HomeMy WebLinkAboutSD1 Ph 5 Trail Align 1 2 Open Space 01 16 2018SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS
SSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W
WWWWWWWWWWWWWWWWWWWWSD SD SD SD SD SD SD SD SD SD SD SD
SDSDSDSDS
D
SD
SDSDSDSDSDSDSDSD
SD
SDSDSDSDC503 C502C505 0+001+002+003+003+77L501L502L503L504L505L506L507 C501C5040+001+002+003+004+005+006+007+00L508DESIGNED BYDRAWN BYCHECKED BYDATEPROJECT NO.FILE NO.SHEETPROJECT TITLESHEET TITLE
(C) 2017 PEAKS TO PLAINS DESIGN, P.C.
LANDSCAPE ARCHITECTURE/PLANNING/CIVIL ENGINEERING
404 NORTH 31ST STREET, SUITE 405
BILLINGS, MONTANA 59101
(406) 294-9499 - (406) 294-9670 FAX
WWW.PEAKSTOPLAINS.COM
PEAKS TO PLAINS DESIGNPC 14041_LS OS_P5 P6.DWGSD1.11404101/16/18JJRGNLGNLBOZEMAN, MONTANA
THE LAKES AT VALLEY WEST
PHASES 5 & 6 OPEN SPACE
ALIGNMENTS 1 & 2
PHASE 5
TRAIL LAYOUT PLANTRAIL LAYOUT PLAN (OPEN SPACE PHASE 5) ALIGNMENTS 1 & 21SCALE: 1" = 30'MATCH LINE 1 / SD1.1
MATCH LINE 1 / SD1.2
AAJKER CREEK AAJKER CREEKWATERCOURSESETBACKZONE 1WATERCOURSESETBACKZONE 2PHASE 4PHASE 5PHASE 4PHASE 5PHASE 4PHASE 5PHASE 4PHASE 5PHASE 4PHASE 5SIDEWALKSIDEWALK SIDEWALKSIDEWALK
SIDEWALKSIDEWALKWESTGATE AVEVAUGHN DRIVEEX. GRAVEL TRAIL8L3.17L3.1EX. SIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALK
SIDEWALK ALIGNMENT 1ALIGNMENT 1ALIGNMENT 2Phase 5 - Alignment 1 - ASPHALT TRAILNumberL501C501L502C502L503C503L504C504L505C505L506L507Length7.0515.7819.0618.99102.628.9846.7316.5326.9611.189.3994.03Radius50.00050.00050.00050.00050.000Line/Chord DirectionS00° 28' 54.91"WS08° 33' 26.68"ES17° 35' 48.27"ES06° 43' 03.30"ES04° 09' 41.67"WS00° 58' 55.38"ES06° 07' 32.42"ES03° 20' 39.32"WS12° 48' 51.07"WS06° 24' 25.54"WS00° 00' 00.00"ES00° 05' 07.72"EStart Sta:0+00.000+07.050+22.820+41.880+60.871+63.491+72.462+19.202+35.732+62.692+73.872+83.25End Sta:0+07.050+22.820+41.880+60.871+63.491+72.462+19.202+35.732+62.692+73.872+83.253+77.28WOOD POST LOCATIONSPOSTNORTHINGEASTING11382.1930-3060.723021383.4600-3013.240031384.7270-2965.757041386.0670-2915.5112NOTES:1.NORTHINGS & EASTINGS ARE BASED ON LOCAL CONTROL POINTS SET UPFOR PHASE 3 OF THE DEVELOPMENT.2.NORTHINGS & EASTINGS REFER TO THE CENTER POINT OF THE POST.12342SD1.2HERSTAL WAY
LEIDEN LNLEIDEN LN
MATCH LINE 1 / SD1.1
MATCH LINE 1 / SD1.2NumberL508Length1272.03RadiusLine/Chord DirectionN88° 28' 17.35"EStart Sta:0+00.00End Sta:12+72.03Phase 5 - Alignment 2 - ASPHALT TRAILALIGNMENT 2GRAVELCONNECTORTO TRAILGRAVELCONNECTORTO TRAILLEGENDMULTI-USE PATH STOP SIGNWOOD POST (NOT DRAWN TO SCALE)STANDARD CITY OF BOZEMAN TRAIL TOTEM