Loading...
HomeMy WebLinkAbout05-21-18 City Commission Packet Materials - C8. Agreement with Montana Rail Link for Broadway Crossing Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Andrew Kerr, Engineering Tech. Supervisor Rick Hixson, City Engineer SUBJECT: Authorize the City Manager to sign agreement with Montana Rail Link (MRL) – Broadway Crossing MEETING DATE: May 21, 2018 AGENDA ITEM TYPE: Consent Agenda RECOMMENDATION: Authorize City Manager to sign agreement with Montana Rail Link for improvements to the Broadway crossing. BACKGROUND: The railroad spur crossing of Broadway near Mendenhall Street has deteriorated to the point where improvements are needed to keep the crossing safe and functional. Citizen complaints regarding the condition of this crossing are common. MRL has proposed to upgrade the street crossing with a new concrete crossing surface to replace the existing asphalt/wood surfaces. They are requesting reimbursement from the City of Bozeman for the cost of materials and shipping. The estimated cost to be borne by the city (as specified in the agreement) is $34,707.00. Staff recommends entering into this agreement for this crossing upgrade. UNRESOLVED ISSUES: None identified ALTERNATIVES: Continue to patch/repair existing crossing. FISCAL EFFECTS: Funds are available in general contracted services, Street Maintenance fund. Attachments: Cover Letter MRL Agreement Report compiled on May 7, 2018 79 80 81 82 83