. FT.
GROSS NEW AREA = 80,573 SQ. FT.
TOTAL AREA RATIO = 20.22%
LANDSCAPING AREAS:
GROSS EXISTING AREA = 1,621,287 SQ. FT.
GROSS NEW AREA = 231,547 SQ. FT.
TOTAL AREA RATIO = 65.12%
PRIVATE OPEN SPACE: N/A
CITY PARKS: N/A
OTHER PUBLIC LANDS: ALL SCHOOL SITE
ZONING WITHIN 200 FT. OF THE SITE
VEHICLE AND BIKE PARKING CALCULATIONS
Existing Automobile Parking Spaces:
Lot West of Stadium = 279 spaces
Lot East of Stadium = 120 spaces
Ruth Thiebualt = 35 Spaces
Total Spaces around Stadium = 434 spaces
Required Bike Parking Spaces:
434 x 10% = 44 Spaces
50 Spaces to be provided
P r o j e c t I n d e x
DATE OF ISSUE
■
●
□
♦
○
∆
Drawing Issued for Construction/Permit
Drawing Issued for Owner Review/Pricing
Drawing issued for Reference Only
Drawing Revisions
Drawing Revisions (Issued via 8 1/2"x11")
Revision Number5.25.18 BID DOCUMENTS5.4.18 95% CD SET4.6.18 75% CD SETARCHITECTURAL COVER
AG-01 FINAL SITE PLAN REVIEW COVER
AG-02 CODE REVIEW
AG-03 LIFE SAFETY
AG-04 LIFE SAFETY
ARCHITECTURAL SITE
AS-00 MASTER SITE PLAN
AS-01 PHASE 1 OVERALL SITE PLAN
ARCHITECTURAL
AS-02 OVERALL STADIUM PLAN
AS-03 ELEVATIONS - SUPPORT BUILDING
AS-04 ELEVATIONS - TEAM BUILDING
AS-05 ELEVATIONS AND DETAILS - BLEACHERS
AS-06 PRODUCT SPECIFICATIONS
CIVIL
C1.0 DIRECTORY
C1.1 NOTES, LEGEND, & ABBREVIATIONS
C2.0 EXISTING CONDITIONS AND SURVEY DATA
C2.1 EXISTING CONDITIONS AND DEMOLITION PLAN
C3.0 SITE PLAN OVERVIEW
C3.1 SITE PLAN OVERVIEW - NEW STADIUM
C3.2 SITE PLAN - NEW PARKING LOT
C3.3 SITE PLAN - NEW SOFTBALL FIELD
C3.4 MASTER SITE PLAN
C4.0 SITE UTILITY PLAN
C5.0 GRADING PLAN
C5.1 GRADIN PLAN
C5.2 GRADING PLAN PARKING LOT
C5.3 GRADING PLAN SOFTBALL FIELDS
C6.0 CIVIL SITE DETAILS
C6.0A CIVIL SITE DETAILS
C6.1 CIVIL SITE DETAILS
C6.1A CIVIL SITE DETAILS
LANDSCAPE
L100 LANDSCAPE OVERALL PLAN
L200 LANDSCAPE ENLARGEMENT PLAN
L300 LANDSCAPE ENLARGEMENT PLAN
L400 IRRIGATION PLAN
ELECTRICAL
ES1-01 SOFTBALL FIELD ELECTRICAL SITE PLAN
ES1-02 SITE POWER PLAN
ES1-03 STADIUM SITE PHOTOMETRIC CALC
PHASE 1 SITE PLAN PROGRAM AREA CALCULATIONS
GROSS AREA SITE = 65.322 ACRES (2,845,426.32 SQ. FT.)
BUILDINGS:
GROSS EXISTING BUILDING AREA = 425,000 SF.(W/ SWIM CENTER)
GROSS NEW BUILDING AREA = 9,483 SQ. FT.
TOTAL FLOOR AREA RATIO = 15.26%
DRIVEWAY CIRCULATION AND PARKING AREAS:
GROSS EXISTING AREA = 494,917 SQ. FT.
GROSS NEW AREA =
TOTAL AREA RATIO = 20.22%
LANDSCAPING AREAS:
GROSS EXISTING AREA = 1,621,287 SQ. FT.
GROSS NEW AREA =
TOTAL AREA RATIO = 65.12%
PRIVATE OPEN SPACE: N/A
CITY PARKS: N/A
OTHER PUBLIC LANDS: ALL SCHOOL SITE
PHASE 1 BIKE PARKING CALCULATIONS
Existing Automobile Parking Spaces:
Lot West of Stadium = 279 spaces
Lot East of Stadium = 120 spaces
Ruth Thiebualt = 35 Spaces
Total Spaces around Stadium = 434 spaces
Required Bike Parking Spaces:
434 x 10% = 44 Spaces
50 Spaces to be provided
MASTER SITE PLAN PROPOSED ENTITLEMENT
TOTAL PROJECT COMPLETION = AUG 2019
-14 MONTHS
PHASE 1 CONSTRUCTION
-JULY 2018 -JUNE 2019
PHASE 2 CONSTRUCTION
-JUNE 2019 -AUGUST 2019
PROJECT SUMMARY MASTER SITE PLAN SUMMARY
258
SS
SS
C P
C P
C P
C P
C P
C P
C P
SS
C PSS
DURSTON ROAD
15TH AVE#2 #4
#7
#3
#5 0 5#5#6
#12N 15TH AVEN 11TH AVEPROPOSED PROJECT
BOUNDARY
MULTI-PURPOSE
HIGH SCHOOL
STADIUM
DEMOLISH HOUSE, SCRAPE
AND BACKFILL FOR
LANDSCAPE INPROVEMENTS
PROPOSED PROJECT
BOUNDARY
REAR SETBACK
20' - 0"SIDE SETBACK5' - 0"FRONT SETBACK
25' - 0"SIDE SETBACK5' - 0"REAR SETBACK
20' - 0"FRONT SETBACK25' - 0"FRONT SETBACK
25' - 0"
EXISTING SOUTH BLEACHERS
TO BE DEMO'D.
EXISTING ATHLETIC FIELD
LIGHTING TO BE DEMO'D.
PROPOSED
PEDESTRIAN PATH
EMERGENCY
VEHICLE ACCESS
PROPOSED DROP OFF TURN
AROUND
PROPOSED PARKING
LOT EXPANSION
REVISED RUTH
THIEBUALT DRIVE
PROPOSED RUTH THIEBUALT
DRIVE DROP OFF
PROJECT PHASE LINE
EMERGENCY VEHICLE
ACCESS VIA WIDENED
SIDEWALK
PEDESTRIAN SIDEWALK
PRIMARY EAST ENTRANCE
PRIMARY WEST ENTRANCE
STADIUM PLAZA
EMERGENCY
VEHICLE ACCESS
CROSSWALK WITH RAPID
FLASHING BEACON WITH
PUSH BUTTON, PER CIVIL
PROPOSED SOFTBALL
FIELDS
EMERGENCY VEHICLE
ACCESS TO STADIUM
PROPOSED
ROUND ABOUT N 15TH AVEPROPOSED PROJECT
BOUNDARY PHASE 1
MULTI-PURPOSE
HIGH SCHOOL
STADIUM
DEMOLISH HOUSE, SCRAPE AND
BACKFILL FOR LANDSCAPE
INPROVEMENTS
PROPOSED PROJECT
BOUNDARY PHASE 1
REAR SETBACK
20' - 0"SIDE SETBACK5' - 0"FRONT SETBACK
25' - 0"SIDE SETBACK5' - 0"REAR SETBACK
20' - 0"FRONT SETBACK25' - 0"PHASE 1
PHASE 1
PHASE 2
PHASE LINE
PHASE 2
PROPOSED PROJECT
BOUNDARY PHASE 2
PHASE 2
PHASE 2
PHASE 1
SHEET
DATE
SHEET TITLE
BSD7
Bozeman School District
Consultant #:1216 West Lincoln Street D, Bozeman, MT 59715404 West Main Street
Bozeman, MT 59715
REVIEWED BY:
DRAWN BY:BID DOCUMENTSMASTER SITE
PLAN
AS-00VAN WINKLE STADIUMRENOVATIONSAuthor
Checker
BSD7# 17-41-36225 Franklin Street, Suite 1100Boston, MA 02110t 617.478.0300f 617.478.0321www.perkinswill.comREV. DESCRIPTION DATE
1" = 100'-0"1 SITE MASTER PLAN
1" = 100'-0"2 SITE PHASING PLAN
MASTER SITE PLAN PROPOSED ENTITLEMENT
TOTAL PROJECT COMPLETION = AUG 2019
-14 MONTHS
PHASE 1 CONSTRUCTION
-JULY 2018 -JUNE 2019
PHASE 2 CONSTRUCTION
-JUNE 2019 -AUGUST 2019
259
PL
IR-
3 R-OR-
2 R-
1R-
3PLI
B-
2PL
I
R-OR-4R-
2 R-
4
B-
3 R-
4 R-
5
R-
3 PLI
PL
IR-
1 B-
1 B-
1
COUNTY
R-OR-
3 R-
1R-
4
R-OR-
3 R-OB-
2
R-
5PL
IR-
4
R-
4
B-
2MR-OR-
4 R-
5 B-
2M
R-
5 R-
3R-4R-OR-2R-OR-
3
DIRECTORY,SCHEDULE, & MAPC-1.0SCALING NOTEHIGH SCHOOL SITE TRACT IN NW 14 OF SEC. 12, T02S, R05ESCHEDULE OF DRAWINGSVICINITY MAP, ZONING MAP, & CONSTRUCTION ROUTESCIVIL ENGINEERARCHITECTOWNERGENERAL CONTRACTORPROJECT DIRECTORYPROJECT LOCATIONLOCATION MAPREV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.com
J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C1.0.dwg, 6/11/2018 1:22:13 PM, ACH
260
EXISTINGDESCRIPTIONNEWNOTES, LEGEND, &ABBREVIATIONSC-1.1AC102GENERAL NOTESSANITARY SEWER NOTESWATER NOTESABBREVIATIONSSTORM DRAIN NOTESSCALING NOTELEGENDPAVING NOTESREV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.com
J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C1.0.dwg, 6/11/2018 12:17:27 PM, MMO
261
CP#5
CP
#
2
C
P
#
5
0
4 CP
#
5
0
5
C
P
#
6
CP
#
7
CP#501CP#3CP#4
N.. 15THAVENUEDURSTON ROAD
MAIN STREET
N89°12'45"W140.23'N01°55'28"E 641.45'S88°34'36"E115.07'
N89°59'09"W 1189.05'N01°51'33"E 1004.30'N02°28'14"E 652.73'S88°25'49"E 593.97'S88°30'44"E 596.50'N01°28'50"E28.95'CONTROL POINTS:EXISTINGCONDITIONS &SURVEY DATAC-2.0REV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.com
J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C2.0.dwg, 6/11/2018 12:43:01 PM, MMO
262
RUTH THIBEAULT WAY
EXISTINGCONDITIONS &DEMOLITION PLANC-2.1REV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.com
J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C2.1.dwg, 6/11/2018 12:18:09 PM, MMO
263
DURSTON ROAD
N. 11TH AVENUEW. MAIN STN. 15TH AVENUERUTH THIBEAULT WAY
SITE PLANOVERVIEWC-3.0REV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.com2DRC RESUBMIT7/10J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 7.10.18\B17-083-VW C3.0.dwg, 7/10/2018 2:30:23 PM, ACH
264
1+00 1+42
N. 15TH AVE.SITE PLAN - NEWSTADIUMC-3.1NOTES:REV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.com
J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C3.1.dwg, 6/11/2018 12:18:50 PM, MMO
265
SITE PLAN - NEWPARKING LOTC-3.2NOTES:REV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.com
J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C3.2.dwg, 6/11/2018 12:19:13 PM, MMO
266
DURSTON ROADSITE PLAN - NEWSOFTBALL FIELDSC-3.3NOTES:REV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.com
J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C3.3.dwg, 6/11/2018 12:29:16 PM, MMO
267
DURSTON ROAD
N. 11TH AVENUEW. MAIN STN. 15TH AVENUERUTH THIBEAULT WAY
MASTER SITE PLANC-3.4REV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.com
J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C3.4.dwg, 6/11/2018 2:40:25 PM, ACH
268
RUTH THIBEAULT WAYSITE UTILITY PLANC-4.0REV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.com2DRC RESUBMIT7/10J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 7.10.18\B17-083-VW C4.0.dwg, 7/10/2018 2:33:13 PM, ACH
269
REV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.comGRADING PLANC-5.0J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C5.0.dwg, 6/11/2018 12:20:41 PM, MMO
270
1+00 1+42
1+00 1+77
POND A SECTIONREV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.comGRADING PLAN -NEW STADIUMC-5.1J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C5.1.dwg, 6/11/2018 12:21:05 PM, MMO
271
1+00 1+42
POND C SECTIONREV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.comGRADING PLAN -PARKING LOTC-5.2J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C5.2.dwg, 6/11/2018 12:21:31 PM, MMO
272
1+001+80DURSTON ROADPOND B PROFILEREV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.comGRADING PLAN -SOFTBALL FIELDSC-5.3J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C5.3.dwg, 6/11/2018 12:21:54 PM, MMO
273
CLEANOUT DETAIL INTEGRAL CONCRETE CURB AND GUTTER DETAIL7C6.0ASPHALT PARKING LOT SECTION DETAIL 3C6.0CONCRETE SIDEWALK SECTION 1C6.0CLEANOUT DETAIL 8C6.0FIELD SECTION 5C6.0CIVIL SITEDETAILSC-6.0ASPHALT SIDEWALK SECTION SIDEWALK GRADING CURB DETAIL 6C6.0RUTH THIBEAULT WAY 4C6.0*ASPHALT SECTION 2C6.0REV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.com
J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C6.0.dwg, 6/11/2018 12:41:55 PM, MMO
274
DRYWELL DETAIL 13C6.0CMP INFILTRATION STRUCTURE DETAIL 12C6.0DIMENSIONS TABLEA
C6.0SECTION C6.0AADA RAMP DETAIL 11C6.0CIVIL SITEDETAILSC-6.0ABOLLARD DETAIL 9C6.0CURB CHANNEL DETAIL 10C6.0REV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.com
J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C6.0.dwg, 6/11/2018 12:41:37 PM, MMO
275
CULVERT DETAIL 2C6.1CIVIL SITEDETAILSC-6.1SIGN POST DETAIL 4C6.18'Ø STORM SEWER MANHOLE 1C6.1RETENTION POND SECTION 3C6.1REV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.com
J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C6.1.dwg, 6/11/2018 12:42:20 PM, MMO
276
CIVIL SITEDETAILSC-6.1AREV.DESCRIPTIONDATEREVIEWED BY:DRAWN BY:SHEETDATESHEET TITLEBOZEMAN SCHOOL
DISTRICT 7
404 West Main Street
Bozeman, MT 59715TDH#: B17-083NOTE: DOCUMENTS MAYNOT BE USED FORREGULATORY APPROVAL,PERMITTING, ORCONSTRUCTIONPURPOSESVAN WINKLE STADIUM
RENOVATIONS
REVISED SITE PLAN SUBMITTAL
MMOACHBSD7# 17-41-366/13/18Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.com
J:\2017\B17-083 Lambert and Van Winkle Fields\CADD\CIVIL VAN WINKLE\DWG\SITE PLAN SUBMITTAL 24X36 SHEETS 6.13.18\B17-083-VW C6.1.dwg, 6/11/2018 12:42:36 PM, MMO
277
WN 15TH AVEN 11TH AVEPROPOSED PROJECT
BOUNDARY
MULTI-PURPOSE
TURF FIELD
DEMOLISH HOUSE, SCRAPE AND
BACKFILL FOR LANDSCAPE
INPROVEMENTS
PROPOSED PROJECT
BOUNDARY
AS-01
2
Sim
AS-02
1
REAR SETBACK
20' - 0"SIDE SETBACK5' - 0"FRONT SETBACK
25' - 0"SIDE SETBACK5' - 0"REAR SETBACK
20' - 0"FRONT SETBACK25' - 0"FRONT SETBACK
25' - 0"
PRIMARY WEST ENTRANCE
PRIMARY EAST ENTRANCE
EMER. VEHICLE
ACCESS
EMER. VEHICLE
ACCESS
WIDENED SIDEWALK
FOR EMER. VEHICLE
ACCESS
CROSSWALK WITH
RAPID FLASHING
BEACON WITH PUSH
BUTTON, PER CIVIL
PROPOSED
DUMPSTER
LOCATION
STADIUM ENTRANCE
STADIUM ENTRANCE
PEDESTRIAN PATH
WITH BOLLARD
LIGHTING, PER
LANDSCAPE
4' - 0"SLOPE 1/4" : 12"YARD DUMPSTER
(N.I.C.)
4" DIA. PROTECTIVE
BOLLARDS, 36" ABV.
SLAB
8" CMU BLOCK
ON LEVEL 2 1/2"
CONCRETE CURB
CLEAR OPENING
10' - 0"
STEEL CANE BOLTS,
WITH COORDINATED
HOLES BORED INTO
APRON
12' - 0"10' - 8"1' - 6"LEVEL 2 1/2"
CONCRETE CURB
AS1-01
2 Sim
AS1-01
2 Sim
EXISTING PUMP HOUSE BUILDING,
FIELD VERIFY LOCATION
4' - 0"2' - 8"4' - 0"EXISTING
CONCRETE APRON
EXTEND CONCRETE
APRON
BORE HOLES IN
APRON FOR GATE
STOPS
180 DEG. MIN.
GATE SWING
4"x4"x3/16" STEEL
TUBE -CAP ENDS
BORE HOLES IN
APRON FOR GATE
STOPS AT 90 DEG.
STEEL TUBE FRAME 180
DEG. MIN. SWING GATE.
CLAD WITH BOX RIB
METAL SIDING
8" CMU WALL
12' - 0"5' - 7"0' - 8"0' - 3"6' - 0"4"X4" TUBE STEEL POST
PRECAST SLOPED
CONCRETE CAP
CONCRETE CURB
STEEL CANE BOLTS, WITH
COORDINATED HOLES
BORED INTO APRON
10' - 0"
EQ EQ
1' - 0"
8" CMU BLOCK ON TOP
OF CONCRETE CURB
3"6' - 0"CONCRETE CURB
AROUND PERIMETER,
WITH TURN DOWN
SLAB, PER CIVIL
PRECAST SLOPED
CONCRETE CAP
3/4" GATE HINGE
BOLT
4X4X3/16" STEEL TUBE
WELD HINGE
TO GATE
2X4X3/16" TUBE STEEL
FRAME
2X2X1/8" STEEL TUBE
*ALL STEEL PAINTED BLACK UNLESS NOTED OTHERWISE
CEDAR SLAT SIDING
SHEET
DATE
SHEET TITLE
BSD7
Bozeman School District
Consultant #:1216 West Lincoln Street D, Bozeman, MT 59715404 West Main Street
Bozeman, MT 59715
REVIEWED BY:
DRAWN BY:BID DOCUMENTSPHASE 1
OVERALL SITE
PLAN
AS-01
05/25/18VAN WINKLE STADIUMRENOVATIONSAuthor
Checker
BSD7# 17-41-36225 Franklin Street, Suite 1100Boston, MA 02110t 617.478.0300f 617.478.0321www.perkinswill.com 1" = 100'-0"1 SITE PHASE 1 PLAN - SPR
1/4" = 1'-0"2 DUMPSTER PLAN 2
1/2" = 1'-0"3 DUMPSTER ELEVATION 2
1/2" = 1'-0"4 DUMPSTER SECTION 2
3" = 1'-0"5 DUMPSTER HINGE PLAN DETAIL
REV. DESCRIPTION DATE
278
24" X 48"24" X 42"
1
3
6
7
10
10
AS-03
I O
11
2
8
5
12
13
B C D
18
NA
14
15
G H J KEF ML
17
16
P Q
4
9 1
AS-03
2
AS-03
3
AS-03
9
AS-03
8
AS-03
6
AS-03
4
AS-03
5
AS-03
7
AS-03
1
AS-04
2
AS-04
4
AS-04
3
AS-04
1
AS-05
2
AS-05
3
AS-05
4
AS-05
FIELD LIGHTING, PER MANUF. REQ. ,
SEE SPECS. COORDINATE THE TOP OF
FOUNDATIONS TO MAINTAIN A
CONSISTANT TOP OF LIGHT FIXTURE
ELEVATION AROUND THE SITE.
COORDINATE WITH MANUF.
FIELD LIGHTING, PER MANUF. REQ. ,
SEE SPECS. COORDINATE THE TOP OF
FOUNDATIONS TO MAINTAIN A
CONSISTANT TOP OF LIGHT FIXTURE
ELEVATION AROUND THE SITE.
COORDINATE WITH MANUF.
FIELD LIGHTING, PER
MANUF. REQ. , SEE
SPECS. COORDINATE
THE TOP OF
FOUNDATIONS TO
MAINTAIN A CONSISTANT
TOP OF LIGHT FIXTURE
ELEVATION AROUND THE
SITE. COORDINATE WITH
MANUF.
FIELD LIGHTING, PER MANUF. REQ. ,
SEE SPECS. COORDINATE THE TOP OF
FOUNDATIONS TO MAINTAIN A
CONSISTANT TOP OF LIGHT FIXTURE
ELEVATION AROUND THE SITE.
COORDINATE WITH MANUF.
FIELD LINES ON ARCH
DRAWINGS ARE SHOWN FOR
REFERENCE ONLY
REMOVABLE FOOT BALL
FIELD GOAL POST. SEE
FIELD DRAWINGS
REMOVABLE FOOT
BALL FIELD GOAL
POST. SEE FIELD
DRAWINGS
BALL NETTING AN POSTS PER
FIELD DRAWINGS. CENTER ON
FIELD
CHAINLINK GATE, TYP
4' CHAINLINK
FENCE AT
PERIMETER
OF FIELD, TYP
30' FLAG POLE
PER SPECS
BALL NETTING AN POSTS PER
FIELD DRAWINGS. CENTER ON
FIELD
4' CHAINLINK FENCE
AT PERIMETER OF
FIELD, TYP
4' CHAINLINK FENCE AT
PERIMETER OF FIELD, TYP
4' CHAINLINK FENCE AT
PERIMETER OF FIELD, TYP
6' DECORATIVE FENCE AT
PERIMETER OF VENUE, TYP
12'-0" x 6'-0"
DECORATIVE GATE ,
TYP
(3) 6'-0" x 6''-0"
DECORATIVE GATE ,
TYP
CONCRETE WALK CONCRETE WALK6' DECORATIVE FENCE AT
PERIMETER OF VENUE, TYP 12'-0" x 6''-0" DECORATIVE
GATE , TYPASPHALT WALKASPHALT WALKCONCRETE WALKC
O
N
CR
ETE W
ALK
CONCRETE WALK CONCRETE WALKCONCRETE WALKCONCRETE WALKCONCRETE WALKSLOPED LAWN
SLOPED LAWN
SLOPED LAWN
SLOPED LAWN
SLOPED LAWN
ASPHALT WALKASPHALT WALK
A
SP
HA
L
T
WAL
KASPHALT WALK ASPHALT WALKCONCRETE WALK
4' CHAINLINK
FENCE AT
PERIMETER OF
FIELD, TYP
CHAINLINK
GATE, TYP
CHAINLINK
GATE, TYP
6' DECORATIVE FENCE
AT PERIMETER OF
VENUE, TYP
12'-0" x 6'-0" DECORATIVE
GATE , TYP
6' DECORATIVE FENCE AT
PERIMETER OF VENUE, TYP
6' DECORATIVE
FENCE AT
PERIMETER OF
VENUE, TYP
6' DECORATIVE FENCE AT
PERIMETER OF VENUE, TYP
6' DECORATIVE FENCE AT
PERIMETER OF VENUE, TYP
6' DECORATIVE FENCE AT
PERIMETER OF VENUE, TYP
12'-0 x 6''-0" DECORATIVE
GATE , TYP
SCOREBOARD
PER SPECS
2
AS-02
8' - 0"8' - 0"8' - 0"
3
AS-02
ASPHALT DRIVE FOR
EMERGENCY VEHICLE
ACCESS
CONCRETE BOLLARD
SEATING
BIKE PARKING PER
LANDSCAPE
BIKE PARKING PER
LANDSCAPE
PRIMARY EAST ENTRANCE
PRIMARY WEST
ENTRANCE
BLEACHER SEATING
EMERGENCY VEHICLE
ACCESS
FIELD LEVEL
-3' - 0"
8' - 0" O.C.7 1/2"1' - 0 5/8"5' - 0 1/2"6' - 0"FORERUNNER RAIL
THIRD RAIL OPTIONAL
POST SIZE VARIES WITH
HEIGHT
3/4" PICKET
2"TYP.
3 7/8"
GATE LATCH
ALUMINUM PAINTED
BLACK, TYP.
TOW 97'
97'-0"
STADIUM LEVEL 1
0' - 0"
FIELD LEVEL
-3' - 0"
REFER TO PLAN
CHAINLINKCHAINLINK
DOME CAP, TYP.
GATE POST
MALE/FEMALE HINGE
GATE LATCH
WITH PAD LOCK
CHAINLINK GATE
DIAGONAL
BRACING
4' - 0"TOW 97'
97'-0"
A1
B4B2
X1
NOTES:
1. TOPS OF ALL SIGNS TO BE MOUNTED AT 60" UNO. WITH EDGE OF
SIGN MOUNTED 9" OFF DOOR FRAME, VERIFY LOCATIONS WITH
DISTRICT SIGNAGE LOCATION STANDARDS
2. TYPE IN BOLD TO BE ACTUAL VERBIAGE ON SIGNS.
3. SIGNS, SIGN SIZES, AND SIGN MOUNTING TO MEET ALL ADA
REQUIREMENTS.
4. COLOR OF SIGNS TO BE SELECTED BY ARCHITECT FROM
MANUFACTURER'S STANDARD COLORS.
SIGNAGE TYPES
DENOTES BRAILLE
B6
A2
TYPICAL SIGNAGE DETAILS
SHEET
DATE
SHEET TITLE
BSD7
Bozeman School District
Consultant #:1216 West Lincoln Street D, Bozeman, MT 59715404 West Main Street
Bozeman, MT 59715
REVIEWED BY:
DRAWN BY:BID DOCUMENTSOVERALL
STADIUM PLAN
AS-02
05/25/18VAN WINKLE STADIUMRENOVATIONSAuthor
Checker
BSD7# 17-41-36225 Franklin Street, Suite 1100Boston, MA 02110t 617.478.0300f 617.478.0321www.perkinswill.com 1" = 30'-0"1 OVERALL STADIUM PLAN
1/2" = 1'-0"2 DECORATIVE FENCE ELEVATION
1/2" = 1'-0"3 CHAINLINK FENCE ELEVATION
REV. DESCRIPTION DATE
1 1/2" = 1'-0"
TYPICAL SIGNAGE DETAILS
279
STADIUM LEVEL 1
0' - 0"
STADIUM LEVEL 2 - PRESS BOX
22' - 6"
STADIUM SUPPORT ROOF
12' - 0"
STADIUM ROOF
38' - 1"
FIELD LEVEL
-3' - 0"
3671011 285121349
CHAINLINK
GUARD RAIL PER BLEACHER MANUF.
DARK GRAY STANDING SEAM
METAL ROOF AND SIDING
CHAINLINK
SCREEN BELOW SEATING
MTL-2 MTL-2
MTL-2
FEILD LIGHTINGFEILD LIGHTING
MTL-1
6' DECORATIVE
FENCING GATE
WD-1 WD-1
MTL-2 MTL-2
PRESS BOX ROOF
31' - 6"
STADIUM LEVEL 1
0' - 0"
STADIUM SUPPORT ROOF
12' - 0"
FIELD LEVEL
-3' - 0"
3 6 7 10 11285 12 1349
CP-1 CP-1 CP-1 CP-1 CP-1
MTL-1MTL-1MTL-1 6' DECORATIVE
FENCING GATE
DRINKING FOUNTAIN
W/ BOTTLE FILLER
MTL-2
WD-1
WD-1
MTL-2
MTL-2
EQ.EQ.EQ.EQ.EQ.EQ.EQ.EQ.
STADIUM SUPPORT ROOF
12' - 0"
B A
CP-1
STADIUM LEVEL 1
0' - 0"
STADIUM SUPPORT ROOF
12' - 0"
3 24
MTL-1
WD-1
WD-1
6' DECORATIVE
FENCING GATE
2' - 10"STADIUM LEVEL 1
0' - 0"
STADIUM SUPPORT ROOF
12' - 0"
B A
CP-1
STADIUM LEVEL 1
0' - 0"
STADIUM SUPPORT ROOF
12' - 0"
32 4
MTL-1WD-1
BA
CP-1
STADIUM LEVEL 1
0' - 0"
STADIUM SUPPORT ROOF
12' - 0"
BA
CP-1MTL-1
STADIUM LEVEL 1
0' - 0"
STADIUM SUPPORT ROOF
12' - 0"
B A
CP-1
MTL-1
STADIUM LEVEL 1
0' - 0"
STADIUM SUPPORT ROOF
12' - 0"
BA
CP-1
EXTERIOR FINISH LEGEND
MTL-1 BOX RIB METAL PANEL
MTL-2 STANDING SEAM METAL
CP-1 CEMENT BOARD PANEL SIDING WITH REVEAL.
WD-1 WOOD SLAT SIDING, STAINED
*REFER TO SPECIFICATIONS FOR MATERIAL
PRODUCT INFORMATION , COLORS AND FINISH.
SHEET
DATE
SHEET TITLE
BSD7
Bozeman School District
Consultant #:1216 West Lincoln Street D, Bozeman, MT 59715404 West Main Street
Bozeman, MT 59715
REVIEWED BY:
DRAWN BY:BID DOCUMENTSELEVATIONS -
SUPPORT
BUILDING
AS-03
05/25/18VAN WINKLE STADIUMRENOVATIONSAuthor
Checker
BSD7# 17-41-36225 Franklin Street, Suite 1100Boston, MA 02110t 617.478.0300f 617.478.0321www.perkinswill.com 3/32" = 1'-0"1 STADIUM WEST OVERALL ELEVATION
3/32" = 1'-0"2 ELEVATION - SUPPORT BUILDING EAST
1/8" = 1'-0"3 ELEVATION - SUPPORT BUILDING NORTH
1/8" = 1'-0"4 ELEVATION - ENTRY CANOPY WEST
1/8" = 1'-0"5
ELEVATION - ENTRY
CANOPY NORTH 1/8" = 1'-0"7
ELEVATION - ENTRY
CANOPY EAST
1/8" = 1'-0"6 ELEVATION - ENTRY CANOPY SOUTH
1/8" = 1'-0"8 ELEVATION - CONCESSION PLAZA NORTH
1/8" = 1'-0"9 ELEVATION - CONCESSION PLAZA SOUTH
1/8" = 1'-0"10 ELEVATION - SUPPORT BUILDING SOUTH
REV. DESCRIPTION DATE
280
STADIUM LEVEL 1
0' - 0"
FIELD LEVEL
-3' - 0"
18151716
T.O. TEAM CMU
9' - 0"T.O. TEAM CMU2
7' - 0"CP-14' - 0"4' - 0"4' - 0"8' - 0"8' - 0"
MTL-2
STADIUM LEVEL 1
0' - 0"
FIELD LEVEL
-3' - 0"
I DNGHJKEFML
T.O. TEAM CMU
9' - 0"
MTL-2 MTL-2MTL-1
CP-1 CP-1
MTL-2 MTL-2MTL-2
ID NGHJKEFML
T.O. TEAM CMU
9' - 0"MTL-1
CP-1 MTL-1 CP-1CP-1MTL-2
4' - 0"4' - 0"4' - 0"8' - 0"8' - 0"5 1/8"5' - 11 1/16"9' - 7 3/16"
STADIUM LEVEL 1
0' - 0"
FIELD LEVEL
-3' - 0"
18 151716
T.O. TEAM CMU
9' - 0"T.O. TEAM CMU2
7' - 0"
CP-1
8' - 0"8' - 0"5' - 3 11/16"4' - 0"4' - 0"4' - 0"MTL-2
EXTERIOR FINISH LEGEND
MTL-1 BOX RIB METAL PANEL
MTL-2 STANDING SEAM METAL
CP-1 CEMENT BOARD PANEL SIDING WITH REVEAL.
WD-1 WOOD SLAT SIDING, STAINED
*REFER TO SPECIFICATIONS FOR MATERIAL
PRODUCT INFORMATION , COLORS AND FINISH.
SHEET
DATE
SHEET TITLE
BSD7
Bozeman School District
Consultant #:1216 West Lincoln Street D, Bozeman, MT 59715404 West Main Street
Bozeman, MT 59715
REVIEWED BY:
DRAWN BY:BID DOCUMENTSELEVATIONS -
TEAM BUILDING
AS-04
05/25/18VAN WINKLE STADIUMRENOVATIONSAuthor
Checker
BSD7# 17-41-36225 Franklin Street, Suite 1100Boston, MA 02110t 617.478.0300f 617.478.0321www.perkinswill.com 1/8" = 1'-0"1 ELEVATION - TEAM BUILDING EAST
1/8" = 1'-0"2 ELEVATION - TEAM BUILDING NORTH
1/8" = 1'-0"3 ELEVATION - TEAM BUILDING SOUTH OVERALL
1/8" = 1'-0"4 ELEVATION - TEAM BUILDING WEST
REV. DESCRIPTION DATE
281
STADIUM LEVEL 1
0' - 0"
STADIUM LEVEL 2 - PRESS BOX
22' - 6"
STADIUM SUPPORT ROOF
12' - 0"
FIELD LEVEL
-3' - 0"
6 7 10 1185 12 1349
CP-1
BLEACHERS BLEACHERS BLEACHERS
WD-1
PRESS BOX ROOF
31' - 6"
STADIUM LEVEL 1
0' - 0"
STADIUM LEVEL 2 - PRESS BOX
22' - 6"
STADIUM SUPPORT ROOF
12' - 0"
FIELD LEVEL
-3' - 0"
B C DA
PRESS BOX ROOF
31' - 6"
WD-1
FEILD LIGHTING
MTL-1
STADIUM LEVEL 1
0' - 0"
STADIUM LEVEL 2 - PRESS BOX
22' - 6"
STADIUM SUPPORT ROOF
12' - 0"
FIELD LEVEL
-3' - 0"
BCD A
PRESS BOX ROOF
31' - 6"
CP-1
FEILD LIGHTING
MTL-1
STADIUM LEVEL 1
0' - 0"
STADIUM SUPPORT ROOF
12' - 0"
FIELD LEVEL
-3' - 0"
1
A3-01
AS-05
5
1
A4-04
STADIUM LEVEL 1
0' - 0"
STEEL FLATBAR SPACED
TO PREVENT PASSAGE
OF 4" ROUND SPHERE
BETWEEN CABLES
6
AS-05
2' - 0"1' - 0"3' - 0"STADIUM LEVEL 1
0' - 0"
O
2x2 STEEL
GUARDRAIL
2" x 3/8" STEEL
FLATBAR, FULL
WELD AND GRIND
BASE PLATE AND
ATTACHMENT PER
STRUCTURAL 3 1/8"2"TYP.4"SHEET
DATE
SHEET TITLE
BSD7
Bozeman School District
Consultant #:1216 West Lincoln Street D, Bozeman, MT 59715404 West Main Street
Bozeman, MT 59715
REVIEWED BY:
DRAWN BY:BID DOCUMENTSELEVATIONS AND
DETAILS -
BLEACHERS
AS-05
05/25/18VAN WINKLE STADIUMRENOVATIONSAuthor
Checker
BSD7# 17-41-36225 Franklin Street, Suite 1100Boston, MA 02110t 617.478.0300f 617.478.0321www.perkinswill.com 3/32" = 1'-0"1 ELEVATION - BLEACHERS EAST
1/8" = 1'-0"2 ELEVATION - BLEACHERS SOUTH
1/8" = 1'-0"3 ELEVATION - BLEACHERS NORTH
1/8" = 1'-0"4 ELEVATION - VISITING BLEACHERS WEST
1/4" = 1'-0"5 GUARDRAIL ELEVATION
1" = 1'-0"6 GUARD RAIL SECTION
REV. DESCRIPTION DATE
282
SHEETDATESHEET TITLEBSD7Bozeman School District17-0311216 West Lincoln Street D,
Bozeman, MT 59715 404 West Main StreetBozeman, MT 59715REVIEWED BY:DRAWN BY:SITE PLAN REVIEW
07/11/18VAN WINKLE STADIUM
RENOVATIONSBSD7# 17-41-36REV.DESCRIPTIONDATE1FINAL SITE PLAN REVIEW06.12.18LANDSCAPE ARCHITECTURE
URBAN DESIGN + LAND PLANNING
ECOLOGICAL PLANNING
27 E Main Street Suite D
Bozeman, MT 59715 |406.219.2012207.11.18FINAL SITE PLAN REVIEWL100SYNTHETICTURF FIELDPRACTICESOCCER FIELDSEXISTINGCOMPETITIONSOCCER FIELDDURSTON ROADNORTH 11TH AVENUEWEST MAIN STREETRUTH THIBEAULT WAYEXISTING FIELDAND TRACKSOFTBALL FIELDSLANDSCAPEOVERALL PLANLEGENDITEMSYMBOLARTIFICIAL TURF FIELDTURF GRASS - SODDECORATIVE CONCRETE PAVINGASPHALT PAVINGDECORATIVE STEEL FENCECHAIN LINK FENCEPROPOSED TREES, SHRUBS, ANDGRASSESBACKSTOPSEE L200NORTH 15TH AVENUE
MANDATORY LANDSCAPINGPROVISIONS COMPILANCELANDSCAPE PERFORMANCESTANDARD CALCULATIONSPROJECT DATAPROJECT LEGAL DESCRIPTIONHIGH SCHOOL SITE TRACTNW 14 OF SEC. 12, T02S, R05EEXISTING ZONING: PLI(PUBLIC LANDS AND INSTITUTIONSDISTRICT)LANDSCAPE ARCHITECTDHM DESIGN27 E MAIN STREET SUITE DBOZEMAN, MONTANA 59715(406) 219-2012YARD LANDSCAPINGNO MINIMUM YARDS ARE REQUIRED IN THE PLI ZONE EXCEPT WHEN ADJACENT TOANOTHER DISTRICT. EASTERN, WESTERN, AND NORTHERN BOUNDARIES AREADJACENT TO RESIDENTIAL DISTRICTS. WESTERN (SIDE) YARD EXISTINGLANDSCAPING WILL NOT BE DISTURBED. NORTHERN (REAR) YARD EXCEEDS THE 25FT REQUIREMENTPARKING LOT LANDSCAPINGPROJECT IS SEEKING EXEMPTION - SEE CIVIL DRAWINGSSTREET FRONTAGE LANDSCAPINGREQUIRED: 1 LARGE CANOPY TREE FOR EACH 50 FEET OF TOTAL STREETFRONTAGE. ONLY A PORTION OF THE NORTHERN STREET FRONTAGE IS BEINGIMPACTED: 500 LINEAR FEET (10 TREES REQUIRED).PROVIDED: 12 LARGE CANOPY TREES.POINTS REQUIRED: 23 POINTS (PLI)(RESIDENTIAL AND COMMUNITY BUSINESS DISTRICT ADJACENCIES)PROJECT OWNERBOZEMAN PUBLIC SCHOOLS404 W. MAIN ST.BOZEMAN, MT 59715P: 406.522.6000TODD SWINEHARTtodd.swinehart@bsd7.orgPOINTS EARNED: 29 POINTS·5 POINTS: AWARDED FOR THE INSTALLATION OF DROUGHT TOLERANT SPECIESFOR 75% OR GREATER OF THE NUMBER OF TREES AND SHRUBS·12 POINTS: AWARDED FOR THE PRESERVATION OF 24 MATURE TREES ON SITE(ROW OF CONIFERS EAST OF PROPOSED SOFTBALL FIELDS)·5 POINTS: AWARDED FOR NORTHERN 12 LARGE CANOPY TREES·2 POINTS: AWARDED FOR FOUNDATION PLANTINGS OBSCURING NOT LESSTHAN 70% OF BUILDING PERIMETER·5 POINTS: AWARDED FOR OVER 5 PERCENT INCREMENT OF LOT AREACOVERED BY PUBLICLY ACCESSIBLE PEDESTRIAN FACILITIES1.MINIMUM 10 FEET HORIZONTAL SEPARATION SHALL BE MAINTAINED BETWEENTREES AND WATER/SEWER MAINS AND SERVICES. REFER TO CIVIL PLANSFOR WATER/SEWER LOCATIONS.2.REFER TO CIVIL PLANS FOR GRADING, DEMOLITION, CULVERT/DRAINAGEINFRASTRUCTURE, SIDEWALK, PARKING, PEDESTRIAN CROSSINGS, ANDUTILITY LOCATIONS.3.ALL PLANT MATERIAL SHALL BE HEALTHY, SOUND AND FREE OF DISEASE. ALLPLANT MATERIAL TO BE APPROVED BY LANDSCAPE ARCHITECT PRIOR TOINSTALLATION.4.TREE PROTECTION FENCE SHALL BE ERECTED AT THE DRIP LINE OF EACHINDIVIDUAL TREE OR GROUPINGS OF TREES ON SITE. NO EXCAVATION,STORAGE OF MATERIALS, STORAGE OF BACKFILL, STORAGE OF EQUIPMENTOR VEHICULAR TRAFFIC ALLOWED WITHIN THE DRIP LINE OF EXISTING TREESTO REMAIN.5.PROTECTION FENCING LAYOUT TO BE STAKED IN FIELD AND APPROVED BYLANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION.6.NO GRADING SHALL TAKE PLACE WITHIN DRIPLINE OF EXISTING TREESEXCEPT WHERE NOTED ON PLAN.PLANT SCHEDULEGENERAL LANDSCAPE NOTES:CGKCJKPER SEC. 38.550.060PER SEC. 38.550.0501" = 120'240'120'60'0'MAXIMUM ALLOWABLE SLOPE OR GRADENO SLOPES SHALL EXCEED A SLOPE OF 25 PERCENTPROTECTMATURECONIFERSSNOW STORAGE, TYP.EXISTING TREES TO BE REMOVEDEXISTING TREES TO REMAINSNOW STORAGE AREASEXIST. TREESTO REMAIN, TYP.EXISTING VEG.ALONG PROPLINE TOREMAINBACKSTOPNEW CANOPYTREESEXISTINGPARKING LOTSCREENINGTO REMAINNEW PATHCONNECTINGSOUTHPARKING TOSTADIUM.REFER TOCIVIL DWGSREFER TO CIVILDWGS FORPARKING LOTBICYCLE PARKING REQUIREMENTREQUIREMENT: THE NUMBER OF OF BICYCLE PARKING SPACES SHALL BE AT LEASTTEN PERCENT OF THE NUMBER OF AUTOMOBILE PARKING STALLS.PROVIDED: 50 BIKE PARKING SPACES·434 AUTOMOBILE PARKING SPACES NEAR THE STADIUM = 44 BIKE SPACES REQ.·279 AUTO SPACES IN LOT WEST OF STADIUM, 120 AUTO SPACES IN LOT EAST OFSTADIUM, AND 35 SPACES ON RUTH THIBEAULTPER SEC. 38.540.050.A.4PHASE 111Ulmus americana 'Lewis & Clark' *Prairie Expedition American ElmBOTANICAL NAMECOMMON NAMETREESSHRUBSSIZESYMBOLSPACINGQTYMATUREHEIGHTMATURESPREADCODE*DROUGHT TOLERANT SPECIESROOTUA3" CAL.B&BSEE PLAN1655 - 60'35 - 40'Acer x freemani 'Jeffersred' *Autumn Blaze Freeman MapleAA4" CAL.B&BSEE PLAN540 - 55'30 - 40'Acer tataricumTatarian MapleAT#25B&BSEE PLAN415-20'15-20'Cotoneaster lucidus *Shiny CotoneasterCL#5CONTSEE PLAN786 - 10'6 - 10'ORNAMENTAL GRASSESCalamagrostis brachytricha *Reed GrassCB#2CONTSEE PLAN8436 - 48"24 - 36"COMMENTMULTI-STEM----Populus tremula 'Erecta'European Columnar AspenPE2.5" CAL.B&BSEE PLAN127 - 10'35 - 40'-Prunus maackiiManchurian CherryPM2.5" CAL.B&BSEE PLAN620 - 30'18 - 25'-Tilia americana 'Redmond'Redmond American LindenTAB&BSEE PLAN230 - 45'50 - 70'-Deschampsia cespitosa *Tufted Hair GrassDC#2CONTSEE PLAN21424 - 36"12 - 24"-Leymus arenarius 'Blue Dune' *Blue Dune Lyme GrassLA#2CONTSEE PLAN8424 - 36" 24" SPREADS-2.5" CAL.1112BEALL STREETSEE L300NATIVE SEED MIX2283
3 AA1 AA1 AA3 AT1 PM1 PM4 PM4 UA1 AT1 TA5 CL10 DC89 DC44 DC84 LA5 PE8 DC6 DC8 DC6 DCNOTES:1.REFER TO ARCH DRAWINGS FOR BLEACHERS ANDALL STRUCTURES.2.MINIMUM 10 FEET HORIZONTAL SEPARATION SHALLBE MAINTAINED BETWEEN TREES ANDWATER/SEWER MAINS AND SERVICES. REFER TOCIVIL PLANS FOR WATER/SEWER LOCATIONS.3.REFER TO CIVIL PLANS FOR GRADING, DEMOLITION,CULVERT/DRAINAGE INFRASTRUCTURE, SIDEWALK,PARKING, PEDESTRIAN CROSSINGS, AND UTILITYLOCATIONS. GRADING PROVIDED TO SHOW DESIGNINTENT.4.ALL PLANT MATERIAL SHALL BE HEALTHY, SOUNDAND FREE OF DISEASE. ALL PLANT MATERIAL TO BEAPPROVED BY LANDSCAPE ARCHITECT PRIOR TOINSTALLATION.5.TREE PROTECTION FENCE SHALL BE ERECTED ATTHE DRIP LINE OF EACH INDIVIDUAL TREE ORGROUPINGS OF TREES ON SITE. NO EXCAVATION,STORAGE OF MATERIALS, STORAGE OF BACKFILL,STORAGE OF EQUIPMENT OR VEHICULAR TRAFFICALLOWED WITHIN THE DRIP LINE OF EXISTING TREESTO REMAIN.6.PROTECTION FENCING LAYOUT TO BE STAKED INFIELD AND APPROVED BY LANDSCAPE ARCHITECTPRIOR TO CONSTRUCTION.7.NO GRADING SHALL TAKE PLACE WITHIN DRIPLINE OFEXISTING TREES EXCEPT WHERE NOTED ON PLAN.LEGENDITEMSYMBOLARTIFICIAL TURF FIELDTURF GRASS - SODDECORATIVE CONCRETE PAVINGASPHALT PAVINGARTIFICIAL TURF FIELDAWAY TEAM BLEACHERSFIELD SURFACEELEVATION = 4799DROP OFF -SEE CIVIL DWGSACCESS TO FIELD(5% SLOPE)PROPOSEDPARKING -SEE CIVILDWGSMATCHLINE - SEE SHEET L3001" = 20'40'20'10'0'RE-STRIPEPARKINGEXISTING TRACKDECORATIVE STEEL FENCECHAIN LINK FENCEBOLLARDS4' HT. BLACK CHAIN LINK FENCEHOME TEAM BLEACHERSBIKE RACK, TYP.BOLLARDSTURF GRASSASPHALT WALKWAYNEW CHAIN LINKFENCE - MATCH ANDTIE-IN TO EXIST.10.0'8.0'6.0'10.0'10.0'16.0'10.0'SHEETDATESHEET TITLEBSD7Bozeman School District17-0311216 West Lincoln Street D,
Bozeman, MT 59715 404 West Main StreetBozeman, MT 59715REVIEWED BY:DRAWN BY:SITE PLAN REVIEW
07/11/18VAN WINKLE STADIUM
RENOVATIONSBSD7# 17-41-36REV.DESCRIPTIONDATE1FINAL SITE PLAN REVIEW06.12.18LANDSCAPE ARCHITECTURE
URBAN DESIGN + LAND PLANNING
ECOLOGICAL PLANNING
27 E Main Street Suite D
Bozeman, MT 59715 |406.219.2012207.11.18FINAL SITE PLAN REVIEWL200LANDSCAPEENLARGEMENTPLANCGKCJKTREESSHRUBSGRASSES6.0'RESTORE LANDSCAPE ASNECESSARY - SEE CIVIL PLANSFIELD LIGHTS, TYP.CONC. BENCHESBIKE RACK, TYP.SNOW STORAGEPHASE LINE11CONC. WALKWAY TOSOUTHERN PARKINGLOTPHASE 22NATIVE SEED MIX2284
1 TA1 TA72 CL84 CB7 PE6 DC9 DC6 DC8 DC6 DC8 DCSHEETDATESHEET TITLEBSD7Bozeman School District17-0311216 West Lincoln Street D,
Bozeman, MT 59715 404 West Main StreetBozeman, MT 59715REVIEWED BY:DRAWN BY:SITE PLAN REVIEW
07/11/18VAN WINKLE STADIUM
RENOVATIONSBSD7# 17-41-36REV.DESCRIPTIONDATE1FINAL SITE PLAN REVIEW06.12.18LANDSCAPE ARCHITECTURE
URBAN DESIGN + LAND PLANNING
ECOLOGICAL PLANNING
27 E Main Street Suite D
Bozeman, MT 59715 |406.219.2012207.11.18FINAL SITE PLAN REVIEWNOTES:1.REFER TO ARCH DRAWINGS FOR BLEACHERS ANDALL STRUCTURES.2.MINIMUM 10 FEET HORIZONTAL SEPARATION SHALLBE MAINTAINED BETWEEN TREES ANDWATER/SEWER MAINS AND SERVICES. REFER TOCIVIL PLANS FOR WATER/SEWER LOCATIONS.3.REFER TO CIVIL PLANS FOR GRADING, DEMOLITION,CULVERT/DRAINAGE INFRASTRUCTURE, SIDEWALK,PARKING, PEDESTRIAN CROSSINGS, AND UTILITYLOCATIONS. GRADING PROVIDED TO SHOW DESIGNINTENT.4.ALL PLANT MATERIAL SHALL BE HEALTHY, SOUNDAND FREE OF DISEASE. ALL PLANT MATERIAL TO BEAPPROVED BY LANDSCAPE ARCHITECT PRIOR TOINSTALLATION.5.TREE PROTECTION FENCE SHALL BE ERECTED ATTHE DRIP LINE OF EACH INDIVIDUAL TREE ORGROUPINGS OF TREES ON SITE. NO EXCAVATION,STORAGE OF MATERIALS, STORAGE OF BACKFILL,STORAGE OF EQUIPMENT OR VEHICULAR TRAFFICALLOWED WITHIN THE DRIP LINE OF EXISTING TREESTO REMAIN.6.PROTECTION FENCING LAYOUT TO BE STAKED INFIELD AND APPROVED BY LANDSCAPE ARCHITECTPRIOR TO CONSTRUCTION.7.NO GRADING SHALL TAKE PLACE WITHIN DRIPLINE OFEXISTING TREES EXCEPT WHERE NOTED ON PLAN.LEGENDITEMSYMBOLFIELD LIGHTS, TYP.EXISTINGTENNISCOURTSFIELD SURFACEELEVATION = 4799CGKCJKMATCHLINE - SEE SHEET L200SLOPED WALKWAYTO CONCOURSEMOUNTABLECURB8' WIDE DOUBLEGATE, TYP.ASPHALT PAVING12' WIDEDOUBLE GATEL300LANDSCAPEENLARGEMENTPLAN1" = 20'40'20'10'0'GREASEINTERCEPTORARTIFICIAL TURF FIELDAWAY TEAM BLEACHERSHOME TEAM BLEACHERS4' HT. BLACK CHAIN LINKFENCE6' HT. BLACK DECORATIVESTEEL FENCEEXISTING PRACTICE FIELDS- NO IMPROVEMENTSARTIFICIAL TURF FIELDTURF GRASS - SODDECORATIVE CONCRETE PAVINGASPHALT PAVINGDECORATIVE STEEL FENCECHAIN LINK FENCETREESSHRUBSGRASSES5.0'10.0'10.0'LANDSCAPEEDGERSTORMWATER POND -SEE CIVIL DRAWINGSGATEADD / ALTERNATESNOW STORAGEBIKE PARKING, TYP.6.0'NATIVE SEED MIX2285
3''4''3''3''3''3''3''3''3''SHEETDATESHEET TITLEBSD7Bozeman School District17-0311216 West Lincoln Street D,
Bozeman, MT 59715 404 West Main StreetBozeman, MT 59715REVIEWED BY:DRAWN BY:SITE PLAN REVIEW
07/11/18VAN WINKLE STADIUM
RENOVATIONSBSD7# 17-41-36REV.DESCRIPTIONDATE1FINAL SITE PLAN REVIEW06.12.18LANDSCAPE ARCHITECTURE
URBAN DESIGN + LAND PLANNING
ECOLOGICAL PLANNING
27 E Main Street Suite D
Bozeman, MT 59715 |406.219.2012207.11.18FINAL SITE PLAN REVIEWL400SYNTHETICTURF FIELD(NO IRRIGATION)MAINTAINEXISTINGZONESDURSTON ROADNORTH 11TH AVENUEWEST MAIN STREETBEALL STREETRUTH THIBEAULT WAYIRRIGATIONOVERALL PLANLEGENDITEMSYMBOLTURF GRASS - SODDECORATIVE CONCRETE PAVING6' HT. DECORATIVE STEEL FENCE4' HT. GALV. CHAIN LINK FENCETREES, SHRUBS, AND GRASSESNORTH 15TH AVENUE
1.PERMANENT IRRIGATION TO BE PROVIDED TO ALL LANDSCAPED AREAS.2.ALL LIMITS OF DISTURBANCE TO BE RE-VEGETATED AND IRRIGATED.3.INFORMATION ON EXISTING IRRIGATION SYSTEM IS BASED ON INCOMPLETEDIAGRAMS. CONTRACTOR TO FIELD VERIFY ALL EXISTING IRRIGATIONCOMPONENTS PRIOR TO FINAL DESIGN.4.ALL TREES TO BE IRRIGATED THROUGH DEDICATED BUBBLERS EVENLYDISTRIBUTED AROUND BASE OF TREE WITH THREE EVENLY SPACED 0.25 GPMBUBBLER EMITTERS.5.TREE AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIPIRRIGATION ADJUSTED PER INDIVIDUAL PLANT REQUIREMENTS.6.TURF GRASS AREAS TO BE IRRIGATED WITH HEADS AND NOZZLES TO MATCHEXISTING EQUIPMENT.7.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE.8.SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR.9.CONTRACTOR IS RESPONSIBLE FOR CONFIRMING WATER SOURCE ANDVERIFYING WATER PRESSURE AND FLOW RATE AVAILABLE. LANDSCAPEARCHITECT AND IRRIGATION CONSULTANT TO BE NOTIFIED OF ANYDISCREPANCIES BETWEEN STATED WATER PRESSURE AND FLOW ANDACTUALIRRIGATION NOTES:CGKCJK1" = 120'240'120'60'0' SHRUB DRIPIRRIGATION, TYP.ARTIFICIAL TURF FIELDBACKSTOP - TO MATCH EXISTINGNEW IRRIGATION FORSOFTBALL FIELDSNEW IRRIGATIONAROUND STADIUMPHASE 112PHASE 222EXIST. IRRIGATIONCONTROLLER.RECONNECT SYSTEM TOCITY WATER SUPPLYQTY.IRRIGATION SCHEDULETYPESPRAY IRRIGATION(TURF)±191,500 SF2TOTAL ANNUAL H20±3,825,755 GALRATE (IN / YEAR) *±36.06 IN / YR22NATIVE SEED MIX(BLUE GRAMA)±29,000 SF±217,254 GAL±12 IN / YRTOTAL-±4,405,098 GAL-*ASSUMES A 5 MONTH WATERING YEARNATIVE SEED MIX286