Loading...
HomeMy WebLinkAbout17 - Traffic Impact Study - West Winds SW Subdivision Lot-, SANDERSON 7 STEWART f •11 ♦. 4 WEST WINDS SW SUBDIVISION TRAFFIC IMPACT STUDY prepared for: Haystack Development PO Box 1793 Bozeman, MT 59771 T QN .4 prepared by: Sanderson Stewart TA � � 106 East Babcock 7ta; WE Bozeman, MT 59715 I December 2017 SAN D ERSONSTEWART. CO SANDERSON W-.9 STEWART r1 i T � �11 � r� --�-- SANDERSONSTEWART.COM c -! _ SANDERSON STEWART TABLE OF CONTENTS INTRODUCTION.....................................................................................................................................1 SITE LOCATION & DESCRIPTION.............................................................................................................1 SITE DEVELOPMENT PLAN.......................................................................................................................1 EXISTINGCONDITIONS..........................................................................................................................1 Streets .............................................................................................................................................. 1 Intersections......................................................................................................................................4 TrafficVolumes..................................................................................................................................5 IntersectionCapacity.........................................................................................................................5 TRIPGENERATION..................................................................................................................................7 TRIP DISTRIBUTION.................................................................................................................................8 TRAFFICASSIGNMENT............................................................................................................................8 TRAFFICIMPACTS.................................................................................................................................11 TrafficVolumes................................................................................................................................ 11 IntersectionCapacity....................................................................................................................... 11 Bicycle and Pedestrian Connectivity.................................................................................................. 12 CONCLUSIONS & RECOMMENDATIONS..............................................................................................13 Conclusions ...................................................................................................................••............... 13 Recommendations...........................................................................................................................14 APPENDICES APPENDIX A—TRAFFIC COUNT DATA APPENDIX B— CAPACITY CALCULATIONS— EXISTING CONDITIONS (2017) APPENDIX C — CAPACITY CALCULATIONS— FULL BUILDOUT (2025) LIST OF TABLES TABLE 1 : EXISTING CONDITIONS (2017) CAPACITY CALCULATION SUMMARY........................................7 TABLE 2: TRIP GENERATION SUMMARY...................................................................................................8 TABLE 3: FULL BUILDOUT (2025) CAPACITY CALCULATION SUMMARY.................................................. 12 West Winds SW Subdivision TIS E ANIL SANDERSON STEWART LIST OF FIGURES FIGURE1: STUDY AREA..........................................................................................................................2 FIGURE2: SITE LAYOUT...................................................................................................................3 FIGURE 3: EXISTING CONDITIONS (2017) TRAFFIC VOLUMES............................................................6 FIGURE 4: TRIP DISTRIBUTION &TRAFFIC ASSIGNMENT SUMMARY.........................................................9 FIGURE 5: FULL BUILDOUT (2025) TRAFFIC VOLUMES...........................................................::.............. 10 FIGURE 6: BIKE AND PEDESTRIAN FACILITIES................................................................................. ...... 13 West Winds SW Subdivision TIS 0 SANDERSON STEWART INTRODUCTION This traffic impact study (TIS) summarizes the projected impacts associated with the proposed development withui the fourth and fifth phases of the West Winds residential development in Bozeman,Montana.The purpose of the study was to assess the traffic-related impacts that the project may have on the surrounding transportation system and to provide recommendations to mitigate any such impacts.'Ihe methodology and analysis procedures used uz this study employ the latest technology and nationally accepted standards ui the areas of site development aid transportation impact assessment. Recommendations made in this report are based on professional judgment and these principles. SITE LOCATION & DESCRIPTION The West Winds development site is located on the northeast corner of West Oak Street and Davis Lane in Bozeman.'file legal description of the property is being Lots 2,3,&4 of Blocks 1,3,&4 of West Winds Subdivision,Phases 4&-'-),located in the northwest quarter of Section 2,°Township 2 South,Range 5 East,as shown in Plat 1-493A.The site is bordered by previous phases of West Winds Subdix-ision to the north,West Oak Street to the south,Davis Lane to the west,and 1\'indNvarcl Avenue to the oast. Fig ure l on the following page depicts the stud} area and the current proposed layout for rite site. SITE DEVELOPMENT PLAN The site development plan for West Winds Subdivision proposes construction of 73 single-family residences.There is currently one access point to this site on Davis Lane at the intersection of Breeze Lane and one access point on West Oak Street at the intersection of Windward Avenue.111s project proposes to maintain these two existing approaches on Davis Lane and West Oak Street and also to extend New Holland Drive north of West Oak Street for an additional access. figure 2 on page 3 illustrates the proposed site layout. EXISTING CONDITIONS Streets The proposed development of this project site will have a direct impact on the adjacent streets and intersections.The following paragraphs describe the existing area roadways that are most likely to be affected by the traffic volumes generated by this development. Baxter Lane Baxter Lane is classified as a Minor Arterial by the City of Bozeman and a Major Collector by TNIDT. Adjacent to the project site, Baxter Lane has a 2-lane typical section with a narrow shoulder and no curb or gutter or sidewalk.The posted speed limit is 40 miles per hour(mph). West Winds SW Subdivision TIS �Y I • - f 3 Nil ' tiM •1 M r � y _ w` _ t ds P . Al = r i r IL 1p so l :1 p ♦ 1 � •y r •a if.• ~ wt1ArLtf _ s�'• 4r• f-� • � 1 'r aaj )• ♦+rYA is r..r �• .��,, *41 • •• oil SANDERSON STEWART 2 ` Ii,Y1t�1giyiv' (gei:i:C:,:1\i' t•r N « !K•YS _ �{. � u^ ..I 4 rtY•C W n.f•"\ 'I M •riL'.1t:1aY.G4 riM. M ... y.'_-7{{tom Y i e �--" •/•J•f'J�� I.K. , _; { i x s au• i. tw�.�.. 3 «x.•r.:...s•«i ).fy;t ''� �scu w a. L 'a ...... iY na •a .. W ..�'$r:.« Y•r -i�!a•u•.r «ya ::.II 1•\44K Mi .\Sf'3 Nn �.rl. •, o„•• .4' ; 47:.:ni' il...,i.j •�ri o.\tui u•Y�« � m•o Ana t I I` H�'r[•rti- ' i%)Nn 1 f.YA I ),f7A Y j2 q •.•. K l !r V! ' ' �:RY=" �,"[(��.•7..-« ♦ � ! Nn. � Na i j I/a :3 N J f � 417G • - ,f f.fJ4 P 'U +5 { .'y�y�' :r n". 1 yLn)• i Na L_..;.. ".i�r"- �• (i�`'''� tri;(x:_......_—.�,,¢s�r--—.�. i .I I .n)fl }l G fn t Nn i NR 2 Nw 3 r '� xxian it ��: 1�-..w,,�i1_ `. _��S_—'. �'y 1�—«..�Trs.,«..•. � -..�uJ�•jl.�......� C� .1 _ i.2�r�. � •�i 4 r'ou Lzi ^' F.• .. __. � r? N� �j�Nya�. � P iiu I� u J � ) W i � I j • .... "�-.. riY,.n � 1 in 'i; is 1 {t .,r•-'� .� y ',� `rt •� ` . 1• ..„�.:7L_ Ir •.•I. � »� 7 tti.','Gaa,}....�i'•..:wi���. I >AN N•- )C.-...- MA ii Ya � I Nan �; q J •i Y l:Yi -t- -t ,� U3 ,•. rn,. KAI rt.In I SRC">a:G h ry 1-' j>°• lt MA .may«..h -35T— a1:i-3r�' "� �. «• yth �J;f �{t i. ffi-SOl /.Ni�tI�'fh1a.=•n-�'.ll )�� \ 1-'r-%T`[ U.f.a. -j'`M_n i-.q4�TifY lfn 2�L!F'J' _• J;2 � 3;�^ ijtf ,4:Nr,J,, 'iNL,•tiii2 j��IiN.z.:�yG WUNJa'J(�1y S1�if(((fVy n,tr'l•.4a V; lm31�G)11 6 i1).24aN,n CJJ1 ,.. Y: ... ., «w� 'b ru�r) Yy e• L^"'s^>��."'L'�.'�.r• �,L•-��r�; Figure 2. Site Layout Davis Lane Davis lane is classified as a Minor Arterial In the CAN,of Bozeman and a local street by lIDT.Adjacent to the project site, Davis Lane has a 4-lane typical section with a divided median. The typical section includes curb,gutter,and sidewalk.The Posted speed limit is 35 mph. Davis Lane is continuous from Oak Street north to Valley Center Road.The Cir?,of Bozeman is planning for a future roadway connection to the south of Oak Street that will connect to the intersection of Durston Road and Fowler Avenue. Breeze Lane Breeze Lane is classified as a local street by the Cite of Bozeman. The typical section for Breeze lane provides one travel lane in each direction ,vith parallel parking curb and glitter and sidcxyalk on both sides of the street.The posted speed limit on Breeze Larie is 25 mph. West Winds SW Subdivision TIS SANDERSON STEWART West Oak Street West Oak Street is classified as a Principal Arterial by the City of Bozeman as a local street west of 19th Avenue by MDT.The typical section for West Oak Street provides two travel lanes in each travel direction separated with a median, curb and gutter and sidewalk on both sides of the street.The speed limit on West Oak Street is 35 rnph.The City of Bozeman recendy improved West Oak Street to provide the full four-lane cross section from Ferguson Avenue to New Holland Drive,including a new signal at the Oak Street/Ferguson Avenue intersection and a new roundabout at the Oak Street/Davis Lane intersection. New Holland Drive New Holland Drive is classified as a local street by the City of Bozeman.the typical section for New Holland Drive provides one travel lane in each direction with parallel parking,curb and gutter and sidewalk on both sides of the street.'The posted speed limit on New i Tolland Driv c is 25 mph. Windward Avenue Windward-Avenue is classified as a local street by the City of Bozeman.The typical section for\`i`indward Avenue provides one travel lane in each travel direction with parallel parking,curb and gutter and sidewalk on both sides of the street. The posted speed limit on Windward Avenue is 25 mph. North 27th Avenue North 27th Avenue is classified as a Collector by the City of Bozeman and a local street by MDT.North 27th Avenue is a r)-picai nvo-lane sweet with curia and gutter and sidewalk south of west Oak Street. North of West Oak Street,2 7 th Avenue has a typical four-lane divided section.The posted speed limit on North 27th Avenue is 25 mph. Intersections The following paragraphs describe the existing major street intersections that are adjacent to the development site and will potentially be impacted by die new development. Baxter Lane/Davis Lane The intersection of Bauer Lane and Davis Lane has four_legs and is controlled as an alt-way stop.The south leg has a dedicated right-turn lane with a thni/left shared lane and all other legs have a single lane for all movements.The south leg is constructed to the full design typical and therefore the north and south legs are skewed by approximately 40 feet. A new traffic signal has been designed for this intersection and is anticipated to be constructed in 2019. Davis Lone/Breeze Lane The intersection of Davis Lane and Breeze Lane has three legs with stop control on the east approach.The sorthbound thru lanes are separated by the raised median and therefore cannot access Breeze Lane. The east approach of Breeze Lane has a single approach lane where only a right turn movement is allowed.The northbound approach consists of a dedicated thm lane and a shared thru/right turn lane. Davis Lane/West Oak Street The intersection of Davis Lane and West Oak Street has recently- been reconstructed as a roundabout. All legs have a single circulating lane and a right turn bypass lane.The south leg has been constructed but is barricaded off until the future roadway connection to Durston Road/Fowler Avenue is constructed. West Winds SW Subdivision TIS SANDERSON STEWART da New Holland Drive/West Oak Street The intersection of New Holland Drive and West Oak Street has three legs with the stop control on the south approach.The east and west legs are divided by a median and have two Lines in each direction.The south leg has a single approach lane for all movements. Windward Avenue/West Oak Street The intersection of Windward Avenue and West Oak Street has three legs with the stop control on the north approach.The east and west legs are divided by a median and have two lines in each direction.The north leg has a single approach lane for all movements. North 271h Avenue/West Oak Street The intersection of North 27th Avenue and West Oak Street is stop-controlled with stop signs posted on the north;rid south (27th Avenue) approaches.The north leg has a dedicated left-turn lane and a shared thni/right-turn lane.The east leg has two Lines with a thru/right shared lane and a tlnru/left shared lane.The south leg has a single Iwie for all movements."11ne wesr kg has a dedicated left-turn lane and a shared thru/right-turn lane.The eastbound and westbound traffic are divided by a median. A signal upgrade has been programed in the City of Bozeman's adopted Capital Improvement Plan(CIP) for fiscal year 2019. Traffic Volumes Weekday ANI and PiNI peak hour turning movement counts were collected for the study area intersections on November 9, 2017.This date was two weeks after the roundabout at Davis Lane and West Oak Street was completed and open to traffic. Traffic volume and patterns were anticipated to be normalized in chat timeframe. In general, the weekday peak hour periods were found to occur from 7:30 to 830 AEI and 4:30 to 3:30 PSI. Raw count data was adjusted for seasonal variation using NIDT seasonal adjustment factors. Figure 3 on the follo%%ing page summarizes the resulting calculated peak hour turning movement volumes for the AM and PM peak hours.Detailed traffic count data worksheets are included in Appendix A. Intersection Capacity Existing Conditions (2017) capacity calculations were performed for the stud-area intersections using highway Capacitv Software (IICS7) as well as RODEL roundabout analysis software. IICS7 is based on the Llighway Capacity Manual,Gth Edition ('Transportation Research Board, 2016) methodologies.The HCNI defines level of service (LOS) as "a quality measure describing operational conditions within a traffic stream,generally in terms of such service measures as speed and travel time, freedom to maneuver,traffic interruptions, comfort and convenience."LOS is a qualitative measure of the performance of an intersection with values ranging from LOS A,indicating good operation and low vehicle delays,to LOS F,wlhich indicates congestion and longer vehicle delays. The results of the Existing Conditions (2017) capacity calculations showed that all intersection approaches operate at or above LOS C. Lengthy queues arc experienced on the east and west approaches of Baxter Lane and Davis Lane,but all other intersections experience minimal queuing.The LOS results for the Baxter Lane/Davis Lane intersection are more favorable than has been shown by previous analyses.This is likely due to a combination of the new Ferguson Avenue connection from Oak Street to Baxter Lane,as well as the segment of Baxter Lune west of Ferguson that was closed for construction at the time data was collected for this analysis. 'Cable 1,on page 7, presents the results of the Existing Conditions (2017) capacity calculations.Capacity calculation worksheets for each of the study area intersections can be found in Appendix B. West Winds SW Subdivision TIS SANDERSON • J I I � n r �. •r w Ilk1 J ,f AM Peak Hour J x x PM Peak Hour Figure 3. Existing Conditions(2017) Traffic Volumes West Winds SW Subdivision TIS SANDERSON STEWART ' Table 1. Existing Conditions(2017)Capacity Calculations Summary Existing 2017 AM Peak PM Peak Intersection Control A%19 95th% Arg 95th 0/6 Delay Queue Delay Queue s/veh LOS veh s/veh LOS veil Intersection Control UI II'riy.'tn Control EB 17.9 C 5 19.3 C 5 Davis Lane& WB 12.4 B 2 18.0 C 5 NB 11.3 B 1 13.1 B 2 Baxter Lane SB 12.9 B 2 15.9 C 3 Intersection 14.8 B -- 17.2 C -- Intersection Control One-lY/rrp /o ntrol IIB Davis Lane& WB 8.8 A 0 9.1 A 0 NB - -- -- -- Breeze Lane SB -- -- I -- I -- -- ntersection Control Roundabout EB 2.5 A 2 4.0 A 1 Davis Lane& WB 4.4 A 1 3.2 A 2 Oak Street SB 2.2 A 1 1.4 A 1 Intersection 3.3 A -- 3.0 A -- Intersection Control One-II"ay Stop Control B Oak Street& EB -- -- -- -- -- -- WB 1.6 A 1 1.5 A 1 New Holland Drive NB 11.4 B 1 11.1 B 1 1 Intersection Control Olie-II%"rt y Stop Gintrol SB) Oak Street& EB 0.3 A 0 0.2 A 0 A'indward Avenue SB 10.3 B 1 12.0 B 1 Intersection Control 7'Y'&- Yiy StopContra B e~S B) EB 0.4 A 1 1.0 A 1 Oak Street& A111 0.8 A 1 1.5 A 1 27th Avenue N B 11.1 B 1 15.6 C 1 S 6. TRIP GENERATION ,1n accurate estimate of site-generated traffic must be made ro analyze the impacts of a new development This study utilized Trip Generation, 10th Edition,published hj-the Institute of'Transportation Engineers ('M),which is the most Nvidely accepted source for determining trip generation projections.1�or the purposes of this studi�, trip generation was calculated using the Single-Family Detached Housing (Land ('se 210" categonZ.Table 2 on the following page illustrates the results of the trip generation calculations for this site. I'pon full occupancy of the residences, the project is projected to generate a total of 689 gross average weekday-trips with 54 trips (14 entering 40 exiting) generated during the zVNI peak hour and 72 trips (45 entering/27 exiting) generated during the PM peak hour. West Winds SW Subdivision TIS SANDERSON STEWART iff Table Z Trip Generation Summary lade+<ndrw Vu ..hlr .Hera rWeekdut• I AM Prak Hour F I'M NAlk', Land Use Intensit Unib total enter exit total enter exit total I rn++-+ I SirWe-Fautily Dewhed Ih uvn f l l -3 Dw&uu U,%a, 659 345 344 5.1 14 1 ❑1 _ Taal No*External Trips 669 345 344 34 14 1 40 72 4 (1) Single-Family Detached Housing-Land Use 210* Units=Dwelling Units Avenge Weekday Average Rate=9.44 (50%enteriug/50%exiting) Peak Hour of the Adjacent Street,One Hour between 7 and 9 AM: Average Rate=0.74 (25%entering/75%exiting) Peak Hour of the Adjacent Street,One Hour between 4 and 6 PM: Avenge Rate=0,99 (63%eutering/37%exiti4 *Tdp Genemlian,1016 Edition,Institute of Transportation Engineers,2017 'I'rip generation projections provide an estimate of the total number of trips that would he generated by a proposed development. I Iowevcr,ui order to esrimatc the uct number of new trips made by personal vehicles external to the site, adjustments must often be made to account for internal capture trips,pass-by trips,and trips made by alternate modes. Internal capture(IC) trips are those trips that do not have origins or destinations external to a project site.Since IC trips occur internally, they do not have an impact on external traffic operations. IC trips most often occur in mixed-use developments where residential,commercial,and office-related land uses exhibit a high rate of internal trip exchange.'This development will consist of only residential uses and IC trips were therefore considered to he negligible. Pass-by trips are those trips that are made as intermediate stops on the way from a point of origin to a primanr trip destination. Pass-by trips are attracted from traffic "passing by"on an adjacent street that offers direct access to that site. Pass-by trips are primarily Attracted by commercial type land uses such as restaurants,convenience markets and gas stations. Again,as this development will consist of only residential uses mid pass-by trips were therefore considered to be negligible. A small percentage of trips generated by the site could be made by alternate modes (walking, biking or transit), but as a measure of conservatism, they have been assumed to be negligible for the purposes of this analysis. TRIP DISTRIBUTION Trip distribution is an estimate of site-generated trip routing,which can be determined by several methods such as computerized travel demand models,calculation of travel time for various available routes and/or simple inspection of existing traffic patterns within the project area. For this study,Sanderson Stewart calculated the trip distribution based on the relative magnitude of existing peak hour turning movement volumes on key travel routes,as well as the proximity of those routes to the site. Figure 4 on the followuig page presents the resulting trip distribution for this study-. TRAFFIC ASSIGNMENT 'I"raffic assignment is the procedure whereby site-generated vehicle trips are assigned to study area streets,intersections and site access driveways based on the calculated trip distribution and the physical attributes of the development site. t Jsuig this approach,site-generated trips were assigned to the study area roadway network for the AM and PM peak hours as shown ill Figure 4. West Winds SW Subdivision TIS S A N D E R S 0 N ST } ' r 1 -�. !1� �r ate- - • • Y i IIIJ 1 1 -- (Y,�,, iaflpiaiiui P%;n)uu:il��u Bey � 1 Figure 4. Trip Distribution& Traffic Assignment Summary West Winds SW Subdivision TIS SANDERSON STEWART 41F 14� 'Pw ry •r ^ a. ,� a �• . _� 1 1 1 r 1 1 r , 1 j •1 � h t I � rfnrrn � - rf rl �. r pia..u• • � �s•.M � AM Pouk Hrnrr • , 'XX I PIA Puok Hour ti V t N - Zrl�in.,r Figure 5. Full Buildout(2025) Traffic Volumes West Winds SW Subdivision TIS m SANDERSON STEWART040 TRAFFIC IMPACTS Traffic Volumes For the purposes of this study, based on uhformation from the owner,it was assumed that full buildout and occupancy for West Winds site development would occur by the end of calendar year 2025. In addition to the site-generated traffic from the subject development, traffic volumes are also expected to increase for study area streets and intersections due to general background growth.To account for that growth,Sanderson Stewart used the 25 percent growth rate that was presented in the Oak Street Improvements Pre-Design Report dated February 2016. In the 2016 report, the growth rate was calculated using traffic volume projections based on modeling of planned development along the corridor. Figure 5 on page 10 illustrates the projected AM and Pitit peak hour Full Buildout(2025) traffic volume projections that were calculated for this study. Intersection Capacity Sanderson Stinvart performed intersection capacity calculations for the Frill Buildout(2025) scenario based on the AM and P111 peak hour traffic volume projections presented in Figure 5,generally based on existing lane configurations and traffic control features. One exception is the intersection of Baxter Lane and Davis Lane,which is prngmmed for the installation of a traffic signal in the Gry of Bozeman's adopted CIP for fiscal year 2019.The intersection is proposed to have three lanes on the west leg(left,thru,and riglht), three lanes on the north leg(left, thru,and shared thni/right), hvo lanes on the east leg(left,and shared thru/right),and four lanes on the south leg(left, two thru,and right). A simple, two--phased (north/south and east/-,sTest)phasing plan was used for the purposes of this analysis. Additionally,the intersection of North 27th Avenue and West Oak Street is also programmed for the installation of a traffic signal un fiscal year 2019.The intersection is proposed to have two lanes on the west leg(shared left/thru and shared thru/right), two lanes on the north leg(shared left/thru and right), three lanes on the east leg Qeft,thru,and shared thru/right),and two lanes on the south leg(shared left/thru and right). Again, a simple, two-phased (north/south and east/west) phasing plan was used for tlus analysis. Finally,Ne\v Holland Drive will continue north of West Oak Street into the site. The New Holland Drive and West Oak Street intersection will operate as a four-leg, nvo-way stop controlled intersection with stop signs on the north and south approaches.The north leg of the intersection will have single ingress and egress lanes. Synchro 8 was used for the signalized capacity analysis and is based on the 1ICM methodologies.Table 3 on page 12 shows the results of the Full Buildout(2025) scenario capacity calculations. Willi the programmed improvements in place,all study area intersections are projected to exlhibit acceptable LOS for the Full Buildout(2025) scenario.projected 95th percentile queues are relatively short;lio,,vever,Baxter Lane is anticipated to experience marginal queueing on the east and west legs of its intersection with Davis Lane. Specific signal phasing plans for this intersection may be able to minimize queueing. Detailed capacity calculation worksheets for the Full Buildout (2025) traffic projection scenario are included in Appendix C. West Winds SW Subdivision TIS m SANDERSON 49 Table 3. Full Buildout(2025)Capacity Calculations Summary Future 2025 + Site AM Peak PiNt Pea Intersection Control Approach A"'g 9 th% Avg 9.t /o Delay Queue Delay Queue shell LOS (veh) (s/veh LOS veh Intersection C;o drol S wali=ed EB 17.0 B 8 16.0 B 5 Davis Lane& WB, 15.9 B 5 16.0 B 8 NB 6.4 A 2 11.1 B 2 Baxter Lane SB 6.4 A 2 11.3 B 2 Intersection 13.2 B -- 14.3 B -- wsation(m&ol eh 11"a) Stop C,wmv/OF Davis Lane& WB 9.0 A 0 1 9.4 A 0 Breeze Lane NB SB Inlerret/ion Contro/ Rnlnldabout EB 4.9 A 2 4.3 A 2 Davis Lane& WB 2.5 A 1 3.5 A 2 Oak Street SB 2.4 A 1 1.7 A 1 Intersection 3.5 A -- 3.3 A -- ntersertron Conlrol Tim-tFay.Viop Conlrol1 B e^ S EB 0.2 A 0 0.7 A 1 Oak Street& WB 1.; A 1 1.5 A 1 New I lollarxl Drive NB 12.5 B 1 13.0 B 1 SB 11.1 B 1 14.1 B 1 I;ffersectran Control Ow-l ay Sta C.anlrol(S'B) Oak Street& EB 0.2 A 0 0.2 A 0 WB Windward Avenue 1513 11.2 13.6 nlerseelion C0,111-ol nali•er EB 6.5 A 4 5.3 A 2 Oak Street& WB 5.7 A 2 6.1 A 3 NB 10.6 B 2 11.5 B 2 27th Avenue SB 0. nterwctio !. 0 - n Bicycle and Pedestrian Connectivity Existing bike and pedestrian facilities along Oak Street and Davis Lane are shown in Figure 6 on the following page. They consist primarily of concrete sidewalk or asphalt path along the segments of both streets that have already been improved to the future five-lane section. Most of these segments also include striped bike lanes.The Davis Lane and Oak Street roundabout was constructed to provide safe access for bicycle and pedestrian traffic through the intersection. Pedestrian hybrid Beacons (also known as HAWK signals) were installed on all the roundabout legs that can be activated by any crossing pedestrian.The adjacent Gallatin County Regional Park trails tie into the pedestrian facilities at the roundabout and at additional locations to the west along Oak Street. The proposed phases of the West Winds Subdivision are designed to have sidewalk constructed oil both sides of both Breeze Lane and New Holland Drive. 'Iliese will connect to the sidewalk adjacent to both Davis Lane and Oak Street.The internal West Winds SW Subdivision TIS SANDERSON STE- WA a' access streets (alleys) m the subdivision provide sidewalk adjacent to one side of the internal roads that connect to the Breeze I.auie and New Holland Drive sidewalks. EXl87MCi-PI VIOSE D Cnh'..R"C SICOVAi K E"tING&AVEL PAIN I a !ram E1tl37Ri0 A$PNALT rrii, EYJ31IN0'9KE tANL A If , •I d 1► dp- 1 - Figure 6. Bike and Pedestrian Facilities CONCLUSIONS & RECOMMENDATIONS Conclusions The preceding analysis has shown that the West kVinds Subdivision (Phase 4 eC )) development will generate a substantial volume of new traffic demand for area streets and intersections. 1 lowever, there are no identified deficiencies for ariv of the studhr area intersections and access points.This is due to the rccendV-constructed roundabout at Davis lane and Oak Street and the signal upgrades programmed at the Davis 1 alne and Batter lane intersection as well as the Oak Street and 27th Avenue intersection drat sue both planned to be completed by the end of fiscal rear 2019 per the adopted CIP. West Winds SW Subdivision TIS SANDERSON STEWART The proposed phases of the West Winds Subdivision include sidewalk connections to adjacent facilities.This will ensure that multi-modal users will have access in to the Oak Street and Davis Lane corridors. Recommendations The following list of recommendations is based on the analysis results from this stud}and the professional judgment of the. author: As planned,traffic signals should be installed at the Davis Lane and Baxter Lane intersection and the Oak Street and 27tb Avenue intersection. Stop signs (R I-1)with street name.signs(1)3-1)should he installed for both Breeze Utne(at Davis Lane) and New Holland Drive (at Oak Street). The north New Holland approach should include ADA accessible pedestrian ramps with appropriate pavement markings. Pavement markings and signage on Oak Street should be updated as needed to reflect the new access. All transportation-related improvements shall be designed in accordance with City of Bozeman standards and the Manual on Uniform Traffic Control Devices (MUTCD). If the above improvements are implemented as recommended,traffic on the area street network should continue to operate in a safe and efficient manner. West Winds SW Subdivision TIS D 0 57< DURING M'J N IT HES SANDERSON STEWART SANDERSON INTERSECTION TURNING MOVEMENT COUNT SUMMARY :onnted By: J.Stu4zcuk Intef,edion: 27th Avenue&Oak Street Agency/Compatn': Sanderson Stewart Date Performed: Thrusday,November 09,2017 lurisdiction: City of Bozeman u Cont Time Period: Ant Peak Hmt :30-8:30 AAO Ptnject Nn nivc.. 17065 Project Description: West Wand,TIS Notdt/Srnuh Street: 27th Avenue Fist/West Street: Oak Street 27th Avenue 27th Avenue Oak Street Oak Street Soutlmbound Northbound Eastbound Westbound Int. Start Time Ri ht Mini Left U-turn Total R ht Thin Left U-turn Total Ri ht Tlim lift U-tmun Total Ri ht Tlum Left U-rum Total Total Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.Ou 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.0f1 7:30 AM 3 15 8 0 26 6 10 1 0 17 4 87 9 0 100 3 36 3 0 42 185 7:45 AA 6 11 13 0 30 18 17 3 0 38 6 105 9 0 120 5 37 6 0 48 236 8:00 AM 4 6 7 0 17 22 14 1 0 37 12 98 4 0 114 6 36 3 1 46 214 8:15 AM 9 18 14 0 41 10 17 2 0 29 22 101 4 0 127 10 50 5 0 65 262 Grand Total 22 50 42 0 114 56 58 7 0 121 44 391 26 0 461 24 159 17 1 201 897 Medium Tmck% 0.0 2.0 0.0 0.0 0.9 1.8 1 1.7 0.0 0.0 1.7 2.3 0.3 0.0 0.0 0.4 8.3 1 3A 0.0 0.0 3.5 Heavy Tmck% 4.5 0.0 0.0 0.0 0.9 1 0.0 3.4 0.0 0.0 1.7 0.0 0.8 0.0 0.0 0.7 0.0 1 3.1 0.0 0.0 2.5 Total Tmck% 4.5 2.0 0.0 0.0 1.8 L8 5.2 0.0 0.0 3.3 2.3 1.0 O.0 0.0 1.1 8.3 6.3 0.0 0.0 61 Total% 2.5 5.6 4.7 0.0 12.7 6.2 6.5 0.8 0.0 13.5 4.9 43.6 2.9 0.0 51.4 2.7 17.7 1.9 0.1 22.4 100.0 PHF (M86 1 0.86 1 0.86 0.86 0.86 1 0.86 0.86 0.86 1 0.86 1 0.86 0.86 ON, 0.86 27th avctnm In Out H 1 108 F2, T TH LT U 50 42 0 tv 7d �0 S TotalEnteringC w N 897 ,- J J H y 0 7 58 56 U LT TH I RT 11] 121 Out In 27th Avenue i.900 ;orh ii�r6tech`i y Cdh,)F3s,lripmono 59102 P1-2,ne 406.656.S2Ss Faa-406.6560967 I nons�ndn5onsit.ori,con•, AM SANDERSON W-.9 INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information ouoted Bv: 1.Staszcuk Intersection: 27t1t Avenue&Oak Street Agency/Comp:uly: Sanderson Stewart Date Performed: Thursday,November 09,2017 junsdiction: City of Bozeman -ouut Time Period: PM Peak Hour 1:30-5:30 PbQ Ptolcct Number! 1'7U65 Ptoject Deseuption; West Winds TIS Nordi/Sotttlt Street: 27th Avenue East/\Vest Street: Oak Street 27th Avenue 27th Avenue Oak Street Oak Street Southbound Northbound Eastbound Westbound Int. Start Time RiLllut 71uu U-11 U-turn Total Ri¢ht Tltm Left U-turn Total Ri ht Tlun Left U-turn Total Right Tluu Ixft ('-nun Total Total Factor 1.00 1.00 1.00 1.00 Im 1-00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 4:30 PM 7 11 3 0 21 4 6 4 0 14 2 51 8 0 61 1s 92 12 1 120 216 4:45 PM 17 15 8 0 40 15 14 5 0 34 1 71 9 0 87 13 87 22 0 122 277 5:00 PM 10 14 9 0 33 11 13 3 0 27 0 58 8 0 66 9 109 26 0 144 270 5:15 Pnl 14 9 12 0 35 12 8 1 0 21 7 65 9 0 81 20 138 23 0 181 318 Grand Total 48 49 32 0 129 42 41 13 0 96 10 245 34 0 289 57 426 83 1 567 1081 Mediumr Truck% 0.0 0.0 0.0 0.0 0.0 0.0 7.3 0.0 0.0 3.1 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.0 100.01 0.9 Heave•Truck% 0.0 0.0 0.0 0.0 0.0 2.4 0.0 0.0 0.0 1.0 0.0 2.9 0.0 0.0 2.4 0.0 0.5 1.2 100.0 0.7 Total Truck"/0 0.0 0.0 0.0 0.0 0.0 2.4 7.3 0.0 0.0 4.2 0.0 2.9 0.0 0.0 2.4 0.0 1.4 1.2 200.0 1.6 Total 7.1=4 4.5 r 3.0 0.0 11.9 1 3.9 1 3.8 1.2 t1.0 8.9 0.9 22.7 3.1 0.0 26.7 5.3 39A 7.7 0.1 52.5 100.0 PFII' 0.85 10,6 1 O.SS 0.85 (1.85 0.45 1 0.85 0.85 0.85 0.85 1 0.85 0.85 0.85 27th Avenue In Out 129 132 RT TH LT U 48 49 32 0 LlJr xt J F1 4- Total Entering r J w 1081 r s s x .. N w n 'cam 0 1 13 1 41 42 U I LT I TH RT 142 96 Out I❑ 27th Avenue I�X)o Nonh-,,,, tech'r1o} I f'dh.)99,i.lontono 59102 fl ne-406.6S6.5255 1 Fox 40&,5r>6Ai67 E „r n s�nderyonsse.,nrf.cor, SANDERSON �► INTERSECTION TURNING MOVEMENT COUNT SUMMARY Counted By: �.Staazcnk Intersection: I Liar Ln&Baxter L i Ageocy/Coinpau a Sander50❑Stewart Date Performed: Thursday,November 09,2017 huisdiction: City of Bozeman Count Time Period: AM Peak Hots :30-8:30 AA project Nauubev 17065 Noleet Description: West WuA TIS North South Street: Davis Lane East/west Street: Baxter Lane Davis Lane Davis Lane Baxter Lane Baxter Lane 6��� Sothbound Northbound I Eastbound I Westbound lilt. Start Tune R lit Tluu Left U-turn Total Right 'nsm Left U-ttun Total Ili it Thm Lett U-turn Total Kr!lit Thin Left U•1unt Total Total Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 7:30 AM 11 27 5 0 43 5 11 6 0 22 9 74 7 0 90 10 47 3 0 60 215 7:45 Al 10 34 0 Sl t6 0 18 78 16 0 ll2 9 35 3 0 8:00 AI41 11 18 13 0 42 3 22 18 0 43 20 G9 6 0 95 15 48 4 0 67 247 8:15 AM 16 19 12 0 47 1 1 0 18 13 94 8 0 115 7 34 1 0 42 222 Grand Total 48 98 37 0 183 17 61 42 0 120 60 315 37 0 412 41 164 11 0 216 931 Medium Tntck% 4.2 2.0 8.1 0.0 ..8 0.0 13.1 0.0 0.0 6.7 0.0 0.3 0.0 0.0 0.2 4.9 0.0 9.1 0.0 1.4 HeavyTruck°/ 0.0 2.0 13.5 0.0 3.8 0.0 4.9 0.0 0.0 2.5 0.0 0.0 2.7 0.0 0.2 22.0 0.0 9.1 0.0 4.6 Total Tmck a/ 4.2 4.1 21.6 0.0 7 0.0 18.0 0.0 0.0 9.2 0.0 0.3 2.7 0.0 0.5 26.8 0.0 18.2 0.0 6.0 Total°/ 5.2 10.5 4.0 0.0 19.7 1.8 6.6 4.5 0.0 12.9 6.4 g33.8 4.0 0.0 44.3 4.4 17.6 l3 0.023.2 100.0 P1IF' 0.94 094 094 0.9.1 0.94 094 0.94 0.94 0.94 0.94 R94 0.94 ^mils Lanc In Out 183 139 RT TH LT U 48 98 37 0 Total Entering = J � 931 M a J E- r- C �1 Fr E" ff04 61 1 TH I RT 169 120 Out I❑ Dave I.rile i3t)0 i`:orb Ta tet�ch'rl_�} I edhog" 59102 fh2 ne i06.6S6.5255 I Fos-406.6C,6-W67 r,n'n-9onder�orui-*rori.c n Aft SANDERSON W7 INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Counted By: ).Staszcuk Intersection: Davis bi&Baxter Lit Agency/Compana: Sanderson Stewart Date Performed: Thursday,November 09,2017 Jurisdiction: City of Bozeman Count Time Period: PM Peak Hour 4:30-5:30 Ph project Number: 17065 Ptojeel Description: West Winds TIS 01th/Sotith Street: Davis Lane EaStj\X est Street: Baxter Lane Darts lane Davis lane Baxter brie Baxter L•ire Southbound Northbound Eastbomnd Westbotuid Iut' Start Time Ri ht 'Iluu Leh U-turn Total Right Tlim Left U-trn Total Right 'Ilitu Leh U-ttmn Total Right 'flint Left U-turn Tut:d Total Factor 1.00 1.00 Dyj LOU 1.00 1.00 1.00 1.00 1.03 L03 1.03 1.03 1.03 1.03 1.03 1.03 4:30 PM 8 30 8 0 46 4 23 8 0 35 I1 65 25 0 101 14 56 6 0 76 258 4:45 PM 20 33 9 0 G2 3 19 13 0 35 6 54 28 0 88 20 65 8 1 94 279 5:00 PM 20 23 11 0 54 5 26 l0 0 41 8 41 28 0 77 16 60 6 0 82 254 5:15 PI\I 19 43 9 0 71 8 25 15 0 48 10 47 24 0 81 15 68 4 0 87 287 Grand Total 67 129 37 0 233 20 93 46 0 159 35 207 105 0 347 65 249 24 1 339 1078 Medium Tmck% 0.0 0.0 0.0 0.0 0.0 0.0 3.2 0.0 0.0 1.9 0.0 1 0.0 2.9 0.0 0.9 1.5 0.0 0.0 0.0 0.3 HeaA1'Truck% 0.0 0.0 16.2 0.0 2.6 0.0 2.2 0.0 1 0.0 1 1.3 0.0 1 1.0 0.0 0.0 0.6 6.2 0.4 0.0 0.0 1.5 Total Tnick% 0.0 0.0 16.2 0.0 2.6 0.0 5.4 0.0 0.0 3.1 0.0 1.0 2.9 0.0 1.4 7.7 0.4 0.0 0.0 1.8 Total°/1 62 120 3.4 0.0 21.6 1.9 8.G 4.3 0.0 14.7 3.2 19.2 9.7 0.0 322 6.0 23.1 22 0.1 31.4 100.0 P1 11-- 0.94 1 094 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Davis Lane Ln Out 233 263 RT TH LT U 67 129 37 0 4- Total Entering 1078 Y r� H 4-1 H 1 0 46 93 20 U I LT TH RT 188 159 Out In Davis Lane 1300 NQph ire wech Woy I Cillmy9,tAonv-)J 59102 ! flwoe i06.656.525S f FJ.406.656.096? � mn_s�ndesansies.o,i.ccntti w SANDERSON t!49 INTERSECTION TURNING MOVEMENT COUNT SUMMARY :ousted By: J.$t"acak latrrercnon: Davis La,Bwrzr Ltr \genes/Company: Sanderson Stewart Date Perfouued: Thursday,November 09,2017 Innsdictioo: City of Bozeman aunt Time Period: AUNI Peak Hour :30-8:30 Ark I'tolect Number-. I7W5 pralecl Description: West Winds l7S North/South Street: Davis Lane Ftast/Wecl Street: Breeze Lane Davis Lane Davis Lane Breeze Laae Breeze Lane Southbomld Northbound Eastbound Westbound Int. Start Time Fi ht 'Iltm Lett U-ttrrn Total Right 'ILm Left U-turn Total R ht Tlu-ii Left U-turn Total Right Tluu Left U-turn Total Total Factor 1.00 1.00 1.0U L00 LW 1.00 L00 1.0U L00 1.00 1.00J00 00 1.00 1.0U 1.00 7:30 AM 41 41 0 18 18 0 1 60 7:45 AM 58 58 0 28 28 0 0 86 8:00 AM 51 51 0 31 31 0 0 82 8:15 A111 50 50 0 14 14 0 0 64 GrandTotul 0 200 0 0 200 0 91 0 0 91 0 0 0 0 0 0 1 292 Medium Track% 0.0 1.0 0.0 0.0 1.0 0.0 6.6 0.0 0.0 6.6 0.0 0.0 0.0 .0 0.0 0.0 0.0 0.0 Heavy Track% 0.0 2.5 0.0 0.0 2.5 0.0 Ll 0.0 0.0 1.1 0.0 0.0 0.0 .0 0.0 0.0 0.0 0.0 TotalInick% 0.0 35 0.0 0.0 3.5 0.0 7.7 0.0 0.0 7,7 0.0 0.0 0.0 .0 0.0 0.0 0.0 0.0 Total% 0.0 68.5 0.0 0.0 68.5 0.0 31.2 0.0 0.0 31.2 0.0 0.0 0.0 3 0.0 0.0 0.0 0.3PIlF 0.85 0.85 0.85 u.85 0.85 085 0.85 0.85 0.8585 0.85 0.85 0.85 In Out 200 9° TH U 200 0 Total Entering 292 C K 91 0 TH RT 200 91 Out I❑ Davis Lane 1300 P;or'h ire nstach`Noy ! [illmg9, 59102 Plx ne-406.6S6.52SS F�a 406.666.0 i67 ! nn'e.9�1 p]Un91<s OR.CViri I SANDERSON STEWART INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information Counted By: J.Staszcnk Intersection: Davis Ln&Breeze Ln Agency/Compare: Sanderson Stewart Date Performed: Thursday,November 09,2017Jurisdiction: City of Bozeman punt Time Period: PM Peak Hour 4i30-5:30 Ph Project Nnmlwc 17065 Ptojeet Description: West Winds TIS Notdl/Soudl Street: Davis Lane East/West Street: Breeze Lane Davis L•utc Davis Inne Breeze Lane Breeze Lithe Soutlrbound Northbound I Eastbound Westbound Int. Start Tune R ght Tlrry Left U-turn Total R lit Tluu Left U-turn Total Right 'Iltnt Lett U-tum Total Right Thin Left U-turn Total Total Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 1.00 1.00 1.00 1.00 100 4.30 Pbl 49 49 0 28 28 No 0 0 0 77 4:45 PAI 52 52 0 36 36 1 0 1 89 5.00 PM 32 32 0 43 1., 0 0 0 75 5:15 PM59 59 1 39 40 0 0 0 99 GrandTotal 0 192 0 0 192 1 146 0 0 147 0 0 0 01 0 0 0 1 340 Aledium Truck% 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0.0 Heae1•Tnrck% 0.0 1.0 0.0 0.0 1.0 0.0 3.4 0.0 0.0 3.4 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 0.0 1 100.0 Total Truk% 0.0 1.0 0.0 0.0 1.0 0.0 5.5 0.0 0.0 5.4 0.0 0.0 0.0 0.0 0.0 100-0 0.0 0.0 0.0 100.0 Total% 0.0 56.5 0.0 0.0 56.5 0.3 42 9 0.0 0.0 432 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.0 0.3 100.0 PHFJ 0.86 1 0,W, 0.86 0.86 0.86 0.86 0.86 0.86 0.86 1 1 r 0.86 0.86 0.86 0.86 Davis Line 1 uI Out 192 147 TH 192 7=1 Total Entering a 340 G 146 1 TH RT 192 147 Out In Davis Lane i�'00 Nonh ii�nsiecl,'iYo} I [Ilinyj,Pvlonv�ti�59102 l'tx ne i06.6S&. 25S f.ix A06.656.0967 I ,.r n_9�nde�oroie.,n i.cU r AM SANDE RSON W-49 " 'Y 4- W A P T INTERSECTION TURNING MOVEMENT COUNT SUMMARY oouted By: J.SuSzl'nl; Lttetsetliou: New Holland Dr&Oak St 'X�ertcy/Colnpauy: Sanderson Stewart Date Performed: Thursday,November 09,2017 1miubctiolt: City-of Bozeman otutl Time Period: ADl Peak Hour :30-8:30 Ah Ptojeet Number: 17065 P-Ject Description: West minds TIS North/South Street: New Holland Drive 1=.ast/lC-I Street: Oak Street New Holland Drive New Hollmul Drive Oak Street Oak Street Soutltbouud Northbound Eastbound Westbotuid Int. Start Time R ht Thru Left U-turn Total ht Tluit Left U-turn Total Ri t Tlrttt Left U-turn Total Ri h t Tlttu Left U-turn Total Total Factor l.uo I oo 1.00 Lowy 1.00 1.00 1.00 1.00 1.00 1.o0 1_ou 1.00 1.00 1.00 1.00 1.00 7:30 AM 0 8 1 0 9 4 71 1 76 37 5 0 42 127 7:45 All 21 6 0 27' ; 2 92 39 1 12 0 51 8:00 AM 0 14 15 0 29 10 89 0 99 40 S 0 48 176 8:15 A l 0 10 4 0 14 10 102 0 112 35 10 0 4` 1 1 Grand T.W1 0 0 0 0 0 53 0 26 0 79 31 345 0 3 1 379 0 151 35 0 186 644 Meclium Tmck 0/ 0.0 0.0 0.0 0.0 0.0 3.8 0.0 0.0 0.0 2.5 9.7 0.6 0.0 0.0 1.3 0.0 0.7 0.0 0.0 0.5 Head*Tmck 0/ 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.7 0.0 2.5 3.2 1 2 0.0 66.7 1.8 0.0 7.9 0.0 0.0 6.5 Total Tmck' 0.0 0.0 0.0 0.0 0.0 3.8 0.0 7.7 0.0 5.1 12.9 1.7 0.0 66.7 3.2 0.0 8.6 0.0 0.0 7.0 Total°/ AA 0.0 0.0 0.0 11 0.0 1 8.2 0.0 4.0 0.0 12.3 4.8 53.6 0.0 0.5 58.9 0.0 23A 5.4 1 0.0 1 289 100.0 PHF 0.91 2-9 0.91 0.91 0.91 0.9] 0.91 0.91 0.91 0.91 0.91 091 0.91 Total Entering n 644 v, ['� M �i 0 26 53 U IT RT 66 79 Out77� lu New Holland Drive i300 i;o ih ir�nsrech'noy I 01.ILng3, 59102 flwne iC6.656.6255 I Foa-006.556.0967 i „a n.vnder5orolts,o i.coo SANDERSON INTERSECTION TURNING MOVEMENT COUNT SUMMARY General Information (:ouuted By: 1.Staszettk httclsecuott: New Holland Dr&Oak St Agency/Company: Sanderson Stewart Date Performed: Tlntrsday,November 09,2017 )urtsdiction: City of Bozeman Count Time Period: PM Peak Hotu(4:30-5:30 P\I) Ptoircl Nund,rr: 17065 Ptojret Desctipuon: West Winds TIS North/South Street: New Holland Drive FAs11W'CTt Street: Oak Street Bmm New Holland Drive New Holland Drive Chili Street Oak Street Soutlnbound Northbomnd Eastbound Westbound Llt titan"funr R, ht Timi Lett U-turn Twal Right "11mt Left U-t„ru Total Right "flu,t Left U-turn Total Rikl,t Thor Left U-rum Total Total Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 L00 1.00 1.00 1.00 1 1.00 1.00 1.00 1.00 1.00 430 PM 0 7 5 0 12 9 47 0 56 68 13 0 81 149 4:45 PM 0 9 6 0 15 6 64 4 74 84 15 0 99 188 5:00 PM 0 12 5 0 17 3 51 0 54 88 16 0 104 175 5:15 PDl 0 12 3 0 15 8 66 0 74 110 21 0 131 220 Grand Total 0 0 0 0 0 40 0 19 0 59 26 228 0 4 258 0 350 65 0 415 732 Medium Tmck% 0.0 0.0 0.0 1 0.0 0.0 1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 25.0 0.4 0.0 1 0.6 0.0 0.0 05 Heavy Tmck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.8 1.3 0-0 50.0 2.3 0.0 0.3 0.0 0.0 0.2 Total Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.8 L3 0.0 75.0 2.7 0.0 0.9 0.0 0.0MO. Total% 0.0 0.0 0.0 0.0 0.0 5.5 0.0 2.6 0.0 8.1 3.6 31.1 0.0 0.5 35.2 0.0 47.8 8.9 0.0 P111 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 t1.8.S Total Entering ~ 732 10 cri x z N 0 19 40 U LT RT 91 59 Out In New Holland Drive 1^00 N00.11 Trwnntech Way, e-Ahngs,Moj-w"n�59102 Plx ne i06.656.5255 I Foa 406.665.0967 E „e _sonde�onsier.o f.coo SANDERSON CID 6m INTERSECTION TURNING MOVEMENT COUNT SUMMARY Counted By: J.Slaszcuh Itlte6er W)It: Dave Ln&Oak St gency/Company: Sanderson Stewatt Date Performed: Thursdav,November 09,2017 lurisdiation: City of Bozeman Couul Time Period: AAl Peak Hour :30-8:30 An Project Numlaee 17065 Project Description: West WildsTlS North;Srmth Street Davis Lane Last/\\'est Street: Oak Street Davis Lane Davis Lane Oak Street Oak Street Southbound Nordrbotmd Eastbound Westbotuid Int Start Time Right Tluu Lett U-turn Total Right Thm Left U-turn Total Rj ht 'suit Lett U-turn Toad itiIjit TInu Lett U-turn Totall Total Factor IMo 1.00 1.00 1.00 1.00 1 1.00 1.00 1 1.00 1.00 1 1.00 1.00 1.00 1.00 1.00 Lt1U 1.00 7:30 AM 15 26 0 41 1 0 1 59 9 0 1 68 9 30 0 39 148 7:45."l 28 30 0 58 1 1 62 17 0 79 12 32 1 45 182 8:00 AM 18 33 0 51 0 1 71 11 0 82 19 34 0 53 186 8:15.-AAJ 15 35 0 50 0 74 11 0 85 8 31 0 39 174 Grand Total 76 0 124 0 200 0 0 0 0 0 0 266 48 0 314 48 127 0 1 176 690 Medium Truck°/n 0.0 0.0 1 6 0.0 1.0 0.0 0.0 0.0 1 0.0 1 0.0 0.0 0.4 8.3 0.0 1 1.6 6-3 0.8 0.0 0.0 2.3 Heavy Track% 2.6 0.0 2.4 0.0 2.5 0.0 0.0 0.0 0.0 0.0 0.0 15 0.0 0.0 1.3 2.1 3.9 0.0 0.0 3.4 Total Truk% 2.6 0.0 4.0 0.0 35 0.0 0.0 0.0 0.0 0.0 0.0 1.9 8.3 0.0 2.9 8.3 4.7 0.0 0.0 5.7 Total% 5.5 0.0 18.0 0.0 29.0 0.0 0.0 0.0 0.0 0.0 0.0 38.6 7.0 0.0 45.5 7.0 18.4 0.0 0.1 25.5 100.0 VHFJ 0.93 1 0.93 1 0.9; 1 11 1 0.93 0.93 0.93 1 0.93 11.93 h 1.7 0.93 0.93 0.93 0.9 lu Out 200 96 RT LT U 76 124 0 N x Total Entering C s 690 r F �I - OJ RM--igs,Nlonlono 59102 #06.656.5255 Foa 406.6&6.0967 E „n�.s�nde soreies,o neon 11 SANDERSON �►49 STEWART INTERSECTION TURNING MOVEMENT COUNT SUMMARY CotuJted By: J.Staszcuk Intt•ta•rtroi, Davis Li&Oak St Agency/Company: Sanderson Stewart Date Performed: 7Lmrsday,November 09,2017 lurisdiction: City of Bozeman :omit Tune Period: PbI Peak Hotu(•1:30 5:30 PAQ Project Ntmibm 11065 Ptotect Description: West Winds TIS North/South Street: Davis Lane East/West Street: Oak Street I Davis Lane Davis Lute Oak Sttem Oak Street Somthbournd Northbound Eastbound Westbound It t. 7-�T4.-:'30 TimeRi lnt Thin Left U-nun Total ht Tlmu Left U-ttun Total Right Them Lett U-turn Total Right Thnt Lett 1_'-rum Total Total 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 26 23 0 49 0 38 14 0 52 17 60 0 T7 178 4:45 PM 39 13 0 52 0 57 16 0 73 22 68 0 90 215 5:00 PM 20 12 0 32 0 42 24 0 66 20 79 1 100 198 5:15 PM 35 23 1 59 0 50 17 1 68 22 82 0 104 231 Grand Total 120 0 71 1 192 0 0 0 0 0 0 187 71 1 259 81 289 0 1 371 822 Median Truk% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0.0 0.0 0.3 Heavy Truck 0/ 0.8 0.0 1.4 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 0.0 IS L2 1.0 0.0 0.0 1.1 Total Tnnck°/1 0.8 0.0 1.4 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 0.0 1.5 2.5 1.0 0.0 0.0 1.3 Total0/t 14.6 0.0 8.6 0.1 23.4 0.0 0.0 0.0 0.0 0.0 0.0 22.7 8.6 0.1 31.5 9.9 35.2 0.0 0.1 45.1 100.0 PII1 0.89 0.R9 0.8� O.R� 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.59 U,ti9 Davis Lane In Out 192 153 RT LT U 120 71 ] x � Total Entering C :J //tt//tt 822 T E o J F 3D 130U i•brih inansier•h'Nog ! [iLnc��,ivlonv�no$^102 � ffwoe iC6.656. ?,75� F�a-0Jb.bri5.0ib? E "nns�,deyoroie..ai.con, SANDERSON �.- " TI \A/A 0 T' INTERSECTION TURNING MOVEMENT COUNT SUMMARY rnlawl Bp: ).Staucuk InterwU011: %V x ward Avenue&Oak,i-vt lgeney/Comllauy: Sanderson Stewart Date Performed: Thursday,November 09,2017 Jurisdiction: City of Bozeman Cowit Time Period: AINI Peak Hour :30-8:30 AND Project Number 17065 Project Description: \Vest Wren is T1S iVosth/South Street: Windward Avenue 11 .r.z W •,I Street: Oak Street MuAwttrd Avenue %VuKt ratd AveuI Oak Street Oak Street Southbound Nortlibourld Eastbound Westbound Int Start Time Right Tluu Leh U-turn Total I Rivju Tluu Left IT-turn Total Ripjtt Tltnt Left U-tturr Total Ri ht 71ira Left U-turn 1'�,i.d 1.,"I Factor 1.00 1A0 1.00 1.00 1.00 1.00 1 1.00 1.00 1.00 1.00 l00 1.00 1.00 1.00 1.00 1.00 - 30 AM 1 0 3 0 4 0 0 0 0 0 0 38 1 0 39 1 22 0 0 23 66 "t 0 3 0 5 0 51 0 0 51 3 19 0 0 22 78 SO)AM 4 0 4 0 8 0 0 0 0 0 0 77 2 0 79 4 38 0 0 42 129 8:15 AM 1 0 4 0 5 0 0 0 0 0 0 100 4 0 104 5 46 0 0 51 160 Grand Total 8 0 14 0 22 0 0 0 0 0 0 266 7 0 273 13 125 0 0 138 433 Medium Tmck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.7 0.0 0.0 QO 0.0 0.0 HeaN r Tmck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9 0.0 0.0 1.8 0.0 9.6 0.0 0.0 8.7 Total Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.6 0.0 0.0 2.6 0.0 9.6 0.0 0.0 8.7 Total°/ 1.8 1 0.0 1 3.2 0.0 5.1 0.0 0.0 1 0.0 1 0.0 0.0 0.0 61.4 1.6 0.0 63-0 3.0 28.9 0.0 0.0 3L9 100.0 PHF 0.68 0.68 0.68 t1.68 0.68 0.68 0.68 0.G8 0.68 0.68 0.68 0.68 0.68 In Out 22 20 RT LT I 8 14 0 a � x = Total Entering 4 r 433 T s. h 13,OO�:onh-.,,, i ch'Non• I C�ihnga,lvlonv�no 50102 F'Fo,ne i06.656.5255� Foa 406.6.55.Ov^6? ' .n n_nand?�onsie*.ar,r'Grri SANDERSON INTERSECTION TURNING MOVEMENT COUNT SUMMARY Gencral Information By: J.Staszcuk lntersectrwt: Witichvattl Avenue&Oak Street :1Keacl/Cotttpa11v: Sanderson Stewart Date Performed: Thursday,November 09,2017 ltuischction: City of Bozeman 'ount Time Period: PDI Peak Hour(4:30-5:30 PAI Project Nutnbct: 17065 Project Descty6on: West Winds TIS Noah/South Street: Windward Avenue East/\Vest Street: Oak Street C�¢V Windward Avenue Winchv:ad Avenue Chtk Street Oak Street Southbound Northbound Eastbound Westboruid Int. Start Time RiLlit Tluu Left U-turn Total Right Tluu Left U-turn Total RiOit 71 m Left U-turn Total RiLylit Tluu Left U-turn Total Total Factor 1.00 1.00 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 L00 1.00 1.00 1 1.00 1.00 1.00 4.30 PM 2 0 2 0 4 0 0 0 0 0 0 54 0 0 54 6 79 0 0 85 143 4:45 Pbl 3 0 3 0 6 0 0 0 0 0 0 71 2 0 73 6 96 0 0 102 181 5:00 PM 2 0 3 0 5 0 0 0 0 0 0 63 0 0 63 4 102 0 0 I 116 174 5:15 PM 5 0 4 0 9 0 0 0 0 0 0 75 3 0 78 6 126 0 0 132 219 Grand Total 12 0 12 0 24 0 0 0 0 0 0 263 5 0 268 22 403 0 0 425 717 Medium Track%. 0-0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 OA 0.0 0.0 0.5 0.0 0.0 0.5 Hearn Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 1.1 0.0 0.0 1.1 0.0 0.2 0.0 0.0 0.2 Total Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.1 0.0 0.0 1.1 0.0 0.7 0.0 0.0 0.7 Total°/ 1-7 0.0 1.7 0.0 3.3 0.0 0.0 o OA 0.0 0.0 36.7 0.7 0.0 37.4 3A 56.2 0.0 0.0 59.3 100.0 P1IF 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0-82 0.82 0.82 0.82 0.82 Windward Avenue In Out 24 27 RT LT U 12 12 0 N � N --] n W x Y V � Vl r7 Total Entering_ J V 717 r 1A J O 1300 itionh nsiecli`Noy 0M.,)9%Nlonhno 59102 rl--&i06.656.52S5 Fax A06-656-0967 i .no•-sonde yoreier.o icon rn Z Pw- WLAH SANDERSON STEWART General Information Site Information A,r*rysl J.Slaw III: Diwvr b Omi Agcncy/Co, sandtaivi 5tewarl Jun-dxbon City of Bozeman 1i+lc Pcrlanned 11I1nIJu11 Oi,l(Arinil Sl(o;O Bn-W L3,1V Analyv;Year 2017 HortIVSmoh Slreol Otrrii lazie Anali>>,Tint Pc6ccl;hrs) O JS Pr+ll How fa(ly Time Analged AM Peak Ho4jr Prujet3 Des(ril;6DI) West Wind Tis Lanes H } II +Yt fr Vehicle Volume and Adjustments Appmacl, Eaahr,;md YfsStbc<.rnd �urlhbnuna u+utnhr�.rnri M.ostirnenl L E R L T R E T R L F R Vol.une i/ 315 60 11 1(A 41 42 61 11 31 hH 0 %Tfuw in shared One land II IJ L3 11 I� L1 L) tJ I it 17 L3 ConfiYUedlJO,I LIR LTR LT R LIR -.low katc,v'We -T'rl 418 t34 110 1H ills Pr•cKll HeaVV Vellides 1 to 0 16 21 Departure Headway and Service Time fr+ti.:PP;lartura+l PA.I.say,Ild 3,20 3,20 1J(1 1 w 3 ifi ll%Ain!13e-oree of utilizaG.on,. 0,390 0704 0,697 0.016 0173 F+nal Dpp.u;ure lle,raway,trtl(s} 5+6 5.91 I-1XI 5 1ei 6.15 F final Degron of Utrizabon,x 0.653 0 317 0.213 0.032 (13.19 LUwa-llp Tin!+-,m iwI 7,(1 2,0 Semite fiine,LS(i) 1,1L 3.91 4,70 4-09 4.45 Capacity, Delay and Level of Service Fs.nv Ratr,v(anhAt) 416 2A IN 1H 195 Cayatily 6/1 609 515 564 SSA (2w+un I c.•+!ilir,[a„{�r'I'+} 4 K 1?� u 8 0.1 l fi Control Delay( -00 119 1 J 4 11.6 9.3 t2,9 lr.vel of S++r,ire,LOS C l B A H Aupiwm Delay(shah) U.9 12.4 113 A;gimar:r 105 C [I N Il Intcrser ion 96ay,s?veh I LOS 114.8 B t= +lryri+)id s: 7017 Unn t^;ly id I+:riri.r 0.'1 R:.:fhi;F rscr.cJ l i;i1' :7+'sfcn/1 1 (+I r,4eu 1l1JRI2[II?Ill ;J O Ih P.,a*pn;7t.is LrisGn;l AM Pcat:xan rtf14S7 All-Way Stop Control General Information Site Information Arltyal 1.Sta;[cI I ?nlrrsrrli�n (Ituty,&Day", 71gt•nry/Co Sbode(i(1n Stfndtt Juristttclion City of lloeenldn f7.11i•PetlornF,"I � 11/If�teitL f � E,tstjtti'�--�1 5[�r�iH I 3t•der Lzr:, - Aru(ysis Year 2017 ND&Oouth 5lrrel f awi;lant AtL+lyio Tn,u•I'v6L d li•.:s) 01a Rank Hrs.Ir Fi:tnr 094— - - rime Nnlyecd PM Peak Hour - ptlh,'rt hl+5nil11irn Y/,•'l wind I IS Lanes Jd 4A� 1. J L 4 `ti Ir 1I Yt hf Vehicle Volume and Adjustments Ap;tru:Klti Easli7nun:1 Wpsl[1ub ;l tinrdll��drd Srulhhr,nd n+a+emen; L T R L T R L r k ! T R VUlurnr tla': ietf 3ti li �4� 6S d? 9] i0 it 1i4 61 W.Thus in Shared Lane L,,•tr it l7 IT tl i2 L3 it It L1 I l7 I coebourallon LTR LTR IT R LTR Flaw Role v(vihlhl 1611 3r.I 148 :1 7-0R I Cr(III11 Heaky Vehi;l('s 3 0 0 5 16 Departure Headway and Service Time 11v0.11 11raff-o"Y",Ild act i i;t 3 Ai i.1U a 7� <M hill OeWee ul Ulibidliork x 0.328 0 of 0,131 0019 Q220 F 'Ia'Orpolturc 1-.cz Jaalt I:d;s} F.1R 5 ft1 t_S t 6 11.4 h 8; F 9rr'la(•gree of Utili[atign.x 0.614 0Ws 010) QW0 0,473 h'ns'r lip T,rnr rn 1s) t ] �n Service Tinse.IS(s) 419 1 11 5.73 4.43 1,81 Capacity, Delay and Level of Service T.°cir;Ra�r,^r cspe,ity S$1 993 478 535 524 7S%Quc,IV.lcr.all,QF,(Yet;" 4% •1.1 1 1 11 1 7 4 C0nttol N4-dy(sh+d)) 191 18.0 116 9.1 1S 9 Apprw(h Ot•Isy Is/vrlil 191 7R0 13 1 15,9 App rarh 1.O5 C L Intc--swiun Dday,s/vi:n I LOS 17 7 C [•:,pynn'II 0,,[1]7 Ilur.ersily(,,':11"101 All llt'S1 'I,WSL Vermi 1 1: �rlu•rn!al 111�.4t��i1J 1GS]:113 A�! 1111;rr l},Iv,.Ft.0irv.l PPA PI••i.rov General Information Site Information Ax4yst 1.Stasnuk Inkr%caion Darts&&aato AgerltyiCo. Santkrson Slawart Jurisdiction City of posoman Dale Pcdwilled 11! G/P Ea%QWCSI Shoal tsrcere lane Analysis Year 2017 NortWSouth Street CW;lane Tirne Anslyced AM Peak Pcvk Wor Fxtar 0,11. lnlersection Otientalion North-South AnnF%k Tirm Period(hrs) a25 Pru{ecl Dmwiplico west W ds TIS Lanes rt 1R Inc,III I y rI Ix�;"s1�1 rs,••:sxw Vehicle Volumes and Adjustments Approach F.ysthcAind Wesltwund Noithh¢sdnd Seull+bourd Mo emwnt U L T R U L T R U L T R U L T R Pric4lty 10 11 12 7 8 9 lU 1 2 3 4U 4 5 6 Number of Lanes 0 0 0 0 0 1 0 0 1 0 0 0 1 0 Canlhptalirsn R Tk T Volume.V(Veml) 1 91 0 200 Pctrt+�l H*-asy Vellide s(9;) 0 Proportion Twe Blocked P*10KII 61,1Kle Irk) 0 Right Turn Chanty iced No No No tic Aledian TY11051-wal 111111 A011 Critical and Follow-up Headways pw*Cr.licdl Hoadw,ry(Sao Critkal Heaclwuy(sec) - aaSo Fellnw Up Ho?'1*0trl(cox) Follow-up Headway(w) Delay, Queue Length, and Level of Service Flow RAIL,, �et1n=�- - -- I C#panty.<(VehA1) 953 YA 1140o 0.00 95%Queue Lenpttt Q,s(a+W 0.0 ctiv> rol De14y(srvtall 8's 1 1 1 lesel of Senirt LOS A Allp-cw 11 Uelrrf ApWoacii LOS A Copynn,`d Ls 7011 Un1sY-osity of fluida NI Ibaltils RFt¢rrotl HC 57"TY1SC W(wo 12 1 Crerrorntnd 11128/2017 10 53 SS Aft boat t3-cem F,itttrsq A W xM •-Way stop-icontrol General Information Site Information Arstly�l }•Stav<iol, Intr rsurllra5 I?avrs At Rrsw�e AgWyXo S.inderwri Stewan h+nsdkbon Ctly or Somman Oalr Prrinrmed I TA(VI r Fa:t/Wrst Sirf-m nreele I drd Analysis Year 2011 NonItISGUIlr SUM Dam t ang 71wc,AmiIpea PA1 Peak Prae Kom Faclor I}tk Intorwtxon Orlantailon North South Analysis Time Famed Onrs) III% Pralert Ucscr,plice. West 1v,nds Its Lanes J •i 1 ,k•i• it L U c- r{ }, � r (I Ot +Y t t• r Vehicle Volumes and Adjustments Alll:•rtixsctr FaHhaund iSt;-=llti��rul � !{;..1.�!rc._rn:! ta..!!:!:�...,,, IduYc+ncnt U L T R U L T R U L T R U L T R Pr.onCy lr� 11 12 J B 9 10 1 2 1 4U t ; G f0umber of Lanes 0 0 0 0 0 1 0 0 1 0 0 0 1 0 r cn.r,aur.,'an !R volume,v(%TMI) 1 146 1 192 Per(cn;Wavy V06Ars Proportion Time Blocked _+4 f'cr(cr'Gradr Rghl Turn C mmOiced No T No No No Mejlan Iypr,/Slo•age Unmy(IM Critical and Follow-tip Headways &s:r CrFb:al He:rdasy(sec) Cntscal Headway(scc) Ha-c icdwo Up ISsoufacy rx�; Follow Up i,w3dnar/(sc4) Eli Delay, Queue Length, and Level of Service FI❑w Rate, Capacity,r(wle/h) 879 vrr Rana U•UU 9S%quer,e length,W(Yeti) 0.0 (_r,nlral Ur.lYf I;���ah1 y.l leM nl SerAce,lOS A Approach I)r'ay;sfrz-`rl 4.1 Approa(h IOS A Ccirreit!Irt(,i.01 J 0!1r,t!r cd F'tiii Ji A•Rri I11,n ICSP- TY61-Version 7 2] Gcnr�aled I I12h12n1 r 10`_,: �L AM Day'-.Rra?m Ex-�linry r'U.Ins General Information Site Information Anal/st 1.Strscui ltslefwlian NPw Holed>4 Oak Agmy/Co. Samdamn stowarl JurtsdlcMn City of 902em80 Dale Pcrforiml I WWI EnSIM05%Slreel Oak Simi( Ana$Als Year 2011 Rlorlh/Soulh Slreot Noar Hol4nd Grove came Ana?yrecl AM Peak Peak How Factor 0,91 intersoulon Cidenladon W-Wast Analysis Time Period(firs) M25 Project Orscripoon West V/rods IIS Lanes Jd 1J1.+ L ;J dJ H Y M r C9 iITrtFr Vehicle Volumes and Adjustments Apptomh lastlwultd Westuowid Horthlornd Sauthhound Movement U L T R U L T R U L T R U L I T R Priority lU 1 2 3 4U Q S G 1 $ 9 lU 11 11 Number of Lanes 0 0 2 0 0 0 2 0 0 1 0 0 0 0 Conliyurotion 1 IR Ll T LR Voltunq V(yell/1►) 348 31 35 1S1 26 $3 Percent H"yy Ve1600%(' ) 5 8 d Pnoporlion Tame slacked I I t4 Peacmt Gracie l ) 0 RIghR Tum ChanneUeed NO llo No No McAan Type/Storage Left Only 1 Critical and Follow-up Headways Base Crilical Headway(sml Critical Headway(sec) Base Foltm-Up Headway Isec) Fol<ow_UpHeadrvuy{sec) — Delay, Queue Length, and Level of Service Flan Rita,v lyc'l1 I 3E 87 Capzcity,c tvd h) 1114 647 v/C R,,ho OD! 0,11 95%(hrcue Length Qn(veh) al 0.5 Contra!uclay(%Ise-h) 8-1 114 Level of SorrAm,LOS A 8 Approach Deli/(s/yrh} 16 114 Apptoach LOS 8 Copytighl C,2011 Uniswsity ar Tlontl,l All Rigdils Rttrsrel IiC57"' IWY Vrtsion 7 2 1 Generated 11/28f2017 11k5/.,02 AM Oils Nee,Hest Tad Fxt,04io AM xtys Stop-Control • General Information Site Information Annis�l ) SLrs�urk Inl4rsi'ttian Hcw Ihrllnnd&tJ,r1: Atlelxyl'Co. Sanderson Slcwxt AKisd(clan City of Donnian f).lic s'erfurrnell 11/lIi/l I Eds!jsti'.hl Sr,ar?I Oak Street Analysis Year 2017 NorthAoulh Sum New Holt"E)rnr lints Mdfrred PNI Peal: Pe W Hrx,r F,r,(Ut 0,83 Inte+seuion Orientdt:otl East-West Anah-os Time fwiad(hrs) 0.25 Ploje;l 0ewilRkIll West 141rds I IS Lanes J k... -r r 1 r, II yt I- r' 1.Sti.:!rua 1--ty"I Vehicle Volumes and Adjustments Apli each Eaitbeu nl Wcslboun Nnrthha:nd SnurrrLnun,r ?An%wnnnt U L T R U L T R U t T R U L T R PrrrnCs' it) 1 T 10 4 r, / R 10 it 12 Number of tar." 0 0 2 0 0 0 2 0 0 1 0 0 0 0 �onlrryur,rq�rrr T f N t l I I R Vcrhmse,V(svlvh) 228 26 65 3W 19 40 Peden?Heir.y VEfnle>JIX-1 0 q Praportian Time 63o(k(41 Pr'rr nnl C,rarl,%(Y,l q Pic 0 Tam Clfannelired No No No No Ms.h�:'i Tyl'.jtitnr��lr' left Crjy 1 -- Critical and Follow top Headways BaseCnhr,� Hr•.Irlr.,ll.(tnCr Critical Freattvja f(sf<) Rose Fulla,rllp Hewltvey Istrcl Fol orwup Hl ath%tIy(Sac) Delay, Queue Length, and Level of Service Fk ,Rite.v IvOk6l Ifs 71 Capacity,c fv�ir/n) 1166 660 •:h Ruliu QUr, R 11 95%Qutve langtlk Q,r lvehl 02 04 C,.rdn)fC Ihy(,,1.vh) b-0 11 i Ievr(of Selvite,tos q g Apprvath 144jy�s/vk:rl 1 11 l AFrproach LOS g t rf'lvuh't U l(;)i7::`nr,rr:.Iy nl Flnnd;% All Rlghts ftr..;,i,,l IIS`51 VC,0u'l t 2.] c>.nrstt�a 11/l /1fj!1 1frS1?¢Ahl Cl iri Nen If,_.Vrj I(xistirrl 1'M+!hv General Information Site Information Ana lyYt 1.Stasrcifc 1111n(Wilm) Wnximard N O+k AgerxyXct. Simdarson Stewart JurfulKOon City 01 Bot6man Duto PaformNi 11/16/11 FasllVJnst Sif"I Oak sueel Analysts Year 2017 NorthlSoull►Surat VAnd*ard Avenue Time Anilymi AM Peak Peak Hour factor 0.68 Ir►bonresilln Ortation East-%Ves( Analysis Tim Period ptrs) 0,25 Project Description West VAnds US Lanes h i4 4 N I Y, r I.Ign•vrtm IJAI Wrst Vehicle Volumes and Adjustments Apv o dl Fastbourld Westbound Northbound Southbound MoverlteM U L T R U L T R U L T R U L T R Priunty 1U 1 2 3 4U 4 5 6 1 8 J 10 11 12 Number of(.ants 0 0 2 0 0 0 2 0 0 0 0 0 1 0 CoMmuration LT T 1 TR LR Volume,V(v*01) 7 206 125 13 14 8 Percent tieatiy Vehicles(%) 0 0 0- Proportion Time Blocked I Percent Grode(%C 0 Right Tum CPomndized No No No No Median TypnlSluraye Lch Only 1 Critical and Follow-up Headways 64%c Critical Ileadway(sec) Clltical Need►vdy(ser 635rc FcituW Up FtedDroay(sec) Follaw•Up Iledift y(stt) Delay, Queue Length, and Level of Service Flow Role,v(vvh/h) t0 33 Capacity,c(velt/l1) 1381 712 v/c Ralio 0.01 M 9S%Queue Length Qcs hehl OLO 01 Control Dalrr7(shel* 1,6 103 Laval of SenmcA LOS A R ApPro h Delay{:/.CI1, Q.j ID 3 Approach LOS B Col;�rrn:rhl n 2017(Ir:vclvty of Fkrriil! A4 Rkjhl>Re5wved I ICS7"7WSC Versimr 1.2.1 (ien vmcd It 1281201 7 1068 SS AM 0ai Wii� amd Fxrsling Mt.rtw o a � General Information Site Information Ana}j:' J ?:awcul, lnlcrsrt4lnn 1Vindwa'd P;C aD, Al)c11cyl+ Sandsrsan Slewarl C-ty of Bateman l5atc I'rl(ormcd l t/lD/L! Eastjs\'a Slrrrt Oak 51reej Mlatjsis.Ycar 2011 NcMVSouth Stroot Windward Avtnue Ilme Analqal PM Peak Prak Hc,.lr Farinr CI8) Intaseclion Oeirntatwn East-West Armlysts Tune Ponod Otis) 075 Project hest=ip6w WMI.w1r ds (IS Lanes JL I w � :.. or. -e ed- CV 4 'Y Ir 10y::u:: 1,Is'„ Vehicle Volumes and Adjustments Atq(n,r h rAs1 u,urlt Vh Slhetmd R.rrlhhau,vl arc !1 hn. i Mtrrrulenl u I T R u l T R u L 1 R u l I R pril,-ily I11 I 1 3 4u 4 ! li t & 9 it) 11 11 Number 01 tatles 0 0 2 0 0 0 2 0 0 0 0 0 1 0 Cw1fill"Fatio'1 I T T t I k t R Volume,V(Yehlls) 5 2G3 403 22 12 12 Percenlltrs'7Velutb2sdYi (1 0 0 Proportion Time Blotk,td I'elcenl Grade Riyhl Turn Crinnnel-tW Mu too tao hb I,bssen Typt•151tn,9t;• I ell Orly ( Critical and Follow-up Headways Puce Crilitel llt i( rr/Iyte Crilital 11M M&I(W) Puss Iok,rr-Up Ht'rrlray iset l Foltrn-up Heatln•ay(set) Delay, Queue Length, and Level of Service Hca,H•ett•,v h'c`Jnl F. ;p Caµnc$y,c(veFtfnj IOS8 547 VA 114110 001 0,95 95%Qtrtrretengl1%Q+'(Yell) 00 07 fnnlrud Ueley(-&huh) 84 17.0 Lev..o1 Servitc.LOS A g Apprnati,004y[,Nell) 02 120 Appruath 10S g 1 :nu}"n1f,I C.J'01I lJn,.,'rsaynt Flnvdt ) All kl_rll'!s llewl'„+,9 Ht'47"'�WG�'!<•niU1 7 71 t;eneratctil:5§i1C+1U1/ 1V,S�rSflfiht C}ak 1:',mk,'ard E,ainil%`f rin 0 0 0 R' V General Information Site Information Artnljst 1,Slasccuk InitKsOction 211h&Wk Agency/Co, Sand[rson Slewert )WISC kllon City of Borman Dale RcMlontxed 11/16/17 fasV1W-51 Street Wk Street Anatysis Yow 1017 NotMouth Street 271h Avwluo birrc Analyzed AIA Pt4k Peak HrAir Ftiour a86 hlersimtion Odentition East-West Analysts 11"Period(11rs) 0.25 Project Uescnptlon West Vfttscls TIS Lanes J4 1 �4. 1• -ti r H Y: .,• r -,, c; 1q Yt 1• I Vehicle Volumes and Adjustments Approach Lxllwund Westuaund Iterlldxwuuci Sorthbnuncl Mcrreirwt U L T A U L T H U L T R U L T R Priwily it) 1 7 4 4U 4 5 6 7 8 9 lU II 17 Number ofLanes 0 1 1 0 0 0 2 0 0 1 0 1 1 0 ConliUurdlirnr L TR LT IR ITR L TR Volume,V(Velt/1t) 26 391 44 18 1511 24 T 58 56 42 1 50 27 P*r(enl IleasyVOIKIrs 15C) 0 0 0 5 2 0 7 C Proportion Time Blocked Percent Grsck�%; 0 0 Right Tum Cltnutwfized No No No No trStzlisn IYpr/Sluraje tell r 11-ru 1 Critical and Follow-up Headways Ddse Criticd Hardnay(%m) Critical Headway(m) Da"follow-Up Headway Isec) FOROrr-UP Headnay(sec) Delay, Queue Length, and Level of Service IIuW Rate,yhrl+lfil TO 21 140 4q 84 Capacky,c tWh/}V 1369 1069 727 265 468 VAPalio 002 0.02 019 0-1/ 0,18 95%Queue Length Q•,tMN at 0.1 Q7 0.6 0,6 Cut"Irol Drlr/(s/Vrh) 7.7 8.4 11 1 7U 7 14A Level of Ser►icq LOS A I I A 8 C 6 Approach Lalay(s1+.nit) 04 D8 i I 1 iris Approach LOS 8 C Cr-lipigla Cw 7017 UniNwsity 0 PLc ida All Hwgnts Rvwiml H:S1"TWSC Vetsron 111 Ceuardled:1112111MI W S:39 AM Oak 77th F d51,rxl AM x1w Vo-Way Stop-conti.01 Report General Information Site Information Mayst l 5t rru'( III tell ha , 7lth t4 O.aSa Arjency/to s3niferserl Steuart Juntth:Gun City of eamnt,n I)slc Oiek Strnnt Analysis Year 2417 Aorlltfsouth S1Wt 77th Noilour Nv,vA„�tlyred PM F'co'( Fran Hc,ur Faclo, 114V tnlerso Wri Otientalion fast\4esl Analysis Time Pernnd(hiQ 075 Pro,cd Gxv:rplicti WC-A Winds Iis Lanes J •1 1 .JL 4- J• L J � Hr r IV r r, 1 'I q.Y t I. f Vehicle Volumes and Adjustments Apt'` '-, I 1dIltsm,nd wfRlh;IIIIYI N'� r•1,'fl}II,Pa Nt �uthkC•unC I'Au%wilenl U 1 t T R U L T R U L T R U L T R Ilf'onty !tt 1 3 4U •I 5 F, ! R i 10 11 12 NuIllb r of Lanes 0 1 1 0 0 0 2 0 0 1 0 1 1 0 ranhryuottm I T!t I I I t+ !is I I� Volume,V(selvh) J342.45 10 84 426 51 11 41 42 S1 44 48 per(eW Healy Veh'kin C) I J w7 II f! Prulwrliuis Tiine Backed 1`00-- r.t ,edr t'✓,I p r� Itiq'rit 7wn Clidnnelited No No No No Mvdinn TyperSwragv Ldt , IWu Critical and Follow-tip Headways Uric CFO•:a' CliUcel Ntud,r.ay(sec) IS•55r!allot':Up I la,iivray i'�-,;. rulluW•Up Ileadwdt(Sec) Delay, Queue Length, and Level of Service 1SJ.S'Itill� '0'(0clijh) 40 99 )31 3R ILt Cayalily.c(MI111) 1014 1265 451 M 445 vt(ltal,o 0011 O.Cr!c (121, II 11 f).29 4S`/.Queue Len_0L Qis(Wh) 0A 0.3 10 06 11 CuiP,101Uelytt:;ve`,1 L,r R.] 7';t, 1,U il.R Lv,aI of Scnice,LOS A A C C Al:proz•-h L'clay(;�.tli;i 3 0 1_', 1'..0 in 6 ApproxIi LOS C C f;q,jnqhl Cr MI It r11ih I li T"TWS(\4rrr Vn;?F Cicnwalctl: lid;8rJJl i 10_'>b Cry AM O,t► 7ilh Fx saris G"!,9,. d.%)I a /►two t ►.IIA JJ►.41. "CIN JIt%4t t l it)It UV tl 111,3 It, S0% Confidence bevel Scheme: 1)avis - 2017 Results Mylight conditions Rodel-WinI - Bull Geometry Scheme Summary Control Data Control Data and Model Parameters Oak StrW Improvements 2017 PHF Flow Profile(veh) Davis-2017 Results 7.5 min Time We Rodel-Win1 Queuing Delays(see) Right Hand Drive Daylight condilions AM Peale I lour Peak 60f15 mn Results Fue Geometry Output flows:Vetwc es Enq>sh Units(ft) 50%Confidence Level Available Data Entry Capacity Calibrated No Entry Capacity Modified No Crosswalks No Flows Facttxed No ApproachlFsit Raid Capacity Calitxated No Acadonii s No Aootlenl Costs No Bypass Model Yes Bypass CallWalion No Global Results Yes Report dated 28-Nov-2017 Page 1 of 6 Rodel Version 1.88 Run number 124 &VI I I%IVI 1 "A ujwt. VQn ► LIUCl 1I11PIUMMUIM, SOei6 Confidence Level Schmne: Davis -2017 Results Daylight conditions Rodel-Win 1 - Full(kolnctry Opomflonai Results 2017 AMA P"k -g0 minuius Flows and Capacity Flows(vah(fir) j— — Capacity(volohrl LOU Lag Nantas I Bypass Arrival Flow oppoalnrg Flow Exit Capacity Avorailo VCR Entry Bypass 1:11lry riyparsc Flow Entry Bypass Entry Bypass 1 Davis-N Free 124 76 125 0 98 1 iO3 1301 OL1138 OAOOt3 2 Oak-W Fres 314 125 0 203 1104 1301 0.28" 0.0008 3 Oak•E From 128 48 40 0 392 1146 1301 0.1129 0.0370 Delays.Queues and Leval of Service Leg Lao Names Bypa+s% Averago Delay(sec) 96%QnaU9(vch) Laval of 8arvico Typo Entry Bypass Leg Entry Bypass Entry Bypass Log 1 Darla-N Free 3.57 0.00 2.21 Q35 0.00 A A 2 Oak-W Free 1 4.39 0.00 *37 1.12 0.00 A A 3 Oak-E Free 3.43 0.0t1 2.60 0.35 01.00 A A A Report dated 28-Nov-2017 Page 5 of 6 Rodel ftelon 1.88 Run number 124 LUI I l IVl 11.c1A VJ1.V1. %J(trt 01141-1 IIIII)MVI-JIM11W 50% Confidence I.evcl Scheme: Davis - 2017 Results Daylight conditions Rodel-Win I - Full Geometry Scheme Summary Control Data Control Data and Model Parameters Oak Street Improvemenle 2017 PHF Flow Profile(veh) Davis•2017 Results 7.5 min Time Slice Rodef-WIn1 Queuing Delays(see) Right Hand Drivo D"Ivl conditions PM Peak Hour Peak 60116 min Rosulls Full Geometry Output(lows:Vehicles English Urals(I!) 50%Confidence Level Available Data Entry Capec7ity Calibrated No Entry Capacity Modified No Crosswniks No Flame Facloled No Approad4ExA Road Capacity Calibraled No Accidents No Accident Costs No Bypass Modol Yes Bypass Calkrallon No Global Results Yes Report dated 28-Nov-2017 Page 1 of 6 Rodel Version 1.88 Run number 123 AM r 11M11 FAA vj"t. kid& ollt.Gt IIIIhJIVVG11tG111J 50%Confidence Level Scheme: Davis-2017 Results Daylight conditions Rode[-Wins - Full Geometry Operational Results 2017 PM Peak -iQ minutia Flom and Capacity Flows(vohfhr) I Capacity(vehlhr) Lag Lag l'binus I Byt�aan I Arrival Flow Opposing Flow co laclt Averat o VCR Tvnn Exit 1 Y 1 - - - - Fntry Bypass Entry Bypass Flow Entry Bypass Entry Bypass 1 1 Davis-N From 72 120 291 0 153 1015 1301 0.072D 0AK7 2 Oft-W Free 2199 1 73 0 410 1132 1301 0 2320 0A006 3 Oak-E Free 290 81 73 0 28 D 1132 1301 0.2MIS OMM Delays.Queues and Level of Service Log Log Name* Bypass Avoragu Delay(xoc) 96%Quouo(voh) Love of Service Type Entry Bypass Lag I Enlry Bypass Entry Bypass Log 1 Dav1s-N Free S.419 0.00 1.39 0.23 OM A A A 2 Oak-W From 3.97 0.00 3.96 0.88 0.00 A A A 3 Oak-E Free 4.11 0.00 3.22 1.03 0.00 A A A Report dated 28-Naar-2017 Page 5 of 6 Rodel Version 1.88 Run number 123 t • f _ m Z -liks. SANDERSON ib STEWART mw r General Information Site Information Mtitl}°st 1 Sl.x:<1;k (r-tcrs�bo� WiMetard H OA Sanderson Stwrart Jurisdiction City of Borman 0.a,w Pclfnrmcci ]l,llb?7I kasl7Wcst Strrel Oak!Arccl Analysts Year 202S NorMouth Scree: YAnc#rrard Avenue Tin',Analyzed PM Prak Peak How fxtor 0.8'1 rntercrcLon Onenaauo-n Ess1-West Annlysis Time Period(Inn) 1125 Prc4ccI LXvoplion WeA Winds TCs Lanes ti (. •I 11•r t I. r Vehicle Volumes and Adjustments A ncunre It F#41 I:v.,nd Y/CStl/L`r,tS1tJ !tarty! Mn5lerrrcnt u L T R U L T R U L T R U t T R Priurily 111 1 i i 411 4 S 1, 7 k q 10 11 12 Number of LJ►ncn 0 0 2 0 0 0 2 0 0 0 0 0 1 0 i re.l..laralir� I' TIl I:. Volume,V(vehpl) 6 126 501 32 19 17 Percent Heavi Vehides 0 0 0 Propwlion Twoe Blocked Pt-,,Evil Grade I'Q 0 Riglst Turn Chennelued No No No Nu MCC.111 Type7Sturage i('It Cr%y I Critical and Follow-Lip Headways Base Criliwl I I(vuw rr(xc; C►itiCJI Hevdwsr2(sec) -- _ Base Folory Up Ilemway Ise() I ollaw-Up Headway(se() Delay, Queue Length, and Level of Service Flue Ft:+r,v Ivr�7rq 7 ,l,t Capacity,c Iv01/111 946 462 Y/C Nst-i IYOJ 010 9SY Q;roue LcNlh Qrr(veil) 0.0 01 cuntier De"ly lslvchl 88 ]:tu larrl of Sarme,LOS A g Jgtl>auh Do1:r1 I�!�rh} !i? 1l.ti Altrrewh LOS B Col;ynrihl C,201 ly i3I Hr•:in.r All R-glIIL IIr.rl"T'.91,Wrt>.^,1!7 7 i Gr I r tlrr5 1112R/7n17 11 C1!I 10 A fLil:Y.i •JrsnrtlF�III, PP1.1xIw Stop-Control General Information Site Information Armlyst J.Sldsceuk Inlorse(tion Wln&).vd Pe Oak Agensy/Co. S"Werson steelimt /uritdklion UY of OQUMM DAla Porlarnwd 11/16A7 14WWPSt S1r#.N1 Ojk strgol Armlysis Year 20225 1404100trll►Street WlndwsrdAvenue 1111W Arsslyzcd AM Peak Peak Wilt Faorsa OU Tntarsoction OdeMalion East-%YBsl M►1lysls Time Poriod Ohm) 02S Prorecl ors.ription West WWiifids T1S Lanes -4 f -• or -r r .I1tYt rF VO srvar F..n wrM Vehicle Volumes and Adjustments 4^dth Easlbourci Wonthaund horthbourxl Souft wnd Ido%memenl U L T R U L I R U L T R U L T R Priority lU 1 7 3 4U 4 5 6 1 8 9 10 11 12 Number of Lanes 0 0 2 0 a 0 2 0 0 0 0 0 1 0- Configuration lT T T TR Lk Volume,V Ih+eFVh) 9 3M 15S FB 22 12 Per,W HemyVehkles(%) 0 0 0 Proportion Time blocked Per,em Grade(%%, 0 Wght turn Channelized No No No No Median Type/Slowge Intl Only 1 Critical and Follow-up Headways ease Critical lteadwx/(Act Critical Headway tier) — Base IoPamUp Heaclrray IseL) Folbvr•UP 14ea("(sec) Delay, Queue Length,and Level of Service FT6w Rate,v Ivchlh} 13 SO Capacity,c(vehA) 1323 626 V/C Rat.o 0,01 0.08 95%Queue Length Q„(Veh) _ 0.0 0.3 Control O0.1y IS/vehl 7.7 11.2 laevl of Senice.LOS A ll /rpprcuch L`elay(-Avk) 02 11.2 Alvroxii Los B Capyriaht 0 2017 Uciwi ity of F'ntidi 41,RKghlc Flwiwd. HIS/ IYO%( Vern nrt /.2 1 Gewreled: I IiM1d017 11 C004 MA Oai Midward Future Mixtw 0 0 0 ' � General information Sire Anaf,lI i Sla;ituk Inlcr:rrlinr Nrrr H1:11,111d Yc Udl: Agoicy/Co. SwWri a Sttrrrart Jtuisdclion city of$01cnaxl 11.1tr T'.!dn.ulal 11>lfs/1 J Fa;tnVrsl Strc c l OA Street An.+hus Year Mn Hortlt/SmAh Street New Holland Onve Iin(-Aii,*t.70 PIA Prie Pr4i Naar Faclo, U.$S hiteisotIiooOr4miatuon Fast-West Arulysis Tlmc Period Mrs) 025 I'mie(t Dncrript ,n i\'rz1 Vhnr z i IS — Lanes Ja 1 ).+ 1. 1. J a •4 `h 4 r -t� r I •tI.yt Fr Vehicle Volumes and Adjustments Afr(7rA.]{.i i.fllnwp.J r�i/CStt1V W/2I i�Ul tlltri)Irr riI ie•rl i i u:,.-ri Notirmrnt U L T R U L T Ft U l T R 11 t T R I'nnnh� 111 t i t .10 d S 6 M32 q 1N 11 1 1<umbtl 01 lanes U 0 2 0 0 0 2 0 0 0 1 0 [anby•ual.�h _I T(1 i.T TA 1TR Volume,V(stih/h) 24 283 37 19 4.16 10 49 6 1Parcrmt Hra.y Vchrim i:c.) 1 27 7 7 7 Prop✓rrlian Tln•,r Bkrrked Ibght Turn Chanrs Wed P10 N0 P10 NO Mrv1Lv1 IpIr'(SI1:rage lelt r lwu Critical and Follow-up Headways F Kr CR;n'dl Headway l6ccl Critical HradwAy isec) ks.H a,h:+ro I1p Hradrral•?:rr:+ FnO(wm-Up Heatltrrry(set) Delay, Queue Length, and Level of Service Fluty R,dx,V Jd 4'r BJ 18 CAP.1r.ty,r(w"I 1021 1l IS 536 412 "A Ralin UO3 0.08 0 17 004 95%Qk�p W911%,Q►,(VI h) 0.1 0.3 06 0.1 Collfrul["Oil)'(thaltii K r_• d 1 13.0 14 1 leW VI SeM(e,IOS A A ft 0 Approakh 111'l t(4lyf•III U,1 1'r ]�I, 1.4 i J10proa(h LOS B 0 rnplvnght V.2alf Unne;zity w,He-O'l All Right R sn<:I tC5J"'IWW Wt 01fi 17 1 f;r•nor,lr.'I llliAfiUlJ 10',8:)/rVr :'rai:Ili-r;isalhr.a F�Ilurr•PL1 xlw • y, F General Information Site Information Asriolyst I J.Slaw<uk hArrsoclion Neer HnNiwl 14 Cask Ayency/Co Sttmanon Slrvratt lurisdktion City of 90"Mim Rate Perlanu(d 11/16.4 Easl/1Nest]Iron Will Stroet An4sis Year 2025 NortWoulh Suaat flew Helfand Drive Time Arirdyied AM Peek Peak sour Faclor 091 Intersection Odenldllen test-Weil I Anrtysis lima Poriod this) 0-3 - - Drrslecl C7woplion Wes3 Winch TIS Lanes JL H ti- ht r a ti •1 +Yt Pr Vitro$1"I tail yiw. Vehicle Volumes and Adjustments Approach Eastlxtund Wesillwmd NurthbuuryJ So,dhbound Mo►ammt U L T R U t T R U L T R U L T R Priority lU 1 J i 4U A 5 6 7 8 9 10 11 11 Nwnbor of tanes 0 0 2 0 0 0 2 0 0 1 0 0 1 0 ConfiguraFon 17 TR tT TR LTR LTR Vo1am0,V(ImhAI) 8 42i) 38 43 186 3 32 0 6S 10 1 13 PP((Pnt Hsxry Vehidet{-)'.1 ] J 2 ! 1 J J 7 Propoi on Time Blocked Percent i5warte(IX.) @ @ Right Tom Channeluad NO ffo Na No Mod AnTylw6toragp N.I'l Thou 1 Critical and Follow-tip Headways Rase Crili(AW Homi*rry(sxI Crfllcal Hea"(sec) Rase Folk),v llp FlPadryay(5oc) Foltow,Up Headway(so() Delay, Queue Length, and Level of Service My.-i Rdty.v IYOVni 9 •11 106 76 Carwity,C(vehlh) 1367 IDS3 S94 617 v/(Ralin 001 0.04 013 ORIt 95%(ueue tenglls,Q"(Yoh) 00 0.1 0.7 0.1 Canlrr;I PM.)y fcl.ti+Is) 77 86 ll S 11 1 levrt of Setsrice,LOS A A s 8 Aupru.tth Retry(sf h) 02 1 7 11 S 11 f Approeth(05 B 8 (rp/vighi Cj)1-51/Ont.w.,lyof Fhnd3 All Rights Rewrwd HC57'"rhsr vcrsinn 7J l Gc�csaled 1t/28/2@l! l@SBUSAM Oak rlcrr HcHand FidorP AFA dw General Information Site Information z A,+rlyd J %Mwitk Intcncclicn 1llb&C7+�c A,gpncy/Co SanFlerson 5tmatt lurisdictron City of Buzemer D!1W L."AMea Street Upi.jlrceF Amtysls Year 202$ WiW/Smilh S1reel 21111 A»mwe T"up A..zlyn'll NA p0A Peak 11aw I'ctor 0.85 InIesnctlan 06anmhon East\Vest Analysis Tints Periud(hrs) 0.25 Pri,Jerl Dr"(wil'orl Vint Winds IIS Lanes .) 4 1 !• L or Ir it 14 +Yf 1. f Vehicle Volumes and Adjustments i415k"uu.>ti t11ur;.lnd h7ov��mnt U i T R tl L T R u I T R Il I T R I .. Number a1 Lanes 0 1 1 0 0 0 2 0 0 1 0 1 1 0 �.li.'•.1ur�:�1n In 11 ,h IIR 1 Irt Va1un"M,V(w". ) 43 305 14 102 528 69 19 50 ST 39 60 bl Perronl Hri%y'1cnl;It;IYo? U i (1 7 7 U D 0 Proparlian 7,me Blacked (irr:;lr;1i) n n Righ T1unCh nne red Ilo Nu Nn Ila Fan 111 Typn)Si -mq.:, lelF - Illm 1 Critical and FO11ow-up Headways Baer CrIIir.11 Iload;vaJ t:e l Critical Headway lss'c) — H7srt I "no Up HVzJnay Falsaw-Up Headway(sec) — — Delay, Queue Length, and Level of Service F r,.i R_a[P,V WCVYI) 51 m 141 deg 143 Capxlty,c IVOIA) 905 284 149 316 v/C Ra1„ ll,pG n50 f111 o4S 955s.Queen taxph Q,(voh) 0,2 26 1 7 27 CnrrVol-DI"ly{;/oral 9.] 1'7 G i9 A.4 mice.LOS A 0 F D Ap.no--i Ai MAq f:,,1 r,11} ! L 1 6 296 79,n Appror� l 1.05 0 D ('11,P lit a%N?t I Ur+vc+sily al H1.•iva All p•,Jhlc k,,.,1.w:I Ill'.]"TWSC Vni:in l J 1 (,rc ralrn I WH.UM r 111! P-1 AM Two-Waye Report' General Information Site Information Arstlysl ).Slasxuk I Intcrsaclion Davis tL Breeze A9"KYXO _ - — Sanderson Stewart ludsclkUon City of Boournan Dwto Pnrinrused 11/lb/11 Untmost SOW Breeze Lana Analysis Year 202$ Nonhlsoulh sheet L}avls Lana Tim#Analyzed AM Peak Peak Hour Farlor 0.95 Inla(soctkon OrfantaUon North-South Analysis lima Nriod(hrs) 0.25 Project Dmrptron Well viluds ITS Lanes J 4, 1. L U Fe �� A .1 •r•r t I. r ?A'o"SOW N%+%_.x/h Vehicle Volumes and Adjustments Appron h [astlwund Westbuand Nonlibourcl Sculhbuurvj Movement U L T R U L T R U L T R U L T R Monty 10 It 12 1 8 9 lU 1 2 3 4U 4 5 6 Number of Lanes 0 0 0 0 0 1 0 0 1 0 0 0 1 0 Conliguralion R TR T volurttrc.V(vehAd 10 120 1 251 Patent Heavy Vehicles 4'%! 0 Proportion Tome Blockal Peresnl Grade V+G) 0 RHjM Turn Channakeed No Pao No Na Medan iypel5torage VrrdMdetl Critical and Follow-up Headways Base Critical Headway(sec) Critical Headway(six) Base Fot'ow Up Headway(sec) FoitarrUp Headway(sac) Delay, Queue Length, and Level of Service Flea"AV,v(vehlb) 12 Capacity,c(vehlb) 911 v/C RAO 001 95%Qusyso Um*,jLmL Qos(vvh) OA Controt W4.1y Is/vt+) 9A Leval of Service,LOS A Apluaa(h W11,YJ Iy.0 Appreacl►LOS A Copyriq a O 2017 Ulweasity of F'41ide.X.,R•glili Reserved. if(S "TVI5C Version 7 2 t 11081M17 10 54,15 AM D7r.is&eope Fmiun AM tW. General Information r 7�iteformation Anttyo 1 slm;:cl:k r,i Dw.vis/V flrerte AgrntyfCo Sandnrsnn Sowml lunurtbn City of surtntNv Mme 1'nrh�u:cl 1117{till! F71511V!(5(Slri•I}I R+,hi•fr.t�.n• Analysis Year T07S WFIN IrAilh slrttl WY4 Idne iww An:lya.,rl PIA F'r'a'( Peak lima F.r(o( 0Rfi rnlorsec[snnOntnlal,On floith•Soulh Analysis Tim#Pt+iod0(s) 0.6 Procd Dr.crinI<m WC-A winri; li5 Lanes -,r or A '1 �t �Yt rf Vehicle Volumes and Adjustments ° , 1�'•'•tr •uin(1 °ric,(uuu-ri Norlhilo-.mc SUuShl:i,un.3 R7ovrmrrt U L T R U L T R U L F R U L F R Fnardv j0 11 12 r . u U,! 1 a 3U n N.Uistmr of Lams 0 0 0 0 0 1 0 0 l 0 0 0 1 0 VQIUMP,V 001111) ! 194 s 2ss - Pcr(cnt Ilcavj 1'chi(Ic;('Y,) 0 Praporliorr T.rne UIDded Ridltt Tum Ch>nn6zed fig _ --- fig NO No AfcUian IyprlSlorara Ur•:Ir.idcd Critical and Follow-up Headways Sa.v Cntl(al ilejuvoot CrilJcal Htmdwey(sec) U.rst•loto.. Up Ile.A.uy,seO Fo"•ax Up Hezdoay(Sot) Delay, Queue Length, and Level of Service flrl::Pity,v ivc•trn) T capsc.ly,c(v0,A) 8l8 v,rr R.IEo 001 95%Qjrje tongll,Q.,(vrh) p,0 LeYN of Scrncc,LOS A A.pprnach hrizy i;Nrhl yq Anpaw(h IUS A opy,i;til : ?O11 lfni.rrsily nl flan?Ip hll Rnll's fi,.,•;.�ry,rl 'il" I\S'c'._ti'(••siti•i f? 1 r_<'I(ralcd 1s%1i!:011 i4_;S:1C•Ah1 Danis Rrevou F(Ili,re PfA r,h•: HCM 2010 Signalized Intersection Summary 2: [Davis lane & Baxter Lane; tsr28'2U17 Lane Configura�'brs tt, Volume(velt9r) 45 384 76 15 200 50 58 79 27 45 121 58 Number 7 4 14 3 8 18 5 2 12 1 6 16 folliial Q(Qb),velr 0 0 0 0 0 0 0 0 0 0 0 0 Pex1•Bike Adj(A pb1) 1.00 1.00 1,00 1.00 1,00 1.00 1.00 1,00 Parking Bus,Adj 1.00 1.00 1.00. 1.00 1.00 1.00 1.00 1.00 1,00 1.00 1,00 1,00 Adj Sal Flow.w4uhlin 1845 1900 1900 1610 18DI 1900 1900 1610 1900 1557 1821 1900 Ad)Flow Rate,vehlh 48 409 8t 16 213 53 62 84 29 48 129 62 Adi No.of lanes 1 1 1 1 1 0 1 2 1 1 2 0 Peak Hour Facia 0.94 0.94 0.94 0.94 0,94 0.94 0,94 A94 0.94 0,94 A94 0,94 Percent He"Veh.% 3 0 0 18 0 0 0 18 0 22 4 4 Cap.vehbt 344 600 510 233 440 110 748 1641 866 691 1243 568 Arrive On Green 0.32 0.32 0.32 0.32 032 0,32 0,54 0,54 0,54 0.64 0.54 0.54 Sat FAw.W111 1098 1900 1615 780 1395 347 1211 3059 1615 1066 2317 1059 Grp Valume(v) veh4i 48 409 81 16 0 266 62 84 29 48 95 96 Gep Sat Flaw(s)%vWhdn 1008 1900 1615 780 0 1742 1211 1530 1615 1066 1730 1640 Q Sewe(g s),s 2.0 10.1 2,0 1.0 0.0 6.7 1.4 0.7 0.5 1.2 1.5 1.6 Cycle Q Clear(g e),s 8.7 101 2.0 11A 0.0 6.7 3.0 0.7 0.5 11.9 1.5 1.6 Prop In Lane 1.03 1,00 1,03 020 1.00 1.00 1.00 0A5 Lane Grp Cap(c),ve* 3" 600 510 233 0 550 748 1641 866 891 931 880 VIC Ratio(X) 014 0.68 016 0.07 0.00 0.48 0.08 0.05 0.03 0.07 0.10 0.11 Avail Cap(c__a),v" 566 084 836 391 0 902 748 1641 866 691 931 880 HCM Plaloon Ratio I.00 1.00 1,00 1.00 1,00 1.00 1.00 1.00 1.00 1-00 1.00 1,00 Upstream Filterp► 1.00 1.00 1.00 1.00 0.00 1A0 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay(d),silveh 184 161 13.3 21.0 0.0 14,9 6.9 6.0 5.9 6.4 6.2 6.2 Incr Delay((12),sMmh 0.2 1.4 0.1 0.1 0.0 0.7 0.2 0.1 0.1 0.2 0.2 03 Initial Q Delay(0).Vmh 00 00 0.0 0,0 00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %Ile 88ck0fQ(51Y%)'wh'ln 0A 5.5 0.9 0.2 0.0 3.3 0.5 0.3 0.2 0.4 0.7 0.8 nGrp Delay(d),shn4i 18.6 17 5 13.5 21.1 0.0 15.6 7.1 6.0 6.0 6.6 6.4 64 LnGrp LOS 8 a B C B A A A A A A 4peoach Vol,w'-Wn 538 282 175 239 Approach Delay,shvlh 17.0 15.9 6.4 6,4 ApV ach LOS B B A A pair- _ _ ww Alm a Ass-qucd Phs 2 4 6 8 Phs Duration(G*Y*Rc),s 33.0 21.1 33.0 21.1 Change Petiod(Y+Rc),s 4.0 4.0 4,0 4.0 Max Green Se4ling(Gmax),s 29.0 28.0 29.0 28A Max Clear Tr110((J_c+11),s 5.0 12.1 3.9 13.1 Green Ext Una(p-c),s 2.1 4.0 2.1 3,9 howim Summary -0 V A* HCM 2010 Ctrs Delay 112 HCfA 2010 LOS B (=[cure J2035)E:xisling Inle-i soc6m 5lano AM Peak Flour WIV2015 Baselii,43 Syncluo 8 Repert Page 1 HCM 20,10 Signalized Intersection Summary 5, 271h Avenue & Oak Street 1V2812017 -♦ 4__ 4N f �► 1 Obit tit toil< :,UL Lane Confrguralions 4 r A �+ Volume(vem) 35 485 57 22 197 29 10 71 68 51 61 28 Wmber 7 4 14 3 8 18 5 2 12 1 6 16 111ftiel 0(0b),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped•Bike Adj(A pbT) 1.00 1,00 1.01 140 1,00 1.00 1.00 1.00 Pa4ldng Bins,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1,00 1A0 Adl Sal Flan,vehrhM 1900 1880 1900 19M 1788 1CAO 19M 1820 IN3 19M 1879 181f1 A4 Flow Relle,vehlh 41 564 66 26 229 34 12 83 79 59 71 33 Ad,No of I nnes A 2 n 1 2 (1 n 1 1 n 1 1 Peek Hour Feelkir 0.86 0.e6 0.86 0.86 Oaeo m 0.86 0.86 0.86 0.86 0.88 0.86 Peroenl Heavy Veh,% I I 1 0 6 6 5 5 2 2 2 5 Cap,vehib 180 1262 144 474 1243 182 160 304 291 275 191 283 Arrive(Xi Green 0.42. 0.42 0,42 0.42 0.42 0,42 0,18 0.18 0.18 0,18 0.18 0.18 Sal Flow,vehlh 100 3020 344 80A 2974 436 115 1654 1583 520 1042 1538 Grp Vofunto(v),vehih 355 0 316 26 129 134 95 0 79 130 0 33 Grp Sal Florv(s),vaWn 1813 0 1650 809 1699 1711 1769 0 1583 1662 0 1538 0 Scryc�g s),s 0.0 00 4.0 0.7 1.4 1 A 0.0 0.0 12 0.7 0.0 05 Gyde 0 Clem(g_c),s 3.9 0.0 4.0 4.1 1.4 1 A 1.3 0.0 1.2 2.1 0.0 0.5 Prop In Lane 0.12 0,21 1.00 0,25 0.13 1,03 0.45 1.00 Lane Grp("ap(c).vehfh 896 0 690 474 710 715 464 0 291 467 0 203 Vic l&1Iicq) 0.40 0,03 0.46 005 0.18 0.19 020 0.00 0.27 0.28 0.00 0.12 Avaa Cap(c_a),vehm 1604 0 1360 002 1400 1410 1591 0 1327 1459 0 1289 lii M Piatwi Ratio 1.0i, i.03 i 00 1.00 i.00 i.00 too 1.00 i.0'a i.00 i.00 1.03 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0A0 1.00 Lhifomr Delay(d),sWh 61 00 6' 7.8 53 54 10.2 00 102 10.5 0.0 99 Ivor Delay IQ),s7veh 0.3 0.0 0.5 0.0 0.1 0.1 0.2 0.0 0.5 0.3 0.0 0.2 Irkal 0 Dela)�0)0mh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 00 `bileBack0f0(50%),vehRn 2.0 0A IA 0.2 0.7 0.7 0.7 0.0 0.6 0.9 0.0 02 LnGrp Dmlay(d).srvch 6.4 0.0 6.6 7.8 5.5 55 10.4 0.0 10.7 10.8 0.0 10.1 LnGrp LOS A A A A A 8 8 B 8 Approach Vol,veh n 671 289 174 163 Approach Delay,sMh 6.5 6.7 10.6 10.7 Approach LOS A A B B Tinrar - 1_-- 3 d 5 _�� 7 8 Assigned Phs 2 4 6 8 Phs Durallon(G*Y+Rc),s I IIA 17.8 11A 17.8 Change Period(Y+Rc),s 6 0 5.13 6.0 5.6 Max Green Selling(Gmax),s 24.4 24.0 24.4 24.0 Max 0 Clear Time(g c+ll),s 33 6.0 4.1 6.7 Green Ext Time(pi),s 1.7 5.5 1.7 5.5 HCM 2010 Cbl Delay 7A HCl`A 70101 OS A Fulure(2035I Exisling Inlerseclicsr Slane Ah Pea- t?ou, C-11712015 Base ine Synchro 8 Reporl Page 2 Queues 2: Davis Lane & Baxter Lane 1112M17 Anne Grof p EHL EHT t BRt WBL W81 NHL WH I 14HR SBL S31 Lane Giu,p I-Wl ivi i) 48 4m 81! 16 266 62 84 29 48 191 vacRabo 016 0.68 0.1-1 ►; '0 047 01C 005 003 01*19 0.11 Conlrol[achy 13.9 22.1 4.1 13,7 1U ); 1 7.9 4.1 8.7 5.7 Queue Delay 0.0 0.0 0.0 00 00 0.0 0.0 0.0 00 00 Told 11day 13,9 22.1 4.1 13.7 15,9 8.7 7.9 4.1 8.7 5.7 Queue Length 50th(ft) 11 112 0 4 tit 9 6 0 7 9 0ocof'.l.oi"glh 95►n(ft) 30 186 21 14 111 20 i2 27 30 Inlemal Llr*Dis1(ft) 490 435 420 460 Tum Bay Lenglh(fl) 100 100 100 103 100 100 Base Capacity(vph) 486 982 874 259 916 643 1638 878 583 1796 Slarvalbo Cap Redur.11) 0 0 0 0 0 0 0 0 0 0 Spll•oack Cap Reducln 0 0 0 0 0 0 0 0 0 0 S1orr,9c Cap Re"n 0 0 0 0 0 0 0 0 0 0 Roduood vk Roo 0.10 0.42 0.09 0.06 0.29 0.10 0.05 0.03 0,08 0.11 Future(2035)Existing Intersection 5 lane AM Nak Hour 6;1712015 Baseline Synchro 8 Regar1 Page 1 Queues 5: 27th Avenue & Oak Street 1112812017 ,�' ♦' t Lane Group Flow(vph) 671 26. 263 T, 79 130 33 we Ratio 0.40 0.07 0.15 0.19 0.15 0 2q 0.07 Control Deny 7.9 7A 6.1 11.8 4.6 13.0 4 0 Queue Delay 0.0 0.0 0.0 00 0.0 0.0 0.0 Total Dc,ay l<j 7A 6.1 118 4.5 13.0 4.0 Queue Length 501h((I) 41 3 12 13 0 18 0 Queue Length Oh(N) 80 13 30 40 19 53 10 Internal Link Dist((I) 503 5 ;20 120 Tum[lay I mith(Al 200 300 3m Base Capacity(vp11) 2454 511 1532 1301 1232 1165 1190 Staervabn r':rp Raduclin 0 0 0 0 0 0 0 Spllback Cap Redudn 0 0 0 0 0 0 0 5toragn Cap Reducrn 0 0 0 0 0 0 0 Reduced vrc Ratio 0.27 0.05 010 0.07 0.06 0.11 0.03 ML Future(2035)EbsUng Intersection 5 lane Ah1 Peak Hour 6117/2015 Baseline SyrOro 8 Report Page 2 I-I(W 2010 Signalizod Intersection Summary 3: Davis Lane & Baxter Lane lJt28J2017 Lane Con6girwens I T r A TT r r'i T1+ Vorume(vehm) 128 262 52 37 303 79 61 116 28 45 162 82 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial 0(0b),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 100 1.00 1.00 1.00 1,00 1.00 1,00 1.00 Parking Bus,Adj 1.00 1.00 1.00 1,00 1.00 1,00 1,00 1.00 1.00 1.00 1A0 1.00 Adi Sat Flow,veK& 1845 1881 1900 1900 1869 1900 1900 1810 1900 1638 1900 1900 A4j Flow Rate,vehlh 136 268 55 39 322 84 65 123 30 48 172 87 Adj No,of Lanes 1 1 1 1 1 0 1 2 1 1 2 0 Peek Hour FaMor 0.94 0.94 0,94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.04 0.94 Percent Heavy Veh, % 3 1 0 0 0 0 0 5 0 16 0 0 Cap.vehAi 367 810 6% 472 616 161 567 1534 721 571 1053 610 Arrive On Green 0.43 0.43 0.43 0.43 0.43 0.43 0.45 0.45 0.45 OA5 0,45 0.45 Sal Flo.v,-MYh 966 1601 1615 1074 1430 373 1138 3430 1615 1081 2361 1142 Grp Valume(v),VOK 136 268 55 39 0 406 65 123 30 48 130 129 Grp Sat Flaa(s),vehfhlln 966 1881 1615 1074 0 1803 1138 1719 1615 1081 1805 1698 C Serve(g S),S 78 6.1 13 1.6 0.0 10.8 2A 1.3 07 1.7 2.8 10 Cycle 0 Claer(g_c),s 18.6 6.1 1.3 7.8 U 10.8 5.3 1,3 0.7 3.1 2A 3.0 Prop In Lane 1.00 1.00 1.00 0.21 1,00 I M 1.00 0.67 Lane Grp Cep(c),vehih 367 810 696 472 0 777 567 1634 721 671 805 758 Vr-RaliolX) 0.37 0,33 0.08 0.08 0.00 0.52 Oil 0-08 0.04 0.08 0.16 0.17 Avail Cap(c_a),vehlh 367 810 696 472 0 777 567 1634 721 571 805 758 I1CM Platoon Ratio 1.00 1.00 1.00 100 1.00 1.00 1.00 1.00 1.00 1.00 1,00 1.00 Upslmam Filler(l) 1.00 1.00 1.00 1.00 0.00 1,00 1,00 1.00 1.00 1.00 1.00 1.00 Uniform Oeldy(d),srveh 20.4 12.3 109 14.9 0.0 136 124 10.3 10.2 112 10.7 10.8 Inor Delay(d2),sNeh 2.9 1.1 0.2 0.3 0.0 2.5 0.4 0.1 0.1 0.3 0.4 0.5 Initial 0 Ootay(d3),sfvoh 0.0 0.0 0,0 0.0 0.0 00 0.0 00 0.0 0.0 0.0 0.0 Wle 8ack010(50%),vehfrn 2.4 3A 0.6 0.5 0.0 5.8 Q8 0.7 0.3 A6 1.5 1.5 LnGrp Delay(d),s►veh 23.3 13.A 11.1 15.2. 0,0 16 1 128 10.4 10.3 115 11.2 11.3 LnGrp LOS C B B B B 8 B B B B B Approach Vol,vehih 459 445 218 307 Approach Delay,sfveh 16.0 1610 11.1 11.3 Approach LOS B B 9 B rum _ 1 3 3 - 4_ 5 _ 6 ?-- 0 Assigned Phs 2 4 6 8 Phs QUfMiQn(G+Y+Rc),s 33.0 320 33.0 32.0 Change Period(Y+Rc),s 4.0 4-0 4.0 4.0 Max Green Setting(Gmax),s 29.0 28.0 29.0 28.0 Max 0 Clear Time(g c+11),s 7.3 206 5.1 12.8 Green Exl Time(p_c),s 2.8 2.0 2.8 4.4 RCM 2010 CAd Delay 14.3 HCM 2010 LOS B Future(2025)Exisling +Site PM Peak Nour tip iV2015 Aaseliiie Syn&fo 8 Report Page 1 I ICM 2010 Signalizod Intel'SHC1iOn Summery 5: 27th Avenue & Oak Street 11/280017 Lane Configurat ons 0 0 4 a (r Volume(VON)) 43 305 14 102 528 69 19 5O 51 39 60 61 Number 1 4 14 3 8 18 5 2 12 1 6 16 InIUM 0(0b),veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped•Bike AdgA,_pbT) 1.00 1.00 1.00 1.09 1.00 1.00 1.00 1.00 Parking Bus Adj 1.00 1.00 1.00 1.00 1,00 1.00 1.00 1.00 1.00 1.00 1,00 1.00 Adj Sat Flaw,velUlh'r) 1900 185s 19W 1081 1803 1900 1900 1808 1863 1900 1900 1900 Ad)Flue Rate,%%hlh 51 359 16 120 621 81 22 59 60 46 71 72 Adj P1o,of lanes 0 2 0 1 2 0 0 i 1 0 1 1 Peak Hour Fedor 0.85 0.85 OA5 0.85 OA5 0.85 0.85 0,85 0.85 0.85 0.85 0.85 Percent Heavy Veh. 3 3 3 1 1 1 7 7 2 0 0 0 CaAvelim 236 1328 58 620 1461 190 194 229 259 242 196 264 Arrive On Green 0.46 0,46 0.46 0.46 0.46 OAG 0.16 0.16 0,16 0.16 0,16 0,16 Sat Flbw,wem 198 2895 126 1013 3185 415 273 1398 1583_ 479 1195 1615 Gap Volume(v),wh9l 215 0 211 120 346 354 81 0 60 117 0 72 Grp Sal FloMs),vehlhiln 1554 0 1664 tO13 17e9 1810 1671 0 1583 1674 0 1615 Q SCAvC(g $),S 0.0 0.0 2.4 2.6 4.0 4.0 0,0 00 1,0 0,6 0.0 1.2 Cycle 0 Cleer(g o),s 2.2 OA 2A &0 4.0 4.0 1.2 0,0 1.0 1.8 0.0 1.2 Prop hi lane 0.24 0.08 1.00 0.23 027 1.00 0.39 1.00 Lane Grp Cap(c),vetch 858 0 763 620 821 830 423 0 259 437 0 264 We Ratiojh) 0.25 0.03 0.28 0.19 0.42 0,43 019 O.W 0.23 0.27 0.00 0,27 Avail Cap(c a),vehfh 1298 0 1300 946 1398 1414 1426 0 1268 1449 0 1283 HCV.PlAon Ratio 1.00 1.03 1.00 1.00 1.00 1.03 1,00 1.00 03 1.00 100 I'm Upslreem Flller(1) 1.00 0.00 1.100 1.00 1.00 1.00 1.00 On 1.00 1.00 0.00 1.00 Uniform Delay(d),sIveh 5A 0.0 5.2 6.7 5,6 56 112 0,0 11.2 115 0,0 11.2 Incr Delay(d2)," 0.2 0.0 0.2 0,2 03 0.3 0.2 0,0 0.5 0,3 0.0 0.5 Initial Q DslBy(d3),s&-eh 0.0 0.0 0.0 0.0 0,0 00 0A 0.0 0.0 00 0.0 0.0 cAils Bacb0fQ(50%),vel* 1.1 0.0 1.1 0.7 2.0 2,0 0.6 0.0 0.5 U 0.0 0.6 LnGrp Dalayjd),sovc-h 52 00 5.3 6.8 5.9 59 11 5 0.0 11.6 11.8 OA 11.8 LnGrp LOS A A A A A 8 8 B 8 Apr.coarh Vol,veh7n 426 822 141 189 Approach Delay,9A0 5.3 6,1 11.5 11.8 Approach LOS A A B B Asygned Phs 2 4 6 B Phs Dursllal(G•Y+Rc),s 11.0 19.7 11.0 19.7 Change Period(Y4Rc),s 6,0 5.6 6,0 5.6 Max Green Selling(Grim),s 24.4 24.0 24.4 24.0 Max Q Clear Time(q_crll),s 3,2 4A 3.8 7.0 Green Ext T1aae(p c),s 1.6 7.6 1.6 7.1 HCM 2010 CUI Delay 1.0 HCIA 2010 LOS A Fulwe(202.5)Fxislwng 1 Site PAS Pea<Kum WI I)h11h Bases ne Spchro 8 Relwrt Page 2 4V6✓ /Illy► ► bQft kfilm Ottl.l.l lltl}ll t.l Yt+111411W 50% Confidence Level Scheme: Davis - 2025 RCsults Daylight conditions Rodel-WinI - Dull Cicomctry Scheme Summary Control Data Control Data and Model Parameters Oak Street Improvements 2025 PHF Flow Pradile(veh) Davis-2025 Results 7.6 mnn Time Slice Rodel-Wint Queuing Doloys(soc) Right Hond Drivo Daylight conditions AM Peak Hour Peak 60015 min Results FtA Geotmetry Output flows:Vehicles English Umts(n) 50%Confidence Level Available Data Entry Capacity CaWrated No i Entry Capacity Modified No Crosswalks No Flaws Factored No ApproacIvEw Road Capacity Calibrated No Accidents No Accidant Costs No Bypass Model Yes Bypass Calibtallon No Global Results Yes Report dated 28-Nov-2017 Page 1 of 7 Rodel Version 1 88 Run number 126 L.V&i !\fY1 1 L'an uj"A. van aueec 3111PIU errrauw 50%Comiidenoe Level Scheme: Davis-2025 Results Daylight conditions Rodel-Win 1 -Full Geometry Operational Results 2025 AM Peak - i® minutee Flows and Capacity I Flows(vol0r) I Capacity(vohihr) Leg Leff Names BTypes I Arrival Flow Opposing Flow Exit I Capacity Avoraijo VCR Entry Bypass Entry Bypass flow Entry Bypass Entry Bypass 1 DoWs-N Fran 158 93 162 0 120 1084 1301 0.1472 0.0716 2 Oak-W Free 384 1 150 0 255 10117 1301 0.3860 0.0008 3 Oak-E Free 162 07 59 0 464 1140 1301 0.1436 O0516 I clays, Queues rand Uvel of Service Log Lag Names Bypass Avarago Dplay(sac) 95Y.Qnnnn(voh) Level of Sorvico Type Entry Bypass Lag Entry t3ypaas Entry Bypass 1.09 1 Deals-N Frw 3.76 0.00 2.37 0.0 0.00 P. A A 2 Oak-W Free 412 O.00 4.90 1,54 0.00 A A A 3 Oak-E Free 3.57 O.00 2.52 0.46 0.00 A A A Report daW 28-NCVV-2017 Page 6 of 7 Rodet Version 1.88 Run number 126 [.v[- ) I wi 14at% tidn ��t4�1 ull�llVYCu�G1�1� 50% Confidence Level Scheme: Davis - 2025 Results I)ayhght Conditions Rodel-Winl - Dull Geometry Scheme Summary Control Data Control Data and Model Parameters Oak Street Improvements 2025 PHF Flow Profile(vdi) Davis-2026 Resuils 7.5 min Time Slice RodolA inl Queuing Delays(sec) Right Hand Dr" Daylight condr lone PM Peak Hour Peak 6QM5 nao Resulls Full Geometry Output Rows:valiicies English Units(0) 50%Confidence Lovel Available Data Entry Capacity Calibrated No Enlry Capacity WNW No Crosswalks No Flows FacAored No Approach/Exit Road Capaclly Calibrated No Accidents No AaWont Cosls No Bypass Model Yes Bypass Calbrallon No Global Resutills Yos Report dated 28-Nov-2017 Page 1 of 7 Rodel Version 188 Run number 127 ivLJ 1 1Y1 1 Gan JJVVL. Wan L3111,;,Gt 111IiJ1VYG111Gr11b 50%Confidence Level Scheme: Davis- 2025 Results Daylight conditions Rodel-Winl - Full Oeoinetry aperaMonal Results 2025 PU P"k - 64 minuties Flows and Capacity Flows(veh(hr) I capacity(vohlllr) Log Log Namas I B7ypax Ar(Wal Flow Opposing Flow Exit Capacity Avorrgo VCR I t nlry Bypass Entry Bypasx plow Entry Bypass Enlry Bypass 1 Davb-N Frog 100 146 357 0 181 ON 1301 0.113D 031128 2 Osk-W Fran 307 1 109 0 6W 1113 1301 OL29W 0=00 3 Oak-E Free 357 106 78 0 341 1131 1301 0.3206 O.Oe11 Delays, Queues and Level of Service Log Log Nantos ' Bypass Avorago belay(sec) 859A queue(null) Lavol of 3orvice YYpo Entry Bypass Leg Entry Byp,s% Entry Bypass Lag 1 Devis-N Frea 4.00 a00 1.71 0.38 0.00 A A A 2 Odk-W I Free 4.30 0.00 4.28 1.14 0.00 A A A 3 Oak-E Fran 4.47 0.00 3.45 1.38 0.00 A A A Repori dtsied 28-NOV-2017 Page 5 of 7 Rodel Verslon 1.88 Run number 127