Loading...
HomeMy WebLinkAboutBozeman Stormwater Improvements 2018RECORD DRAWINGS: COMPLETED BY CITY OF BOZEMAN STORMWATER DIVISION STAFF WHO COMPLETED ALL PROJECT INSPECTION. CHANGES ARE DETAILED IN RED THROUGHTOUT THE PLAN SET. BOZEMAN STORMWATER IMPROVEMENTS 2018BOZEMAN, MTALLEY NORTH OF MAIN STREETN. 3RD AVE. TREATMENT UNIT A 2N. 3RD AVEPLAN AND PROFILE ALLEY 11' x 17' AREA 8" ABANDONED GAS MAIN 11' TO CENTER OF MANHOLE17' L.F 18" CLAY 18" CLAYCLAY NTS BOZEMAN STORMWATER IMPROVEMENTS 2018BOZEMAN, MT 3N. GRAND AVEALLEY NORTH OF MAIN STREETN. GRAND AVE. TREATMENT UNIT BPLAN AND PROFILE ALLEY 8' TO CENTER OF MANHOLE DID NOT CONSTRUCT MANHOLE OR LATERAL LINE 10' X 15' 10 L.F. 20'' CLAY EXISTING LATERAL LINE EXISTING LATERAL LINE CONNECTION CLAY&/$< PIPE WITH &/$< NTS BOZEMAN STORMWATER IMPROVEMENTS 2018BOZEMAN, MT 4N. TRACY AVEALLEY NORTH OF MAIN STREETN. TRACY AVE. TREATMENT UNIT DPLAN AND PROFILE ALLEY BURIED STREET LIGHT CONDUIT 12" CLAY18' TO CENTER OF MANHOLE 28 L.F. CURB 2.5' X 20' SECTION 37' X 6' 37' L.F. 12" CLAY BURIED STREET LIGHT CONDUIT 12-INCH CLAY PIPE NTS BOZEMAN STORMWATER IMPROVEMENTS 2018BOZEMAN, MTMANHOLE DETAILSHYDRODYNAMIC SPERATOR D1 HYDRODYNAMIC SEPARATOR TREATMENT UNIT A HYDRODYNAMIC SEPARATOR TREATMENT UNIT B HYDRODYNAMIC SEPARATOR TREATMENT UNIT D 12" CLAY 12" 12" CLAY18" CLAY BOZEMAN STORMWATER IMPROVEMENTS 2018BOZEMAN, MTDETAILSMISCELLANEOUSD2 STREET PAVEMENT REPLACEMENT SECTION CURB AND GUTTER / SIDEWALK CITY OF BOZEMAN 36" STORM DRAIN INLET STORM DRAIN MANHOLE #1 DID NOT CONSTRUCT DID NOT CONSTRUCT