HomeMy WebLinkAboutT1 Title Sheet Open Space 01 16 2018DESIGNED BYDRAWN BYCHECKED BYDATEPROJECT NO.FILE NO.SHEETPROJECT TITLESHEET TITLE
(C) 2017 PEAKS TO PLAINS DESIGN, P.C.
LANDSCAPE ARCHITECTURE/PLANNING/CIVIL ENGINEERING
404 NORTH 31ST STREET, SUITE 405
BILLINGS, MONTANA 59101
(406) 294-9499 - (406) 294-9670 FAX
WWW.PEAKSTOPLAINS.COM
PEAKS TO PLAINS DESIGNPC 14041_LS OS_P5 P6.DWGT11404101/16/18JJRGNLGNLBOZEMAN, MONTANA
THE LAKES AT VALLEY WEST
PHASES 5 & 6 OPEN SPACE
TITLE SHEETNORTHBOZEMAN, MT 59718DESIGN TEAM2880 TECHNOLOGY BLVD. W.THE LAKES AT VALLEY WEST LLCOWNERBILLINGS, MT 59101404 NORTH 31ST STREET, STE. 405PEAKS TO PLAINS DESIGN, P.C.LANDSCAPE ARCHITECTDRAWING INDEXOPEN SPACE: PHASES 5 & 6THE LAKES AT VALLEY WESTBOZEMAN, MONTANAPROJECT LOCATION MAP1NOT TO SCALEE. MAIN ST.LOCATIONPROJECTDURSTON RD.W. OAK STBAXTER LN.W. BABCOCK ST.W. COLLEGE ST.W. KAGY BLVD.HUFFINE LN.W. GRIFFIN DR.COTTONWOOD RD.
FERGUSON RD.
19TH AVE.
7TH AVE.
N ROUSE AVE.
DAVIS LN.INTERSTATE 90INTERSTATE 90INTERSTATE 9019TH AVE.T1TITLE SHEETSD1.1TRAIL LAYOUT PLAN (OPEN SPACE PHASE 5) ALIGNMENTS 1 & 2SD1.2TRAIL LAYOUT PLAN (OPEN SPACE PHASE 5) ALIGNMENTS 2 & 3SD2.1TRAIL LAYOUT PLAN (PARK & OPEN SPACE PHASE 6) ALIGNMENTS 1, 2, & 3L1.1PHASE 5 OPEN SPACE: PLANTING PLAN - WESTL1.2PHASE 5 OPEN SPACE: PLANTING PLAN - EASTL2.1PHASE 6 OPEN SPACE: PLANTING PLANL3.1PLANTING DETAILS & NOTESL4.1PHASE 5 OPEN SPACE: IRRIGATION PLAN - WESTL4.2PHASE 5 OPEN SPACE: IRRIGATION PLAN - EASTL4.3PHASE 6 OPEN SPACE: IRRIGATION PLANL4.4IRRIGATION DETAILS & NOTES