Loading...
HomeMy WebLinkAbout18- Guaranteed Maximum Price Amendment 7 - Dick Anderson Construction, Inc. - Bozeman Sports Park Alternate Parking Lot and Storm Drain Piping T TTACHMENT A k AIA Document A133'�" - 2009 Exhibit A Guaranteed Maximum Price Amendment No . 7 for the following PROJECT: (.Vane and address or location) ADDITIONS AND DELETIONS: Bozeman Sports Park 4600 Baxter Lane Bozeman, MT 59718 THE OWNER: (Al'ante, legal status and address) The City of Bozeman Montana (A 3 1 121 N. Rouse Ave. PO Box 1230 Bozeman, MT 59771-1230 jj 1 7 ("Owner") and the Construction Manager: (Name, legal status and address) "T -171 Dick Anderson Construction, Inc. 4498 jackrabbit Lane Bozeman, MT 59718 ("Construction Manager") ARTICLE A.1 5 A.1.1&uaranteed Maximum Price Pursuant to Section 2.2.6 of the Agreement, die Owner and CODAI-LICdon Manager hereby amend the Agreement to establish a Guaranteed Maximum Price.As agreed by the Owner and Construction Manager, the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed. The Contract Sum consists of die Construction Manager's Fee plus the Cost o f the Work, as that term is defined in Article 6 o f this Agreement. A.111 The Contract Sum (No. 6) is guaranteed by the Construction Manager not to exceed one hun(tred -ty-tivo thousand seven hundred thirty-eight dollars and 05 cents, ($142,738.05), for 11) Bid Add Alternate No. I for additional paving ("Exhibit U of Attachment "B"); and 2)storni sewer extension for a total contract sum of four million seven hundred eight thousand four hundred one dollars and 05 cents ($4,708,401.05) Subject to additionsand deductions by Change Order as provided inthe Contract Documents. -T A.1.1.2 Itemized Statement ofthe Guaranteed Maximum Price. Provided below is aniternized ELECTRONIC COPYING statement o fthe Guaranteed Maximum Price organized by trade categories,allowances, contingencies, alternates, the Construction Manager's Fee, and other items thatcomprise the 11—S a Gtiai-aiiteedMa3dniLu-n Pike.(AtrachmetitB-Proposal from General Coiltra(-tor.) Ln -he A.113The Guaranteed Maximum Price is based on the following alternates, ifarly, which are described in the Contract Documents and are hereby accepted by the Owner: D. A_ CCPYIJIh i, , '0113 b" Tne ZI­j_­ T—,j-­TC- �f A—hi—ts. All Tl AIA' IT,— P----t—] L"y -,T Pv,ighl L, 'Jn--h—iz.d prcd,-Ili— - dln—ibnt �- PI.— a::i this ALM c� an pn-- - �, 1-v rea.lt in -, end —end a,,J will L -ed the m ra— ant—1 possiblepossible 'd— -ft-3 ��,i 7n, 7— p—j,—� by ATA 14: 45: i, cn 1-1�31/1,DT, unuec --ler N,. 1, �—j i- rot U.— Notes: 2P9!WAIF) (State the number's or other identlfcation olaccepte.(ialter'nates. Ythe Contract Documentspermit the Owner to accept other alternates subsequent to the execution ofthis Amembnent, attach a schedule ofsuch other alternates showing the ainountfor each and the date when the cunount expires.) Bid Alternate No.l» §A.1.1.4 Allowances included in the Guaranteed Maximum Price, i f any: (Identify allolvanee andstate exclusions, if iqv front the allowance price.) Item Price ($0.00) c NL4» § A.1,1.5 Assumptions, if any, cn which the Guaranteed Maximum Prices based: The work is a a continuation of site work improvements for the project as per the approved Bozeman Sports Park Master Plan. § A.t.1.6 The Guaranteed Maximum Price is based upon the Supplementary and other Conditions of the Contract included in die project specifications. § A.1.1.7 The Guaranteed Maximum Price is based upon the following Specifications:previously issued specifications dated Nov. 11, 2016. § A.1.1.8 The Guaranteed Maximum Price is based upon the following Drawings: original project drawings dated Nov.11,2016 and"EYltibit B"ofAttachnient B-FD04 dale(!12-07-17(attached). § A,1.1.9 The Guaranteed Maximum Price is based upon the following other documents and information: till other applicable tlrmvings and specification of the original contract under Gd1P No. 1. ARTICLE A,2§A.2.1 The anticipated date of Substantial Completion for the Contract established by this Amendment: September 4. 2018. OWNER(Signature/date CONST U I N MANAGER(S' nature/date) Andrea Surratt By: Fi Y --RZ ff-1 Bozeman City Manager Name/Title Dick Anderson Construction,Inc. AIA Document A133"' - 2009 Exhibit A copyright 1931, ]003 and 2009 by The American Institute of Architects. A1.1 rights reserved. MWMiG: This 1U._- fta�..,�a4 is protected by O 5 copyright Ian and ir,temational Treaties Itnanthor.l.zed reproduction or distrl.lutl-cn of this AIA.• Document or a y portion of it, may salt In —,e civil and crivarialu1t.l.es, and will to pro toted to the maximum extant 2 possible uxd.. the Is., This draft — produced b,AIA software at 14: 45: 47 m 12/02/2015 under Order tk,. 710997362? which e:_pires an 12/01/zoi6' and is not toi 1-ea1=. II— Notts. 1369A.DA1F) DICK ANDERSON CONSTRUCTION, INC. May 1, 2018 Carolyn Poissant, MLA, MPA,AICP, Manager of Trails City of Bozeman-Department of Parks and Recreation 415 N. Bozeman Street Bozeman, MT 59715 Re: Bozeman Sports Park Accept Additive Alternate Parking lot and Storm Drain Piping/Structures for Synthetic Turf Fields,GMP Amendment##7 Request Dear Carolyn, As per our agreement for the Bozeman Sports Park Project,we are requesting Amendment#7 to accept the i additive alternate in the Site Hardscape package for the north half of the parking lot and to incorporate the storm drain system for the synthetic turf fields into this project. This amendment is in the amount of $142,738,05. The amended GMP total would be$4,708,401.05. Please reference exhibit"A"for a breakdown on how we derived our proposed amendment. The contingency for this amendment is estimated at$6,750 which is estimated at approximately 5%of the construction cost for the above referenced scopes of work. Contingency will be utilized per the AIA Document A133-2009 agreement between the owner and Construction Manager. We have reviewed the bids submitted for the synthetic turf storm drain, H and H Earthworks is the low responsible bidder. With the addition of the synthetic turf fields acceptance of the parking lot additive alternate is needed. CMG Construction LLC is contracted to perform the parking lot base bid and their previous submitted alternate value is reasonable. We have the following clarifications as per section 2.2.3 of our contract: 1. We acknowledge the attached of drawing(exhibit B). Bid results(exhibit C) 2. Our clarifications and assumptions in regards to our GMP as follows. a. This GMP is only for incorporating additive alternate parking lot gravel/paving and the portion of the storm drain system need for the synthetic turf. b. Additional phases and scope will cause amending our agreement at a later date. c. DAC has not included any allowances in our GMP. d. Testing services shall be contracted separately by the owner. e. As per section 3.7.1 of the contract the owner shall secure and pay for the building permits and fees as well as for other permits,fees, licenses,and inspections by government agencies necessary for proper execution and completion of the work that are customarily secured I 3424 HIGHWAY 12 EAST,HELENA,MONTANA 59601 406-443-3225 FAX 406-443-1537 4610 TRI-HILL FRONTAGE ROAD, GREAT FALLS,MONTANA 59404 406-761-8707 FAX406-761-3134 4498 JACKRABBIT LANE,BOZEMAN,MONTANA 59718 406-586-0889 FAX 406-388-4263 PO BOX 31511, BILLINGS,MONTANA 59107 406-248-3700 after execution of the contract and legally required at the time bids are received or negotiations concluded. f. There is no general condition cost in our spreadsheet as this work will be completed during other scopes of work currently under contract. Additional general condition costs will be added as scope from other trades are added to our contract. 3. Our proposed GMP as per exhibit A is$142,738.05. Please reference the spreadsheet exhibit A for a breakdown of the bid package cost, contingency and construction manager fee. Scope of work contained in the bid packages for site improvements phase 1A 2018 can be found in the project manual under instructions to bidders and attached revisions. 4. The anticipated date of substantial completion is November 1, 2018 5. Our GMP 47 must be accepted and approved by May 16, 2018 for the above to become valid. If you have any questions or required additional information on the items above, please give me at(406) 360-6673 or email at(miller@daconstruction.com. Sincerely, Louie Miller Project Manager Dick Anderson Construction CC: Zachary Lowe, PE 3424 HIGHWAY 12 EAST, HELENA, MONTANA 59601 406-443-3225 FAX 406-443-1537 4610 TRI-HILL FRONTAGE ROAD, GREAT FALLS,MONTANA 59404 406-761-8707 FAX 406-761-3134 4498 JACKRABBIT LANE,BOZEMAN, MONTANA 59718 406-586-0889 FAX 406-388-4263 PO BOX 31511, BILLINGS, MONTANA 59107 406-248-3700 Exhibit A Proposed GIVIP Amendment for Bozeman i Sports i Improvements ` Bozeman Sports Park,Additive Alternate Parking Lot and Storm Drain Piping/Structures for Synthetic Turf Fields DAC Project#:02-16-238 } 1 Location: Bozeman GMP Amendment #: 7 i Contractor: Dick Anderson Construction Date: May 1,2018 Address: 2525 Palmer St.Suite 1,Missoula,MT 59808 Phone: 406-360-6673 II The Contractor Is herebudirected to make the following changes in the Contract upon receipt of an approved copy of this Amendment. { ITEM NO. DESCRIPTION/UNIT BREAKDOWN/UNIT COSTS COST SEE ATTACHED BREAKDOWN (indicate+or-) 1 Complete North Half of Parking Lot. Base and Paving $ 59,912.00 2 Storm Drain System for Synthetic Turf Fields $ 65,208.00 3 5 6 i 7 8 9 SUBTOTAL $ 125,120.00 10 GCCM fee @ 5.5% $ 6,881.60 11 Subtotal line 9,10 $ 132,001.60 12 Bond 1% $ 1,320.02 13 Insurance 1% $ 1,320.02 14 General conditions $ - 15 Subtotal Line 11,12, 13,14 $ 134,641.63 16 State Gross Receipts Tax 1% $ 1,346,42 i 17 Proposed Contingency 5% $ 6,750.00 18 TOTAL COST $ 142,738.05 19 20 TOTAL $ 142,738.05 CONTRACT STATUS 1.original Contract Amount $ 303,761.07 2.Net Change by Previous Change Orders/Amendments $ 4,261,901.93 } 3.Current Contract Amount(1+2) $ 4,565,663.00 j 4.Amendment#7 Total Amount $ 142,738.05 5.New Contract Amount(3+4) $ 4,708,401.05 6,Total Cast of All Amendments to Date $ 4,404,639.98 i APPROVALS Approved by Architect: Date: _ Approved by Contractor: Date: Approved by Owner: Date: R7'4ELL/UNDERDRAIN 722.5 1 1� 4722.5 .- s I a o _ 91F 12'PVC a-0,44% SS YI 455V 12•PVC a-0.49R \ z 5 pp'y 1 I aYMELL 4722. �I�I -pRYNELI m o ,o Y __4723.0 ._.— II'll uuc w rcEi •9RM —4721D I( l d l 4740 Q '= 4740 b 4735 �".r;z 8«GAY 4735 'd$.R Su d �"' E7.16TIN0 Fa�.ii..wi. SH1��z �•— FINISHED-4730 jigt fAPPROX 473' DRDUNO 4725 4725 ;CN O 82 lF 12•PVC O 61S q G a 1r¢- .a 4720 --465 lFl 1Y PVC 0.49% -.. _ 4720 ~>Z 0_ O I O�1 a 471$ 59 LF 12'P'C 0 0.44% N d Q z 4715 4 W W Z.-n 0 N W 4710 4710 DOQ W 4705 4705 eiV QV uy4 VU �• u� X 20+00 21.00 22+00 23+00 24+00 25+00 26+00 27+00 29+DO FIELD DRAIN 2 „ I•-50'NORIx 9 1'-5' vERr FQ04 Louie Miller From: Zachary Lowe <Zbowe@dmwl-com^ Sent Tuesday,Aph|24, 20lO8:1SAM To: Louie Miller Subject: S[14-CS-SI-PMAS[l_BELD DRAINAGE PLAN_OCT 2Ul7rD04-0 �� �mthtu Attachments. 5[I4-CS-�-PHASEI_FIELDDR/QNAGEPLAN_O[TZOI7FDO4.pdf Louie. Here's our proposed storm line from the synthetic fielda'underdnain. / haven't received any comments(or approval)from Fieldturfyat` but this will gonond|ybe vxhatwono|ooWngat. Ai,Ruud 12-14-2017 B­n Spurts Park Phass IA lawm­onm 3018 Custracilor cudty L Bitl Ad4-IW NI�N­ Ts... GQ 'unGot.s Fun Von .3 Sitq H A X 624029. S 73 020 CC) 3 'S 030 W 7 OD -AM9. SWC CONSTRUCTION x 5 AtSU j* r—-------- bid Addenda Nm* Non. Alternate Shrubs& Alb"m B.Ild..LUd IA kregbon/Landscap./Anwad—rd, security 1&2 discriminad.. Collusion B­Sfd T.W Pgrartmw Altornot.Sod I field Fl.ld i RAINMAKER x i x 4a0 163 4#.0 GOODEARII-MORKS x x i 389500 al oc, eo,o, 00 _4 rwk QV 4F. ./c fL" 12-2.b-1-1 _tv, co.-I