HomeMy WebLinkAbout08-20-18 City Commission Packet Materials - C13. Res. 4951, CO1 with Williams Bro. for WRF Small Works Project Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brian Heaston, Senior Engineer Shawn Kohtz, Interim Director of Public Works SUBJECT: Resolution 4951 Authorizing Change Order No. 1 to the WRF Small Works Construction Project MEETING DATE: August 20, 2018 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution 4951 authorizing Change Order No. 1 to the WRF Small Works Construction Project. BACKGROUND: Attached is Resolution 4951 and Change Order No. 1 for the above referenced project. The change order covers minor items identified during construction requiring work not included in the construction contract but authorized under change proposal requests made by the Contractor and negotiated and approved by the Engineer and City during the progress of the work. Change Order No. 1 amends the contract price by a net increase of $20,254.63 and adds 67 days to the contract time. The contract time extension was necessary to allow membrane roof replacement for Digester 1, Digester 2 and the old admin building to occur during dry weather conditions. FISCAL EFFECTS: Work authorized under the change proposal requests made by the Contractor and approved by the Engineer have already been paid. Change Order No. 1 amends the contract price for the project to $859,054.63. Sufficient capital funding exists in the WRF budget to cover the total amended contract price. ALTERNATIVES: As suggested by the Commission ATTACHMENTS: Resolution 4951 Change Order No. 1 221 RESOLUTION NO. 4951 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH WILLIAMS BROTHER CONSTRUCTION, LLC, SPOKANE, WASHINGTON WHEREAS, The City Commission did, on the August 28, 2017, authorize award of the bid for the WRF Small Works Construction Project to Williams Brother Construction, LLC, Spokane, Washington; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Williams Brother Construction, LLC, as contained in Change Order No. 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 222 PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 20th day of August, 2018. ___________________________________ CYNTHIA L. ANDRUS Mayor ATTEST: __________________________________ ROBIN CROUGH City Clerk APPROVED AS TO FORM: ___________________________________ GREG SULLIVAN City Attorney 223 EJCDC® C-941, Change Order. Prepared and published 2013 by the Engineers Joint Contract Documents Committee. Page 1 of 2 Change Order No. 01 Date of Issuance: 8/1/2018 Effective Date: 8/1/2018 Owner: City of Bozeman Owner's Contract No.: Contractor: Williams Brother Construction Contractor’s Project No.: Engineer: HDR Engineering Engineer's Project No.: Project: Bozeman WRF Small Works Project Contract Name: The Contract is modified as follows upon execution of this Change Order: Description: Includes CPR’s No. 1 through 8: CPR No. 1 Mixer gaskets $1,950.00 CPR No. 2 Additional Mixer Bolts $4,523.98 CPR No. 3 Digester No. 1 Risers and paint $ 8,413.66 CPR No. 4 Credit for Digester Cleaning $ (2,295.00) CPR No. 5 Electrical Broken Connections $246.24 CPR No. 6 VFD replacement $6,713.75 CPR No. 7 Conduit for PSH's on WAS Pumps $702.00 CPR No. 8 No cost time extension $0.00 Subtotal $20,254.63 Attachments: CPR’s No. 1 through 8 CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES [note changes in Milestones if applicable] Original Contract Price: Original Contract Times: Substantial Completion: April 14, 2018 $ 838,800.00 Ready for Final Payment: May 4, 2018 days or dates Increase from previously approved Change Orders No. to No. : Increase from previously approved Change Orders No. to No. : Substantial Completion: N/A $ N/A Ready for Final Payment: days Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: April 14, 2018 $ 838,800.00 Ready for Final Payment: May 4, 2018 days or dates Increase of this Change Order: Increase of this Change Order: Substantial Completion: June 20, 2018 $ 20,254.63 Ready for Final Payment: July 10, 2018 days or dates Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial Completion: June 20, 2018 224 225 City of Bozeman WRF Small Works Project No. 1 CHANGE PROPOSAL REQUEST (Not a Change Order) HDR ENGINEERING, INC. Project: Bozeman WRF Small Works CPR No: 01 CPR Date: 10/30/2017 Date Sent to Contractor: 10/30/2017 Date Rec'd from Contractor: ________________ TO: Williams Brother Construction Please furnish your proposal for executing the following changes(s): During removal of the draft tubes for Digester No. 2, it was noted that the two lower gaskets were in need of replacement. It is assumed that the gaskets should be closed-cell neoprene, ¼” thick, matching the existing size and bolt pattern. Please provide costs for replacing the four (4) gaskets. HDR: Coralynn Revis___________________________________________________ Date: 10/30/2017 TO: HDR Engineering, Inc. Proposal: ___________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Cost: _____________________________________________________ Credit: ____________________________ (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor: ________________________________________________ Date: __________________________ TO: Town of Stevensville Accepted/Not Accepted _______________________________/ HDR Date: ________________________ Accepted/Not Accepted ______________________________/ Owner Date_________________________ 226 Bozeman Small Works BWC Gaskets for Mixers Date: 11-13-17 Unit Cost Items Description Unit Quantity Cost (NWP) New Gaskets $243.75 ea 8 $1,950.00 Subtotal $1,950.00 Markup TOTAL $1,950.00 227 City of Bozeman WRF Small Works Project No. 1 CHANGE PROPOSAL REQUEST (Not a Change Order) HDR ENGINEERING, INC. Project: Bozeman WRF Small Works CPR No: 02 CPR Date: 10/30/2017 Date Sent to Contractor: 10/30/2017 Date Rec'd from Contractor: ________________ TO: Williams Brother Construction Please furnish your proposal for executing the following changes(s): Replacement of bolts as needed for Digester No. 2 per response to RFI. HDR: Coralynn Revis___________________________________________________ Date: 10/30/2017 TO: HDR Engineering, Inc. Proposal: ___________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Cost: _____________________________________________________ Credit: ____________________________ (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor: ________________________________________________ Date: __________________________ TO: City of Bozeman Accepted/Not Accepted _______________________________/ HDR Date: ________________________ Accepted/Not Accepted ______________________________/ Owner Date_________________________ 228 Bozeman Small Works BWC Field Order to remove and Replace 46 Additional Bolts Date: 11-13-17 Unit Cost Items Description Unit Quantity Cost (NWP) 3/4" SSHilti Bolts $10.00 ea 46 $460.00 Hilti Hit Epoxy $37.50 ea 9 $337.50 Core Drill Bits $78.00 ea 2 $156.00 Labor Description Unit Quantity Cost Laborer $39.36 hr 27.5 $1,082.40 Millwright $51.30 hr 27.5 $1,410.75 Superitendant $45.00 hr 8 $360.00 Equipment Description Unit Quantity Cost Core Drill $5.00 hr 12 $60.00 Sub- Contractors Description Unit Quantity Cost Subtotal $3,866.65 Markup $657.33 TOTAL $4,523.98 229 City of Bozeman WRF Small Works Project No. 1 CHANGE PROPOSAL REQUEST (Not a Change Order) HDR ENGINEERING, INC. Project: Bozeman WRF Small Works CPR No: 03 CPR Date: 12/18/2017 Date Sent to Contractor: 12/18/2017 Date Rec'd from Contractor: ________________ TO: Williams Brother Construction Please furnish your proposal for executing the following changes(s): The support risers on Digester No. 1 joint appears lower than planned from the as-builts. It is assumed a cold joint exists right along the roof line. Provide costs for removal and replacement of both risers by chipping down to the cold joint along the roof and replacement. HDR: Coralynn Revis___________________________________________________ Date: 12/18/2017 TO: HDR Engineering, Inc. Proposal: ___________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Cost: _____________________________________________________ Credit: ____________________________ (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor: ________________________________________________ Date: __________________________ 230 Bozeman Small Works HDR/WBC CPR 03 Time and Materials 3/27/2018 Unit Cost Items Description Unit Quantity Cost (NWP) Extra Concrete and Rebar $500.00 Labor Description Unit Quantity Cost Demolition Superintendent-3/26/2018 $45.00 hr 8 $360.00 Superintendent-3/27/2018 $45.00 hr 7.5 $337.50 Superintendent-3/28/2018 $45.00 hr 4 $180.00 Superintendent 3/29/2018 $45.00 hr 8 $360.00 Superintendent 04/04/2018 $45.00 hr 5.5 $247.50 Super 4/16 $45.00 hr 6 $270.00 Super 4/17 $45.00 hr 8 $360.00 Laborer 4/17 $39.36 hr 6 $236.16 Equipment Description Unit Quantity Cost 18" Hydraulic wet saw $20.00 hr 8 $160.00 Electric Demo Hammer $15.00 hr 12 $180.00 Sub- Contractors Description Unit Quantity Cost T&L Painting $4,000.00 Subtotal Markup $7,191.16 TOTAL $1,222.50 $8,413.66 231 City of Bozeman WRF Small Works Project No. 1 CHANGE PROPOSAL REQUEST (Not a Change Order) HDR ENGINEERING, INC. Project: Bozeman WRF Small Works CPR No: 04 CPR Date: 1/29/2018 Date Sent to Contractor: 1/29/2018 Date Rec'd from Contractor: ________________ TO: Williams Brother Construction Please furnish your proposal for executing the following changes(s): Modification of CY of Digester No. 1 cleaning for reconciliation with bid. Planned bid was 520 CY, total was 493 CY. Credit is for 27 CY. Credit of $2,295 due. HDR: Coralynn Revis___________________________________________________ Date: 1/29/2018 TO: HDR Engineering, Inc. Proposal: ___________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Cost: _____________________________________________________ Credit: ____________________________ (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor: ________________________________________________ Date: __________________________ TO: City of Bozeman Accepted/Not Accepted _______________________________/ HDR Date: ________________________ Accepted/Not Accepted ______________________________/ Owner Date_________________________ 232 City of Bozeman WRF Small Works Project No. 1 CHANGE PROPOSAL REQUEST (Not a Change Order) HDR ENGINEERING, INC. Project: Bozeman WRF Small Works CPR No: 05 CPR Date: 1/29/2018 Date Sent to Contractor: 1/29/2018 Date Rec'd from Contractor: ________________ TO: Williams Brother Construction Please furnish your proposal for executing the following changes(s): Electrical addition for broken connections at Digester No. 2 mixers. HDR: Coralynn Revis___________________________________________________ Date: 1/29/2018 TO: HDR Engineering, Inc. Proposal: ___________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Cost: _____________________________________________________ Credit: ____________________________ (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor: ________________________________________________ Date: __________________________ TO: City of Bozeman Accepted/Not Accepted _______________________________/ HDR Date: ________________________ Accepted/Not Accepted ______________________________/ Owner Date_________________________ 233 51 Lost trail Clancy, MT 59634, U.S.A. (406) 431-3368 - Cell (406) 438-1789 - Office rlevandowski@frontierelectric.us REQUEST FOR A CHANGE Date: December 13, 2017 To: Barry Curtis From: Robert Levandowski Project No.: City of Bozeman WRF Small Works Project No. 1 CHANGE: Frontier Electric hereby submits a request for a change on the above-referenced project. DESCRIPTION: Plant personnel disconnected the motors and broke/lost pieces for the re- installation. $222.24 for parts/ $24.00 rental fee. This proposed change will result in an increase cost of $246.24 RESPONSE: Approved: ____________________________ Date: _______________________________________ Since time is of the essence and the impact of this change may be significant, Frontier Electric requests that Williams Brothers Construction (Barry Curtis) respond to this request within 10 working days. Sincerely, Robert Levandowski Project Manager Frontier Electric 234 City of Bozeman WRF Small Works Project No. 1 CHANGE PROPOSAL REQUEST (Not a Change Order) HDR ENGINEERING, INC. Project: Bozeman WRF Small Works CPR No: 06 CPR Date: 2/27/2018 Date Sent to Contractor: 2/27/2018 Date Rec'd from Contractor: ________________ TO: Williams Brother Construction Please furnish your proposal for executing the following changes(s): Replace specified 5HP VFDs with ABB # ACS310-03U-17A2-4+J400/7.5 kw10HP Lift 1: Install new rating plugs (30A) in the two breakers and run #10 wire to the 10HP VFDs. Recommended rating plugs are found on the following page. Lift 2: Replace 7 amp breaker with 30 amp and installation of #10 wire. Recommended breaker is displayed on following page. HDR: Ben Fennelly, Dan Harmon, Cora Revis________________________________________________ Date: 2/27/2018 TO: HDR Engineering, Inc. Proposal: ___________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Cost: _____________________________________________________ Credit: ____________________________ (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor: ________________________________________________ Date: __________________________ TO: City of Bozeman Accepted/Not Accepted _______________________________/ HDR Date: ________________________ Accepted/Not Accepted ______________________________/ Owner Date_________________________ 235 City of Bozeman WRF Small Works Project No. 1 RECOMMENDED RATING PLUG: GENERAL ELECTRIC SRPE30A30 RATING PLUG RECOMMENDED 30 AMP BREAKER: EATON / CUTLER HAMMER HFD3030 3 POLE CIRCUIT BREAKER 236 Item Part #Note QNTY Cost ea.Cost Labor hours Labor cost 10 HP VFDs ACS310-03U-17A2-4+j400 3 $1,562.25 4,688.25 3 $240.00 GE 30 amp plug SRPE30A30 2 $277.00 $554.00 2 $160.00 Eaton 30 Amp Breaker HFD3030 1 $836.00 $836.00 2 $160.00 Credit 1 $900.00 $900.00 0 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $5,178.25 $560.00 Bozeman WWTP 10 HP VFDs TOTAL $5,738.25 237 Work order for Time and Materials Thank You For Your Business MT LIC #2505 Phone Order Date: 51 Lost Trail 2/27/2018 Clancy, MT 59634 Order taken Robert 406-431-3368 Job Site: Bill To: [x ] Day W [ ] Contract [ ] Extra Qty Materials Price Total Discription of Work 0 ABB 10 HP 480VAC VFDs $0.00 $0.00 3 #ACS310-03U-17A2-4+J400 $1,562.75 $4,688.25 0 GE 30 amp plugs $0.00 2 #SRPE30A30 $277.00 $554.00 0 Eaton 30 amp Breaker $0.00 1 HFD3030 $836.00 $836.00 $0.00 1 Credit -$900.00 -$900.00 Other Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Other $0.00 $0.00 LABOR HRS RATE AMOUNT $0.00 Call out 0 $125.00 $0.00 $0.00 Labor 7 $80.00 $560.00 $0.00 Electrical services 0 $60.00 $0.00 $0.00 Misc 0 $30.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor 7 $560.00 Total Materials $5,178.25 Total Materials $5,178.25 Competed Date Other Total $0.00 Ordered By: Tax Signature________________________________________TOTAL $5,738.25 ELECTRICAL SERVICES Replace the VFDs with ABB Drives for WAS 1,2,3 Change Breaker Rate plugs WAS 1&2 Change Breaker in WAS 3 Williams Brothers Construction 1123 Cerise Rd Billings, MT. 59101 Bozeman WRF Small Works Change order CPR-06 238 City of Bozeman WRF Small Works Project No. 1 CHANGE PROPOSAL REQUEST (Not a Change Order) HDR ENGINEERING, INC. Project: Bozeman WRF Small Works CPR No: 07 CPR Date: 4/12/2018 Date Sent to Contractor: 4/12/2018 Date Rec'd from Contractor: ________________ TO: Williams Brother Construction Please furnish your proposal for executing the following changes(s): Run conduit to connect the PSH’s for the WAS pumps to the motor control bucket or PLC, as directed on-site. HDR: Cora Revis________________________________________________ Date: 4/12/2018 TO: HDR Engineering, Inc. Proposal: ___________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Cost: _____________________________________________________ Credit: ____________________________ (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor: ________________________________________________ Date: __________________________ TO: City of Bozeman Accepted/Not Accepted _______________________________/ HDR Date: ________________________ Accepted/Not Accepted ______________________________/ Owner Date_________________________ 239 240 City of Bozeman WRF Small Works Project No. 1 CHANGE PROPOSAL REQUEST (Not a Change Order) HDR ENGINEERING, INC. Project: Bozeman WRF Small Works CPR No: 07 CPR Date: 4/12/2018 Date Sent to Contractor: 4/12/2018 Date Rec'd from Contractor: ________________ TO: Williams Brother Construction Please furnish your proposal for executing the following changes(s): Run conduit to connect the PSH’s for the WAS pumps to the motor control bucket or PLC, as directed on-site. HDR: Cora Revis________________________________________________ Date: 4/12/2018 TO: HDR Engineering, Inc. Proposal: ______price is for all three psi switches _///_80 ft of conduit, 3/4 pulling elbows , nipples, straps, Unistrut, anchors, 16 gauge single pair wire. Parts $150 Labor $450 ________________________________________________________________________________________ _ __________________________________________________________________________________________ Cost: _____$600.00_________________________________________ Credit: ____________________________ (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor: Frontier Electric , Robert Levandowski____ Date: _____4/12/2018 TO: City of Bozeman Accepted/Not Accepted _______________________________/ HDR Date: ________________________ Accepted/Not Accepted ______________________________/ Owner Date_________________________ 241 City of Bozeman WRF Small Works Project No. 1 CHANGE PROPOSAL REQUEST (Not a Change Order) HDR ENGINEERING, INC. Project: Bozeman WRF Small Works CPR No: 08 CPR Date: 4/12/2018 Date Sent to Contractor: 4/12/2018 Date Rec'd from Contractor: ________________ TO: Williams Brother Construction Please furnish your proposal for executing the following changes(s): This is a no-cost change order to extend the contract time to June 20 to allow good weather for roofing. HDR: Cora Revis________________________________________________ Date: 4/12/2018 TO: HDR Engineering, Inc. Proposal: ___________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Cost: _____________________________________________________ Credit: ____________________________ (A time extension is not required for this modification unless otherwise detailed and justified:) Contractor: ________________________________________________ Date: __________________________ TO: City of Bozeman Accepted/Not Accepted _______________________________/ HDR Date: ________________________ Accepted/Not Accepted ______________________________/ Owner Date_________________________ 242