HomeMy WebLinkAbout07 - Design Report - Highland & Main WH,► ENGINEERING , INC . A Consulting Engineers and Land Surveyors O", tU, F p G LPN DESIGN REPORT FOR HIGHLAND BOULEVARD & EAST MAIN STREET INTERSECTION IMPROVEMENTS PREPARED FOR BOZEMAN DEACONESS HEALTH SERVICES C/0 PC ENGINEERING, LLC 3991 VALLEY COMMONS DRIVE,SUITE 200 BOZEMAN, MT 59718 JANUARY 2007 BOZ_06052 1300 North Transtech Way Billings, Montana 59102 Phone 406.656.5255 Fax 406.656.0967 info@enginc.com www.enginc.com Ull L L, Highland&Main Design Report TABLE OF CONTENTS Page INTRODUCTION 4 TRAFFIC VOLUMES 7 Existing Design Hour Volumes 7 Existing+ Site Design Hour Volumes 7 CAPACITY ANALYSIS 10 Existing Intersection Capacity 10 Existing+ Site Intersection Capacity 12 QUEUE STORAGE 12 RECOMMENDED IMPROVEMENTS 13 Lane Configurations 13 Design Vehicle 13 Pavement Markings and Signage 17 Signal Modifications 17 Appendix A—Traffic Volume Data Appendix B—Capacity Calcs—Existing Volumes &Existing Lane Configurations Appendix C—Capacity Calcs—Existing Volumes &Northbound Left-Turn Lane Appendix D—Capacity Calcs—Existing Volumes &Northbound Dual Left Appendix E—Capacity Calcs—Existing+ Site Volumes &Existing Lane Configurations Appendix F—Capacity Calcs—Existing+ Site Volumes &Northbound Left-Turn Lane Appendix G—Capacity Calcs—Existing+ Site Volumes &Northbound Dual Left LIST OF FIGURES Figure 1. Project Location 5 Figure 2. Existing Lane Configurations 6 Figure 3. Existing Traffic Volumes 8 Figure 4. Existing+ Site Traffic Volumes 9 Figure 5. W13-40 Turning Template (Existing) 14 Figure 6. WB-50 Turning Templates 15 Figure 7. WB-67 Turning Templates 16 LIST OF TABLES Table 1. Summary of Capacity Calculation Results 11 ENGINEERING, INC. 2 . i DESIGN REPORT HIGHLAND BOULEVARD & EAST MAIN STREET INTERSECTION IMPROVEMENTS r�l �� 1N r II ���� :L. � Highland&Main Design Report INTRODUCTION This design report is provided as a supplement to the preliminary plans for intersection improvements at Highland Boulevard and East Main Street in Bozeman, MT. The intersection is being redesigned to provide interim improvements, as recommended in The Knolls at Hillcrest Traffic Accessibility Study (TAS) performed by Robert Peccia & Associates in May 2006. Recommended improvements from the TAS included construction of a dedicated left-turn lane on the northbound approach to the intersection of Highland Boulevard and East Main Street. Since completion of the TAS, it has been suggested that a northbound left-turn lane and shared left, through and right-turn lane be evaluated as an alternative due to high left-turn volumes in the PM peak hour. This report will include an analysis of both options, as well as the signal modifications that would be required for each. The improvements recommended in this report shall be considered interim improvements only. The intersection of Highland Boulevard and East Main Street will require additional improvements as other nearby properties are developed. As shown in Figure 1, the intersection of Highland Boulevard and East Main Street is located just west of the East Bozeman I-90 Interchange. The intersection is currently controlled by a semi-actuated signal with lead left-turn phasing for the westbound approach. The intersection is a T-type intersection with a driveway on the north side essentially acting as a fourth leg, but with very low traffic volumes. Existing lane configurations at the intersection are shown in Figure 2. Existing accessibility ramps at the intersection will be brought into conformance with current ADA standards as part of an MDT project that should be coordinated with construction of this project. Highland Boulevard is classified as an MDT Urban Route (U-1215), more specifically as an urban minor arterial. It is a north-south two-lane roadway that provides access from East Main Street to Kagy Boulevard. At its intersection with East Main Street, Highland Boulevard is currently 28 feet wide, measured from back of curb to back of curb. ENGINEERING, INC. 4 i �. ,; Highland&Main Design Report PROJECT INTERSECTION KFRIDA - CIA_ REACq w z m E MENDE HA T m to 1 E. M UN ST. m 0 E BABC)CK ST a a F E BABCOCK ST f, 4�y�N g N 3T E _ E. 0 IVE T a Ix E, OLIVE ST P r m Q G c> o N m E. CU TISS ST a cR�Fk U RO u FgONTgcf R0. 0 in om ti9 C SUNS£ HILLS D CFRlr CEM TERY �� ELLIS STREET FIGURE 1: PROJECT LOCATION ENGINEERING, INC. 5 :,, j, ,t I':1r 1�' °y, y, .�i Highland&Main Design Report T � 16. ` ^� , o FIGURE 2: EXISTING LANE CONFIGURATIONS ENGINEERING, INC. 6 Highland&Main Design Report East Main Street is classified as an MDT Primary Route (P-50) and a principal arterial in Bozeman's functional classification network. It provides direct access from I-90 to downtown Bozeman via the East Bozeman Interchange. At its intersection with Highland Boulevard, East Main Street is four lanes wide with dedicated left-turn lanes and parking on both sides of the street. TRAFFIC VOLUMES EXISTING DESIGN HOUR VOLUMES Existing intersection volumes used for this analysis were obtained from The Knolls at Hillcrest Traffic Accessibility Study (TAS). The intersection counts were conducted in February of 2006 and analysis of the counts showed that the AM peak hour occurred between 7:45 and 8:45 AM and the PM peak hour occurred between 4:30 and 5:30 PM. According to the TAS, raw count data was adjusted for seasonal variation in accordance with data collected from MDT's annual count station located on US Highway 191 near Four Corners (Station A-106). Figure 3 summarizes the existing AM and PM peak hour turning volumes obtained from TAS. Volume summaries obtained from the TAS are included in Appendix A. EXISTING + SITE DESIGN HOUR VOLUMES Because the proposed improvements at the intersection of Highland Boulevard and East Main are partially being triggered by the development of The Knolls at Hillcrest, intersection improvements were also evaluated with the addition of traffic generated by this development. Peak hour turning volumes generated by this development were also obtained from The Knolls at Hillcrest TAS. Figure 4 summarizes the combination of existing and site-generated peak hour turning volumes. ENGINEERING, INC. 7 �.,� ' �� '�1 Highland&Main Design Report �v �O Q- �v (1) (1) (4) 1 l 1I 1 4(1) (579)295 454(428) (241)240�� ��262 (107) 1 T r 189 (312) (1) (239) AM PEAK (PM PEAK) FIGURE 3: EXISTING TRAFFIC VOLUMES ENGINEERING, INC. 8 :. � � , , � � J Highland&Main Design Report my �v (1) (1) (4) 1 1 1 4(1) (579)295 454(428) (276) 244 262(107) 1 t r 218 2 80 (325) (1)(239) AM PEAK (PM PEAK) FIGURE 4: EXISTING + SITE TRAFFIC VOLUMES ENGINEERING, INC. 9 i� t '� ���� ► � I' .I Highland&Main Design Report CAPACITY ANALYSIS Capacity calculations for the intersection of Highland Boulevard and East Main Street were performed using SIG/Cinema, which is based on the procedures contained in Chapter 17 of the 2000 Highway Capacity Manual (HCM2000). The HCM2000 defines level-of-service (LOS) as "a quality measure describing operational conditions within a traffic stream, generally in terms of such service measures as speed and travel time, freedom to maneuver, traffic interruptions and comfort and convenience." LOS is described using letter designations from A to F, with A being the most favorable operating conditions and F being the worst. EXISTING INTERSECTION CAPACITY Consistent with the results from The Knolls at Hillcrest TAS, the results of the capacity calculations performed for existing traffic volumes with existing lane configurations show that the northbound approach currently operates at LOS F during the PM peak hour. Under existing conditions, the intersection operates at overall LOS C during the AM peak hour and D during the PM peak hour. Results of the capacity calculations for existing conditions are summarized in Table 1 and detailed results are included in Appendix B. As previously discussed, proposed improvements for the northbound approach include either a northbound left-turn lane with a shared through and right-turn lane or a northbound left-turn lane with a shared left, through and right-turn lane, which would create dual left-turn lane operation on the northbound approach. Each of these proposed improvements were analyzed using existing peak hour volumes, as summarized in Table 1. Results show that both of the proposed alternatives would bring the intersection back to acceptable levels, with the single left-turn lane resulting in slightly lower delays and better overall LOS. Detailed summaries of these calculations are included in Appendices C and D. ENGINEERING, INC. 10 P 1 Highland&Main Design Report Table 1. Summary of Capacity Calculation Results AM Peak Hour Existing+ Existing Volumes The Knolls of Hillcrest Lane Configurations Approach Delay LOS v/c Delay LOS v/c EB 21.5 C 0.512 21.6 C 0.517 WB 8.9 A 0.532 8.9 A 0.533 Existing NB 34.7 C 0.796 45.9 D 0.888 SB 19.4 B 0.020 19.4 B 0.020 Intersection 17.; 13 20.1 C EB 2 0.3 C 0.499 20.3 C 0.502 Northbound WB 7.9 A 0.513 8.0 A 0.514 Left NB 24.5 C 0.618 27.6 C 0.714 SB 19.9 B 0.021 19.9 B 0.021 Intersection 14.9 13 15.7 B' EB 24.6 C 0.548 24.7 C 0.552 WB 11.3 B 0.579 11.3 B 0.581 Northbound NB 29.5 C 0.518 30.8 C 0.598 Dual Left SB 33.5 C 0.066 33.5 C 0.066 Intersection 18.9 B 19.4 B PM Peak Hour Existing+ The Knolls at Existln�� Volumes Lane Hillerest Configurations Approach Delay LOS v/c Delay LOS v/c EB 25.9 C 0.732 26.8 C 0.758 WB 11.2 B 0.342 11.3 B 0.350 Existing NB 104.6 F 1.132 115.6 F 1.161 SB 15.3 B 0.027 15.3 B 0.027 Intersection 44.2 D 48.0 1) EB 21.1 C 0.671 21.3 C 0.671 Northbound WB 8.5 A 0.301 8.7 A 0.309 Left NB 25.8 C 0.785 28.1 C 0.814 SB 16.7 B 0.031 17.3 B 0.031 Intersection 18.6 B 19.E 13 EB 28.6 C 0.762 29.6 C 0.789 Northbound WB 14.2 B 0.423 14.3 B 0.435 Dual Left NB 29.7 C 0.774 30.1 C 0.781 SB 32.6 C 0.099 32.6 C 0.099 Intersection 24.6 C 2 5.2 C ENGINEERING, INC. >> .,,i ���' �a� . 1 r s-.- Highland&Main Design Report EXISTING+ SITE INTERSECTION CAPACITY Capacity calculations were also performed for existing and proposed lane configurations with the addition of traffic generated by The Knolls at Hillcrest. As shown by the results in Table 1, both of the proposed alternatives would provide LOS C or better, even with the addition of traffic generated by The Knolls at Hillcrest. However, as with existing volumes, the single northbound left-turn lane would result in slightly lower delays and better LOS for each approach and the intersection overall. Because of this, and because this project is intended to be an interim improvement only, the northbound approach should be redesigned to include a single northbound left-turn lane and a shared through and right-turn lane. Detailed summaries of the capacity calculations performed for the existing+ site volume scenario are included in Appendices E, F and G. QUEUE STORAGE Average and maximum predicted queue lengths were determined for each scenario using the results from the NETSIM simulation reports produced by SIG/Cinema. NETSIM summary sheets for each scenario are included with the corresponding capacity calculation summaries in Appendices B through G. As shown by these results, the maximum predicted queue length for the single northbound left-turn lane would be 6 vehicles. Therefore, the northbound left-turn lane should provide for 200 feet of storage (5 cars at 25-foot spacing and 1 truck at 75-foot spacing). In addition to queue storage, the northbound left-turn lane should be designed to MDT standards for deceleration distance and taper rates, as discussed in the following section. The proposed alternative design of a northbound left-turn lane and shared left, through and right-turn lane would result in a maximum predicted queue length of 5 vehicles and would require 175 feet of storage. ENGINEERING, INC. 12 Highland&Main Design Report RECOMMENDED IMPROVEMENTS LANE CONFIGURATIONS As shown by the results of the capacity analysis, the addition of a single northbound left- turn lane would provide better overall LOS than the proposed northbound left-turn lane and shared left, through and right-turn lane. Because of this, and because it would require fewer modifications to the existing signal, a single northbound left-turn lane and shared through and right-turn lane is the preferred alternative as an interim improvement. All lanes on the northbound approach should be constructed to provide 12 foot wide lanes in order to accommodate the design vehicle, as discussed in the following section. DESIGN VEHICLE Turning movements at the intersection were evaluated using AutoTURN, a supplemental turning template program used in conjunction with AutoCAD. As shown in Figure 5, the intersection as currently designed accommodates a WB-40 design vehicle. The standard design vehicle typically used for an MDT signalized intersection is a WB-67. However, the largest vehicle currently accessing the hospital and other nearby developments on Highland Boulevard is a WB-50. Because these improvements are intended to be interim improvements only and because it would provide an improvement over existing conditions, a design exception for a WB-50 design vehicle is being sought. Figure 6 shows the turning templates for the WB-50 with the new lane configurations and curb and gutter on the southwest corner. Figure 7 shows the turning templates for the WB-67. In order to design for the WB-67, right-of-way would need to be acquired on the southwest and southeast corners of the intersection. Because right-of-way will need to be acquired within the next several years for future improvements at the intersection, it is not desirable to make right-of-way acquisitions at this time for interim improvements only. ENGINEERING, INC. 13 K.�if Il. I.�I I�� I } I. v'� r t Highland&Main Design Report tea. FIGURE 5: WB-40 TURNING TEMPLATE (EXISTING) ENGINEERING, INC. 14 Highland&Main Design Report lu �I FIGURE 6: WB-50 TURNING TEMPLATES ENGINEERING, INC. 15 �� 1 1 C 1 �+ 1 Highland&Main Design Report V i I I FIGURE 7: WB-67 TURNING TEMPLATES ENGINEERING, INC. 16 Highland&Main Design Report PAVEMENT MARKINGS AND SIGNAGE All pavement markings and signage should conform to the Manual on Uniform Traffic Control Devices (MUTCD) and City of Bozeman and MDT standards. The new northbound left-turn lane should be constructed to provide storage, deceleration, and taper rates consistent with MDT's Road Design Manual. The northbound left-turn lane should provide for 200 feet of storage and a deceleration distance of 246 feet (including the bay taper). The existing crosswalk striping on the northbound approach should be modified as shown on the plans due to the widening of Highland Boulevard. All new words, symbols, crosswalks and stop bars should be thermoplastic. All other new pavement markings should be epoxy paint. Signing should be specified as high intensity consistent with current MDT standards. The existing street name sign and a new lane designation sign for the northbound left-turn lane should be mounted on the new mast arm. SIGNAL MODIFICATIONS The intersection of Highland Boulevard and East Main Street is currently controlled by a semi-actuated traffic signal with an 8-phase controller and a westbound lead phase. Existing loop detectors are located on the northbound and southbound approaches and in the westbound left-turn lane. Current phasing would be adequate for the preferred design alternative of a northbound left-turn lane and shared through and right-turn lane. In conjunction with these improvements, the signal should be retimed to provide minimum green times consistent with those used for the capacity calculations included in Appendix F. The existing loop detectors on the northbound approach should be abandoned and replaced with a video detector that would serve both the northbound left-turn lane and shared through and right-turn lane. The cost of video detection is comparable to the cost of adding new loop detectors and modifying existing loop detectors on the northbound approach. The video detector would also be more likely to be reused when the intersection is reconstructed in the future. ENGINEERING, INC. 17 i „ J s Highland&Main Design Report Due to widening of the northbound approach, the existing luminaire on the southwest corner of the intersection will need to be moved. The existing signal heads, pedestrian signal, and pedestrian push button mounted on this luminaire pole should be remounted on the pole in its new location. One additional pedestrian push button should be added to the luminaire pole since pedestrians will be able to approach the pole from both directions in its new location. The existing signal standard with 15-foot mast arm on the north side of the intersection will need to be replaced with a new signal standard with a 25-foot mast arm. The existing signal head on the mast arm may be reused along with a new one to provide a signal head over the center of each lane. The existing signal head and pedestrian signal head mounted on the signal standard may also be reused. One additional pedestrian push button should be added to the new signal standard since pedestrians will be able to approach the pole from both directions in its new location. ENGINEERING, INC. 18 APPENDIX A TRAFFIC VOLUME DATA t 1 1 1 1 1 1 1 1 1 1 1 1 Robert Peccia & Associates 825 Custer Avenue Bozeman Deaconess Health Services Helena, MT 59.601 File Name : bozeman 1 ':ars & Trucks 406-447-5000 Site Code : 00000000 Start Date : 2/14/2006 Page No : 1 Groups Printed-Unshifted-Bank 1 _ HIGHLAND MAIN HIGHLAND MAIN Southbound Westbound Northbound Eastbound Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left F, Right Thru Left Peds Int. Total Factor 1.091 1.091 1.091 1.091 1.091 1.091 1.091 1.691 1.091 1.091 1.091 1 1.091 1.091 1.091 1.091 1.091 07:00 AM 0 0 0 0 0 61 37 0 13 0 23 1 29 38 0 0 202 07:15 AM 0 0 0 0 0 73 27 0 16 0 25 0 22 41 0 0 204 07:30 AM 0 0 0 0 1 91 68 0 20 0 24 1 33 56 0 0 294 07:45 AM 0 0 0 1 0 129 83 01 23 0 50 01 57 71 0 01 414 Total 0 0 0 1 1 354 215 01 72 0 122 21 141 206 0 01 1114 08:00 AM 0 0 0 0 0 148 72 0 22 1 58 1 74 88 0 0 464 ' 08:15 AM 0 0 0 0 2 93 60 0 20 0 36 2 56 56 0 0 325 , 08:30 AM 0 0 0 4 2 84 47 0 15 1 45 1 53 80 1 0 333 08:45 AM 0 0 0 4 0 70 24 0 23 0 43 0 55 73 1 0 293 Total 0 0 0 8 4 395 203 0 80 2 182 4 238 297 2 0 1415 BREAK"" 04:00 PM 1 0 0 0 0 90 26 0 38 0 75 0 56 118 1 0 405 04:15 PM 0 0 0 0 0 99 16 0 40 0 62 0 63 119 1 0 400 04:30 PM 0 0 1 0 0 101 22 0 52 0 77 0 60 122 0 0 435 - 04:45 PM 0 0 1 0 0 107 21 0 60 0 80 2 56 141 1 0 469 - To 1 0 2 0 0 397 85 0 190 0 294 2 235 500 3 0 1709 05:00 PM 1 0 2 0 0 119 35 0 65 0 84 1 57 167 0 0 531 05:15 PM 0 0 0 0 1 101 29 0 62 0 71 2 68 149 0 0 483 05:30 PM 0 0 0 0 0 99 19 0 56 0 76 1 51 121 0 0 423 05:45 PM 0 0 0 _0 0 81 22 0 45 0 68 0 39 119 1 0 375 Total 1 0 2 01 1 400 105 0 228 0 299 4 215 556 1 0 1812 Grand Total 2 0 4 9 6 1546 608 0 I 570 2 897 12 I 829 1559 6 0 6050 Apprch% 13.3 0.0 26.7 60.0 0.3 71.6 28.1 0.0 38.5 0.1 60.6 0.8 34.6 65.1 0.3 0.0 Total% 0.0 0.0 0.1 0.1 0.1 25.6 10.0 0.0 9.4 0.0 14.8 0.2 13.7 25.8 0.1 0.0 HIGHLAND MAIN HIGHLAND MAIN Southbound Westbound Northbound Eastbound Rig, Left Thr Ped App. Rig ThrLeft Left Ped App. Rig Thr Ped App. Rig Thr Ped App. Int. Start Time ht u s Total ht u s Total ht u s Total ht u Left s Total Total Peak Hour From 07:00 AM to 11:45 AM-Peak 1 of 1 Intersectio 07:45 AM n Volume 0 0 0 5 5 4 454 262 0 720 80 2 189 4 275 240 295 1 0 536� 1536 Percent 0.0 0.0 0.0 100. 0.6 63.1 36.4 0.0 29.1 0.7 68.7 1.5 44.8 55.0 0.2 0.0 08:00 0 0 0 0 0 0 148 72 0 220 22 1 58 1 82 74 88 0 0 162 464 Volume Peak 0.828 Factor High Int. 08:30 AM 08:00 AM 08:00 AM 08:00 AM Volume 0 0 0 4 4 0 148 72 0 220 22 1 58 1 82 74 88 0 0 162 Peak 0.313 0.818 0.838 0.827 Factor Robert Peccia & Associates 825 Custer Avenue Bozeman Deaconess Health Services Helena, MT 59601 File Name : bozem- -11 ';ars & Trucks 406-447-5000 Site Code : 00000( )0 Start Date : 2/14/2006 Page No : 2 HIGHLAND Out In Total I� 5 12 01 01 01 5 Right Thru Left Peds ~� T ,, North 1— C u' 2J1 412006 7:45:00 AM _ E 8:30:00 AM 14/2006 ro i-0- =r N j D UnStlifted O �� Bank — a No Leh Thru Rihl Pods 789 21 801 4 502 275 777 Out In Total HIGI-11 AND Peak Hour From 12:00 PM to 05:45 PM-Peak 1 of 1 Intersectio 04:30 PM n Volume 1 0 4 0 5 1 428 107 0 536 239 0 312 5 556 241 579 1 0 821 191 Percent 20.0 0.0 80.0 0.0 0.2 79.9 20.0 0.0 43.0 0.0 56.1 0.9 29.4 70.5 0.1 0.0 05:00 1 0 2 0 3 0 119 35 0 154 65 0 84 1 150 57 167 0 0 224 531 Volume Peak 0.' 3 Factor High Int. 05:00 PM 05:00 PM 05:00 PM 05:00 PM Volume 1 0 2 0 3 0 119 35 0 154 65 0 84 1 150 57 167 0 0 224 Peak 0.417 0.870 0.927 0.916 Factor Robert Peccia & Associates 825 Custer Avenue Bozeman Deaconess Health Services Helena, MT 59601 File Name : bozeman1 gars & Trucks 406-447-5000 Site Code : 00000000 Start Date : 2/14/2006 Page No : 3 HIGHLAND Out In Total i� 5 7 I 1r7 01 41 0 Right Thru Left Peds L+ o CO �—�' ? O J N C North ^' L-� -�A Z C C NW 2— 14/2006 4:30:00 PM w N 14/2006 5:15:00 PM m a)ix ��o Unshifted 1 O�` Dank 1 a. 4 T r Left Thru Ri ht Peds 3121 01 2391 5 34 556 904 Out In Total I APPENDIX B CAPACITY CALCULATIONS FOR EXISTING VOLUMES & EXISTING LANE CONFIGURATIONS HCM Analysis Summary Existing Main St/Highland Blvd Area Type:Non CBD DMR 01/01/2007 Analysis Duration: 15 mins. AM Peak Hour Case: HIGHLAND-MAIN-EX-AM Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet) A roach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB 3 2 L 12.0 T 12.0 TR 12.0 WB 3 2 L 12.0 T 12.0 TR 12.0 NB 1 1 LTR 12.0 SB 1 1 LTR 12.0 East West North South Data L T R L T R L T R L T R Movement Volume v h 1 295 240 262 454 4 189 2 80 1 1 1 PHF 0.83 0.83 0.83 0.82 0.82 0.82 0.84 0.84 0.84 0.31 0.31 0.31 %Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1 Lane Groups L TR L TR LTR LTR Arrival Type 3 3 3 3 3 3 RTOR Vol v h 72 0 8 0 Peds/Hour 5 5 5 0 %Grade 0 0 -3 0 Buses/Hour 0 0 0 0 Parkers/Hour LeB� --- I --- i --- --- --- __ _-_ __- Signal Settings:Actuated Operational Analysis Cycle Length: 73.0 Sec Lost Time Per Cycle:13.0 Sec Phase: 1 2 3 4 5 6 7 8 Ped Only EB LTP WB LTR LTP NB LTP SB LTP Green 16.0 24.0 20.0 0 Yellow I All Red I 3.0 0.0 3.5 1 1.5 1 3.5 1.5 Ca a ity Analysis Results Approach: Lane Cap v/s g/C Lane v/c Delay Delay pp Group (yph) at 0 EB L 268 0.001 0.329 L 0.004 16.5 B 21.5 C * TR 1087 0.169 0.329 TR 0.512 21.5 C WB L er 218 0.000 0.397 8.9 A * L ro 384 0.183 0.219 L 0.532 10.9 B TR 2062 0.160 0.589 TR 0.271 7.7 A NB * LTR 393 0.218 0.274 LTR 0.796 34.7 C 34.7 C SB LTR 448 0.006 0.274 LTR 0.020 19.4 B 19.4 B Intersection:Delay= 17.5 sec/veh Int.LOS=B Xc 0.69 * Critical Lane Group (v/s)Crit=0.57 SIG/Cinema v3.08 Page 1 HCM Summary Results Existing Main St/Highland Blvd DMR 01/01/2007 AM Peak Hour Case: HIGHLAND-MAIN-EX-AM Lane Group Approach Delay Delay Lane X (sec/ (sec/ 1 App Grp v/s We veh) LOS veh) LOS 1 1 EB1 1, 1 J L 0.00 0.00 16.5 B 21.5 C * TR 0.17 0.51 21.5 C — 4 -- I f--454 I ��► r-262 .� WB L er 0.00 8.9 A - _-__-_-__ *L ro 0.18 0.534 10.9 B - ---- - - --- - - - - TR 0.16 0.27 7.7 A ------------ ------ --- - ---------------------- 295 i NB *LTR 0.22 0.80 34.7 C 34.7 C 240 189 80 2 I SB LTR 0.01 0.02 19.4 B 19.4 B 1 2 3 , 16 3 0 23 4 2 19 �' 4 2 I Int. 0.57 0.69 17.5 B * Critical Lane Group #Left Movement Total SIG/Cinema v3.08 Page 2 NETSIM Summary Results Existing Main St/Highland Blvd DMR 01/01/2007 AM Peak Hour Case: HIGHLAND-MAIN-EX-AM LAvg/Max Spillback in Average Worst Lane Lane Speed (%of Peak 1 App Group (mph) Period) 1 1 EB L 0/ 0 0.0 0.0 TR 4/ 7 12.4 0.0 L 4 —454 ;--262 All12.4 0.0 - -- - ------------- - -- -- --------- -------------- ---- - -- - - - --- WB L 2/ 5 16.0 0.0 TR3 / 4 18.2 0.0 -------- - - -- - - ----- - --- -------- - - - - ----------- 1 � �► All 17.5 0.0 295 —► 240 NB LTR 4/ 5 12.4 0.0 189 80 2 All 12.4 0.0 1 2 3 SB LTR 0/ 1 14.4 0.0 16 3 0 23 4 2 19 �' 4 2 All 14.4 0.0 Intersect. 14.4 SIG/Cinema v3.08 Page 3 i HCM Analysis Summary Existing Main St/Highland Blvd Area Type: Non CBD DMR 01/01/2007 Analysis Duration: 15 mins. PM Peak Hour Case: HIGHLAND-MAIN-EX-PM Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB 3 2 L 12.0 T 12.0 1 TR 12.0 WB 3 2 L 12.0 T 12.0 TR 12.0 ' NB 1 1 LTR 12.0 SB 1 1 LTR 12.0 East West North South Data L T R L T R L T R L T R Movement Volume(vph) 1 579 241 107 428 1 312 1 239 4 1 1 1 PHF 0.92 0.92 0.92 0.87 0.87 0.87 0.93 0.93 0.93 0.42 0.42 0.42 %Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1 Lane Groups L TR L TR LTR LTR Arrival Type 3 3 3 3 3 3 RTOR Vol v h 72 0 2 0 Peds/Hour 5 5 5 0 %Grade 0 0 -3 0 Buses/Hour 0 0 0 0 Parkers/Hour(LeftlRighl) I --- --- - - -- --_ -� Signal Settings:Actuated Operational Analysis Cycle Length: 73.0 Sec Lost Time Per Cycle:13.0 Sec Phase: 1 2 3 4 5 6 7 8 Ped Only EB LTP WB LTR LTP NB LTP SB LTP Green 10.0 24.0 26.0 0 Yellow All Red 3.0 0.0 3.5 1.5 3.5 1.5 Ca a ity Analysis Results Approach: Lane Cap v/s g/C Lane v/c Delay Delay App Ciro p (Yph) Ratio Ratio _-Graux Ratio (sec/veh EB L 285 0.001 0.329 L 0.004 16.5 B 25.9 C * TR 1111 0.241 0.329 TR 0.732 25.9 C WB L er 120 0.000 0.397 11.2 B * L ro 240 0.070 0.137 L 0.342 13.1 B TR 1776 0.141 0.507 TR 0.278 10.7 B NB * LTR 522 0.403 0.356 LTR 1.132 104.6 F 104.6 F SB LTR 520 0.010 0.356 LTR 0.027 15.3 B 15.3 B Intersection:Delay=44.2 sec/veh Int.LOS=D Xc 0.87 * Critical Lane Group :T(v/s)Crit=0.71 SIG/Cinema v3.08 Page 1 HCM Summary Results Existing Main St/Highland Blvd DMR 01/01/2007 PM Peak Hour Case: HIGHLAND-MAIN-EX-PM Lane Group Approach Delay Delay Lane X (sec/ (sec/ 1 App Grp v/s v/c veh) LOS veh) LOS 1 I4 EB + L 0.00 0.00 16.5 B 25.9 C _ * TR 0.24 0.73 25.9 C ➢ .-428 ++ 107 ---- -- - --- - - - - ---- - --- ---- - - - -- -- - - - - B L er 0.00 11.2 B *L ro 0.07 0.344 13.1 B TR 0.14 0.28 10.7 B -------- --- - -- -- - - ----- 579 -1 NB *LTR 0.40 1.13 104.6 F 104.6 F 241 3121239 1 SB LTR 0.01 0.03 15.3 B 15.3 B 1 2 3 10 3 0 23 4 2 25 111 4 2 Int. FO.711 0.87 44.2 D * Critical Lane Group #Left Movement Total SIG/Cinema v3.08 Page 2 ■ NETSIM Summary Results Existing Main St/Highland Blvd DMR 01/01/2007 PM Peak Hour Case: HIGHLAND-MAIN-EX-PM Queues Spillback in Per Lane Average Worst Lane Lane Avg/Max Speed (% of Peak I App Group (veh) (mph) Period) 1 14I EB L 0 / 0 0.0 0.0 TR 7/ 9 11.4 � _ 428► All11.4 0.0 -------------- -- ------- ---- - ------ r-107 WB L 2/ 3 14.4 0.0 TR 3 / 5 17.6 0.0 ----------------------- I All 17.1 0.0 579 241 NB LTR 7/ 9 11.3 0.0 • 312 239 1 All 11.3 0.0 SB LTR 0/ 1 13.0 0.0 10 3 0 23 4 2 25 4 2 All 13.0 0.0 Intersect. 12.6 SIG/Cinema v3.08 Page 3 APPENDIX C CAPACITY CALCULATIONS FOR EXISTING VOLUMES & NORTHBOUND LEFT-TURN BAY � � t t HCM Analysis Summary Existing Main St/Highland Blvd Area Type:Non CBD DMR 01/01/2007 Analysis Duration: 15 mins. AM Peak Hour Case: HIGHLAND-MAIN-EX-AM-NB LEFT Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet) A roach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB 3 1 2 L 12.0 T 12.0 TR 12.0 WB 3 2 L 12.0 T 12.0 TR 12.0 NB 2 1 L 12.0 TR 12.0 SB 1 I LTR 12.0 East West North South Data L T R L T R L T R L T R Movement Volume v h 1 295 240 262 454 4 189 2 80 1 1 1 PHF 0.83 0.83 0.83 0.82 0.82 0.82 0.84 0.84 0.84 0.31 0.31 0.31 %Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1 Lane Groups L TR L TR L TR LTR Arrival T 3 3 3 3 3 3 3 RTOR Vol v h 72 0 8 0 Peds/Hour 5 5 5 0 %Grade 0 0 -3 0 Buses/Hour 0 0 0 0 Parkers/Hour(LeRiRight) --- I --- --- -~ I -" --- --- --- Signal Settings:Actuated Operational Analysis Cycle Length: 71.0 Sec Lost Time Per Cycle:13.0 Sec Phase: 1 2 3 4 5 6 7 8 Ped Only EB LTP WB LTR LTP NB LTP SB LTP Green 16.0 24.0 18.0 0 Yellow I All Red 3.0 0.0 3.5 1.5 1 3.5 1.5 Cana i Analysis Results Approach: Lane Cap v/s g/C Lane v/c Delay Delay pp Kati (a O s EB L 275 0.001 0.338 L 0.004 15.6 B 20.3 C * TR 1117 0.169 0.338 TR 0.499 20.3 C WB L er 229 0.000 0.408 7.9 A * L ro 395 0.183 0.225 L 0.513 9.8 A TR 2120 0.160 0.606 TR 0.264 6.9 A NB * L 364 0.157 0.254 L 0.618 25.8 C 24.5 C TR 411 0.054 0.254 TR 0.214 21.0 C SB LTR 427 0.005 0.254 LTR 0.021 19.9 B 19.9 B Intersection:Delay= 14.9 sec/veh Int.LOS=B Xc 0.62 * Critical Lane Group 2�(v/s)Crit=0.51 SIG/Cinema v3.08 Page 1 HCM Summary Results Existing Main St/Highland Blvd DMR 01/01/2007 AM Peak Hour Case: HIGHLAND-MAIN-EX-AM-NB LEFT Lane Group Approach Delay Delay Lane X (sec/ (sec/ I App Grp v/s v/c veh) LOS veh) LOS 1 11 EB I I J L 0.00 0.00 15.6 1 B 20.3 I C * TR 0.17 0.50 20.3 C L 4 454 41.0 �262 -------- WB L er 0.00 7.9 A *L ro 0.18 0.514 9.8 A ------------- TR 0.16 0.26 6.9 A -------- - ---- --------- I 295 NB * L 0.16 0.62 25.8 C 24.5 C 240 TR 0.05 0.21 21.0 C r' r 189I 80 - •! 2 SB LTR 0.011 0.02 19.9 1 B 19.9 1 B 1 2 3 4- -1 16 3 0 23 4 2 17 4 2 Int. 0.51 0.62 14.9 I B * Critical Lane Group #Left Movement Total SIG/Cinema v3.08 Page 2 NETSIM Summary Results Existing Main St/Highland Blvd DMR 01/01/2007 AM Peak Hour Case: HIGHLAND-MAIN-EX-AM-NB LEFT EA?vg/Max Spillback in Average Worst Lane Lane Speed (%of Peak 1 App Group (mph) Period) 1 1II EB L 0 / 0 0.0 0.0 L' TR 4/ 6 12.9 0.0 t 4 454 ► —262 All 12.9 0.0 --------------------- WB L 3 / 5 13.9 0.0 - - TR 3 / 5 18.7 0.0 -------- ---------- -- All 17.0 0.0 295 240 NB L 3 / 4 6.0 0.0 TR 1 / 2 25.0 0.0 �189 80 2 All 14.0 0.0 1 2 3 SB LTR 0/ 1 10.8 1 0.0 16 3 0 23--• 4 2 17 4 2 All 10.8 0.0 Intersect. 14.8 SIG/Cinema v3.08 Page 3 HCM Analysis Summary Existing Main St/Highland Blvd Area Type:Non CBD DMR 01/01/2007 Analysis Duration: 15 mins. PM Peak Hour Case: HIGHLAND-MAIN-EX-PM-NB LEFT Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB 3 2 L 12.0 T 12.0 TR 12.0 WB 3 2 L 12.0 T 12.0 TR 12.0 NB 2 1 L 12.0 TR 12.0 SB 1 1 LTR 12.0 East West North South Data L T R L T R L T R L T R Movement Volume v h 1 579 241 107 428 1 312 1 239 4 1 1 1 PHF 0.92 0.92 0.92 0.87 0.87 0.87 0.93 0.93 0.93 0.42 0.42 0.42 %Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1 Lane Groups L TR L TR L TR LTR Arrival Type 3 3 3 3 3 3 3 I RTOR Vol v h 72 0 2 0 Peds/Hour 5 5 5 0 %Grade 0 0 -3 0 Buses/Hour 0 0 0 0 Parkers/Hour(LeflRight) --- I - -- I --- --- --- I --- Signal Settings:Actuated Operational Analysis Cycle Length: 67.0 Sec Lost Time Per Cycle:13.0 Sec ' Phase: 1 2 3 4 5 6 7 8 Ped Only EB LTP WB LTR LTP ' NB LTP SB LTP Green 10.0 24.0 20.0 0 Yellow All Red 3.01 0.01 3.5 1 1.5 1 3.5 1.5 Ca a ity Analysis Results Approach: Lane Cap v/s g/C Lane v/c Delay Delay R- Ratio (sedveh (se. EB L 311 0.001 0.358 L 0.003 13.8 B 21.1 C * TR 1211 0.240 0.358 TR 0.671 21.1 C WB L er 148 0.000 0.433 8.5 A * L ro 261 0.070 0.149 L 0.301 9.8 A TR 1935 0.141 0.552 TR 0.255 8.1 A NB * L 427 0.234 0.299 L 0.785 30.0 C 25.8 C TR 482 0.158 0.299 TR 0.531 20.2 C SB LTR 448 0.009 0.299 LTR 0.031 16.7 B 16.7 B Intersection:Delay= 18.6 sec/veh Int.LOS=B Xc 0.68 * Critical Lane Group :T(v/s)Crit=0.55 SIG/Cinema v3.08 Page 1 HCM Summary Results Existing Main St/Highland Blvd DMR 01/01/2007 PM Peak Hour Case: HIGHLAND-MAIN-EX-PM-NB LEFT Lane Group Approach Delay Delay Lane X (sec/ (sec/ 1 App Grp v/s v/c veh) LOS veh) LOS 1 �4 EB L 0.00 0.00 13.8 B 21.1 C _ * TR 0.24 0.67 21.1 C —428 107 WB L er 0.00 8.5 A ------_--___. *L ro 0.07 0.30 9.8 A EMIR -- ---- ;7— TR 0.14 0.25 8.1 A - - - - - - - - - - - -- ' 1 579 , NB * L 0.23 0.78 30.0 C 25.8 C 241 —z TR 0.16 0.53 20.2 C f' j 312�239 I 1 SB LTR 0.01 0.03 16.7 B 16.7 B 1 2 3 10 3 0 23 4 2 19 �� 4 2 Int. 0.55 0.68 18.6 B * Critical Lane Group #Left Movement Total SIG/Cinema v3.08 Page 2 NETSIAI Summary Results Existing Main St/Highland Blvd DMR 01/01/2007 PM Peak Hour Case: HIGHLAND-MAIN-EX-PM-NB LEFT Queues Spillback in Per Lane Average Worst Lane Lane Avg/Max Speed (%of Peak 1 App Group (veh) (mph) Period) 1I 14 EB L 0/ 0 0.0 0.0 'J TR 51 8 13.1 0.0 L 1 —428 F--107 All13.1 0.0 ---------------------- ------------ - - - - ----------- - - - WB L 2/ 3 13.9 0.0 TR 3 / 4 16.9 0.0 ---------------------- -- - All 16.4 0.0 579 241 —� NB L 4/ 6 6.3 0.0 TR 1 / 3 23.3 0.0 �312 t 239 1 All 14.8 0.0 1 2 3 i SB LTR 0/ 1 14.1 0.0 ~' 10 3 0 23 4 2 19 ��� 4 2 All 14.1 0.0 Intersect. 14.4 SIG/Cinema v3.08 Page 3 APPENDIX D CAPACITY CALCULATIONS FOR EXISTING VOLUMES & NORT116011Np DUAL LEFT HCM Analysis Summary Existing Main St/Highland Blvd Area Type:Non CBD DMR 01/01/2007 Analysis Duration: 15 mins. AM Peak Hour Case: HIGHLAND-MAIN-EX-AM-NB DUAL LEFT Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet) Anproach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB 3 2 L 12.0 T 12.0 TR 12.0 WB 3 2 L 12.0 T 12.0 TR 12.0 NB 2 1 L 12.0 LTR 12.0 SB 1 1 LTR 12.0 East West North I South Data L T R L T R L T R L T R Movement Volume v h 1 295 240 262 454 4 189 2 80 1 1 1 PHF 0.83 0.83 0.83 0.82 0.82 0.82 0.84 0.84 0.84 0.31 0.31 0.31 %Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1 Lane Groups L TR L TR L LTR LTR Arrival Type 3 3 3 3 3 3 3 RTOR Vol v h 72 0 1 0 Peds/Hour 5 5 5 0 %Grade 0 0 -3 0 Buses/Hour 0 0 0 0 Parkers/Hour(Le Ri ) Signal Settings:Actuated Operational Analysis Cycle Length: 78.0 Sec Lost Time Per Cycle:18.0 Sec Phase: 1 2 3 4 5 6 7 8 Ped Only EB LTP WB LTR LTP NB LTP SB LTP Green 16.0 24.0 14.0 6.0 0 Yellow All Red 3.0 0.0 3.5 1.5 3.5 1.5 3.5 1 1.5 Capacity Analysis Results Approach. Lane Cap v/s g/C Lane v/c Delay Delay sesLveh) EB L 250 0.001 0.308 L 0.004 18.7 B 24.6 C * TR 1017 0.169 0.308 TR 0.548 24.6 C WB L er 194 0.000 0.372 11.3 B * L ro 359 0.183 0.205 L 0.579 14.1 B TR 1929 0.160 0.551 TR 0.290 9.7 A NB * L 326 0.093 0.179 L 0.518 29.6 C 29.5 C LTR 304 0.090 0.179 LTR 0.500 29.3 C SB * LTR 136 0.005 0.077 LTR 0.066 33.5 C 33.5 C Intersection:Delay= 18.9sec/veh Int.LOS=B Xc-0.58 * Critical Lane Group 2:(v/s)Crit=0.45 SIG/Cinema v3.08 Page 1 HCM Summary Results Existing Main St/Highland Blvd DMR 01/01/2007 AM Peak Hour Case: HIGHLAND-MAIN-EX-AM-NB DUAL LEF Lane Group Approach Delay Delay Lane X (sec/ (sec/ 1 App Grp v/s v/c veh) LOS veh) LOS 1 11 EB L 0.00 0.00 18.7 B 24.6 C * TR 0.17 0.55 24.6 C �454 • —262 - - - - - - - ------- ---------------- - - -- - WB L er 0.00 11.3 B *L ro 0.18 0.58 14.1 B ----�- tLL�` �� TR 0.16 0.29 9.7 A ----- - --------- - ----- ---------- - - V, 1 � 295 NB * L 0.09 0.52 29.6 C 29.5 C 240 LTR 0.09 0.50 29.3 C 1891 80 I 2 SB LTR 0.01 0.07 33.5 C 33.5 C 1 2 3 4 1 I � L _mot ram- - 16 3 0 23 4 2 13 1 4 2 5 4 2 7 Int. 0.45I 0.58 18.9 B * Critical Lane Group #Left Movement Total SIG/Cinema v3.08 Page 2 NETSIM Summary Results Existing Main St/Highland Blvd DMR 01/01/2007 AM Peak Hour Case: HIGHLAND-MAIN-EX-AM-NB DUAL LEF" Queues Spillback in Per Lane Average Worst Lane Lane Avg/Max Speed (% of Peak I App Group (veh) (mph) Period) 1 1 EB L 0/ 0 0.0 0.0 TR 51 6 11.8 0.0 L 4 —454 262 r All 11.8 0.0 - ------ - -- -- --------- - - - WB L 5 / 8 11.1 0.0 J _ _ - - - - - - - - - 1 — —� TR3 / 4 16.1 0.0 --- - -- --- ----- ------ --- - -- --- ------------- All 14.1 0.0 295 240 NB L 2/ 3 4.2 0.0 �l 1 LTR 3 / 4 15.5 0.0 189 80 2 All 11.3 0.0 1 2 3 4 SB LTR 0/ 1 10.6 0.0 ' 16 3 0 23 4 2 13 4 2 5 4 2 All 10.6 0.0 Intersect. 12.7 SIG/Cinema v3.08 Page 3 HCM Analysis Summary y Existing Main St/Highland Blvd Area Type:Non CBD DMR 01/01/2007 Analysis Duration: 15 mins. PM Peak Hour Case: HIGHLAND-MAIN-EX-PM-NB DUAL LEFT Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB 3 2 L 12.0 T 12.0 TR 12.0 WB 3 2 L 12.0 T 12.0 TR 12.0 NB 2 1 L 12.0 LTR 12.0 SB 1 1 LTR 12.0 East West North South Data L T R L T R L T R L T R Movement Volume v h 1 579 241 107 428 1 312 1 239 4 1 1 PHF 0.92 0.92 0.92 0.87 0.87 0.87 0.93 0.93 0.93 0.42 0.42 0.42 %Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1 Lane Groups L TR L TR L LTR LTR Arrival Type 3 3 3 3 3 3 3 RTOR Vol v h 72 0 2 0 Peds/Hour 5 5 5 0 %Grade 0 0 -3 0 Buses/Hour 0 0 0 0 Parkers/Hour(Left[Right -- --- -- -- - --- --- Signal Settings:Actuated Operational Analysis Cycle Length: 76.0 Sec Lost Time PerCycle:18.0 Sec Phase: 1 2 3 4 5 6 7 8 Ped Only EB LTP WB LTR LTP NB LTP SB LTP Green 8.0 24.0 20.0 6.0 0 Yellow All Red 3.0 1 0.0 3.5 1.5 3.5 1.5 3.5 1.5 Ca a ity Analysis Results Apprmoach: Lane Cap v/s g/C Lane v/c Delay Delay p --Group--- (v_ph) EB L 274 0.001 0.316 L 0.004 17.8 B 28.6 C * TR 1067 0.241 0.316 TR 0.762 28.6 C WB L er 107 0.000 0.382 14.2 B * L ro 184 0.070 0.105 L 0.423 17.4 B TR 1614 0.141 0.461 TR 0.305 13.4 B NB L 477 0.138 0.263 L 0.526 24.5 C 29.7 C * LTR 439 0.204 0.263 LTR 0.774 33.6 C SB * LTR 141 0.008 0.079 LTR 0.099 32.6 C 32.6 C Intersection:Delay=24.6 sec/veh Int.LOS=C Xc 0.68 * Critical Lane Group :E(v/s)Crit= 0.52 SIG/Cinema v3.08 Page 1 HCM Summary Results Existing Main St/Highland Blvd DMR 01/01/2007 PM Peak Hour Case: HIGHLAND-MAIN-EX-PM-NB DUAL LEF a Lane Group Approach Delay Delay Lane X (sec/ (sec/ 1 App Grp v/s v/c veh) LOS veh) LOS - 1 �4 EB L 0.00 0.00 17.8 B 28.6 C L * TR 0.24 0.76 28.6 C -428 t1. 107 WB L er 0.00 14.2 B ~_________ *L ro 0.07 0.424 17.4 B TR 0.14 0.31 13.4 B -- -- - --- - - - - - ----- - - I '�► 579 NB L 0.14 0.53 24.5 C 29.7 C 241 —z *LTR 0.20 0.77 33.6 C 3121239 � 1 SB *LTR 0.01 0.10 32.6 C 32.6 C 1 2 3 4 I 8 3 0 23 4 2 19 �', 4 2 5 4 2 Int. 0.52 0.68 24.6 C * Critical Lane Group #Left Movement Total SIG/Cinema v3.08 Page 2 NETSIM Summary Results Existing Main St/Highland Blvd DMR 01/01/2007 PM Peak Hour Case: HIGHLAND-MAIN-EX-PM-NB DUAL LEF Queues Spillback in Per Lane Average Worst Lane Lane Avg/Max Speed (% of Peak 1 App Group (veh) (mph) Period) 1 4 EB L 0/ 0 0.0 0.0 TR 7/ 9 11.7 0.0 I L 1 —42 8 107 All 11.7 0.0 --------------------- -------------- ----------- - WB L 2/ 3 10.7 0.0 j TR 4/ 5 14.9 0.0 ---- ----------------- ----------------- -- -- 1 J h � ► All 14.1 0.0 579 I � 241 NB L 4/ 5 5.2 0.0F_ 1 LTR 4 / 6 16.4 0.0 312 1239 1 All 12.6 0.0 1 2 3 4 SB LTR 0/ 1 11.3 0.0 8 3 0 23 4 2 19 4 2 5 4 2 All 11.3 0.0 Intersect. 12.6 SIG/Cinema v3.08 Page 3 APPENDIX E CAPACITY CALCULATIONS FOR EXISTING + SITE VOLUMES & EXISTING LANE CONFIGURATIONS 1 1 1 1 1 1 1 1 1 1 HCM Analysis Summary Existing+The Knolls at Hillcrest Main St/Highland Blvd Area Type:Non CBD DMR. 01/01/2007 Analysis Duration: 15 mins. AM Peak Hour Case: HIGHLAND-MAIN-EX+SITE-AM Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet) Approach I Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB 3 2 L 12.0 T 12.0 TR 12.0 WB 3 2 L 12.0 T 12.0 TR 12.0 NB 1 1 LTR 12.0 SB 1 1 LTR 12.0 East West North South Data L T R L T R L T R L T R Movement Volume v h 1 295 244 262 454 4 218 2 80 1 1 1 PHF 0.83 0.83 0.83 0.82 0.82 0.82 0.84 0.84 0.84 0.31 0.31 0.31 %Heavy Vehicles 3 3 3 3 3 1 3 1 1 1 1 1 1 Lane Groups L TR L TR -1 LTR LTR Arrival Type 3 3 3 3 3 3 RTOR Vol v h 73 0 8 0 Peds/Hour 5 5 5 0 %Grade 0 0 -3 0 Buses/Hour 0 0 0 0 Parkers/Hour(Leftf Right) -- -- --- --- --- --- --- --- Signal Settings:Actuated Operational Analysis Cycle Length: 73.0 Sec Lost Time Per Cycle:13.0 Sec Phase: 1 2 3 4 5 6 7 8 Ped Only EB LTP WB LTR LTP NB LTP SB LTP Green 16.0 1 24.0 1 20.0 0 Yellow All Red 1 3.01 0.01 3.51 1.5 1 3.5 1 1.5 Ca a ity Analysis Results Approach: Lane Cap v/s g/C Lane v/c Delay Delay g Rat' atio FEB L 268 0.001 0.329 L 0.004 16.5 B 21.6 C * TR 1086 0.170 0.329 TR 0.517 21.6 C WB L er 216 0.000 0.397 8.9 A * L ro 384 0.183 0.219 L 0.533 11.0 B TR 2062 0.160 0.589 TR 0.271 7.7 A NB * LTR 392 0.244 0.274 LTR 0.888 45.9 D 45.9 D SB LTR 445 0.006 0.274 LTR 0.020 19.4 B 19.4 B f Intersection:Delay=20.1 sec/veh Int.LOS=C Xc 0.73 * Critical Lane Group 2:(v/s)Crit=0.60 SIG/Cinema v3.08 Page I i HCM Summary Results Existing+The Knolls at Hillerest Main St/Highland Blvd DMR 01/01/2007 AM Peak Hour Case: HIGHLAND-MAIN-EX+SITE-AM Lane Group Approach Delay Delay Lane X (sec/ (sec/ 1 App Grp v/s We veh) LOS veh) LOS 1 � 1 EB L 1 0.00 0.00 16.5 B _21.6 C * TR 0.17 0.52 21.6 C 4 i —454 ,--262 ---------------------- - --------------------- WB L er 0.00 1 8.9 A ~-------___ *L ro 0.18 0.534 11.0 B ---- - - - - - - -- - TR 0.16 0.27 7.7 A ----- ---------- - ------ ---- - ------------- 295 �► 4r I NB *LTR 0.24 0.89 45.9 D 45.9 D 244 218? 80 2 SB LTR 0.01 0.02 19.4 B 19.4 B 2 3 , , 16 3 0 23 4 2 19 il� 4 2 I Int. 0.60 0.73 20.1 C * Critical Lane Group #Left Movement Total SIG/Cinema v3.08 Page 2 I NETSIM SummarY Results Existing+The Knolls at Hillcrest Main St/Highland Blvd DMR 01/01/2007 AM Peak Hour Case: HIGHLAND-MAIN-EX+SITE-AM Queues Spillback in Per Lane Average Worst Lane Lane Avg/Max Speed (%of Peak 1 App Group (veh) (mph) Period) 1 1I EB L 0/ 0 0.0 0.0 TR 4/ 7 12.2 0.0 4 454 —262 All 12.2 0.0 WB L 3 / 5 14.5 0.0 - •y N. TR 3 / 5 18.3 0.0 - - - ----- -- - - ------ - - - -- - m . All 17.0 0.0 295 244 —z NB LTR 4 / 6 12.8 0.0 218 80 2 All 12.8 0.0 1 2 3 SB LTR 0/ 1 14.6 0.0 16 3 0 23 4 2 19 4 2 All 14.6 0.0 Intersect. 14.2 SIG/Cinema v3.08 Page 3 HCM Analysis Summary Y Existing+The Knolls at Hillcrest Main St/Highland Blvd Area Type:Non CBD DMR 01/01/2007 Analysis Duration: 15 mins. PM Peak Hour Case: HIGHLAND-MAIN-EX+SITE-PM Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet) Approach I Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB 3 2 L 12.0 T 12.0 TR 12.0 WB 3 2 L 12.0 T 12.0 TR 12.0 ' NB 1 1 LTR 12.0 SB 1 1 LTR 12.0 East West North South ' Data L T R L T R L T R L T R Movement Volume v h 1 579 276 107 428 1 325 1 239 4 1 1 PHF 0.92 0.92 0.92 0.87 0.87 0.87 0.93 0.93 0.93 0.42 0.42 0.42 ' %HeavyVehicles 3 3 3 3 3 3 1 1 1 1 1 1 Lane Groups L TR L TR LTR LTR Arrival Type 3 3 3 3 3 3 ' RTOR Vol v h 83 0 2 0 Peds/Hour 5 5 5 0 %Grade 0 0 -3 0 Buses/Hour 0 0 0 0 Parkers/Hour(LcfljRight) I --- I -- -» I --- I -- I --- w Signal Settings: ctuated Operational Analysis Cycle Length: 73.0 Sec Lost Time Per Cycle: 13.0 Sec Phase: 1 2 3 4 5 6 7 8 Ped Only EB LTP WB LTR LTP NB LTP SB LTP Green 10.0 24.0 1 26.0 1 0 Yellow All Red 3.0 0.0 3.5 1.5 1 3.5 1 1.5 Capacity Analysis Results roach: Lane Cap v/s g/C Lane v/c Delay Delay App roi EB L 285 0.001 0.329 L 0.004 16.5 B 26.8 C * TR 1107 0.249 0.329 TR 0.758 26.8 C WB L er 111 0.000 0.397 11.3 B * L ro 240 0.070 0.137 L 0.350 13.4 B TR 1776 0.141 0.507 TR 0.278 10.7 B NB * LTR 521 0.414 0.356 LTR 1.161 115.6 F 115.6 F SB LTR 523 0.010 0.356 LTR 0.027 15.3 B 15.3 B Intersection:Delay=48.0 sec/veh Int.LOS=D Xc 0.89 *Critical Lane Group :Z(v/s)Crit=0.73 SIG/Cinema v3.08 Page 1 HCM Summary Results Existing+The Knolls at Hillcrest Main St/Highland Blvd DMR 01/01/2007 PM Peak Hour Case: HIGHLAND-MAIN-EX+SITE-PM Lane Group Approach Delay Delay Lane X (sec/ (sec/ 1 App Grp v/s v/c veh) LOS veh) LOS 1 4 EB L 0.00 0.00 16.5 B 26.8 C L * TR 0.25 0.76 26.8 C II t-428 —107 - - - - - - --- - WB L er 0.00 11.3 B _ ---- - - - - - _ *L ro 0.07 0.354 13.4 B ---- - - - - -- - TR 0.14 0.28 10.7 B - -- - - - - - -- - - - - - - - - 579 —y NB *LTR 0.41 1.16 115.6 F 115.6 F 276 325j239 1 SB LTR 0.01 0.03 15.3 B 15.3 B 1 2 3 10 3 0 23 4 2, 25 �' 4 2 Int. 0.73 1 0.89 1 48.0 D * Critical Lane Group #Left Movement Total SIG/Cinema v3.08 Page 2 NETSIM Summary Results Existing+ The Knolls at Hillcrest Main St/Highland Blvd -L DMR 01/01/2007 PM Peak Hour Case: HIGHLAND-MAIN-EX+SITE-PM Queues Spillback in Per Lane Average Worst Lane Lane Avg/Max Speed (% of Peak I App Group (veh) (mph) Period) 1 4I EB L 0/ 0 0.0 0.0 TR 6/ 10 12.4 0.0 L 1 428 --107 All12.4 0.0 •---------------------- -------- ---------- WB L 2/ 3 13.6 0.0 ``; —? -------------- ------------ TR3 / 5 17.6 0.0 -------- ------------— ----------------------- All 16.9 0.0 579 --► 276 1 I F LTR 10/ 13 8.4 0.0 325 1239� 1 r All 8.4 0.0 I 1 2 3 1 I SB LTR 0/ 1 12.7 0.0 10 3 0 23 4 2 25 �� 4 2 All 12.7 0.0 I Intersect. 11.8 SIG/Cinema v3.08 Page 3 APPENDIX F CAPACITY CALCULATIONS FOR EXISTING + SITE VOLUMES & NORTHBOUND LEFT-TURN BAY � I i e i i e 0 HCM Analysis Summary Existing+The Knolls at Hillerest Main St/Highland Blvd Area Type: Non CBD DMR 01/01/2007 Analysis Duration: 15 mins. AM Peak Hour Case: Highland-Main-Ex+Site-AM-NB Left Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB 3 2 L 12.0 T 12.0 TR 12.0 WB 3 2 L 12.0 T 12.0 TR 12.0 NB 2 1 L 12.0 TR 12.0 SB 1 1 LTR 12.0 East West North South Data L T R L T R L T R L T R Movement Volume v h 1 295 244 262 454 4 218 2 80 1 1 1 PHF 0.83 0.83 0.83 0.82 0.82 0.82 0.84 0.84 0.84 0.31 0.31 0.31 %Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1 Lane Groups L TR L TR L TR LTR Arrival Type 3 3 3 3 3 3 3 RTOR Vol NDW 73 0 8 0 Peds/Hour 5 5 5 0 %Grade 0 0 -3 0 Buses/Hour 0 0 0 0 Parkers/Hour(LeftIRight) I -- I --- I -- --- --- --- --- Signal Settings:Actuated Operational Analysis Cycle Length; 71.0 Sec Lost Time Per Cycle:13.0 Sec Phase: 1 2 3 4 5 6 7 8 Ped Only EB LTP WB LTR LTP NB LTP SB LTP Green 16.0 24.0 18.0 0 Yellowl All Red 3.0 0.0 1 3.5 F 1.5 1 3.5 1.5 Ca a ity Analysis Results Approach: F apsec Lane Cap v/s g/C Lane v/c Delay Delay OS EB L 275 0.001 0.338 L 0.004 15.6 B 20.3 C * TR 1117 0.170 0.338 TR 0.502 20.4 C WB der 227 0.000 0.408 8.0 A * L ro 395 0.183 0.225 L 0.514 9.8 A TR 2120 0.160 0.606 TR 0.264 6.9 A NB * L 364 0.181 0.254 L 0.714 29.8 C 27.6 C TR 411 0.054 0.254 TR 0.214 21.0 C SB I LTR 427 0.005 0.254 LTR 0.021 19.9 B 19.9 B Intersection:Delay= 15.7 sec/veh Int.LOS=B Xc 0.65 * Critical Lane Group :Z(v/s)Crit=0.53 SIG/Cinema v3.08 Page 1 HCM Summary Results Existing+The Knolls at Hillcrest Main St/Highland Blvd DMR 01/01/2007 AM Peak Hour Case: Highland-Main-Ex+Site-AM-NB Left Lane Group Approach Delay Delay Lane X (sec/ (sec/ 1 App Grp v/s v/c veh) LOS veh) LOS 1 1 EB � + � L 0.00 0.00 15.6 B 20.3 C * TR 0.171 0.50 20.4 C L 4 = 454 �,--262 .s— - ------ WB L er 0.00 8.0 A *L ro 0.18 0.514 9.8 A -- ---- - - -- -- - - - TR 0.16 0.26 6.9 A --- --- -- - -- -- - - - - - - --- --- 1 � �1 295 I NB * L 0.18 0.71 29.8 C 27.6 C 244 TR 0.05 0.21 21.0 C '} li 218� 80 2 SB LTR 0.01 0.02 19.9 B 19.9 B 1 2 3 16 3 0 23 4 2 17 4 2 Int. 0.53 0.65 15.7 B * Critical Lane Group #Left Movement Total SIG/Cinema v3.08 Page 2 NETSIM Summary Results Existing+The Knolls at Hillcrest Main St/Highland Blvd DMR 01/01/2007 AM Peak Hour Case: Highland-Main-Ex+Site-AM-NB Left Queues Spillback in Per Lane Average Worst Lane Lane Avg/Max Speed (%of Peak 1 App Group (veh) (mph) Period) 1 1 EB L 0 / 0 0.0 0.0 TR 4/ 6 12.4 0.0 L 4 —454 -- 262 t� All12.4 0.0 ------ --- --- - - -- - - - - - - - - - - - - - - --- WB L 3 / 7 13.5 0.0 f+j TR 3 / 5 18.7 0.0 -- -- -------- -- -- - - --- ---- - -- 4,� �[► All 16.8 0.0 295 244 NB L 3 / 6 5.4 0.0 TR 1 / 1 24.8 0.0 218 80 2 All 13.2 0.0 1 2 3 T L - _ SB LTR 0/ 1 10.6 0.0 16 3 0 23 4 2 17 4 2 All 10.6 0.0 Intersect. 14.3 SIG/Cinema v3.08 Page 3 r HCM Analysis Summary Existing+The Knolls at Hillcrest Main St/Highland Blvd Area Type:Non CBD DMR 01/01/2007 Analysis Duration: 15 mins. PM Peak Hour Case:Highland-Main-Ex+Site-PM-NB Left Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB 3 2 L 12.0 T 12.0 TR 12.0 WB 3 2 L 12.0 T 12.0 TR 12.0 NB 2 1 L 12.0 TR 12.0 SB 1 1 1 LTR 12.0 East West North South Data L T R L T R I R L T R Movement Volume v h 1 579 276 1071 428 1 325 1 239 4 1 _ 1 PHF 0.92 0.92 0.92 0.87 0.87 0.87 0.93 0.93 0.93 0.42 0.42 0.42 ' %Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1 Lane Groups L TR L TR L TR LTR Arrival Type 3 3 3 3 3 3 3 ' RTOR Vol v h 83 0 2 0 Peds/Hour 5 5 5 0 %Grade 0 0 -3 0 Buses/Hour 0 0 0 0 Parkers/Hour(Ls Right) --- I --- --- -- --- I --- --- I --- Signal Settings: ctuated Operational Anal sis Cycle Length: 70.0 Sec Lost Time Per Cycle:13.0 Sec Phase: 1 2 3 4 5 1 6 7 8 Ped Only EB LTP WB LTR LTP NB LTP SB LTP Green 10.0 26.0 21.0 0 Yellow All Red 3.0 0.0 3.5 1.5 3.5 1.5 Ca a ity Analysis Results Approach: Lane Cap v/s g/C Lane v/c Delay Delay App up ou sedve EB L 322 0.001 0.371 L 0.003 13.9 B 21.3 C * TR 1251 0.249 0.371 TR 0.671 21.3 C WB L er 148 0.000 0.443 8.7 A * L ro 250 0.070 0.143 L 0.309 10.3 B TR 1952 0.141 0.557 TR 0.253 8.3 A NB * L 429 0.244 0.300 L 0.814 33.4 C 28.1 C TR 485 0.158 0.300 TR 0.528 20.9 C _ SB LTR 452 0.009 0.300 LTR 0.031 17.3 B 17.3 B Intersection:Delay= 19.5 sec/veh Int.LOS=B Xc 0.69 * Critical Lane Group :5:(v/s)Crit=0.56 SIG/Cinema v3.08 Page 1 ^HC M Summary Results Existing+The Knolls at Hillerest Main St/Highland Blvd DMR 01/01/2007 PM Peak Hour Case: Highland-Main-Ex+Site-PM-NB Left Lane Group Approach Delay Delay Lane X (sec/ (sec/ 1 App Grp v/s v/c veh) LOS veh) LOS 1 4 EB i L 0.00 0.00 13.9 B 21.3 C L * TR 0.25 0.67 21.3 C �428 �y �107 ____ __ __ ___ ___ - _ _- _ WB L er 0.00 8.7 A r - *L ro 0.07 0.314 10.3 B - ------------ TR 0.14 0.25 8.3 A -- --------------- 579 NB * L 0.24 0.81 33.4 C 28.1 C 276 —z TR 0.16 0.53 20.9 C 325�239 SB LTR 0.01 0.03 17.3 B 17.3 B 1 2 3 10 3 0 25 4 2 20 4 2 Int. 0.56 0.69 19.5 1 B * Critical Lane Group #Left Movement Total SIG/Cinema v3.08 Page 2 NETSIM Summary Results Existing+The Knolls at Hillcrest Main St/Highland Blvd DMR 01/01/2007 PM Peak Hour Case: Highland-Main-Ex+Site-PM-NB Left Queues Spillback in Per Lane Average Worst Lane Lane Avg/Max Speed (%of Peak 1 App I Group (veh) (mph) Period) 1 4 EB L 0/ 0 0.0 0.0 TR 6/ 9 11.5 0.0 t— 1 428 107 r- -107 All 11.5 0.0 - -------------------- ------- - - --- WB L 1 / 3 15.3 0.0 -----------� TR3 / 4 17.5 0.0 - - ----- -------- ----- ---------------- - - - - 1 � All 17.1 0.0 579 276 —z NB L 51 6 6.4 0.0 TR 1 / 2 24.4 0.0 �23r9325 1 All 15.4 0.0 1 2 3 SB LTR 0/ 1 11.1 0.0 10 3 0 25 4 2 20 4 2 All 11.1 0.0 Intersect. 13.8 SIG/Cinema v3.08 Page 3 APPENDIX G CAPACITY CALCULATIONS FOR EXISTING + SITE VOLUMES & NORTHBOUND DUAL LEFT 1 1 1 1 1 1 � I 1 � 1 1 1 1 1 1 1 1 1 1 HCM Analysis Summary Existing+ The Knolls at Hillcrest Main St/Highland Blvd Area Type:Non CBD DMR 01/01/2007 Analysis Duration: 15 mins. AM Peak Hour Case: HIGHLAND-MAIN-EX+SITE-AM-NB DUAL LEFT Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB 3 2 L 12.0 T 12.0 TR 12.0 WB 3 2 L 12.0 T 12.0 TR 12.0 NB 2 1 L 12.0 LTR 12.0 SB 1 I LTR 12.0 East West North South Data L T R L T R L T R L T R Movement Volume(v h) 1 295 244 262 454 4 218 _ 2 80 1 1 1 PHF 0.83 0.83 0.83 0.82 0.82 0.82 0.84 0.84 0.84 0.31 0.31 0.31 %Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1 Lane Groups L TR L TR L LTR LTR Arrival Type 3 3 3 3 3 3 3 RTOR Vol v h 73 0 1 0 Peds/Hour 5 5 5 0 %Grade 0 0 -3 0 Buses/Hour 0 0 0 0 Parkers/Hour(Le$IRight) --- "- Signal Settings:Actuated Operational Analysis Cycle Length: 78.0 Sec Lost Time Per Cycle:18.0 Sec Phase: 1 2 3 4 5 6 7 8 Ped Only EB LTP WB LTR LTP NB LTP SB LTP Green 16.0 24.0 14.0 6.0 0 Yellow All Red 3.0 0.0 3.5 1.5 3.5 1 1.5 3.5 1 1.5 Capacity Analysis Results Approach: Lane Cap v/s g/C Lane v/c Delay Delay Gmu ph) _(se EB L 250 0.001 0.308 L 0.004 18.7 B 24.7 C * TR_ 1016 0.170 0.308 TR 0.552 24.7 C i -WB T- L er 192 0.000 0.372 11.3 B * L ro 359 0.183 0.205 L 0.581 14.1 B TR 1929 0.160 0.551 TR 0.290 9.7 A NB * L 326 0.107 0.179 L 0.598 31.5 C 30.8 C LTR 305 0.095 0.179 LTR 0.528 29.9 C SB * LTR 136 0.005 0.077 LTR 0.066 33.5 C 33.5 C Intersection:Delay= 19.4 sec/veh Int.LOS=B Xc 0.60 * Critical Lane Group '2(v/s)Crit=0.47 SIG/Cinema v3.08 Page 1 I HCM Summary Results Existing+The Knolls at Hillcrest Main St/Highland Blvd DMR 01/01/2007 AM Peak Hour Case: HIGHLAND-MAIN-EX+SITE-AM-NB DUE Lane Group Approach Delay Delay :Grp ne X (sec/ (sec/ 1 Ap v/s v/c veh) LOS veh) LOS 1 I1 EB + L L 0.00 0.00 18.7 B 24.7 C * TR 0.17 0.55 24.7 C 4 454 ,--262 ---------------------- WB L er 0.00 11.3 B -----------.� *L ro 0.18 0.584 14.1 B ---- - --- TR 0.16 0.29 9.7 A --------- --- --------------------- 1 J - ' ♦ 295 NB * L 0.11 0.60 31.5 C 30.8 C 244 —� LTR 0.09 0.53 29.9 C 2187 80 2 SB *LTR 0.01 1 0.07 33.5 C —3 3.5 C 1 2 3 4 L 16 3 0 23 4 2 13 �II 4 2 5 4 2 Int. 0.47 0.60 19.4 B * Critical Lane Group #Left Movement Total SIG/Cinema v3.08 Page 2 NETSIM Summary Results Existing+The Knolls at Hillerest Main St/Highland Blvd DMR 01/01/2007 AM Peak Hour Case: HIGHLAND-MAIN-EX+SITE-AM-NB DUA Queues Spillback in Per Lane Average Worst Lane Lane Avg/Max Speed (%of Peak 1 App Group (veh) (mph) Period) 1 1 EB L 0/ 0 0.0 0.0 TR 51 7 11.8 0.0 � 4 454 - _ 262 All 11.8 0.0 �� - -- --------- - WB L 4/ 6 11.9 0.0 -------`- TR3 / 5 15.7 0.0 - -- ------------------ ------ - -- ------------ on 410 All 14.3 0.0 295 244 NB L 3 / 4 4.1 0.0 LTR 3 / 4 15.9 0.0 �218 80 2 All 11.4 0.0 1 2 3 4 L __ L SB LTR 0/ 1 10.6 0.0 1 16 3 0 23 4 2 13 4 2 5 4 2 All 10.6 0.0 Intersect. 12.8 SIG/Cinema v3.08 Page 3 HCM Analysis Summary Existing+The Knolls at Hillcrest Main St/Highland Blvd Area Type:Non CBD DMR 01/01/2007 Analysis Duration: 15 mins. PM Peak Hour Case: Highland-Main-Ex+Site-PM-NB Dual Left Lanes Geometry:Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB 3 2 L 12.0 T 12.0 TR 12.0 WB 3 2 L 12.0 T 12.0 TR 12.0 NB 2 1 L 12.0 LTR 12.0 SB 1 1 LTR 12.0 East West North South Data L T R L T R L T R L T R Movement Volume v h) 1 579 276 107 428 1 325 1 239 4 1 1 PHF 0.92 0.92 0.92 0.87 0.87 0.87 0.93 0.93 0.93 0.42 0.42. 0.42 %Heavy Vehicles 3 3 3 3 3 3 1 1 1 1 1 1 Lane Groups L TR L TR L LTR LTR Arrival Type 3 3 3 3 3 3 3 RTOR Vol v h 83 0 2 0 Peds/Hour 5 5 5 0 %Grade 0 0 -3 0 Buses/Hour 0 0 0 0 Parkers/Hour(LeNlti ht) --- I --- - --- --- I --- --- --- Signal Settings:Actuated Operational Analysis Cycle Length: 76.0 Sec Lost Time Per Cycle:18.0 Sec ' Phase: 1 2 3 4 5 6 7 8 Ped Only EB LTP WB LTR LTP ' NB LTP SB j LTP Green 8.0 24.0 20.0 1 6.0 1 1 1 1 0 Yellow All Red 3.01 0.0 3.5 1.5 3.5 1 1.5 1 3.5 1 1.5 Capacity Analysis Results Approach: Lane Cap v/s g/C Lane v/c Delay Delay R .(sue veh) EB L 274 0.001 0.316 L 0.004 17.8 B 29.6 C * TR 1063 0.249 0.316 TR 0.789 29.7 C WB L er 99 0.000 0.382 14.3 B * L ro 184 0.070 0.105 L 0.435 17.9 B TR 1614 0.141 0.461 TR 0.305 13.4 B NB L 477 0.144 0.263 L 0.549 24.9 C 30.1 C * LTR 439 0.206 0.263 LTR 0.781 34.1 C _ 1 SB * LTR 141 0.008 0.079 LTR 0.099 32.6 C 32.6 C Intersection:Delay= 25.2 sec/veh Int.LOS=C XC 0.70 * Critical Lane Group 2(v/s)Crit=0.53 SIG/Cinema v3.08 Page 1 HCM Summary Results Existing+The Knolls at Hillcrest Main St/Highland Blvd DMR 01/01/2007 PM Peak Hour Case: Highland-Main-Ex+Site-PM-NB Dual Left Lane Group Approach Delay Delay Lane X (sec/ (sec/ 1 App Grp v/s v/c veh) LOS veh) LOS 1 �4 EB L 0.00 0.00 17.8 B 29.6 C L * TR 0.25 0.79 29.7 C 1 p —428 �:► 107 WB L er 0.00 14.3 B ~_________. *L ro 0.07 0.434 17.9 B ONEW -- - TR 0.14 0.31 13.4 B - ------ 1 579 NB L 0.14 0.55 24.9 C 30.1 C 276 *LTR 0.21 0.78 34.1 C 3251239 � 1 1 : SB *LTR 0.01 0.10 32.6 C 32.6 C 1 2 3 4 t— _ 8 3 0 23 4 2 19 �' 4 2 5 4 2 Int. 0.53 0.70 25.2 C * Critical Lane Group #Left Movement Total SIG/Cinema v3.08 Page 2 NETSIM Summary Results Existing+The Knolls at Hillcrest Main St/Highland Blvd DMR 01/01/2007 PM Peak Hour Case: Highland-Main-Ex+Site-PM-NB Dual Left Queues Spillback in Per Lane Average Worst Lane Lane Avg/Max Speed (%of Peak 1 App Group (veh) (mph) Period) 1 4II - � r L► EB I L 0/ 0 0.0 0.0 TR 7/ 9 10.7 0.0 1 428 �107 All 10.7 0.0 ---------------------- WB L 2/ 3 10.9 0.0 —� TR 4/ 4 14.8 0.0 ------------------ All 14.1 0.0 579 276 NB L 4/ 5 4.5 0.0 ' LTR 4/ 6 16.2 0.0 325 239 1 All 12.0 0.0 1 2 3 4 ,-IL SB LTR 0/ 1 11.3 0.0 = 8 3 0 23 4 2 19 4 2 5 4 2 All 11.3 0.0 Intersect. 11.9 SIG/Cinema v3.08 Page 3