HomeMy WebLinkAboutBozeman Stormwater Improvements 2018RECORD DRAWINGS: COMPLETED BY CITY OF BOZEMAN STORMWATER DIVISION STAFF WHO COMPLETED ALL PROJECT INSPECTION. CHANGES ARE DETAILED IN RED THROUGHTOUT THE PLAN SET.
BOZEMAN STORMWATER IMPROVEMENTS 2018BOZEMAN, MTALLEY NORTH OF MAIN STREETN. 3RD AVE. TREATMENT UNIT A
2N. 3RD AVEPLAN AND PROFILE
ALLEY
11' x 17' AREA
8" ABANDONED GAS MAIN
11' TO CENTER OF MANHOLE17' L.F 18" CLAY
18" CLAYCLAY
NTS
BOZEMAN STORMWATER IMPROVEMENTS 2018BOZEMAN, MT
3N. GRAND AVEALLEY NORTH OF MAIN STREETN. GRAND AVE. TREATMENT UNIT BPLAN AND PROFILE
ALLEY
8' TO CENTER OF MANHOLE
DID NOT CONSTRUCT MANHOLE OR LATERAL LINE
10' X 15'
10 L.F. 20'' CLAY
EXISTING LATERAL LINE
EXISTING LATERAL LINE CONNECTION CLAY&/$< PIPE WITH
&/$<
NTS
BOZEMAN STORMWATER IMPROVEMENTS 2018BOZEMAN, MT
4N. TRACY AVEALLEY NORTH OF MAIN STREETN. TRACY AVE. TREATMENT UNIT DPLAN AND PROFILE
ALLEY
BURIED STREET LIGHT CONDUIT
12" CLAY18' TO CENTER OF MANHOLE
28 L.F. CURB
2.5' X 20' SECTION
37' X 6'
37' L.F. 12" CLAY
BURIED STREET LIGHT CONDUIT
12-INCH CLAY PIPE
NTS
BOZEMAN STORMWATER IMPROVEMENTS 2018BOZEMAN, MTMANHOLE DETAILSHYDRODYNAMIC SPERATOR
D1
HYDRODYNAMIC SEPARATOR TREATMENT UNIT A HYDRODYNAMIC SEPARATOR TREATMENT UNIT B
HYDRODYNAMIC SEPARATOR TREATMENT UNIT D
12" CLAY
12"
12"
CLAY18" CLAY
BOZEMAN STORMWATER IMPROVEMENTS 2018BOZEMAN, MTDETAILSMISCELLANEOUSD2
STREET PAVEMENT REPLACEMENT SECTION CURB AND GUTTER / SIDEWALK
CITY OF BOZEMAN 36" STORM DRAIN INLET STORM DRAIN MANHOLE #1
DID NOT CONSTRUCT
DID NOT CONSTRUCT