Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Carolyn Poissant – Manager of Trails, Open Space, and Parks
Design and Development
Mitch Overton – Director of Parks and Recreation
SUBJECT: Authorize City Manager to Sign Professional Services Agreement with TD&H Engineering for the Bozeman Sports Park Project
MEETING DATE: August 13, 2018
AGENDA ITEM TYPE: Consent
RECOMMENDATION: Authorize the City Manager to sign the Professional Services
Agreement (Attachment A) with TD&H Engineering, hereinafter referred to as, “Consultant” for
geotechnical engineering services for the Bozeman Sports Park Project for an amount not to
exceed $2800.
BACKGROUND: Resolution No. 4521 was unanimously approved by the Commission April 14, 2014 for the allocation of Trails, Open Space and Parks (TOP) bond funding in an amount not to
exceed $7,500,000 for the acquisition of park land and development of the Bozeman Sports Park
Project (“Park Project”), which requires professional design and engineering services. The
resolution allocated up to (i) $2,100,000 for the acquisition of approximately 80 acres of park land;
(ii) up to $1,788,000 for infrastructure improvements as stated in the Commission motion adopted April 7, 2014; and (iii) the remainder of the $7,500,000 for park development and construction of
the approved Bozeman Sports Park Master Plan. Resolution 4844 allocating an additional
$917,000 in TOP bond funding was approved by Commission for construction of the project.
TD&H Engineering completed the initial soils report in 2014, which included analyses and
recommendations for natural turf fields and paving. Contracts with FieldTurf® to provide and install synthetic turf fields were executed on June 11, 2018. Preliminary design and engineering for
the fields and associated infrastructure (grading, drainage, and irrigation) was completed in mid-
July and initial grading began in late July. FieldTurf® has now requested that a geotechnical report
and recommendations specific to the synthetic turf installation be provided prior to further grading
operations in order to ensure appropriate preparation of the subgrade and warranty of their product.
The FieldTurf® proposal incorporated into the contracts excludes such work:
133
The Scope of Services for geotechnical engineering services is attached (Attachment A – Exhibit
A). The total amount budgeted for design, engineering, inspection, testing and construction
administration for the entire Sports Park project, including Phases 1A and 1B is $650,000, which is approximately 7% of the total project construction budget. Approximately $580,000 has been expended to date, with an additional $33,310 under contract for the landscape architect, and
$19,981 for civil engineering, leaving $16,709 in the budget for this work. The remaining budget
will be $13,909.
UNRESOLVED ISSUES: The geotechnical report will include recommendations that may increase the cost of the fields.
ALTERNATIVES: Per Commission.
FISCAL EFFECTS: The Agreement will allow the project to proceed as previously approved.
Attachments:
Attachment A - Professional Services Agreement with TD&H Engineering for the Bozeman Sports
Park Project with Exhibit A – Scope of Services
Report compiled on: August 2, 2018
134
Professional Services Agreement with TD&H Engineering FY 2017 – FY 2018
Page 1 of 10
PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT is made and entered into this _____ day of ____________, 201__, by
and between the CITY OF BOZEMAN, MONTANA, a self-governing municipal corporation
organized and existing under its Charter and the laws of the State of Montana, 121 North Rouse Street,
Bozeman, Montana, with a mailing address of P.O. Box 1230, Bozeman, MT 59771, hereinafter
referred to as “City,” and, TD&H Engineering, with a mailing address of 234 East Babcock, Suite 3,
Bozeman, MT 59715, hereinafter referred to as “Contractor.”
In consideration of the mutual covenants and agreements herein contained, the receipt and
sufficiency whereof being hereby acknowledged, the parties hereto agree as follows:
1. Purpose: City agrees to enter this Agreement with Contractor to perform for City
services described in the Scope of Services attached hereto as Exhibit “A” and by this reference made
a part hereof.
2. Term/Effective Date: This Agreement is effective upon the date of its execution and
will terminate upon completions of the work or as determined by the City.
3. Scope of Services: Contractor will perform the work and provide the services in
accordance with the requirements of the Scope of Services. For conflicts between this Agreement and
the Scope of Services, unless specifically provided otherwise, the Agreement governs.
4. Payment: City agrees to pay Contractor the amount specified in the Scope of
Services. Any alteration or deviation from the described services that involves additional costs above
the Agreement amount will be performed by Contractor after written request by the City, and will
become an additional charge over and above the amount listed in the Scope of Services. The City
must agree in writing upon any additional charges.
5. Contractor’s Representations: To induce City to enter into this Agreement,
Contractor makes the following representations:
a. Contractor has familiarized itself with the nature and extent of this Agreement, the
Scope of Services, and with all local conditions and federal, state and local laws, ordinances, rules,
135
Professional Services Agreement with TD&H Engineering FY 2017 – FY 2018
Page 2 of 10
and regulations that in any manner may affect cost, progress or performance of the Scope of Services.
b. Contractor represents and warrants to City that it has the experience and ability to
perform the services required by this Agreement; that it will perform said services in a professional,
competent and timely manner and with diligence and skill; that it has the power to enter into and
perform this Agreement and grant the rights granted in it; and that its performance of this Agreement
shall not infringe upon or violate the rights of any third party, whether rights of copyright, trademark,
privacy, publicity, libel, slander or any other rights of any nature whatsoever, or violate any federal,
state and municipal laws. The City will not determine or exercise control as to general procedures or
formats necessary to have these services meet this warranty.
6. Independent Contractor Status/Labor Relations: The parties agree that Contractor
is an independent contractor for purposes of this Agreement and is not to be considered an employee
of the City for any purpose. Contractor is not subject to the terms and provisions of the City’s
personnel policies handbook and may not be considered a City employee for workers’ compensation
or any other purpose. Contractor is not authorized to represent the City or otherwise bind the City in
any dealings between Contractor and any third parties.
Contractor shall comply with the applicable requirements of the Workers’ Compensation Act,
Title 39, Chapter 71, MCA, and the Occupational Disease Act of Montana, Title 39, Chapter 71,
MCA. Contractor shall maintain workers’ compensation coverage for all members and employees of
Contractor’s business, except for those members who are exempted by law.
Contractor shall furnish the City with copies showing one of the following: (1) a binder for
workers’ compensation coverage by an insurer licensed and authorized to provide workers’
compensation insurance in the State of Montana; or (2) proof of exemption from workers’
compensation granted by law for independent contractors.
In the event that, during the term of this Agreement, any labor problems or disputes of any
type arise or materialize which in turn cause any services to cease for any period of time, Contractor
specifically agrees to take immediate steps, at its own expense and without expectation of
reimbursement from City, to alleviate or resolve all such labor problems or disputes. The specific
steps Contractor shall take shall be left to the discretion of Contractor; provided, however, that
Contractor shall bear all costs of any related legal action. Contractor shall provide immediate relief
to the City so as to permit the services to continue at no additional cost to City.
Contractor shall indemnify, defend, and hold the City harmless from any and all claims,
demands, costs, expenses, damages, and liabilities arising out of, resulting from, or occurring in
136
Professional Services Agreement with TD&H Engineering FY 2017 – FY 2018
Page 3 of 10
connection with any labor problems or disputes or any delays or stoppages of work associated with
such problems or disputes.
7. Indemnity/Waiver of Claims/Insurance: For other than professional services
rendered, to the fullest extent permitted by law, Contractor agrees to release, defend, indemnify, and
hold harmless the City, its agents, representatives, employees, and officers (collectively referred to
for purposes of this Section as the City) from and against any and all claims, demands, actions, fees
and costs (including attorney’s fees and the costs and fees of expert witness and consultants), losses,
expenses, liabilities (including liability where activity is inherently or intrinsically dangerous) or
damages of whatever kind or nature connected therewith and without limit and without regard to the
cause or causes thereof or the negligence of any party or parties that may be asserted against,
recovered from or suffered by the City occasioned by, growing or arising out of or resulting from or
in any way related to: (i) the negligent, reckless, or intentional misconduct of the Contractor; or (ii)
any negligent, reckless, or intentional misconduct of any of the Contractor’s agents.
For the professional services rendered, to the fullest extent permitted by law, Contractor
agrees to indemnify and hold the City harmless against claims, demands, suits, damages, losses, and
expenses, including reasonable defense attorney fees, to the extent caused by the negligence or willful
misconduct of the Contractor or Contractor’s agents or employees.
Such obligations shall not be construed to negate, abridge, or reduce other rights or obligations
of indemnity that would otherwise exist. The indemnification obligations of this Section must not be
construed to negate, abridge, or reduce any common-law or statutory rights of the indemnitee(s)
which would otherwise exist as to such indemnitee(s).
Contractor’s indemnity under this Section shall be without regard to and without any right to
contribution from any insurance maintained by City.
Should any indemnitee described herein be required to bring an action against the Contractor
to assert its right to defense or indemnification under this Agreement or under the Contractor’s
applicable insurance policies required below the indemnitee shall be entitled to recover reasonable
costs and attorney fees incurred in asserting its right to indemnification or defense but only if a court
of competent jurisdiction determines the Contractor was obligated to defend the claim(s) or was
obligated to indemnify the indemnitee for a claim(s) or any portion(s) thereof.
In the event of an action filed against City resulting from the City’s performance under this
Agreement, the City may elect to represent itself and incur all costs and expenses of suit.
137
Professional Services Agreement with TD&H Engineering FY 2017 – FY 2018
Page 4 of 10
Contractor also waives any and all claims and recourse against the City or its officers, agents
or employees, including the right of contribution for loss or damage to person or property arising
from, growing out of, or in any way connected with or incident to the performance of this Agreement
except “responsibility for his own fraud, for willful injury to the person or property of another, or for
violation of law, whether willful or negligent” as per 28-2-702, MCA.
These obligations shall survive termination of this Agreement and the services performed
hereunder.
In addition to and independent from the above, Contractor shall at Contractor’s expense secure
insurance coverage through an insurance company or companies duly licensed and authorized to
conduct insurance business in Montana which insures the liabilities and obligations specifically
assumed by the Contractor in this Section. The insurance coverage shall not contain any exclusion
for liabilities specifically assumed by the Contractor in subsection (a) of this Section.
The insurance shall cover and apply to all claims, demands, suits, damages, losses, and
expenses that may be asserted or claimed against, recovered from, or suffered by the City without
limit and without regard to the cause therefore and which is acceptable to the City and Contractor
shall furnish to the City an accompanying certificate of insurance and accompanying endorsements
in amounts not less than as follows:
• Workers’ Compensation – statutory;
• Employers’ Liability - $1,000,000 per occurrence; $2,000,000 annual aggregate;
• Commercial General Liability - $1,000,000 per occurrence; $2,000,000 annual
aggregate;
• Automobile Liability - $1,000,000 property damage/bodily injury per accident; and
• Professional Liability - $1,000,000 per claim; $2,000,000 annual aggregate.
The above amounts shall be exclusive of defense costs. The City of Bozeman, its officers,
agents, and employees, shall be endorsed as an additional or named insured on a primary non-
contributory basis on both the Commercial General and Automobile Liability policies. The insurance
and required endorsements must be in a form suitable to City and shall include no less than a sixty
(60) day notice of cancellation or non-renewal. The City must approve all insurance coverage and
endorsements prior to the Contractor commencing work. Contractor shall notify City within two (2)
business days of Contractor’s receipt of notice that any required insurance coverage will be terminated
or Contractor’s decision to terminate any required insurance coverage for any reason.
138
Professional Services Agreement with TD&H Engineering FY 2017 – FY 2018
Page 5 of 10
The City must approve all insurance coverage and endorsements prior to the Contractor
commencing work.
8. Termination for Contractor’s Fault:
a. If Contractor refuses or fails to timely do the work, or any part thereof, or fails
to perform any of its obligations under this Agreement, or otherwise breaches any terms or
conditions of this Agreement, the City may, by written notice, terminate this Agreement and
the Contractor’s right to proceed with all or any part of the work (“Termination Notice Due
to Contractor’s Fault”). The City may then take over the work and complete it, either with its
own resources or by re-letting the contract to any other third party.
b. In the event of a termination pursuant to this Section 8, Contractor shall be
entitled to payment only for those services Contractor actually rendered.
c. Any termination provided for by this Section 8 shall be in addition to any other
remedies to which the City may be entitled under the law or at equity.
d. In the event of termination under this Section 8, Contractor shall, under no
circumstances, be entitled to claim or recover consequential, special, punitive, lost business
opportunity, lost productivity, field office overhead, general conditions costs, or lost profits
damages of any nature arising, or claimed to have arisen, as a result of the termination.
9. Termination for City’s Convenience:
a. Should conditions arise which, in the sole opinion and discretion of the City,
make it advisable to the City to cease performance under this Agreement City may terminate
this Agreement by written notice to Contractor (“Notice of Termination for City’s
Convenience”). The termination shall be effective in the manner specified in the Notice of
Termination for City’s Convenience and shall be without prejudice to any claims that the City
may otherwise have against Contractor.
b. Upon receipt of the Notice of Termination for City’s Convenience, unless
otherwise directed in the Notice, the Contractor shall immediately cease performance under
this Agreement and make every reasonable effort to refrain from continuing work, incurring
additional expenses or costs under this Agreement and shall immediately cancel all existing
orders or contracts upon terms satisfactory to the City. Contractor shall do only such work as
may be necessary to preserve, protect, and maintain work already completed or immediately
139
Professional Services Agreement with TD&H Engineering FY 2017 – FY 2018
Page 6 of 10
in progress.
c. In the event of a termination pursuant to this Section 9, Contractor is entitled
to payment only for those services Contractor actually rendered on or before the receipt of the
Notice of Termination for City’s Convenience.
d. The compensation described in Section 9(c) is the sole compensation due to
Contractor for its performance of this Agreement. Contractor shall, under no circumstances,
be entitled to claim or recover consequential, special, punitive, lost business opportunity, lost
productivity, field office overhead, general conditions costs, or lost profits damages of any
nature arising, or claimed to have arisen, as a result of the termination.
10. Limitation on Contractor’s Damages; Time for Asserting Claim:
a. In the event of a claim for damages by Contractor under this Agreement,
Contractor’s damages shall be limited to contract damages and Contractor hereby expressly
waives any right to claim or recover consequential, special, punitive, lost business
opportunity, lost productivity, field office overhead, general conditions costs, or lost profits
damages of any nature or kind.
b. In the event Contractor wants to assert a claim for damages of any kind or
nature, Contractor shall provide City with written notice of its claim, the facts and
circumstances surrounding and giving rise to the claim, and the total amount of damages
sought by the claim, within thirty (30) days of the facts and circumstances giving rise to the
claim. In the event Contractor fails to provide such notice, Contractor shall waive all rights
to assert such claim.
11. Representatives:
a. City’s Representative: The City’s Representative for the purpose of this
Agreement shall be the Manager of Trails Open Space and Parks Design and Development,
or such other individual as City shall designate in writing. Whenever approval or
authorization from or communication or submission to City is required by this Agreement,
such communication or submission shall be directed to the City’s Representative and
approvals or authorizations shall be issued only by such Representative; provided, however,
that in exigent circumstances when City’s Representative is not available, Contractor may
direct its communication or submission to other designated City personnel or agents as listed
above and may receive approvals or authorization from such persons.
140
Professional Services Agreement with TD&H Engineering FY 2017 – FY 2018
Page 7 of 10
b. Contractor’s Representative: The Contractor’s Representative for the
purpose of this Agreement shall be Ahren Hastings, P.E. or such other individual as
Contractor shall designate in writing. Whenever direction to or communication with
Contractor is required by this Agreement, such direction or communication shall be directed
to Contractor’s Representative; provided, however, that in exigent circumstances when
Contractor’s Representative is not available, City may direct its direction or communication
to other designated Contractor personnel or agents.
12. Permits: Contractor shall provide all notices, comply with all applicable laws,
ordinances, rules, and regulations, obtain all necessary permits, licenses, including a City of Bozeman
business license, and inspections from applicable governmental authorities, and pay all fees and
charges in connection therewith.
13 Laws and Regulations: Contractor shall comply fully with all applicable state and
federal laws, regulations, and municipal ordinances including, but not limited to, all workers’
compensation laws, all environmental laws including, but not limited to, the generation and disposal
of hazardous waste, the Occupational Safety and Health Act (OSHA), the safety rules, codes, and
provisions of the Montana Safety Act in Title 50, Chapter 71, MCA, all applicable City, County, and
State building and electrical codes, the Americans with Disabilities Act, and all non-discrimination,
affirmative action, and utilization of minority and small business statutes and regulations.
14. Nondiscrimination: The Contractor agrees that all hiring by Contractor of persons
performing this Agreement shall be on the basis of merit and qualifications. The Contractor will have
a policy to provide equal employment opportunity in accordance with all applicable state and federal
anti-discrimination laws, regulations, and contracts. The Contractor will not refuse employment to a
person, bar a person from employment, or discriminate against a person in compensation or in a term,
condition, or privilege of employment because of race, color, religion, creed, political ideas, sex, age,
marital status, national origin, actual or perceived sexual orientation, gender identity, physical or
mental disability, except when the reasonable demands of the position require an age, physical or
mental disability, marital status or sex distinction. The Contractor shall be subject to and comply
with Title VI of the Civil Rights Act of 1964; Section 140, Title 2, United States Code, and all
regulations promulgated thereunder. The Contractor shall require these nondiscrimination terms of
its sub-Contractors providing services under this agreement.
15. Intoxicants; DOT Drug and Alcohol Regulations/Safety and Training: Contractor
shall not permit or suffer the introduction or use of any intoxicants, including alcohol or illegal drugs,
by any employee or agent engaged in services to the City under this Agreement while on City property
141
Professional Services Agreement with TD&H Engineering FY 2017 – FY 2018
Page 8 of 10
or in the performance of any activities under this Agreement. Contractor acknowledges it is aware of
and shall comply with its responsibilities and obligations under the U.S. Department of Transportation
(DOT) regulations governing anti-drug and alcohol misuse prevention plans and related testing. City
shall have the right to request proof of such compliance and Contractor shall be obligated to furnish
such proof.
The Contractor shall be responsible for instructing and training the Contractor's employees
and agents in proper and specified work methods and procedures. The Contractor shall provide
continuous inspection and supervision of the work performed. The Contractor is responsible for
instructing his employees and agents in safe work practices.
16. Modification and Assignability: This Agreement may not be enlarged, modified or
altered except by written agreement signed by both parties hereto. The Contractor may not
subcontract or assign Contractor’s rights, including the right to compensation or duties arising
hereunder, without the prior written consent of City. Any subcontractor or assignee will be bound by
all of the terms and conditions of this Agreement.
17. Reports/Accountability/Public Information: Contractor agrees to develop and/or
provide documentation as requested by the City demonstrating Contractor’s compliance with the
requirements of this Agreement. Contractor shall allow the City, its auditors, and other persons
authorized by the City to inspect and copy its books and records for the purpose of verifying that the
reimbursement of monies distributed to Contractor pursuant to this Agreement was used in
compliance with this Agreement and all applicable provisions of federal, state, and local law. The
Contractor shall not issue any statements, releases or information for public dissemination without
prior approval of the City.
18. Non-Waiver: A waiver by either party any default or breach by the other party of any
terms or conditions of this Agreement does not limit the other party’s right to enforce such term or
conditions or to pursue any available legal or equitable rights in the event of any subsequent default
or breach.
19. Attorney’s Fees and Costs: That in the event it becomes necessary for either Party of
this Agreement to retain an attorney to enforce any of the terms or conditions of this Agreement or to
give any notice required herein, then the prevailing Party or the Party giving notice shall be entitled
to reasonable attorney's fees and costs, including fees, salary, and costs of in-house counsel to include
City Attorney.
20. Taxes: Contractor is obligated to pay all taxes of any kind or nature and make all
142
Professional Services Agreement with TD&H Engineering FY 2017 – FY 2018
Page 9 of 10
appropriate employee withholdings.
21. Dispute Resolution:
a. Any claim, controversy, or dispute between the parties, their agents,
employees, or representatives shall be resolved first by negotiation between senior-level
personnel from each party duly authorized to execute settlement agreements. Upon mutual
agreement of the parties, the parties may invite an independent, disinterested mediator to assist
in the negotiated settlement discussions.
b. If the parties are unable to resolve the dispute within thirty (30) days from the
date the dispute was first raised, then such dispute may only be resolved in a court of
competent jurisdiction in compliance with the Applicable Law provisions of this Agreement.
22. Survival: Contractor’s indemnification shall survive the termination or expiration of
this Agreement for the maximum period allowed under applicable law.
23. Headings: The headings used in this Agreement are for convenience only and are not
be construed as a part of the Agreement or as a limitation on the scope of the particular paragraphs to
which they refer.
24. Severability: If any portion of this Agreement is held to be void or unenforceable, the
balance thereof shall continue in effect.
25. Applicable Law: The parties agree that this Agreement is governed in all respects by
the laws of the State of Montana.
26. Binding Effect: This Agreement is binding upon and inures to the benefit of the heirs,
legal representatives, successors, and assigns of the parties.
27. No Third-Party Beneficiary: This Agreement is for the exclusive benefit of the
parties, does not constitute a third-party beneficiary agreement, and may not be relied upon or
enforced by a third party.
28. Counterparts: This Agreement may be executed in counterparts, which together
constitute one instrument.
29. Integration: This Agreement and all Exhibits attached hereto constitute the entire
143
Professional Services Agreement with TD&H Engineering FY 2017 – FY 2018
Page 10 of 10
agreement of the parties. Covenants or representations not contained therein or made a part thereof
by reference, are not binding upon the parties. There are no understandings between the parties other
than as set forth in this Agreement. All communications, either verbal or written, made prior to the
date of this Agreement are hereby abrogated and withdrawn unless specifically made a part of this
Agreement by reference.
**** END OF AGREEMENT EXCEPT FOR SIGNATURES ****
IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year
first above written.
CITY OF BOZEMAN, MONTANA CONTRACTOR - TD&H Engineering
By________________________________ By__________________________________
Andrea Surratt, City Manager
Print Name: ___________________________
Print Title: ____________________________
APPROVED AS TO FORM:
By_______________________________
Greg Sullivan, Bozeman City Attorney
144
Exhibit A
BOZEMAN, GREAT FALLS, KALISPELL & SHELBY, MT | SPOKANE, WA | LEWISTON, ID | WATFORD CITY, ND | MEDIA, PA
406.586.0277
tdhengineering.com
234 East Babcock Street
Suite 3
Bozeman, MT 59715
August 2, 2018
Carolyn Poissant City of Bozeman
PO Box 1230 Bozeman, MT 59715 Email: cpoissant@bozeman.net
RE: BOZEMAN SPORTS COMPLEX ARTIFICAL TURF
GEOTECHNICAL RECOMENDATIONS
Dear Carolyn,
Thank you for the opportunity to present this proposal to geotechnical engineering services
for the new Bozeman Sports Complex located off Flanders Mill Road and Baxter Lane. It is
our understanding that the City of Bozeman has modified the original design for two of the fields from grass turf to artificial turf. This proposal is for providing recommendations for
the section below the proposed new turf and sub-field drainage. GEOTECHNICAL SCOPE OF WORK
The purpose of our geotechnical investigation is to provide a preliminary analysis of the
onsite soils and their engineering properties with respect to future construction of an
artificial turf field. We propose investigating the site using test pits and anticipate excavating up to four test pits across the site. Test pits will be necessary to gather
adequate subsurface data and samples for use in our material testing and analysis.
The subsurface profile will be observed and logged by an experienced TD&H geotechnical
engineer. Samples will be collected as excavation proceeds if necessary and only if soil
properties differ from the original TD&H Engineering Soils Analysis dated June 2014. If needed, samples will be analyzed in our construction materials testing laboratory to
determine the appropriate physical and engineering properties. If soil properties are the
same as the original report, laboratory testing from that report will be used in our analysis.
We will inform you of any noticeable issues the subsurface conditions may present such as
expansive or settlement potential and the possible need for over excavation of unsuitable soils. The results of our field and laboratory studies and preliminary analyses will be
summarized in a geotechnical engineering report in the form of a letter.
Our field scope of work does not include determining the presence or absence of
subsurface soil and ground water contamination. Test pits will be backfilled and graded to approximate finished ground. Existing topsoil will be spread out as best as possible over
the excavation, but existing vegetation will not be reestablished.
145
PAGE NO. 2
tdhengineering.com
AUGUST 2, 2018
We can typically schedule geotechnical field work within one week of your authorization to proceed understanding that an excavator and operator will be onsite and provided by you.
Report preparation will commence as soon as authorization to proceed is given and
typically requires two weeks. Our scope of work does not include excavator and operator equipment fees. Our lump sum fee for the scope of services, as outlined above, is $2,800.
Should you find this proposal acceptable, please sign and return to us the attached short
form agreement and we will schedule the work. If you wish to modify this scope of work, please contact us at your earliest convenience to discuss how we can best meet your
needs.
Sincerely,
Ahren Hastings PE Project Manager
TD&H ENGINEERING