Loading...
HomeMy WebLinkAbout04-02-18 City Commission Packet Materials - C2. Notice of Award to Sime Construction for Baxter Lane Improvements Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Baxter Lane Improvements Project from North 19th Avenue to North 7th Avenue – Notice of Award MEETING DATE: April 2nd, 2018 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign the Notice of Award to Sime Construction, Inc. for the Project Bid Price in the amount of $2,409,992.23. BACKGROUND: Attached is a copy of the Notice of Award for the above referenced project. The project is for the construction of Baxter Lane between North 19th Avenue and North 7th Avenue. It includes roadway widening and reconstruction, new corridor lighting with LED luminaires, new sidewalk, new storm drain infrastructure, signal alteration at 19th and Baxter, and utility adjustments. Bids for the above-referenced project were opened on March 13, 2018 with 4 bids being submitted. The low bid was submitted by Sime Construction, Inc. for the Project Bid Price of $2,409,992.23. Then engineers estimate for the project was $2,982,975.50. The Notice of Award, Award Recommendation from our consultant, and Bid Tabulation are attached. UNRESOLVED ISSUES: None ALTERNATIVES: Disapprove FISCAL EFFECTS: The project will be paid from the Street Impact Fee Fund, the Arterial and Collector District Fund, and the PT Land Subdivision which will pay for the curb, gutter and sidewalk along its frontage. Attachments: Award Recommendation, Bid Tabulation, Notice of Award Report compiled on: 3/20/18 6 7 8 9 10