Loading...
HomeMy WebLinkAbout06-18-18 City Commission Packet Materials - C5. NOA to Treasure State for the 2018 Sidewalk Improvements Project Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Andrew Kerr, Engineering Assistant Rick Hixson, City Engineer Shawn Kohtz, Interim Director of Public Works SUBJECT: Authorize the City Manager to sign the Notice of Award to award the contract for the 2018 Sidewalk Improvements Project to Treasure State, Inc., Belgrade, MT, in the amount of $189,058.25, and final contract documents once received. MEETING DATE: June 18, 2018 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign the Notice of Award to award the contract for the 2018 Sidewalk Improvements Project to Treasure State, Inc., Belgrade, MT, in the amount of $189,058.25, and final contract documents once received. BACKGROUND: Bids were opened June 5, 2018, for the 2018 Sidewalk Improvements Project. The project consists of installation of a new concrete sidewalk along W. Graf to complete a connection of a trail to the intersection of Graf and MacNab (Schedule 1), installation of street corner pedestrian ramps (Schedule 2), and sidewalk repairs that were ordered at various locations (Schedule 3). One bid was received for the project, submitted by Treasure State Inc, Belgrade, MT, in the amount of $189,058.25. The bid appears to be reasonable with the bid being approximately 13% above the construction estimate ($166,855.00). A copy of the Certified Bid Tabulation is attached. Upon approval and execution, final contract documents will be available online and retained in the City Clerk’s office. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: The cost of Schedule 1 (Graf St sidewalk) and of Schedule 2 (street corner ramps) has been planned for in the Street Maintenance fund. The cost of Schedule 3 (sidewalk repairs) will be billed to property owners, with some repairs that are the responsibility of the city funded out of Street Maintenance. 73 Attachments: Bid Tabulation Notice of Award (3) Project Map Report compiled on June 6, 2018 74 75 NOTICE OF AWARD Dated: __________________________ TO: Treasure State, Inc. ADDRESS: P.O. Box 588, Belgrade, MT 59714 PROJECT: City of Bozeman 2018 Sidewalk Improvements Project CONTRACT FOR: installation and repair of concrete sidewalks, and installation of street corner pedestrian ramps (Schedules 1, 2, and 3). You are notified that your Bid dated June 5, 2018, for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded a Contract for installation and repair of concrete sidewalks, and installation of street corner pedestrian ramps The Contract Price of your Contract is: one hundred eighty nine thousand fifty eight and 25/100 Dollars ($189,058.25). Three copies of the proposed Contract Documents accompany this Notice of Award. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is, by . 1. You must deliver to the OWNER 3 fully executed counterparts of the Agreement including all the Contract Documents and Drawings. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instruction to Bidders (page 7), General Conditions (paragraph 5.01) and Supplementary Conditions (paragraph SC-5.02). 3. List other conditions precedent: You must deliver with the executed Agreement the Certificates of Insurance as specified in the General Conditions (paragraph 5.03) and Supplementary Conditions (paragraph SC-5.04). Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award, and to declare your Bid Security forfeited. Within ten (10) days after you comply with these conditions, OWNER will return to you one fully signed counterpart of the Agreement with the Contract Documents attached. CITY OF BOZEMAN, MONTANA ATTEST: BY: __________________________________ BY: ____________________________ (CITY MANAGER) (CITY CLERK) DATE: _______________________________ 76 77