Loading...
HomeMy WebLinkAbout04-16-18 City Commission Packet Materials - C7. PSA with Sprout, Inc. for Ground Maintenance Services Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: John Van Delinder, Streets Superintendent Craig Woolard, Director of Public Works SUBJECT: Authorize the City Manager to sign the Professional Services Agreement with Sprout, Inc. for median and grounds maintenance services. MEETING DATE: April 16, 2018 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign the Professional Services Agreement with Sprout, Inc. for median and grounds maintenance services. BACKGROUND: Since 2015, the City has contracted with Sprout, Inc. for median maintenance and grounds services as listed in the attached Scope of Services. The contract expired at the end of 2017 so in accordance with the purchasing policy for a contract under $80,000, we requested quotes from five local landscaping contractors. We received one response, from Sprout, Inc. which we found to be acceptable. We have been pleased with their work and responsiveness so we’d like to enter into a new agreement with them for 2018. UNRESOLVED ISSUES: There are no known unresolved issues. ALTERNATIVES: As suggested by the Commission. FISCAL EFFECTS: Capital Improvement Program Item STR30 was approved for $55,000 in FY18 and $55,000 in FY19. This item includes median and grounds maintenance services as well as irrigation maintenance (handled under a separate contract). Attachments: Professional Services Agreement Exhibit A: Scope of Services Exhibit B: Approved Proposal Report compiled on: March 22, 2018 113 114 115 116 117 118 119 120 121 122 123 124 EXHIBIT A: SCOPE OF SERVICES LOCATION: ADDRESS: MOWING FREQUENCY: TRIMMING FREQUENCY: SPRAYING FREQUENCY: MISC: GROUNDS City Shops Complex 814 N. Bozeman Ave. 1x/week 1x/week 1x/year Water Reclamation Facility 2245 Springhill Rd. 1x/week 1x/week 1x/year Vehicle Maintenance Shop 1812 N. Rouse Ave. 1x/month 2x/year 1x/year Green Sand Shed E. Griffin Dr. 1x/month 2x/year 1x/year Mowing to occur until the vegetation dies (approx. end of July) Old Landfill 2125 N. Rouse Ave. 2x/year 2x/year 1x/year The area to be mowed may be reduced in the future. MEDIANS North 7th Avenue Aspen St. to Villard St. n/a 1x/year pruning in the fall (cut back perennials) 1x/year pre- emergent herbicide spraying (early spring) Other: 2x/month  Garbage removal  Re-cover/pin down fabric and irrigation drip lines  Weeding South 8th Avenue Main St. to College St. 1x/week 2x/month 1x/year North 19th Avenue Durston Rd. to Beall St. 1x/week As needed 1x/year 125 LOCATION: ADDRESS: MOWING FREQUENCY: TRIMMING FREQUENCY: SPRAYING FREQUENCY: MISC: North 27th Avenue Oak St. to Baxter Ln. As needed As needed Multiple times to keep weeds under control Medians are not currently landscaped. Weed removal will be necessary until landscaping occurs. South 27th Avenue Kurk Dr. to Blackwood Rd. 1x/week 1x/month 1x/year The southernmost median just north of Blackwood Rd. is not currently landscaped. Weed removal will be necessary until landscaping occurs. College Street 19th Ave. to Main St. n/a 1x/year pruning in the fall (cut back perennials) 1x/year pre- emergent herbicide spraying (early spring) Other: 2x/month  Garbage removal  Re-cover/pin down fabric and irrigation drip lines  Weeding Cottonwood Road Between Babcock St. and Fallon St. 1x/week 1x/month 1x/year Cottonwood Road Babcock St. to Durston Rd. Future medians to be built in 2018. Maintenance needs to be determined. Davis Lane Oak St. to Baxter Ln. n/a As needed n/a 126 LOCATION: ADDRESS: MOWING FREQUENCY: TRIMMING FREQUENCY: SPRAYING FREQUENCY: MISC: Fowler Avenue Huffine Rd. to Garfield St. As needed Other:  Median currently contains artificial turf but turf will be removed and median will be landscaped in the near future. Maintenance needs to be determined. Graf Street 19th Ave. to Macnab St. Multiple times to keep weeds under control Weed removal will be necessary on a regular basis within the medians, boulevards, and the roundabouts. Highland Boulevard Hillcrest to Holly Dr. 1x/week As needed 1x/year Medians are not irrigated and will only need to be mowed until they become dry. Kagy Boulevard Willson Ave. to 7th Ave. 1x/week 1x/month 1x/year 127 LOCATION: ADDRESS: MOWING FREQUENCY: TRIMMING FREQUENCY: SPRAYING FREQUENCY: MISC: Kagy Boulevard Highland Blvd. to Willson Ave. 1x/week 1x/month 1x/year Medians are not irrigated and will only need to be mowed until they become dry. Oak Street Ferguson Ave. to 27th Ave. 1x/week 2x/month 1x/year Medians between New Holland Dr. and Ferguson Ave. are not currently landscaped. Weed removal will be necessary on a regular basis until landscaping occurs. Once landscaping is installed, maintenance needs will be determined. Valley Center Road 19th Ave. to 27th Ave. 1x/week 1x/month 1x/year ADDITIONAL MAINTENCE AND SERVICES:  Spraying of weeds along cracks adjacent to medians where the concrete meets the asphalt.  Additional medians or boulevards may be added as needed.  Additional services as requested: landscaping consultation, garden maintenance, landscaping, maintenance of native grasses/drought tolerant plants, weed pulling. 128 EXHIBIT B - APPROVED PROPOSAL 129 130 131 132