Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Brit Fontenot, Economic Development Director
SUBJECT: Authorize the City Manager to sign Sewer and Water Pipeline and
Access Easement and Agreement with Emerald Tamarack LLC, for
Improvements Related to the Front Street Interceptor Sewer
Project (WWIF11) to be Completed while Reconstructing East
Tamarack Street as Part of the Northeast Urban Renewal District
Bonded and Approved Projects.
MEETING DATE: June 11, 2018
AGENDA ITEM TYPE: Consent
RECOMMENDATION:
Authorize the City Manager to sign the Sewer and Water Pipeline and Access
Easement and Agreement for improvements related to the Front Street Interceptor
sewer project (WWIF11).
BACKGROUND:
The Front Street Interceptor Project is identified on the City’s FY 19 Capital
Improvement Plan. (Attachment 1) The sewer upgrade project will facilitate multiple
developments upstream of the undersized sewer pipes currently located under East
Tamarack and along Front Street. In an effort to gain efficiencies and save limited
infrastructure dollars and preserve the life of City assets, Economic Development is
working alongside the Public Work Department to facilitate the necessary sewer
upgrades while East Tamarack Street is under construction as part of a Northeast Urban
Renewal District bonded street reconstruction project. Due to the location and design
of the East Tamarack Street bridge, the proposed sewer upgrade requires a pipe
relocation and additional access in the area described in the attached easement and
exhibit. (Attachment 2)
62
2
UNRESOLVED ISSUES: None at this time.
ALTERNATIVES: There are no timely and cost effective alternatives at this time.
FISCAL EFFECTS:
This Sewer and Water Pipeline and Access Easement and Agreement costs
$10,000 and is necessary for the Front Street Interceptor sewer project (WWIF11) in the
approved CIP. It will be paid for from cash-on-hand in the Wastewater Impact Fee
fund.
ATTACHMENTS:
1. Capital Improvement Plan Project Worksheet WWIF11.; and
2. Sewer and Water Pipeline and Access Easement and Agreement with Emerald
Tamarack, LLC.
Report compiled on: May 30, 2018