Loading...
HomeMy WebLinkAboutCity of Bozeman Sediment Management Waste FacilityCOLUMBIA FALLSKALISPELL WHITEFISH POLSON MISSOULA LOLO HAMILTON BOZEMAN HELENA BUTTE GREAT FALLS DEER LODGE MILES CITY GLENDIVE BILLINGS HAVRE HARDIN LEWISTOWN PROJECT LOCATION Ï INT E R S T A T E 9 0 FR O N T A G E R D .SPRINGHILL RD.BOZEMAN HWY. 191JACKRABBIT RD.HWY. 191BELGRADE BRIDGER CANY O N RD. LOCATION PROJECTProject No. Bozeman, Montana C o n t r a c t D r a w i n g s F o r 10045441 March 2018 I N D E X O F D R A W I N G S 01G001 GENERAL LEGEND AND NOTES 01C101 DEMOLITION AND OVERALL SITE PLANS PHASE I & II 01C102 GRADING PLAN PHASE I & II 01C103 DRAINAGE AND UTILITY PLANS 01C104 ACCESS ROAD ALIGNMENT AND PROFILE 01C301 PLANS AND PROFILES 01C501 UTILITY NOTES AND DETAILS I 01C502 UTILITY NOTES AND DETAILS II 01C503 UTILITY NOTES AND DETAILS III City of Bozeman, Montana City of Bozeman Sediment Management Waste Facility RECORD DRAWINGS 1.THIS IS A STANDARD SHEET SHOWING COMMON SYMBOLOGY. ALL SYMBOLS ARE NOT NECESSARILY USED ON THIS PROJECT. 2.SCREENING OR SHADING OF WORK IS USED TO INDICATE EXISTING COMPONENTS OR TO DE-EMPHASIZE PROPOSED IMPROVEMENTS TO HIGHLIGHT SELECTED TRADE WORK. REFER TO CONTEXT OF EACH SHEET FOR USAGE. GENERAL NOTES: RIPRAP (PLAN AND/OR SECTION) GROUT (SECTION) SECTION LETTER FLAG INDICATES DIRECTIONOF SECTION CUT SECTION LETTER SECTION CUT MARKER GRANULAR FILL (SECTION) SAND (SECTION) PLAN TITLE SHEET WHERE SECTION IS LOCATED * SHEET WHERE SECTION VIEW IS FIRST CUT * SECTION TITLE DETAIL TITLE ASPHALT (PLAN OR SMALL-SCALE SECTION) GENERAL SYMBOLOGY MATERIALS IN PLAN/SECTION MATCHLINE SEE SHEET XX FOR CONTINUATION X XXX X XXX DETAIL NUMBER SHEET WHERE DETAIL VIEW IS FIRST CUT * # XXX UTILITY BENEATH STRUCTURE RAILROAD CENTERLINE PROPERTY LINE EASEMENT LIMITS OF CONSTRUCTION ROW EXISTING CONTOUR W/ELEVATION (MAJOR)25 EXISTING CONTOUR (MINOR) NEW CONTOUR (MAJOR)25 NEW CONTOUR (MINOR) BOTTOM OF DITCH EXISTING FENCE EXISTING VEGETATION/BRUSH LINE SS SS SS W W W NPW NPW NPW DOMESTIC WATER NON-POTABLE DOMESTIC WATER SANITARY SEWER SURVEY BENCHMARK SPOT ELEVATION/POINT # SURVEY CONTROL POINT123 IDENTIFICATION AND APPROXIMATE LOCATION OF SOIL TEST HOLE CIVIL MAPPING SYMBOLOGY EMBANKMENT SLOPE (CUT) FLOW ARROW EMBANKMENT SLOPE RIGHT ARROW RIGHT EMBANKMENT SLOPE LEFT ARROW LEFT CLEANOUT EMBANKMENT SLOPE (FILL) HORIZONTAL CONTROL POINT VERTICAL CONTROL POINT SECTION CORNER MONUMENT SECTION CORNER NO MONUMENT STORM DRAINAGE MANHOLE WATER/AIR VENT WATER LEVEL IN SECTION/PROFILE UTILITY/CIVIL LINE SYMBOLOGY VALVE CULVERT END SYMBOL (WITH CULVERT SHOWN BETWEEN SYMBOLS) H:V H:V CP-X CO D W W WATER BLOWOFF WATER METER WATER SHUTOFF WATER VALVE VAULT TANK BELOW GROUND X SOIL BORING X TEST PIT X X X X X X X X SD SD SD STORM SEWER TOE OF SLOPE TOP OF SLOPE SWO REMOVEABLE ECOLOGY BLOCK, TYPE 1 - 3' X 3' X 6' GROUTED ECOLOGY BLOCK, TYPE 1 - 3' X 3' X 6' WASH STATION REMOVEABLE ECOLOGY BLOCK, TYPE 2 - 2' X 2' X 6' SYMBOLOGY IN PLAN/SECTION ROADBED FILL (PLAN) PIPELINE SYMBOLOGY DRAIN POTABLE WATER FORCE MAIN24"-FM 6"-D 1"-PW 1/4" = 1'-0" PLAN 3/8" = 1'-0" SECTION 3/8" = 1'-0" DETAIL PIPING IDENTIFICATION 6"LINE SIZE DRAINSERVICE EXAMPLE6"-DFIGURE KEY NOTE NUMBER KEY NOTE DESIGNATION DETAIL NUMBER DETAIL MARKER SHEET WHERE DETAIL IS LOCATED * FOR REFERENCING DETAILS INCLUDED IN DRAWING SET. # 1 A B C 2 3 4 5 6 7 8 D ISSUE DESCRIPTION PROJECT MANAGER PROJECT NUMBER 0 1"2"FILENAME SCALE SHEET DATE DAN MARCH 10045441 City of Bozeman Sediment Management Facility Bozeman, Montana 2017 DESIGNED BY D. MARCH DRAWN BY M. WINSLOW CHECKED BY D. HARMON T. PETERSON PREPARED ACCORDING TO CONSTRUCTION RECORDS. RECORD DRAWINGS PREPARED FROM RECORD INFORMATION CONTAINED INADDENDA AND CHANGE ORDERS AND OTHER INFORMATION PROVIDED BY THE CONTRACTOR. THESE HAVE NOT BEENSUPPLEMENTED WITH INFORMATION KNOWN TO THE ENGINEER THAT WAS NOT INDICATED BY THE CONTRACTOR'S RECORDS. RECORD DRAWING:RECORD DRAWING MARCH 2018 GENERAL LEGEND AND NOTES 00G001.dwg NONE 00G001 PREPARED ACCORDING TO CONSTRUCTION RECORDS. RECORD DRAWINGS PREPARED FROM RECORD INFORMATION CONTAINED INADDENDA AND CHANGE ORDERS AND OTHER INFORMATION PROVIDED BY THE CONTRACTOR. THESE HAVE NOT BEENSUPPLEMENTED WITH INFORMATION KNOWN TO THE ENGINEER THAT WAS NOT INDICATED BY THE CONTRACTOR'S RECORDS. RECORD DRAWING:RECORD DRAWING MARCH 2018 4600460146014601 4601 460246014600 4600460146014602 460246024601 4602 4600 20'-0" 20'-0" 6'-0" +/-20'-0"+/- 1 A B C 2 3 4 5 6 7 8 D ISSUE DESCRIPTION PROJECT MANAGER PROJECT NUMBER 0 1"2"FILENAME SCALE SHEET DATE DAN MARCH 10045441 City of Bozeman Sediment Management Facility Bozeman, Montana 2017 DESIGNED BY D. MARCH DRAWN BY M. WINSLOW CHECKED BY D. HARMON T. PETERSON PREPARED ACCORDING TO CONSTRUCTION RECORDS. RECORD DRAWINGS PREPARED FROM RECORD INFORMATION CONTAINED INADDENDA AND CHANGE ORDERS AND OTHER INFORMATION PROVIDED BY THE CONTRACTOR. THESE HAVE NOT BEENSUPPLEMENTED WITH INFORMATION KNOWN TO THE ENGINEER THAT WAS NOT INDICATED BY THE CONTRACTOR'S RECORDS. RECORD DRAWING:RECORD DRAWING MARCH 2018 DEMOLITION & OVERALL SITE PLANS PHASE I AND PHASE II 01C101.dwg AS NOTED 01C101 DRYING BEDS HOT BAYS PHASE II SEDIMENTATION BASIN CLEAR, GRUB AND STRIP SITE PHASE I PHASE II 1" = 60'-0" DEMOLITION PLAN 1" = 120'-0" OVERALL SITE PLAN GENERAL NOTES: 1.THE CONTRACTOR SHALL NOTIFY ONE CALL @ 1-800-424-5555 FOR ONSITE UTILITY LOCATION. ALL EXISTING UTILITIES SHALL BE MARKED BEFORE DIGGING. 2.COORDINATE ACTUAL LOCATION AND AREA LIMITS WITH OWNER. DO NOT DISRUPT OWNER'S ACTIVITIES IN THE AREA. SITE PROTECTION FROM VANDALISM, ETC. IS THE CONTRACTOR'S RESPONSIBILITY. 3.SEE SPECIFICATIONS FOR DEMOLITION, CUTTING AND PATCHING REQUIREMENTS. REMOVE AND DISPOSE OF EXCESS MATERIALS ON SITE. X GROUNDWATER WELL GROUNDWATER WELL KEYNOTES: 1.DEMOLISH EXISTING BIOSOLIDS STORAGE POND, AS REQUIRED, FOR 6"-D INSTALLATION. REPLACE EXISTING POND LINER FOLLOWING UTILITY BACKFILL. 2.DEMOLISH EXISTING GRAVEL AND STOCKPILE A 6"-D TRENCH RESTORE ROAD GRAVEL FOLLOWING UTILITY INSTALLATION. 3.CLEAR AND STRIP TOPSOIL AND SAND AT EXISTING IP CELL BASIN. EXCAVATE TO REQUIRED SUBGRADE ELEVATION AND COMPACT. 3 EACH EXISTING IP CELL DRAIN LATERALS EXIST AT +3 FT BELOW GROUND SURFACE. 4.REMOVE ROADWAY GRAVEL AND SUBSURFACE PER GRAVEL ROADWAY SECTION. SEE SHEET 01C502. RE-USE GRAVEL FOR SUBGRADE FILL IF VOID OF ORGANIC CONTAMINATION. 5.START OF 20 FT WIDE GRAVEL ROAD. MATCH EXISTING ROAD ELEVATION. 6.NEW PHASE I SEDIMENTATION BASIN, SEE SHEET 01C102. TO BE INCLUDED IN THIS CONTRACT. 7.20FT WIDE GRAVEL ROADWAY ENTRANCE APRON. SEE DETAIL 5/01C502, SIM. 8.PHASE II SEDIMENTATION BASIN, NOT THIS CONTRACT. EXCESS FILL MATERIAL SHALL BE PLACED IN THIS AREA. TOPSOIL AND SAND REMOVED PER DEMOLITION PLAN FOR PHASE I AND PHASE II AREAS, SEE SHEET 01C102. 9.20 FT WIDE GRAVEL ROADWAY, CONSTRUCT FOLLOWING 2"-W INSTALLATION, SEE DETAIL 5/01C502. 10.2"-W, SEE UTILITY PLAN ON SHEET 01C103. 11.6"-D, SEE UTILITY PLAN ON SHEET 01C103. 12.BACKFILL AREA FOR EXCESS MATERIALS FROM PHASE I. BACKFILL TO GRAVEL SHOWN ON PHASE II AREA BEFORE BACKFILLING TO EAST. 12 87 6 11 PHASE I SEDIMENTATION BASIN DRAIN PIPELINE 9 10 1 2 4 3 5 15.00' 12.00'12.00'12.00' 90.00' 12.00'12.00'14.00'5.00'SEWER SEDIMENTATION BASIN FUTUREDISCHARGE MANHOLE EDGE OF FUTURE ASPHALT/DEVELOP REMOVABLE ECOLOGY BLOCKS, TYPE 2, TYPICAL FUTURE 33.00'19.00' 1 1% SLOPE1% 1% 4600.5 4600.5 4600.5 4600.5 7 5 REMOVABLE ECOLOGY BLOCKS, TYPE 1, TYPICAL 32.00'21.50'39.00'21.50'20.00' 68.00' 72.50'38.00'20.00'20.00'20.00' 138.00'15.00'12.00' CONTAINMENT VAULT WITH DRAIN ANDMANHOLE LIDS, TYPICAL HOT BAYS EDGE OF ASPHALT/DEVELOPMENT REMOVABLE ECOLOGY BLOCKS, TYPE 25.00'5.00' 5.00' 12.00'12.00'12.00'12.00'12.00'12.00'12.00'12.00' DISCHARGE MANHOLE 95.00'5.00'5.00'5.00'1%1%1%1% 1%1%1% 1% 1% 1% 1% 1% 1% 1% 1% 1%1% 4602.37 4601.61 4601.61 4601.99 4602.37 1% 4600.5 4600.5 4600.5 4600.5 11 1%1% 9 3GROUTED TYPE 1 ECOLOGY BLOCKS, TYPICAL 1 2 4602.37 PHASE I PHASE II 21.50' 1% S L O P E1% SLOPE1% SL O PE 1% SLOPE1% S L O P E R = 2 5 . 0 0 'R=25.00 '7.61'50.77'3.45'N 67091.06 E 42306.42 4602 4601 4600 460246014600460246014600N 67091.06 E 42234.42 N 67278.06 E 42234.17 N 67278.06 E 42372.17 6 10 8 DRYING BEDSREMOVABLEECOLOGY BLOCKS, TYPE 2 REMOVABLE ECOLOGY BLOCKS, TYPE 1, TYPICAL FUTURE REMOVABLE ECOLOGY BLOCKS, TYPE 1, TYPICAL FUTURE REMOVABLE ECOLOGY BLOCKS, TYPE 2, TYPICAL 1% 4 1 A B C 2 3 4 5 6 7 8 D ISSUE DESCRIPTION PROJECT MANAGER PROJECT NUMBER 0 1"2"FILENAME SCALE SHEET DATE DAN MARCH 10045441 City of Bozeman Sediment Management Facility Bozeman, Montana 2017 DESIGNED BY D. MARCH DRAWN BY M. WINSLOW CHECKED BY D. HARMON T. PETERSON PREPARED ACCORDING TO CONSTRUCTION RECORDS. RECORD DRAWINGS PREPARED FROM RECORD INFORMATION CONTAINED INADDENDA AND CHANGE ORDERS AND OTHER INFORMATION PROVIDED BY THE CONTRACTOR. THESE HAVE NOT BEENSUPPLEMENTED WITH INFORMATION KNOWN TO THE ENGINEER THAT WAS NOT INDICATED BY THE CONTRACTOR'S RECORDS. RECORD DRAWING:RECORD DRAWING MARCH 2018 GRADING PLAN PHASE I & II 01C102.dwg 1" = 20'-0"01C102 GENERAL NOTES: 1.SEE SHEET 01C101 FOR SITE DEMOLITION. 2.SEE SHEET 01C103 FOR YARD PIPING. 3.SITE SURVEY AND CONTOURS BASED ON SURVEY BY MONTANA AERIAL IN 2007 WITH CONTROL BY MORRISON-MAIORLE, INC. TWO CONTROL POINTS WILL BE PROVIDED BY THE OWNER, LOCATED WITHIN THE WASTEWATER TREATMENT FACILITY FENCE. 4.CONTRACTOR TO PROTECT ALL EXISTING FACILITIES DURING CONSTRUCTION. IF DAMAGED BY CONSTRUCTION ACTIVITIES, CONTRACTOR SHALL RESTORE FACILITIES TO ORIGINAL CONDITION AT NO COST TO OWNER. 5.COORDINATES FOR WASHDOWN STATIONS ARE FOR THE NORTHWEST CORNER OF THE HOSE REEL AND ARE AS FOLLOWS: WASH STATION: N = 67230.76 E = 42377.48 6.COORDINATE ACTUAL LOCATION AND AREA LIMITS WITH THE OWNER. DO NOT DISRUPT OWNERS ACTIVITIES IN THE AREA. SITE PROTECTION FROM VANDALISM, ETC. IS THE CONTRACTOR'S RESPONSIBILITY. KEYNOTES: 1.ECOLOGY BLOCK WALLS: TYPE 1: DETAIL 3/01C502. TYPE 2: DETAIL 4/01C502. 2.DISCHARGE MANHOLE. SEE DETAIL 1/01C501. SEE SHEET 01C103 FOR EFFLUENT PIPELINE. 3.TYPE 1 ECOLOGY BLOCK WALL. GROUTED BASE AND JOINTS. SEE DETAIL 3/01C502. 4.WASHDOWN STATION WITH HOSE REEL. SEE DETAIL 5/01C501. 5.FUTURE DISCHARGE MANHOLE. PHASE II. 6.ASPHALT CONCRETE PAVEMENT SEDIMENT HANDLING PAD, SEE DETAIL 8/01C502. 7.FUTURE TYPE 2 ECOLOGY BLOCK WALL. PHASE II. 8.FUTURE ASPHALT CONCRETE PAVEMENT SEDIMENT HANDLING PAD. AREA FOR EXCESS MATERIALS PLACEMENT, SEE SHEET 01C101. 9.HOT BAY CONTAINMENT VAULT WITH DRAIN AND MANHOLE COVERS, SEE DETAIL 2/01C501. 10.GRAVEL ROAD, SEE DETAIL 5/01C502, SEE PLAN AND PROFILE ON SHEET 01C104. X OHP OH P OHP OH P NG NG NG NG NG NG NG NGWWWWWWWBFBFBFBFBFBFBFBFBFBFBFBFBFBFBF////////////////// /// /// /// /// /// /// OHP OH P OHP OH P NG NG NG NG NG NG NG NGWWWWWWWBFBFBFBFBFBFBFBFBFBFBFBFBFBFBF0 + 0 0 1+002+00 3+00 4+00 5+00 6+00 7+008+009+0010+00 BP 0+00.00EP 10+00.70 PI 1+16.55PI 7+76.00 PI 7+90.53PI 9+68.63STA 3+22.11, 0.00' STA 4+33.40, 0.00' L 4 8 2"-PW 8 8 1 2"-PW 10 BP 0+00.00 EP 4+35.00 PI 0+49.63PI 3+32.11 0+001+00 2+00 3+00 4+004+356"-D 8 MH N = 67270.07 E = 42243.17 2 1 9 01C502 2 01C502 END OF PIPELINE N = 67653.66 E = 42280.27 3 CLEANOUT 9MH N = 67298.14 E = 42202.24 1 A B C 2 3 4 5 6 7 8 D ISSUE DESCRIPTION PROJECT MANAGER PROJECT NUMBER 0 1"2"FILENAME SCALE SHEET DATE DAN MARCH 10045441 City of Bozeman Sediment Management Facility Bozeman, Montana 2017 DESIGNED BY D. MARCH DRAWN BY M. WINSLOW CHECKED BY D. HARMON T. PETERSON PREPARED ACCORDING TO CONSTRUCTION RECORDS. RECORD DRAWINGS PREPARED FROM RECORD INFORMATION CONTAINED INADDENDA AND CHANGE ORDERS AND OTHER INFORMATION PROVIDED BY THE CONTRACTOR. THESE HAVE NOT BEENSUPPLEMENTED WITH INFORMATION KNOWN TO THE ENGINEER THAT WAS NOT INDICATED BY THE CONTRACTOR'S RECORDS. RECORD DRAWING:RECORD DRAWING MARCH 2018 DRAINAGE & UTILITY PLANS 01C103.dwg AS NOTED 01C103 GENERAL NOTES: 1.CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL EXISTING UNDERGROUND UTILITIES. 2.FOR PIPING ABBREVIATIONS, SEE SHEET 00G001. 3.SPECIAL PRECAUTIONS MUST BE USED IN AREAS OF EXISTING PIPING. EXPLORATORY EXCAVATION SHALL BE EXPECTED BY THE CONTRACTOR, INCLUDING "POT-HOLING" TO EXPOSE THE PIPE SURFACE. FIELD VERIFY ALL EXISTING PIPING LOCATIONS AND ELEVATIONS BEFORE BEGINNING TRENCHING WORK. 4.PLACE WARNING TAPE AND TRACER WIRE ABOVE ALL BURIED PIPING. SEE DETAIL 7/01C502. 1" = 60'-0" UTILITY PLAN 1" = 30'-0" DRAINAGE PLAN X 1 1/2"-PW 5 2"-PW7 1 KEYNOTES: 1.6"-D AND 2"-PW, SEE PIPELINE PROFILES ON SHEET 01C301. SEE CLASS B TRENCH BACKFILL PER DETAIL 7/01C502. 2.DISCHARGE MANHOLE. SEE DETAIL 4 ON SHEET 01C501. 3.6"-D OUTLET. SEE DETAIL 2/01C502. EXISTING POND LINER SHALL BE REMOVED AND REPLACED FOLLOWING UTILITY CONSTRUCTION. WELD LINER IN ACCORDANCE WITH LINER MANUFACTURERS RECOMMENDATIONS. 4.HOT TAP 2"-PW TO EXISTING 8"-W. 5.INSTALL WATER METER PIT, BACK FLOW PREVENTER, AND CURB STOPS, SEE DETAIL 1/01C502. SEE PW PROFILE ON 01C301 FOR 2" TO 1-1/2" PIPE REDUCER LOCATIONS. 6.NOT USED. 7.WASHDOWN STATIONS. SEE DETAIL 5/01C501. 8.EXISTING CULVERT OR PIPELINE CROSSING. SEE GENERAL NOTE 3. 9.MANHOLE SEE DETAIL 1/01C503. 10.ADD CURB STOP 8' FROM WATER MAIN TAP. 6"-D V Scale: 1" = 10.00' 4590 4600 4610 4620 4630 4590 4600 4610 4620 4630 -1+00.00 0+00.00 1+00.00 2+00.00 3+00.00 4+00.00 5+00.00 6+00.00 7+00.00 8+00.00 9+00.00 10+00.00 11+00.00 11+82.00 PROFILE DATA -0.00% -2.83% -0.00% -0.94% -1.43% HP STA = 3+38.45 HP EL = 4608.36 VPI STA = 3+75.10 VPI EL = 4608.36 K = 26.00 73.30' VC VPC STA 3+38.45VPC EL 4608.36VPT STA 4+11.75VPT EL 4607.33VPI STA 0+00EL 4608.37VPI STA 4+94.14EL 4605.00VPI STA 6+25.06EL 4605.00VPI STA 9+42.87EL 4602.00VPI STA 10+81EL 4600.02-1+00 4608.04608.371+004608.04608.374608.04608.372+004607.04608.374607.04608.373+004607.04608.374607.04608.344+004606.14607.634606.04606.255+004605.04605.004605.04605.006+004605.04605.004604.44604.767+004604.04604.294603.14603.828+004603.14603.354602.84602.889+004602.04602.404601.74601.9010+004601.04601.184600.04600.4711+00 11+82 16" PIPE PROPOSED COVER = 7.30' 46" C.M.P PROPOSED COVER = 3.34'OHPOHPOHPOHPOHPOHPNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGWVDYHWV WVDYH W W W W W W W W W BFBFBFBF BF BF BFBFBF BF BF BF BF BF BF BF BF BF BFBF BF BF BF BF BF BF BF BF EX. 24" FORCE MAIN DISCHARGE STRUCTURE ACCESS ROAD STA. 0+00.00 BEGIN IMPROVEMENTS N 66517.32 E 42177.02 ACCESS ROAD STA. 7+97.00 END IMPROVEMENTS SEE SITE DESIGN 10+81 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 PT: 0+95.25PI STA=0+48.38 N=66561.95 E=42158.35 Δ=24°48'21" R=220.00' T=48.38' L=95.2471' N2°06'25.65"E ACCESS ROAD ALIGNMENT AND PROFILE 01C104.dwg AS NOTED 01C104 GENERAL NOTES: 1.CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL EXISTING UNDERGROUND UTILITIES. 2.FOR PIPING ABBREVIATIONS, SEE SHEET 00G001. 3.SPECIAL PRECAUTIONS MUST BE USED IN AREAS OF EXISTING PIPING. EXPLORATORY EXCAVATION SHALL BE EXPECTED BY THE CONTRACTOR, INCLUDING "POT-HOLING" TO EXPOSE THE PIPE SURFACE. FIELD VERIFY ALL EXISTING PIPING LOCATIONS AND ELEVATIONS BEFORE BEGINNING TRENCHING WORK. 4.PLACE WARNING TAPE AND TRACER WIRE ABOVE ALL BURIED PIPING. SEE DETAIL 6/01C502. 5.CONTRACTOR TO PROVIDE THRUST PROTECTION OF POTABLE WATER PIPELINES. SEE DETAIL 10/01C502. H: 1" = 100'-0" V: 1"=10' ACCESS ROAD PROFILE 1" = 30'-0" ACCESS ROAD PLAN 1 A B C 2 3 4 5 6 7 8 D ISSUE DESCRIPTION PROJECT MANAGER PROJECT NUMBER 0 1"2"FILENAME SCALE SHEET DATE DAN MARCH 10045441 City of Bozeman Sediment Management Facility Bozeman, Montana 2017 DESIGNED BY D. MARCH DRAWN BY M. WINSLOW CHECKED BY D. HARMON T. PETERSON PREPARED ACCORDING TO CONSTRUCTION RECORDS. RECORD DRAWINGS PREPARED FROM RECORD INFORMATION CONTAINED INADDENDA AND CHANGE ORDERS AND OTHER INFORMATION PROVIDED BY THE CONTRACTOR. THESE HAVE NOT BEENSUPPLEMENTED WITH INFORMATION KNOWN TO THE ENGINEER THAT WAS NOT INDICATED BY THE CONTRACTOR'S RECORDS. RECORD DRAWING:RECORD DRAWING MARCH 2018 0+00.00 4610 STA 0+00.004600 IE = 4599.831+00.00 2+00.00 3+00.00 4+00.00 4590 STA 1+18.062" 45° BEND PWIE = 4599.8424" SW-EXISTING2"-PW IE = 4600.30MATCHLINEGRAVEL ROAD SEE 5 01C5024610 4600 1+00.00 2+00.00 3+00.00 4+00.00 4590 2"-PW STA 0+08.00CURB STOPIE = 4599.83IE = 4599.5516" SW-EXISTING4610 2" 90° BENDIE = 4591.86STA 9+00.634600 PW 2" 90° BENDSTA 9+20.144590 IE = 4591.863" VT-NEWIE = 3094.00BP-NEWIE = 3094.005+00.00 6+00.00 7+00.00 8+00.00 9+00.0016" SW-EXISTINGIE = 4599.092"-PW MATCHLINEGRAVEL ROAD SEE 5 01C502 STA 8+06.00CURB STOPWATER METERCURB STOPBACKFLOW PREVENTER2" 90° BENDIE = 4595.90STA 7+76.00EXISTING GRAVEL RESTORE ASPHALT CONCRETE SEE 6'' PVC 4610 4600 5+00.00 6+00.00 7+00.00 8+00.00 9+00.00 8 01C502 STA 0+86.002"x1 1/2" REDIE = 4595.901 01C502 1 1/2"-PW 0+00.00 4610 STA 0+00.004600 1+00.00 2+00.00 3+00.00 4+00.00 4590 STA 0+49.636"- D16" SW-EXISTINGIE = 4592.75STA 3+32.116" 45 BEND6"-D 6"-PVC IE = 4594.82IE = 4595.25IE = 4594.2524" SW-EXISTINGIE = 4583.074580 GRAVEL ROAD SEE POND LINER STA 4+35.00IE = 4593.915 01C502 2 01C502 WITH C.O.MH0+004600.01+004602.32+004601.03+004600.04+004602.60+00.00 4610 4610 4600 4600 4590 1+00.00 2+00.00 3+00.00 4+00.00 4590 4580 4580 RIM EL 4603.07INSULATE BETWEEN EXISTING AND 6" DRAIN 1 A B C 2 3 4 5 6 7 8 D ISSUE DESCRIPTION PROJECT MANAGER PROJECT NUMBER 0 1"2"FILENAME SCALE SHEET DATE DAN MARCH 10045441 City of Bozeman Sediment Management Facility Bozeman, Montana 2017 DESIGNED BY D. MARCH DRAWN BY M. WINSLOW CHECKED BY D. HARMON T. PETERSON PREPARED ACCORDING TO CONSTRUCTION RECORDS. RECORD DRAWINGS PREPARED FROM RECORD INFORMATION CONTAINED INADDENDA AND CHANGE ORDERS AND OTHER INFORMATION PROVIDED BY THE CONTRACTOR. THESE HAVE NOT BEENSUPPLEMENTED WITH INFORMATION KNOWN TO THE ENGINEER THAT WAS NOT INDICATED BY THE CONTRACTOR'S RECORDS. RECORD DRAWING:RECORD DRAWING MARCH 2018 PLANS AND PROFILES 01C301.dwg AS NOTED 01C301 GENERAL NOTES: 1.CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING UNDERGROUND UTILITIES. 2.SPECIAL PRECAUTION MUST BE USED IN AREAS OF EXISTING 24" AND 16" FORCE MAIN PIPING, EXPLORATORY EXCAVATION SHALL BE EXPECTED BY THE CONTRACTOR, INCLUDING "POT HOLING" TO EXPOSE THE PIPE SURFACE. 3.PLACE PIPELINES AT ELEVATION SHOWN OR AS SHOWN ON PROFILE. 6.5 FEET MINIMUM COVER REQUIRED WHERE ELEVATION NOT INDICATED ON PLAN OR PROFILE. MAINTAIN SLOPE FOR GRAVITY LINES. SEE TRENCH DETAIL 7/01C502. 4.PLACE WARNING TAPE AND TRACER WIRE ABOVE ALL BURIED PIPING. SEE DETAIL 6/01C502. 5.CONTRACTOR TO PROVIDE THRUST PROTECTION OF POTABLE WATER PIPELINES. SEE DETAIL 10/01C502. PROFILE SCALE: HORZ: 1" = 20'-0" VERT: 1"= 10'-0" TYPE 3 MANHOLE ROOF SLAB AND COVER SLAB T K ROOF SLAB CHANNEL BOTTOM BARS TOP BARS COVER DIA. MH DIA. ~48"58"6"6"#4_AT_6" ADJUSTING RING AS NEEDED FURNISH MANHOLE WITH STEPS WHENEVER THE DEPTH IS MORE THAN 4 FEET [1219]. SEE TYPE 1 FOR STANDARD. #4 [#13] BARS AT 12" OC, EACH WAY 6" FOR UP TO 78" DIA.B B AA 0.5 DIA.OF PIPE SLOPE 4% SHELF CHANNEL SHELF 3"ASREQUIRE D NOTE: CENTER THE OPENING OVER THE ROOF SLAB FOR TYPE I, II, IV AND V INLETS ON 48" COMBINATION TYPE 3 MANHOLES. CONCRETE BASE TO BE POURED IN FIELD OR PRECAST STANDARD FRAME AND INLET GRATE LID CONCRETE BASE TO BE POURED IN FIELD OR PRECAST 1"T1"REINFORCED CONCRETE PIPE BARREL ROOF SLAB SECTION A-A SECTION B-BVARIABLECOVER DIAMETER AS REQUIRED K NTS HOT BAY VAULT NTS DISCHARGE MANHOLE 01C102 1 6'-5 1/2"14'-10"XAIR SPACEXLIQUID LEVELSECTION 5/8" DIA EPOXY ANCHORS AT 4 LOCATIONS 6'-0"01C102 2 PRECAST CONCRETE SLAB COVER SLAB PLAN - 4 DRAIN MANHOLE RING AND COVER NEENAH R-2525-G OR EQUAL NOTE: SEE SPECIFICATION SECTION 02515 FOR PRECAST CONCRETE VAULT. PROVIDE H-2 LOAD RATED LID FOR VAULT. STANDARD 24" MANHOLE RING AND COVER NTS DISCHARGE MANHOLE W/CAGE AND GRATE COVER - 4 1/2" x 1/2" x 18 GA EXPANDED STEEL SCREEN NOTE: HOT DIP GALVANIZED DRAINAGE GAGE AFTER FABRICATION. MOUNT TO CONCRETE COVER WITH 5/8" DIA EPOXY ANCHORS AT MIN 4" EMBED. 1 1/2" x 3/16" STEEL BAND, TYP OF 3 1/2" DIA x 3" x 4" HANDLE, TYP OF 2 NOTES: 1.POST HYDRANTS SHALL BE NON-FREEZING, SELF DRAINING TYPE. HYDRANTS SHALL BE FURNISHED WITH A 2" HORIZONTAL INLET, A NON-TURNING OPERATING ROD, AND SHALL OPEN TO THE LEFT. ALL OF THE WORKING PARTS SHALL BE OF BRONZE-TO-BRONZE DESIGN, AND BE SERVICEABLE FROM ABOVE GRADE WITH NO DIGGING. THE OUTLET SHALL ALSO BE BRONZE AND BE 1-1/2" NST. HYDRANTS SHALL BE LOCKABLE TO PREVENT UNAUTHORIZED USE AS MANUFACTURED BY KUPFERLE FOUNDRY CO., ST. LOUIS, MO, OR APPROVED EQUAL. 2.MATCH DRAIN PORT SIZE PROVIDED BY MANUFACTURER. 3.PROVIDE HOSE RACK FOR EACH YARD HYDRANT. MAINGUARD 1 1/2" BLOW OFF HYDRANT #7 w/HORIZONTAL INLET 1 1/2" PACK JOINT FOR PVC PIPE UNDISTURBED EARTH OR THRUST BLOCK CRUSHED ROCK SUPPLY 12" THICK CONCRETE PAD REINF W/ #4 @ 6 E.W.6'-0" MINVARIES3'-0"MIN4'-0"2'-0"4"8"8 1/4"8 1/4"8"2"4"4"2"12" EXPANSION MATERIAL, CONT, AT CONCRETE CONCRETE FOOTING 12" Ø X 4" LONG STEEL STUDS WELDED TO STEEL POST, FOUR STUDS AT EACH LOCATION, TWELVE AT EACH POST FINISHED GRADE, PAVEMENT, OR SIDEWALK, SEE PLANS FOR MATERIAL 8" Ø SCHEDULE 80 STEEL POST, HOT DIPPED GALVANIZED AND FILLED WITH CONCRETE 6" WIDE REFLECTIVE TAPE BAND ROUNDED CONCRETE CAP NTS BOLLARD - 6 NTS YARD HYDRANT - 76'-0"2'-10"2'-6"2'-6"7'-2" 3/4" = 1'-0" WASHDOWN STATION 01C102 5 1'-11" - 6 BOLLARD, TYP - 7 2'-8" x 4'-6"x12" THICK CONCRETE PAD HOSE REEL 1 1/4" HOSE REEL UNION 5/ 8" DIA EPOXY ANCHOR, TYP 2 EACH END CONCRETE BASE ASPHALT CONCRETE PAVEMENT VARIES- A - B 3/4" = 1'-0" WASHDOWN STATION - B 3/4" = 1'-0" WASHDOWN STATION - A 2'-9"1 12" HOSE CONNECTION CONCRETE BASE 1 1/4" HOSE REEL. SEE SPECIFICATIONS 4"GROUND SURFACE - 7 YARD HYDRANT 1 1/2" - PW 1 1/2" - PWREEL BASE CONTROL POINT SEE SHEET 01C502 1 1/4" x 1 1/2" REDUCER REDUCED PRESSURE BACKFLOW PREVENTER MOUNTED TO REEL BASE. REDUCED PRESSURE BACKFLOW PREVENTER MOUNTED TO REEL BASE. 1 A B C 2 3 4 5 6 7 8 D ISSUE DESCRIPTION PROJECT MANAGER PROJECT NUMBER 0 1"2"FILENAME SCALE SHEET DATE DAN MARCH 10045441 City of Bozeman Sediment Management Facility Bozeman, Montana 2017 DESIGNED BY D. MARCH DRAWN BY M. WINSLOW CHECKED BY D. HARMON T. PETERSON PREPARED ACCORDING TO CONSTRUCTION RECORDS. RECORD DRAWINGS PREPARED FROM RECORD INFORMATION CONTAINED INADDENDA AND CHANGE ORDERS AND OTHER INFORMATION PROVIDED BY THE CONTRACTOR. THESE HAVE NOT BEENSUPPLEMENTED WITH INFORMATION KNOWN TO THE ENGINEER THAT WAS NOT INDICATED BY THE CONTRACTOR'S RECORDS. RECORD DRAWING:RECORD DRAWING MARCH 2018 UTILITY NOTES AND DETAILS 01C501.dwg AS NOTED 01C501 2 01C102 PIPE TO LAGOON NTS 1 01C102 WATER METER PIT NTS STAINLESS STEEL BAND 2" STRIP OF LINER, RUBBER OR NEOPRENE CUSHION BOOT TUBE/SHAFT SEALANT/BUTYL CAULK PIPE WALL LAGOON LINEREXTRUSION WELD SEAM LINER MATERIALBOOT APRONEXTRUSION WELD SEAM PIPE HDPE SLEEVE 8" MIN 3'-0"3'-0" 3 01C102 TYPE 1 ECOLOGY BLOCK NTS 5 01C102 GRAVEL ROAD SECTION NTS 2'-0"2'-0" 4 01C102 TYPE 2 ECOLOGY BLOCK NTS2" AC PAVEMENT2" AC SURFACE COURSE AND NOTE: PRIME ALL SURFACES PRIME EDGES AND CUT ASPHALT. HEAT & FINAL JT MUST BE SAW SURFACE EXISTING PAVEMENT PRIME COAT (ASPHALT ONLY) 12" OF 1 1/2" CRUSHED BASE COARSE TRENCH BACKFILL OR SUBGRADE 6" SCARIFIED AND RECOMPACTED SUBGRADE NOTE: AC SURFACE COURSE AND AC BASE COURSE TO BE PER CITY STANDARD MODIFICATIONS FOR TYPE B-MODIFIED ASPHALTIC SURFACING. 3" AC BASE COURSE NON-WOVEN GEOTEXTILE FABRIC BELOW1/3 Bc,6" MINSUBGRADE STABILIZATION1/4 Bc,4" MINBc+24" MAXCOVERBEDDINGTRENCHBACKFILLPIPE EMBEDMENTSEE SITE PLAN FOR SURFACE TREATMENT TRACER WIRE AND WARNING TAPE, TYP 18"CONCRETE PAD FINISH GRADE 24" SQUARE WATERTIGHT PIPE PLUG CLEANOUT BOX WITH CI COVER MARKED 'CO' SAME SIZE AS MAINLINE PLUG OR ADAPTOR TO MAINLINE PIPE PROVIDE PIPE ZONE MATERIAL FOR A MIN OF 8" AROUND CLEANOUT RISER VALVE BOX, TYPICAL 8"x8"x6" CONCRETE BLOCK UNDER BODY OF BURIED VALVES THRU 10". 12"x12"x6" FOR 12" AND LARGER TRENCH BEDDING EXTENSION TRACER WIRE TRAFFIC AREANON-TRAFFIC AREA VALVE BOX AND LID 6"4"2"TAPERED CONCRETE CIRCULAR COLLAR 3" MINOVERLAPTRAFFIC SURFACE VALVE TAPERED CONCRETE COLLAR OR MATCH TRAFFIC SURFACE VALVE OPERATOR EXTENSION WITH 2x2 OPERATING NUT TO 6" BGS 3:1 SLOPE TYP2% SLOPE2% SLOPE3:1 SLOPE TYP EXISTING GROUND SURFACE 20'-0" COMPACTED SUBGRADE CULVERTS (WHERE SHOWN) MIN SLOPE + 0.7% 8" MIN COVER REQUIRED 4" OF 34" MINUS SURFACE COURSE & 8" OF 1 12" MINUS CRUSHED BASE COURSE AND TYPE 1 GEOGRID PROVIDE PIPE ZONE MATERIAL FOR A MIN OF 8" AROUND CLEANOUT RISER 12" M I N AC PAVEMENT AC PAVEMENT #4 6" NOTES: 1.Bc=OUTSIDE DIAMETER OF PIPE. 1/3 CY OF 3/4" WASHED ROCK6.5' COVER (MIN.)4"CURB STOP AND WASTE/BOX WITH COMPRESSION COUPLINGS FOR TOWN WATER SHUT-OFF FINISHED GRADE MONITOR COVER WITH LOCKING ELECTRONIC METER READING LID.4" POLYSTYRENE INSULATION. SECTION BACKFLOW PREVENTER IN INSULATED WATER BOX ANGLE BALL METER VALVE (TYP) 112" WATER METER CURB STOP AND WASTE (WATER DRAIN)CURB STOP & WASTE 8"NOTE: COVER METER WITH 4'X4' FLEX METER PIT INSULATING BLANKET (FORD MODEL FIB) 112" WATER METER CURB STOP & WASTE (WATER DRAIN) INSTALL CURB STOP & WASTE (WATER DRAIN) COPPER BRACE BAR (NOT A BY-PASS) PVC SUPPORT END OF COPPER/BRASS FITTINGS PLAN CURB STOP AND WASTE 1/3 CY OF 3/4" WASHED ROCK 36"WATER PIPE FORD PLASTIC PITSETTER METER PIT (OR APPROVE EQUAL) 6 01C103 7 01C103 8 01C102 9 01C103 CLASS B TRENCH BACKFILL NTS ASPHALT PAVEMENT & PATCH NTS GRAVITY CLEANOUT NTS BURIED VALVE BOX WITH TRACER WIRE NTS 1 A B C 2 3 4 5 6 7 8 D ISSUE DESCRIPTION PROJECT MANAGER PROJECT NUMBER 0 1"2"FILENAME SCALE SHEET DATE DAN MARCH 10045441 City of Bozeman Sediment Management Facility Bozeman, Montana 2017 DESIGNED BY D. MARCH DRAWN BY M. WINSLOW CHECKED BY D. HARMON T. PETERSON PREPARED ACCORDING TO CONSTRUCTION RECORDS. RECORD DRAWINGS PREPARED FROM RECORD INFORMATION CONTAINED INADDENDA AND CHANGE ORDERS AND OTHER INFORMATION PROVIDED BY THE CONTRACTOR. THESE HAVE NOT BEENSUPPLEMENTED WITH INFORMATION KNOWN TO THE ENGINEER THAT WAS NOT INDICATED BY THE CONTRACTOR'S RECORDS. RECORD DRAWING:RECORD DRAWING MARCH 2018 UTILITY NOTES AND DETAILS II 01C502.dwg AS NOTED 01C502 SEE NOTE 19 SEE NOTE 20 A LOCK GASKET, OR APPROVED EQUAL 0.8 x PIPE DIA 6" SEE NOTE 1 4" MIN, 4' DIA MANHOLE 6" MIN, 6' DIA MANHOLE NOTE 11 A LOCK GASKET, OR APPROVED EQUAL SOLID WALL PIPE FLEXIBLE JOINT: BELL OR DOUBLE BELL COUPLER, TYP 6" MIN, 6' DIA MANHOLES PRECAST SECTION, SEE NOTE 11 PRECAST ECCENTRIC CONE, SEE NOTE 20 SEE NOTE 17ELEVATION VIEW MANHOLE STEPS 90° FROM PIPE OR AT LOCATION TO PROVIDE MAXIMUM DISTANCE FROM SEWER FLOW LINE 4" MIN 4' OR 6' (7" TO 8" FROM FLOW LINE) TYPE 'C' NOTES:3" MIN PER FOOT SEE NOTE 16 VIEW FROM TOP 6" TO 8" PIPE INSERTED INTO MH 2' TO 3' FROM MANHOLE FLEXIBLE JOINT FILL CONCRETE AROUND PIPE TOP OF PIPE LINE SLOPE TO SPRING LINE 1'-0" AT 1/4" CHANNEL DEPTH 0.8 PIPE DIA 4'-0" FOR PIPE UNDER 24" ID 6'-0" FOR PIPE 24" ID AND OVER SEALED JOINT FLEX JOINT TYPICAL PIPING AT DROP MANHOLE TYPICAL PIPING AT STANDARD MANHOLE 8" MAX 6" MIN FILL CONCRETE AROUND PIPE18" MAX TO TOP STEP2'-0"4'-0" (3'-0" MIN)1'-4"6" STEPS 90° FROM PIPE IF POSSIBLE 4" MIN, 4' DIA MANHOLES 2' TO 3' SEE NOTE 3 UNLESS OTHERWISE NOTED IFCO #777, OLYMPIC MH-31 RING AND COVER, OR APPROVED EQUAL SET IN MASTIC OR MORTAR (SEE NOTE 14 & 15) CATCHPAN CONCRETE ADJUSTMENT RINGS SET IN MASTIC: 12" MAXIMUM 2" MINIMUM VARIABLEFINISH GRADE GALVANIZED WIRE HANDLE 1.PRECAST BASE, MINIMUM THICKNESS TO BE 6 INCHES. 2.ALL MANHOLE JOINTS SHALL HAVE O-RING GASKET JOINTS MEETING ASTM C443. INSTALL AN EXTERNAL JOINT WRAP "CADDILOC" OR APPROVED EQUAL ON ALL JOINTS. FOR TYPE C MANHOLE. MANHOLE JOINTS SHALL BE SHOWN ON SUBMITTALS. 3.6" CONCRETE ENCASEMENT TO SPRING LINE AND FIRST JOINT OF INLET PIPE. POUR AGAINST UNDISTURBED EARTH. 4.SEE MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS (MPWSS) SECTION 02722 WITH BOZEMAN AMENDMENTS. 5.ALL JOINTS BETWEEN MANHOLE SECTIONS, ADJUSTING RINGS, MANHOLE RING AND TOP SECTION, AND AROUND SEWER PIPE INTO MANHOLE SHALL BE WATERTIGHT. JOINTING MATERIAL SHALL BE "RAM-NEK" OR EQUAL FOR ALL JOINTS EXCEPT BETWEEN SEWER PIPE AND MANHOLE WALL. 6.CONCRETE FOR DROP STRUCTURES SHALL BE FORMED. 7.ALL MANHOLE PENETRATIONS SHALL BE MADE BY CORE DRILLING. 8.DROP MANHOLE CONNECTIONS SHALL BE USED ONLY WHERE SHOWN ON DRAWINGS. 9.CROWN OF LATERAL MAIN SHALL MATCH CROWN OF TRUNK SEWER. 10.MANHOLES PLACED IN UNPAVED AREA SHALL HAVE THE COVERS PLACED 18" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED ON MANHOLE SCHEDULE. 11.THE EXTERIOR OF TYPE 'C' MANHOLES SHALL HAVE A MINIMUM OF 1/16" THICKNESS EXTERIOR COATING OF "CULVERT MASTIC MF #75CM" OR APPROVED EQUAL MEETING ASTM A 849-90 SPRAYED OR BRUSH APPLIED. PROVIDE INTERIOR CORROSION COATING WHERE SCHEDULED ON DRAWINGS. 12.TEST TYPE 'C' MANHOLES IN ACCORDANCE WITH ASTM C 1244-93. TEST METHOD FOR CONCRETE SEWER MANHOLES BY THE NEGATIVE AIR PRESSURE (VACUUM) TEST. 13.PRECAST MANHOLE BASE SECTION (ASTM C478) SHALL BE MONOLITHICALLY POURED WITH THE MANHOLE WALLS OR CONSTRUCTED WITH AN INTEGRAL WATER STOP GASKET AT THE CONSTRUCTION JOINT BETWEEN THE BASE AND WALL. 14.DUE TO PROVISIONS IN THE FEDERAL TRANSPORTATION ACT, VENDOR MUST AUTHENTICATE U.S. ORIGIN OF CASTINGS FOR FEDERALLY FUNDED PROJECTS. 15.CAST "BOZEMAN SEWER" OR "BOZEMAN STORM SEWER" AS APPROPRIATE IN COVER. 16.ALL PVC TO PVC DEFLECTION JOINTS SHALL BE MADE WITH GASKETED PVC REPAIR COUPLING AS A GPK 906 STYLE COUPLING OR EQUIVALENT. THE USE OF A PIPE BELL AND SPIGOT ASSEMBLY WILL ALSO BE ALLOWED. 17.ALL TYPE C PRECAST MANHOLE BASES SHALL HAVE INTEGRAL FLOOR AND BASE. 18.IFCO #777 MANHOLE RING AND COVER MODIFIED WITH 3-BOLT TAB MOUNTING, O-RING GASKET AND SEALED POCKET LIFT HANDLE. 19.REFERENCE PROJECT PLAN AND PROFILE DRAWINGS FOR FLOW DROPS ACROSS MANHOLES. PIPELINE GRADE DROPS ARE DELINEATED AT CENTERLINE OF MANHOLE. IN LOCATIONS WHERE DROP IS NOT SHOWN, DROP SHALL EQUAL A MIN OF 0.05 FT OR MATCHING PIPELINE SLURE. 20.FOR 4'-0" DIA MANHOLES, PROVIDE MIN 4'-0" FROM PIPELINE CROWN TO START OF PRECAST ECCENTRIC CONE SECTION. 1 01C103 SANITARY SEWER MANHOLE W/ PRECAST BASE (MANHOLE TYP C) NTS 1 A B C 2 3 4 5 6 7 8 D ISSUE DESCRIPTION PROJECT MANAGER PROJECT NUMBER 0 1"2"FILENAME SCALE SHEET DATE DAN MARCH 10045441 City of Bozeman Sediment Management Facility Bozeman, Montana 2017 DESIGNED BY D. MARCH DRAWN BY M. WINSLOW CHECKED BY D. HARMON T. PETERSON PREPARED ACCORDING TO CONSTRUCTION RECORDS. RECORD DRAWINGS PREPARED FROM RECORD INFORMATION CONTAINED INADDENDA AND CHANGE ORDERS AND OTHER INFORMATION PROVIDED BY THE CONTRACTOR. THESE HAVE NOT BEENSUPPLEMENTED WITH INFORMATION KNOWN TO THE ENGINEER THAT WAS NOT INDICATED BY THE CONTRACTOR'S RECORDS. RECORD DRAWING:RECORD DRAWING MARCH 2018 UTILITY NOTES AND DETAILS III 01C503.dwg AS NOTED 01C503