HomeMy WebLinkAbout18- Task Order - Tetra Tech, Inc. - 2018-2019 Remediation Systems Oversight at the Bozeman Landfill TETRA TECH TASK ORDER 2018-2019 REMEDIATION SYSTEMS OVERSIGHT BOZEMAN LANDFILL June 15, 2018 CLIENT: CONSULTANT: The City of Bozeman Tetra Tech, Inc. P.O. Box 1230 851 Bridger Drive, Ste 6 Bozeman, Montana 59711-1230 Bozeman, MT 59718 Attention: Mr. Rick Hixson Attention: Mr. Mark F. Pearson INTRODUCTION The purpose of this task order is to allow Tetra Tech to continue oversight of operation, monitoring, and maintenance of the remediation systems at the Bozeman Landfill. This task order when approved, will replace Task Order 2017-2018 Remediation Systems Oversight. In August 2016 the new remediation system began operation. The system consists of a landfill gas (LFG) extraction system, pumps installed in selected LFG wells to remove leachate, a soil vapor extraction (SVE) system, and an air injection (AI) system. LFG and SV are burned in an enclosed flare system that includes two regenerative blowers, air compressor, and instrumentation. In addition, leachate and LFG condensate is collected in a 4,000 gallon underground storage tank that is regularly emptied and the liquid discharged into the City of Bozeman municipal sewer for treatment at the City of Bozeman Water Reclamation Facility. SCOPE OF WORK Tetra Tech's proposed scope of work is summarized in the following tasks: Task 100. LFG Extraction System, Leachate Pumps, and Flare System Tetra Tech will conduct monthly monitoring and adjustment of individual LFG extraction wells, leachate pumps, and flare/compressor system. In addition, there will be regular service events for the flare/compressor system. These service events will consist of inspection of the compressor and compressor filter replacement, flare components inspection and testing, blower re-greasing, and related activities. Task 200. SVE and Al Systems Tetra Tech will conduct monthly monitoring and adjustment of individual SVE and Al wells. The SVE and Al wellheads (within the bolt-down steel manhole covers) will be visually inspected every six months to ensure air-tight fittings and valves. It is anticipated that some of the Al wells will need to be cleaned out every six months to maintain sediment-free well screens. Tetra Tech 851 Br idger• Drive, Suite 6; Bozeman, 1`l F 59715 Tel 406.582.8780 Fax 406.582.8790 tetratech.com Task Order—2018-2019 Remediation Systems Oversight Bozeman Landfill, Bozeman, Montana June 15, 2018 Task 300. Leachate/Condensate UST Tetra Tech will conduct monitoring of liquid levels in the UST, calculate volume and accumulation rates, and conduct sampling of the liquid in the UST in accordance with City of Bozeman Water Reclamation Facility (WRF) requirements. Tetra Tech will also supervise the pumping and discharge of the leachate and condensate into City of Bozeman sanitary sewer. In addition, to prevent corrosion and leaks developing in the UST, cathodic protection will be installed by a subcontractor. An inspection of the cathodic protection system will also be conducted on an annual basis. Task 400. Database EntrV and Management Information collected during monitoring and adjustment activities will be placed into a project database. This database will be maintained and updated following every monitoring event described in Tasks 100 and 200. The database will be used to evaluate operations and effectiveness of the systems. Task 500. Project Management and Reporting Project management will include, scheduling of personnel, monitoring equipment/meters, and activities; communication with City of Bozeman and DEQ; data management; administration/invoicing; and task order preparation for 2019-2020 system oversight activities. Reporting will consist of a brief summary of system operation and monitoring provided to City of Bozeman on a monthly basis. PERIOD OF PERFORMANCE AND COSTS This task order will be applicable from the time it is approved by City of Bozeman until May 2019. Estimated costs to complete the foregoing scope of services are shown below: ESTIMATED COSTS TASK ORDER -2018-2019 REMEDIATION SYSTEMS OVERSIGHT BOZEMAN LANDFILL Task Description Estimated Cost Task 100. LFG Extraction System, Leachate Pumps, and Flare System $55,080 Task 200. SVE and Al Systems $20,320 Task 300. Leachate/Condensate UST $38,838 Task400. Data Management $15,120 Task 500. Project Management and Reporting $22,320 TOTAL $151,678 The services conducted and invoicing will be on a time and materials basis. A detailed cost estimate can be provided upon request. Page 2 of 3 TETRA TECH Task Order—2018-2019 Remediation Systems Oversight Bozeman Landfill, Bozeman, Montana June 15, 2018 SPECIAL CONDITIONS: Execution of this Task Order constitutes acceptance of all terms and conditions contained in Tetra Tech's Professional Services Agreement with the City of Bozeman, dated April 15, 2014. CLIENT: CONSULTANT: City of Bozeman Tetra Tech By: By: Printe Name: Printed Name: Mark F. Pearson Its: 41�� G/T% A1�I� Its: Project Hydrogeologist Date: 7-/6-2 Date: June 15, 2018 NOTICE OF CONFIDENTIALITY This Task Order(including attachments)contains information confidential to Tetra Tech, Inc.. its subsidiaries; and subcontractors. It is intended only for City of Bozeman to consider Tetra Tech providing professional services at the Bozeman Landfill. Any other use is prohibited, without the prior written consent of Tetra Tech. Page 3 of 3 TETRA TECH